Report 22 - 2010 Mid Cycle
ML102440876
Person / Time
Site: Saint Lucie, 07200061  NextEra Energy icon.png
Issue date: 09/01/2010
From:
NRC/RGN-II
To:
Shared Package
ML102440858 List:
References
Download: ML102440876 (2)


Text

Page 1 of 2 Turkey Point 09/01/2010 08:15:20 Inspection / Activity Plan Report 22 09/01/2010 - 12/31/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL EXAM PREP WEEK 1 5 3 09/27/2010 10/01/2010 V23312 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES PSB1-RP - RP ACCESS CONTROLS 2 3, 4 09/27/2010 10/01/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 09/27/2010 10/01/2010 IP 71151 Performance Indicator Verification PSB1-TI - TI-179 NSTS VERIFICATION 2 3, 4 09/27/2010 10/01/2010 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS OL EXAM - INITIAL EXAM PREP WEEK 2 4 3 10/04/2010 10/07/2010 V23312 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES EB3ISI - UNIT 3 INSERVICE INSPECTION 1 3 10/04/2010 10/08/2010 IP 7111108P Inservice Inspection Activities - PWR EB3SGISI - UNIT 3 SG INSERVICE INSPECTION 1 3 10/11/2010 10/15/2010 IP 7111108P Inservice Inspection Activities - PWR OL EXAM - INITIAL EXAM WEEK 1 8 3 10/25/2010 10/29/2010 V23312 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 3 5 3 11/15/2010 11/19/2010 V23312 TURKEY POINT/OCTOBER 2010 EXAM AT POWER FACILITIES DRP/BR3 - 95001 SUPPLEMENTAL INSPECTION 3 3 11/29/2010 12/02/2010 IP 95001 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area DRP/NR3 - 92702 FOLLOWUP CORRECTIVE ACTIONS 2 3 11/29/2010 12/02/2010 IP 92702 Followup On Corrective Actions For Violations And Deviations TI-177 - TI-177 GAS INTRUSION 3 3, 4 01/10/2011 01/14/2011 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 3, 4 02/07/2011 02/11/2011 IP 7111401 Exercise Evaluation 3, 4 02/07/2011 02/11/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 3, 4 02/07/2011 02/11/2011 IP 71151 Performance Indicator Verification EB3 ISI - UNIT 4 IN-SERVICE INSPECTION 1 4 03/28/2011 04/01/2011 IP 7111108P Inservice Inspection Activities - PWR EB3SGISI - UNIT 4 SG INSERVICE INSPECTION 1 4 04/04/2011 04/08/2011 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - RP OCCUPATIONAL WEEK 1 4 3, 4 04/11/2011 04/15/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 04/11/2011 04/15/2011 IP 71124.02 Occupational ALARA Planning and Controls 3, 4 04/11/2011 04/15/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Turkey Point 09/01/2010 08:15:20 Inspection / Activity Plan Report 22 09/01/2010 - 12/31/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RP OCCUPATIONAL WEEK 1 4 3, 4 04/11/2011 04/15/2011 IP 71124.04 Occupational Dose Assessment 3, 4 04/11/2011 04/15/2011 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3, 4 04/11/2011 04/15/2011 IP 71151 Performance Indicator Verification PSB1-RP - RP OCCUPATIONAL WEEK 2 3 3, 4 04/18/2011 04/18/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3, 4 04/18/2011 04/18/2011 IP 71124.02 Occupational ALARA Planning and Controls 3, 4 04/18/2011 04/18/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 04/18/2011 04/18/2011 IP 71124.04 Occupational Dose Assessment 3, 4 04/18/2011 04/18/2011 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3, 4 04/18/2011 04/18/2011 IP 71151 Performance Indicator Verification ISFSI - ISFSI DRY RUN 5 3, 4 05/16/2011 05/20/2011 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants CDBI - COMPONENT DESIGN BASES INSPECTION 9 3, 4 06/27/2011 07/01/2011 IP 7111121 Component Design Bases Inspection 3, 4 07/11/2011 07/14/2011 IP 7111121 Component Design Bases Inspection 3, 4 07/25/2011 07/29/2011 IP 7111121 Component Design Bases Inspection 3, 4 08/08/2011 08/12/2011 IP 7111121 Component Design Bases Inspection ISFSI - ISFSI FIRST CAMPAIGN 2 3, 4 07/18/2011 07/22/2011 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants OL EXAM - INITIAL EXAM PREP 3 3 10/31/2011 11/04/2011 V23364 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 3 3 12/05/2011 12/09/2011 V23364 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 3 3 12/12/2011 12/16/2011 V23364 TURKEY POINT / DECEMBER 2011 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure