ML102440876
| ML102440876 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, 07200061 |
| Issue date: | 09/01/2010 |
| From: | NRC/RGN-II |
| To: | |
| Shared Package | |
| ML102440858 | List: |
| References | |
| Download: ML102440876 (2) | |
Text
Inspection / Activity Plan Page 1 of 2 09/01/2010 08:15:20 Report 22 09/01/2010 - 12/31/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Turkey Point OL EXAM
- INITIAL EXAM PREP WEEK 1 5
3 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES V23312 09/27/2010 10/01/2010 PSB1-RP
- RP ACCESS CONTROLS 2
3, 4 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/27/2010 10/01/2010 3, 4 IP Performance Indicator Verification 71151 09/27/2010 10/01/2010 PSB1-TI
- TI-179 NSTS VERIFICATION 2
3, 4 IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 09/27/2010 10/01/2010 OL EXAM
- INITIAL EXAM PREP WEEK 2 4
3 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES V23312 10/04/2010 10/07/2010 EB3ISI
- UNIT 3 INSERVICE INSPECTION 1
3 IP Inservice Inspection Activities - PWR 7111108P 10/04/2010 10/08/2010 EB3SGISI
- UNIT 3 SG INSERVICE INSPECTION 1
3 IP Inservice Inspection Activities - PWR 7111108P 10/11/2010 10/15/2010 OL EXAM
- INITIAL EXAM WEEK 1 8
3 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES V23312 10/25/2010 10/29/2010 OL EXAM
- INITIAL EXAM WEEK 3 5
3 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES V23312 11/15/2010 11/19/2010 DRP/BR3
- 95001 SUPPLEMENTAL INSPECTION 3
3 IP Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 95001 11/29/2010 12/02/2010 DRP/NR3
- 92702 FOLLOWUP CORRECTIVE ACTIONS 2
3 IP Followup On Corrective Actions For Violations And Deviations 92702 11/29/2010 12/02/2010 TI-177
- TI-177 GAS INTRUSION 3
3, 4 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 01/10/2011 01/14/2011 PSB1EP
- EMERGENCY PREPAREDNESS EXERCISE 3
3, 4 IP Exercise Evaluation 7111401 02/07/2011 02/11/2011 3, 4 IP Emergency Action Level and Emergency Plan Changes 7111404 02/07/2011 02/11/2011 3, 4 IP Performance Indicator Verification 71151 02/07/2011 02/11/2011 EB3 ISI
- UNIT 4 IN-SERVICE INSPECTION 1
4 IP Inservice Inspection Activities - PWR 7111108P 03/28/2011 04/01/2011 EB3SGISI
- UNIT 4 SG INSERVICE INSPECTION 1
4 IP Inservice Inspection Activities - PWR 7111108P 04/04/2011 04/08/2011 PSB1-RP
- RP OCCUPATIONAL WEEK 1 4
3, 4 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/11/2011 04/15/2011 3, 4 IP Occupational ALARA Planning and Controls 71124.02 04/11/2011 04/15/2011 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/11/2011 04/15/2011 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Inspection / Activity Plan Page 2 of 2 09/01/2010 08:15:20 Report 22 09/01/2010 - 12/31/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Turkey Point PSB1-RP
- RP OCCUPATIONAL WEEK 1 4
3, 4 IP Occupational Dose Assessment 71124.04 04/11/2011 04/15/2011 3, 4 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 04/11/2011 04/15/2011 3, 4 IP Performance Indicator Verification 71151 04/11/2011 04/15/2011 PSB1-RP
- RP OCCUPATIONAL WEEK 2 3
3, 4 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/18/2011 04/18/2011 3, 4 IP Occupational ALARA Planning and Controls 71124.02 04/18/2011 04/18/2011 3, 4 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/18/2011 04/18/2011 3, 4 IP Occupational Dose Assessment 71124.04 04/18/2011 04/18/2011 3, 4 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 04/18/2011 04/18/2011 3, 4 IP Performance Indicator Verification 71151 04/18/2011 04/18/2011 ISFSI
- ISFSI DRY RUN 5
3, 4 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 05/16/2011 05/20/2011 CDBI
- COMPONENT DESIGN BASES INSPECTION 9
3, 4 IP Component Design Bases Inspection 7111121 06/27/2011 07/01/2011 3, 4 IP Component Design Bases Inspection 7111121 07/11/2011 07/14/2011 3, 4 IP Component Design Bases Inspection 7111121 07/25/2011 07/29/2011 3, 4 IP Component Design Bases Inspection 7111121 08/08/2011 08/12/2011 ISFSI
- ISFSI FIRST CAMPAIGN 2
3, 4 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 07/18/2011 07/22/2011 OL EXAM
- INITIAL EXAM PREP 3
3 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES V23364 10/31/2011 11/04/2011 OL EXAM
- INITIAL EXAM - WEEK 1 3
3 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES V23364 12/05/2011 12/09/2011 OL EXAM
- INITIAL EXAM - WEEK 2 3
3 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES V23364 12/12/2011 12/16/2011 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure