Annual Assessment Letter - St. Lucie Nuclear Plant (NRC Inspection Report 05000335/2008001 and 05000389/2008001)
ML080630208
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/03/2008
From: Marvin Sykes
NRC/RGN-II/DRP/RPB3
To: Stall J
Florida Power & Light Co
References
IR-08-001
Download: ML080630208 (7)


See also: IR 05000335/2008001

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER

61 FORSYTH STREET, SW, SUITE 23T85

ATLANTA, GEORGIA 30303-8931

March 3, 2008

Florida Power and Light Company

ATTN: Mr. J. A. Stall, Senior Vice President

Nuclear and Chief Nuclear Officer

P. O. Box 14000

Juno Beach, FL 33408-0420

SUBJECT:

ANNUAL ASSESSMENT LETTER - ST. LUCIE NUCLEAR PLANT

(NRC INSPECTION REPORT 05000335/2008001 AND 05000389/2008001)

Dear Mr. Stall:

On February 7, 2008, the NRC staff completed its performance review of the St. Lucie Nuclear

Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and

inspection results for the period from January 1 through December 31, 2007. The purpose of

this letter is to inform you of our assessment of your safety performance during this period and

our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A

separate letter designated and marked as "Official Use Only--Security Information" will include

the security cornerstone review and resultant inspection plan.

Overall, St. Lucie operated in a manner that preserved public health and safety and fully met all

cornerstone objectives. Plant performance for the most recent quarter, as well as for the first

three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s

Action Matrix, based on all inspection findings being classified as having very low safety

significance (Green) and all PIs indicating performance at a level requiring no additional NRC

oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline

inspections at your facility. We also plan on conducting several non-ROP inspections which

include TI 2515/171, Verification of Site Specific (B.5.b) Phase 2 and 3 Mitigation Strategies and

TI 2515/172, Reactor Coolant System Dissimilar Metal.

The enclosed inspection plan details the inspections, less those related to physical protection

scheduled through September 30, 2009. The inspection plan is provided to allow for the

resolution of any scheduling conflicts and personnel availability issues well in advance of

inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and

continuous nature. The inspections in the last nine months of the inspection plan are tentative

and may be revised at the mid-cycle review.

FP&L

2

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to

discuss the change as soon as possible. Please contact me at (404) 562-4629 with any

questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Marvin D. Sykes, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Docket Nos.: 50-335, 50-389

License Nos.: DPR-67, NPF-16

Enclosure: St. Lucie Inspection/Activity Plan (03/01/08 - 09/30/09)

cc w/encl: (See page 3)

Distribution:

Normal distribution list

_________________________

OFFICE

RII:DRP

RII:DRP

SIGNATURE

MDS1

JDH4

NAME

MSykes

JHamman

DATE

03/03/2008

03/03/2008

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

FP&L

3

cc w/encl:

Gordon L. Johnston

Site Vice President

St. Lucie Nuclear Plant

Electronic Mail Distribution

Christopher R. Costanzo

Plant General Manager

St. Lucie Nuclear Plant

Electronic Mail Distribution

Bill Parks

Operations Manager

St. Lucie Nuclear Plant

Electronic Mail Distribution

Terry L. Patterson

Licensing Manager

St. Lucie Nuclear Plant

Electronic Mail Distribution

Rajiv S. Kundalkar

Vice President

Nuclear Technical Services

Florida Power & Light Company

Electronic Mail Distribution

Don E. Grissette

Vice President

Nuclear Training and Performance

Improvement

Florida Power & Light Company

Electronic Mail Distribution

Seth B. Dunston

Training Manager

St. Lucie Nuclear Plant

Electronic Mail Distribution

M. S. Ross

Managing Attorney

Florida Power & Light Company

Electronic Mail Distribution

Marjan Mashhadi

Senior Attorney

Florida Power & Light Company

Electronic Mail Distribution

William A. Passetti

Bureau of Radiation Control

Department of Health

Electronic Mail Distribution

Craig Fugate

Director

Division of Emergency Preparedness

Department of Community Affairs

Electronic Mail Distribution

J. Kammel

Radiological Emergency Planning

Administrator

Department of Public Safety

Electronic Mail Distribution

Douglas Anderson

County Adminstrator

St. Lucie County

2300 Virginia Avenue

Ft. Pierce, FL 34982

Mano Nazar

Senior Vice President

and Nuclear Chief Operating Officer

Florida Power & Light Company

Electronic Mail Distribution

FP&L

4

Letter to J. A. Stall from Marvin D. Sykes dated March 3, 2008.

SUBJECT:

ANNUAL ASSESSMENT LETTER - ST. LUCIE NUCLEAR PLANT

(NRC INSPECTION REPORT 05000335/2008001 AND 05000389/2008001)

Distribution w/encl:

C. Evans, RII (Part 72 Only)

L. Slack, RII

OE Mail (email address if applicable)

INPO

ROP Reports

RIDSNRRDIRS

PUBLIC

B. Mozafari, NRR

Saint Lucie

Inspection / Activity Plan

03/01/2008 - 02/28/2009

Inspection

Type

Inspection Activity

Planned Dates

Start End

No. of Staff

on Site

Title

Unit

Number

Page 1 of 2

03/03/2008

11:35:06

Report 22

1

PI&R

- PREP TRIP-PROBLEM ID AND RESOL

Baseline Inspections

Identification and Resolution of Problems

05/26/2008

05/30/2008

1, 2

71152B

IP

3

OL EXAM

- INITIAL EXAM PREP

Not Applicable

ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES

06/30/2008

07/03/2008

1

V23284

5

PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION

Baseline Inspections

Identification and Resolution of Problems

07/07/2008

07/11/2008

1, 2

71152B

IP

Baseline Inspections

Identification and Resolution of Problems

07/21/2008

07/25/2008

1, 2

71152B

IP

3

OL EXAM

- INITIAL EXAM

Not Applicable

ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES

07/21/2008

08/01/2008

1

V23284

1

PSB1-RP

- RADIATION PROTECTION PREINSPECTION VISIT

Baseline Inspections

Access Control to Radiologically Significant Areas

08/11/2008

08/13/2008

1, 2

7112101

IP

3

TI-171

- B.5.B PHASE 2&3

Generic Safety Inspectio

Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies

08/25/2008

08/29/2008

1, 2

2515/171

IP

4

PSB1-RP

- RADIATION PROTECTION PUBLIC BASELINE

Baseline Inspections

Access Control to Radiologically Significant Areas

09/08/2008

09/12/2008

1, 2

7112101

IP

Baseline Inspections

Radiation Monitoring Instrumentation and Protective Equipment

09/08/2008

09/12/2008

1, 2

7112103

IP

Baseline Inspections

Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems

09/08/2008

09/12/2008

1, 2

7112201

IP

Baseline Inspections

Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program

09/08/2008

09/12/2008

1, 2

7112203

IP

Baseline Inspections

Occupational Exposure Control Effectiveness

09/08/2008

09/12/2008

1, 2

71151-OR01

IP

Baseline Inspections

RETS/ODCM Radiological Effluent

09/08/2008

09/12/2008

1, 2

71151-PR01

IP

1

EB3ISI

- U1 ISI

Baseline Inspections

Inservice Inspection Activities - PWR

10/13/2008

10/17/2008

1

7111108P

IP

1

EB3SGISI

- UNIT 1 SGISI

Baseline Inspections

Inservice Inspection Activities - PWR

10/20/2008

10/24/2008

1

7111108P

IP

1

EB3TI172

- TI-172

Generic Safety Inspectio

Reactor Coolant System Dissimiliar Metal Butt Welds

11/17/2008

11/21/2008

1, 2

2515/172

IP

7

STL TFPI

- TFPI INSP

Baseline Inspections

Fire Protection-NFPA 805 Transition Period [Triennial]

01/26/2009

01/30/2009

1, 2

7111105P

IP

Baseline Inspections

Fire Protection-NFPA 805 Transition Period [Triennial]

02/09/2009

02/13/2009

1, 2

7111105P

IP

1

PSB1EP

- EP INSP

EP Baseline Inspection

Alert and Notification System Testing

02/09/2009

02/13/2009

1, 2

7111402

IP

EP Baseline Inspection

Emergency Response Organization Augmentation Testing

02/09/2009

02/13/2009

1, 2

7111403

IP

EP Baseline Inspection

Emergency Action Level and Emergency Plan Changes

02/09/2009

02/13/2009

1, 2

7111404

IP

EP Baseline Inspection

Correction of Emergency Preparedness Weaknesses and Deficiencies

02/09/2009

02/13/2009

1, 2

7111405

IP

Baseline Inspections

Performance Indicator Verification

02/09/2009

02/13/2009

1, 2

71151

IP

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Saint Lucie

Inspection / Activity Plan

03/01/2008 - 02/28/2009

Inspection

Type

Inspection Activity

Planned Dates

Start End

No. of Staff

on Site

Title

Unit

Number

Page 2 of 2

03/03/2008

11:35:06

Report 22

1

PSB1-RP

- RADIATION PROTECTION PREINSPECTION VISIT

Baseline Inspections

Access Control to Radiologically Significant Areas

02/23/2009

02/25/2009

1, 2

7112101

IP

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.