Report 22 - Inspection/Activity Plan 08/01/08 - 12/31/09
ML082460588
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 09/02/2008
From:
NRC/RGN-II/DRP/RPB3
To:
Shared Package
ML082460584 List:
References
Download: ML082460588 (2)


Text

Page 1 of 2 Saint Lucie 09/02/2008 11:54:37 Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-RP - RADIATION PROTECTION PUBLIC BASELINE 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/08/2008 09/12/2008 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 09/08/2008 09/12/2008 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 09/08/2008 09/12/2008 Baseline Inspections 1, 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 09/08/2008 09/12/2008 Baseline Inspections 1, 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 09/08/2008 09/12/2008 Baseline Inspections EB3ISI - UNIT 1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/27/2008 10/31/2008 Baseline Inspections EB3SGISI - UNIT 1 STEAM GENERATOR INSERVICE INSP 2 1 IP 7111108P Inservice Inspection Activities - PWR 11/03/2008 11/07/2008 Baseline Inspections EB3TI172 - TI-172 1 1, 2 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 12/08/2008 12/12/2008 Generic Safety Inspectio STL TFPI - TRIENNIEL FIRE PROTECTION INSPECTION 7 1, 2 IP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial] 01/26/2009 01/30/2009 Baseline Inspections 1, 2 IP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial] 02/09/2009 02/13/2009 Baseline Inspections PSB1EP - EMERGENCY PREPAREDNESS PROTECTION 1 1, 2 IP 2515/175 Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 02/09/2009 02/13/2009 Baseline Inspections 1, 2 IP 7111402 Alert and Notification System Testing 02/09/2009 02/13/2009 EP Baseline Inspection 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 02/09/2009 02/13/2009 EP Baseline Inspection 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 02/09/2009 02/13/2009 EP Baseline Inspection 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 02/09/2009 02/13/2009 EP Baseline Inspection 1, 2 IP 71151 Performance Indicator Verification 02/09/2009 02/13/2009 Baseline Inspections PSB1-RP - RP OCCUPATIONAL PREINSPECTION VISIT 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/30/2009 04/03/2009 Baseline Inspections EB3ISI - UNIT 2 INSERVICE INSPECTION 2 2 IP 7111108P Inservice Inspection Activities - PWR 04/27/2009 05/01/2009 Baseline Inspections EB3TI172 - TI-172 RCS DM BUTT WELDS 1 2 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 04/27/2009 05/01/2009 Generic Safety Inspectio PSB1-RP - RP OCCUPATIONAL INSPECTION WK1 (OUTAGE) 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 04/27/2009 05/01/2009 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 04/27/2009 05/01/2009 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 04/27/2009 05/01/2009 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 04/27/2009 05/01/2009 Baseline Inspections EB3SGISI - UNIT 2 STEAM GENERATOR INSERVICE INSP 1 2 IP 7111108P Inservice Inspection Activities - PWR 05/04/2009 05/08/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Saint Lucie 09/02/2008 11:54:37 Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-RP - RP OCCUPATIONAL INSPECTION WK2 (OUTAGE) 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 05/11/2009 05/15/2009 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 05/11/2009 05/15/2009 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 05/11/2009 05/15/2009 Baseline Inspections INSP - COMPONENT DESIGN BASIS INSPECTION (CDBI) 5 1, 2 IP 7111121 Component Design Bases Inspection 07/13/2009 07/17/2009 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 07/27/2009 07/31/2009 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 08/10/2009 08/14/2009 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 08/24/2009 08/28/2009 Baseline Inspections OL EXAM - INITIAL EXAM PREP 3 1 V23284 ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 09/14/2009 09/18/2009 Not Applicable OL EXAM - INITIAL EXAM - WEEK 1 3 1 V23284 ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 10/05/2009 10/09/2009 Not Applicable OL EXAM - INITIAL EXAM - WEEK 2 3 1 V23284 ST LUCIE/JULY 2008 EXAM AT POWER FACILITIES 10/19/2009 10/23/2009 Not Applicable OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 11/16/2009 11/20/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.