UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER

61 FORSYTH STREET, SW, SUITE 23T85

ATLANTA, GEORGIA 30303-8931

March 3, 2008

Florida Power and Light Company

ATTN: Mr. J. A. Stall, Senior Vice President

Nuclear and Chief Nuclear Officer

P. O. Box 14000

Juno Beach, FL 33408-0420

SUBJECT: ANNUAL ASSESSMENT LETTER - ST. LUCIE NUCLEAR PLANT

(NRC INSPECTION REPORT 05000335/2008001 AND 05000389/2008001)

Dear Mr. Stall:

On February 7, 2008, the NRC staff completed its performance review of the St. Lucie Nuclear

Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and

inspection results for the period from January 1 through December 31, 2007. The purpose of

this letter is to inform you of our assessment of your safety performance during this period and

our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A

separate letter designated and marked as "Official Use Only--Security Information" will include

the security cornerstone review and resultant inspection plan.

Overall, St. Lucie operated in a manner that preserved public health and safety and fully met all

cornerstone objectives. Plant performance for the most recent quarter, as well as for the first

three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s

Action Matrix, based on all inspection findings being classified as having very low safety

significance (Green) and all PIs indicating performance at a level requiring no additional NRC

oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline

inspections at your facility. We also plan on conducting several non-ROP inspections which

include TI 2515/171, Verification of Site Specific (B.5.b) Phase 2 and 3 Mitigation Strategies and

TI 2515/172, Reactor Coolant System Dissimilar Metal.

The enclosed inspection plan details the inspections, less those related to physical protection

scheduled through September 30, 2009. The inspection plan is provided to allow for the

resolution of any scheduling conflicts and personnel availability issues well in advance of

inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and

continuous nature. The inspections in the last nine months of the inspection plan are tentative

and may be revised at the mid-cycle review.

FP&L 2

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to

discuss the change as soon as possible. Please contact me at (404) 562-4629 with any

questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Marvin D. Sykes, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Docket Nos.: 50-335, 50-389

License Nos.: DPR-67, NPF-16

Enclosure: St. Lucie Inspection/Activity Plan (03/01/08 - 09/30/09)

cc w/encl: (See page 3)

Distribution:

Normal distribution list

_________________________

OFFICE RII:DRP RII:DRP

SIGNATURE MDS1 JDH4

NAME MSykes JHamman

DATE 03/03/2008 03/03/2008

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

FP&L 3

cc w/encl: William A. Passetti

Gordon L. Johnston Bureau of Radiation Control

Site Vice President Department of Health

St. Lucie Nuclear Plant Electronic Mail Distribution

Electronic Mail Distribution

Craig Fugate

Christopher R. Costanzo Director

Plant General Manager Division of Emergency Preparedness

St. Lucie Nuclear Plant Department of Community Affairs

Electronic Mail Distribution Electronic Mail Distribution

Bill Parks J. Kammel

Operations Manager Radiological Emergency Planning

St. Lucie Nuclear Plant Administrator

Electronic Mail Distribution Department of Public Safety

Electronic Mail Distribution

Terry L. Patterson

Licensing Manager Douglas Anderson

St. Lucie Nuclear Plant County Adminstrator

Electronic Mail Distribution St. Lucie County

2300 Virginia Avenue

Rajiv S. Kundalkar Ft. Pierce, FL 34982

Vice President

Nuclear Technical Services Mano Nazar

Florida Power & Light Company Senior Vice President

Electronic Mail Distribution and Nuclear Chief Operating Officer

Florida Power & Light Company

Don E. Grissette Electronic Mail Distribution

Vice President

Nuclear Training and Performance

Improvement

Florida Power & Light Company

Electronic Mail Distribution

Seth B. Dunston

Training Manager

St. Lucie Nuclear Plant

Electronic Mail Distribution

M. S. Ross

Managing Attorney

Florida Power & Light Company

Electronic Mail Distribution

Marjan Mashhadi

Senior Attorney

Florida Power & Light Company

Electronic Mail Distribution

FP&L 4

Letter to J. A. Stall from Marvin D. Sykes dated March 3, 2008.

SUBJECT: ANNUAL ASSESSMENT LETTER - ST. LUCIE NUCLEAR PLANT

(NRC INSPECTION REPORT 05000335/2008001 AND 05000389/2008001)

Distribution w/encl:

C. Evans, RII (Part 72 Only)

L. Slack, RII

OE Mail (email address if applicable)

INPO

ROP Reports

RIDSNRRDIRS

PUBLIC

B. Mozafari, NRR

Page 1 of 2 Saint Lucie

03/03/2008 11:35:06 Inspection / Activity Plan

Report 22

03/01/2008 - 02/28/2009

Unit No. of Staff Planned Dates Inspection

Number Inspection Activity Title on Site Start End Type

PI&R - PREP TRIP-PROBLEM ID AND RESOL 1

1, 2 IP 71152B Identification and Resolution of Problems 05/26/2008 05/30/2008 Baseline Inspections

OL EXAM - INITIAL EXAM PREP 3

1 V23284 ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 06/30/2008 07/03/2008 Not Applicable

PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5

1, 2 IP 71152B Identification and Resolution of Problems 07/07/2008 07/11/2008 Baseline Inspections

1, 2 IP 71152B Identification and Resolution of Problems 07/21/2008 07/25/2008 Baseline Inspections

OL EXAM - INITIAL EXAM 3

1 V23284 ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 07/21/2008 08/01/2008 Not Applicable

PSB1-RP - RADIATION PROTECTION PREINSPECTION VISIT 1

1, 2 IP 7112101 Access Control to Radiologically Significant Areas 08/11/2008 08/13/2008 Baseline Inspections

TI-171 - B.5.B PHASE 2&3 3

1, 2 IP 2515/171 Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 08/25/2008 08/29/2008 Generic Safety Inspectio

PSB1-RP - RADIATION PROTECTION PUBLIC BASELINE 4

1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/08/2008 09/12/2008 Baseline Inspections

1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 09/08/2008 09/12/2008 Baseline Inspections

1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 09/08/2008 09/12/2008 Baseline Inspections

1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 09/08/2008 09/12/2008 Baseline Inspections

1, 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 09/08/2008 09/12/2008 Baseline Inspections

1, 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 09/08/2008 09/12/2008 Baseline Inspections

EB3ISI - U1 ISI 1

1 IP 7111108P Inservice Inspection Activities - PWR 10/13/2008 10/17/2008 Baseline Inspections

EB3SGISI - UNIT 1 SGISI 1

1 IP 7111108P Inservice Inspection Activities - PWR 10/20/2008 10/24/2008 Baseline Inspections

EB3TI172 - TI-172 1

1, 2 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 11/17/2008 11/21/2008 Generic Safety Inspectio

STL TFPI - TFPI INSP 7

1, 2 IP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial] 01/26/2009 01/30/2009 Baseline Inspections

1, 2 IP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial] 02/09/2009 02/13/2009 Baseline Inspections

PSB1EP - EP INSP 1

1, 2 IP 7111402 Alert and Notification System Testing 02/09/2009 02/13/2009 EP Baseline Inspection

1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 02/09/2009 02/13/2009 EP Baseline Inspection

1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 02/09/2009 02/13/2009 EP Baseline Inspection

1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 02/09/2009 02/13/2009 EP Baseline Inspection

1, 2 IP 71151 Performance Indicator Verification 02/09/2009 02/13/2009 Baseline Inspections

This report does not include INPO and OUTAGE activities. Enclosure

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Saint Lucie

03/03/2008 11:35:06 Inspection / Activity Plan

Report 22

03/01/2008 - 02/28/2009

Unit No. of Staff Planned Dates Inspection

Number Inspection Activity Title on Site Start End Type

PSB1-RP - RADIATION PROTECTION PREINSPECTION VISIT 1

1, 2 IP 7112101 Access Control to Radiologically Significant Areas 02/23/2009 02/25/2009 Baseline Inspections

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.