UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
SAM NUNN ATLANTA FEDERAL CENTER
61 FORSYTH STREET, SW, SUITE 23T85
ATLANTA, GEORGIA 30303-8931
March 3, 2008
Florida Power and Light Company
ATTN: Mr. J. A. Stall, Senior Vice President
Nuclear and Chief Nuclear Officer
P. O. Box 14000
Juno Beach, FL 33408-0420
SUBJECT:
ANNUAL ASSESSMENT LETTER - ST. LUCIE NUCLEAR PLANT
(NRC INSPECTION REPORT 05000335/2008001 AND 05000389/2008001)
Dear Mr. Stall:
On February 7, 2008, the NRC staff completed its performance review of the St. Lucie Nuclear
Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and
inspection results for the period from January 1 through December 31, 2007. The purpose of
this letter is to inform you of our assessment of your safety performance during this period and
our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A
separate letter designated and marked as "Official Use Only--Security Information" will include
the security cornerstone review and resultant inspection plan.
Overall, St. Lucie operated in a manner that preserved public health and safety and fully met all
cornerstone objectives. Plant performance for the most recent quarter, as well as for the first
three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s
Action Matrix, based on all inspection findings being classified as having very low safety
significance (Green) and all PIs indicating performance at a level requiring no additional NRC
oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline
inspections at your facility. We also plan on conducting several non-ROP inspections which
include TI 2515/171, Verification of Site Specific (B.5.b) Phase 2 and 3 Mitigation Strategies and
TI 2515/172, Reactor Coolant System Dissimilar Metal.
The enclosed inspection plan details the inspections, less those related to physical protection
scheduled through September 30, 2009. The inspection plan is provided to allow for the
resolution of any scheduling conflicts and personnel availability issues well in advance of
inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and
continuous nature. The inspections in the last nine months of the inspection plan are tentative
and may be revised at the mid-cycle review.
2
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's document
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to
discuss the change as soon as possible. Please contact me at (404) 562-4629 with any
questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Marvin D. Sykes, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Docket Nos.: 50-335, 50-389
Enclosure: St. Lucie Inspection/Activity Plan (03/01/08 - 09/30/09)
cc w/encl: (See page 3)
Distribution:
Normal distribution list
_________________________
OFFICE
RII:DRP
RII:DRP
SIGNATURE
MDS1
JDH4
NAME
MSykes
JHamman
DATE
03/03/2008
03/03/2008
E-MAIL COPY?
YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO
3
cc w/encl:
Gordon L. Johnston
Site Vice President
St. Lucie Nuclear Plant
Electronic Mail Distribution
Christopher R. Costanzo
Plant General Manager
St. Lucie Nuclear Plant
Electronic Mail Distribution
Bill Parks
Operations Manager
St. Lucie Nuclear Plant
Electronic Mail Distribution
Terry L. Patterson
Licensing Manager
St. Lucie Nuclear Plant
Electronic Mail Distribution
Rajiv S. Kundalkar
Vice President
Nuclear Technical Services
Florida Power & Light Company
Electronic Mail Distribution
Don E. Grissette
Vice President
Nuclear Training and Performance
Improvement
Florida Power & Light Company
Electronic Mail Distribution
Seth B. Dunston
Training Manager
St. Lucie Nuclear Plant
Electronic Mail Distribution
M. S. Ross
Managing Attorney
Florida Power & Light Company
Electronic Mail Distribution
Marjan Mashhadi
Senior Attorney
Florida Power & Light Company
Electronic Mail Distribution
William A. Passetti
Bureau of Radiation Control
Department of Health
Electronic Mail Distribution
Craig Fugate
Director
Division of Emergency Preparedness
Department of Community Affairs
Electronic Mail Distribution
J. Kammel
Radiological Emergency Planning
Administrator
Department of Public Safety
Electronic Mail Distribution
Douglas Anderson
County Adminstrator
St. Lucie County
2300 Virginia Avenue
Ft. Pierce, FL 34982
Mano Nazar
Senior Vice President
and Nuclear Chief Operating Officer
Florida Power & Light Company
Electronic Mail Distribution
4
Letter to J. A. Stall from Marvin D. Sykes dated March 3, 2008.
SUBJECT:
ANNUAL ASSESSMENT LETTER - ST. LUCIE NUCLEAR PLANT
(NRC INSPECTION REPORT 05000335/2008001 AND 05000389/2008001)
Distribution w/encl:
C. Evans, RII (Part 72 Only)
L. Slack, RII
OE Mail (email address if applicable)
ROP Reports
RIDSNRRDIRS
PUBLIC
B. Mozafari, NRR
Saint Lucie
Inspection / Activity Plan
03/01/2008 - 02/28/2009
Inspection
Type
Inspection Activity
Planned Dates
Start End
No. of Staff
on Site
Title
Unit
Number
Page 1 of 2
03/03/2008
11:35:06
Report 22
1
- PREP TRIP-PROBLEM ID AND RESOL
Baseline Inspections
Identification and Resolution of Problems
05/26/2008
05/30/2008
1, 2
IP
3
OL EXAM
- INITIAL EXAM PREP
Not Applicable
ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES
06/30/2008
07/03/2008
1
V23284
5
- PROBLEM IDENTIFICATION AND RESOLUTION
Baseline Inspections
Identification and Resolution of Problems
07/07/2008
07/11/2008
1, 2
IP
Baseline Inspections
Identification and Resolution of Problems
07/21/2008
07/25/2008
1, 2
IP
3
OL EXAM
- INITIAL EXAM
Not Applicable
ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES
07/21/2008
08/01/2008
1
V23284
1
PSB1-RP
- RADIATION PROTECTION PREINSPECTION VISIT
Baseline Inspections
Access Control to Radiologically Significant Areas
08/11/2008
08/13/2008
1, 2
7112101
IP
3
TI-171
- B.5.B PHASE 2&3
Generic Safety Inspectio
Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies
08/25/2008
08/29/2008
1, 2
2515/171
IP
4
PSB1-RP
- RADIATION PROTECTION PUBLIC BASELINE
Baseline Inspections
Access Control to Radiologically Significant Areas
09/08/2008
09/12/2008
1, 2
7112101
IP
Baseline Inspections
Radiation Monitoring Instrumentation and Protective Equipment
09/08/2008
09/12/2008
1, 2
7112103
IP
Baseline Inspections
Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems
09/08/2008
09/12/2008
1, 2
7112201
IP
Baseline Inspections
Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program
09/08/2008
09/12/2008
1, 2
7112203
IP
Baseline Inspections
Occupational Exposure Control Effectiveness
09/08/2008
09/12/2008
1, 2
71151-OR01
IP
Baseline Inspections
RETS/ODCM Radiological Effluent
09/08/2008
09/12/2008
1, 2
71151-PR01
IP
1
EB3ISI
- U1 ISI
Baseline Inspections
Inservice Inspection Activities - PWR
10/13/2008
10/17/2008
1
7111108P
IP
1
EB3SGISI
- UNIT 1 SGISI
Baseline Inspections
Inservice Inspection Activities - PWR
10/20/2008
10/24/2008
1
7111108P
IP
1
EB3TI172
- TI-172
Generic Safety Inspectio
Reactor Coolant System Dissimiliar Metal Butt Welds
11/17/2008
11/21/2008
1, 2
2515/172
IP
7
STL TFPI
- TFPI INSP
Baseline Inspections
Fire Protection-NFPA 805 Transition Period [Triennial]
01/26/2009
01/30/2009
1, 2
7111105P
IP
Baseline Inspections
Fire Protection-NFPA 805 Transition Period [Triennial]
02/09/2009
02/13/2009
1, 2
7111105P
IP
1
PSB1EP
- EP INSP
EP Baseline Inspection
Alert and Notification System Testing
02/09/2009
02/13/2009
1, 2
7111402
IP
EP Baseline Inspection
Emergency Response Organization Augmentation Testing
02/09/2009
02/13/2009
1, 2
7111403
IP
EP Baseline Inspection
Emergency Action Level and Emergency Plan Changes
02/09/2009
02/13/2009
1, 2
7111404
IP
EP Baseline Inspection
Correction of Emergency Preparedness Weaknesses and Deficiencies
02/09/2009
02/13/2009
1, 2
7111405
IP
Baseline Inspections
Performance Indicator Verification
02/09/2009
02/13/2009
1, 2
71151
IP
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Saint Lucie
Inspection / Activity Plan
03/01/2008 - 02/28/2009
Inspection
Type
Inspection Activity
Planned Dates
Start End
No. of Staff
on Site
Title
Unit
Number
Page 2 of 2
03/03/2008
11:35:06
Report 22
1
PSB1-RP
- RADIATION PROTECTION PREINSPECTION VISIT
Baseline Inspections
Access Control to Radiologically Significant Areas
02/23/2009
02/25/2009
1, 2
7112101
IP
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.