ML082460588

From kanterella
Jump to navigation Jump to search
Report 22 - Inspection/Activity Plan 08/01/08 - 12/31/09
ML082460588
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 09/02/2008
From:
NRC/RGN-II/DRP/RPB3
To:
Shared Package
ML082460584 List:
References
Download: ML082460588 (2)


Text

Saint Lucie Inspection / Activity Plan 09/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 09/02/2008 11:54:37 Report 22 3

PSB1-RP

- RADIATION PROTECTION PUBLIC BASELINE Baseline Inspections Access Control to Radiologically Significant Areas 09/08/2008 09/12/2008 1, 2 7112101 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 09/08/2008 09/12/2008 1, 2 7112103 IP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 09/08/2008 09/12/2008 1, 2 7112203 IP Baseline Inspections Occupational Exposure Control Effectiveness 09/08/2008 09/12/2008 1, 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 09/08/2008 09/12/2008 1, 2 71151-PR01 IP 1

EB3ISI

- UNIT 1 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 10/27/2008 10/31/2008 1

7111108P IP 2

EB3SGISI

- UNIT 1 STEAM GENERATOR INSERVICE INSP Baseline Inspections Inservice Inspection Activities - PWR 11/03/2008 11/07/2008 1

7111108P IP 1

EB3TI172

- TI-172 Generic Safety Inspectio Reactor Coolant System Dissimiliar Metal Butt Welds 12/08/2008 12/12/2008 1, 2 2515/172 IP 7

STL TFPI

- TRIENNIEL FIRE PROTECTION INSPECTION Baseline Inspections Fire Protection-NFPA 805 Transition Period [Triennial]

01/26/2009 01/30/2009 1, 2 7111105P IP Baseline Inspections Fire Protection-NFPA 805 Transition Period [Triennial]

02/09/2009 02/13/2009 1, 2 7111105P IP 1

PSB1EP

- EMERGENCY PREPAREDNESS PROTECTION Baseline Inspections Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 02/09/2009 02/13/2009 1, 2 2515/175 IP EP Baseline Inspection Alert and Notification System Testing 02/09/2009 02/13/2009 1, 2 7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 02/09/2009 02/13/2009 1, 2 7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 02/09/2009 02/13/2009 1, 2 7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 02/09/2009 02/13/2009 1, 2 7111405 IP Baseline Inspections Performance Indicator Verification 02/09/2009 02/13/2009 1, 2 71151 IP 1

PSB1-RP

- RP OCCUPATIONAL PREINSPECTION VISIT Baseline Inspections Access Control to Radiologically Significant Areas 03/30/2009 04/03/2009 1, 2 7112101 IP 2

EB3ISI

- UNIT 2 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 04/27/2009 05/01/2009 2

7111108P IP 1

EB3TI172

- TI-172 RCS DM BUTT WELDS Generic Safety Inspectio Reactor Coolant System Dissimiliar Metal Butt Welds 04/27/2009 05/01/2009 2

2515/172 IP 2

PSB1-RP

- RP OCCUPATIONAL INSPECTION WK1 (OUTAGE)

Baseline Inspections Access Control to Radiologically Significant Areas 04/27/2009 05/01/2009 1, 2 7112101 IP Baseline Inspections ALARA Planning and Controls 04/27/2009 05/01/2009 1, 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 04/27/2009 05/01/2009 1, 2 7112202 IP Baseline Inspections Performance Indicator Verification 04/27/2009 05/01/2009 1, 2 71151 IP 1

EB3SGISI

- UNIT 2 STEAM GENERATOR INSERVICE INSP Baseline Inspections Inservice Inspection Activities - PWR 05/04/2009 05/08/2009 2

7111108P IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Saint Lucie Inspection / Activity Plan 09/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 09/02/2008 11:54:37 Report 22 3

PSB1-RP

- RP OCCUPATIONAL INSPECTION WK2 (OUTAGE)

Baseline Inspections Access Control to Radiologically Significant Areas 05/11/2009 05/15/2009 1, 2 7112101 IP Baseline Inspections ALARA Planning and Controls 05/11/2009 05/15/2009 1, 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 05/11/2009 05/15/2009 1, 2 7112202 IP 5

INSP

- COMPONENT DESIGN BASIS INSPECTION (CDBI)

Baseline Inspections Component Design Bases Inspection 07/13/2009 07/17/2009 1, 2 7111121 IP Baseline Inspections Component Design Bases Inspection 07/27/2009 07/31/2009 1, 2 7111121 IP Baseline Inspections Component Design Bases Inspection 08/10/2009 08/14/2009 1, 2 7111121 IP Baseline Inspections Component Design Bases Inspection 08/24/2009 08/28/2009 1, 2 7111121 IP 3

OL EXAM

- INITIAL EXAM PREP Not Applicable ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 09/14/2009 09/18/2009 1

V23284 3

OL EXAM

- INITIAL EXAM - WEEK 1 Not Applicable ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 10/05/2009 10/09/2009 1

V23284 3

OL EXAM

- INITIAL EXAM - WEEK 2 Not Applicable ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 10/19/2009 10/23/2009 1

V23284 2

OL RQ

- REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 11/16/2009 11/20/2009 1, 2 7111111B IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.