| | title = Pilgrim Nuclear Power Station - ERO Staffing and Training Teleconference with NRC Staff | | | title = ERO Staffing and Training Teleconference with NRC Staff |
| | author name = | | | author name = |
| | author affiliation = Entergy Nuclear Generation Co | | | author affiliation = Entergy Nuclear Generation Co |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Pilgrim Nuclear Power StationERO Staffing and TrainingTeleconference with NRC StaffOctober 20, 201510/15/15 1400 AgendaIntroduction of ParticipantsBackground and HistoryProblem StatementProposed ResolutionBasis for ChangeIntended ActionsNRC Staff Questions and PerspectiveConclusions2 Introduction of ParticipantsNRC StaffEntergy -Pilgrim3 Background and HistoryJuly 14, 2006 letter from Entergy to NRC StaffoERO substitution: ChemTech for RP TechoTraining for ChemTechs describedFeb 5, 2007 letter from NRC Staff to EntergyoChange does not decrease effectiveness of planoNo NRC approval necessary2015: Entergy determined ChemTech trainingnot consistent with July 14, 2006 letterImmediate actions; RP Tech added back to shifts;4 Problem StatementLevel of training for ChemTechs acting for RPTechs described in July 14, 2006 letter exceedsactual requirements of the ERO function.5 July 14, 2006 Letter: ChemTech Training6 Proposed ResolutionEntergy proposal:oReturn to onshiftChemTechs fulfilling the RP TechERO function for first 30 minutes of ERO initiationoReduce the scope of ChemTech trainingoSubmittal to NRC for review and approval prior toimplementationEntergy has concluded this change is acceptable7 Basis for ChangeReduced level of training -consistent with limitedspecific actions of the ChemTechs within 30 minutesSpecific on-shift staffing study supports limited scopeof responsibilities of ChemTech for RP TechsOE review identified similar implementationsFebruary 5, 2007 NRC Staff letter concluded:oPrevious Entergy proposal met requirements of:10CFR50.47(b)(2) -adequate staffing provided10CFR50, App E, IV.A -organization for copingoChemTech training considered an enhancementoNo decrease in effectiveness / no NRC approval required8 Intended ActionsConference call with NRC StaffPreparation and submittal of request for priorNRC Staff review and approvalRevise trainingRevise ERO staffing9 NRC Staff Questions and Perspective10 Conclusions11Proposed change in Chemistry Technician isappropriate based on ERO assignmentsProposed change is justified by staffing studyEntergy intends on submitting the proposedchange for prior NRC review and approval Pilgrim Nuclear Power StationERO Staffing and TrainingTeleconference with NRC StaffOctober 20, 201510/15/15 1400 AgendaIntroduction of ParticipantsBackground and HistoryProblem StatementProposed ResolutionBasis for ChangeIntended ActionsNRC Staff Questions and PerspectiveConclusions2 Introduction of ParticipantsNRC StaffEntergy -Pilgrim3 Background and HistoryJuly 14, 2006 letter from Entergy to NRC StaffoERO substitution: ChemTech for RP TechoTraining for ChemTechs describedFeb 5, 2007 letter from NRC Staff to EntergyoChange does not decrease effectiveness of planoNo NRC approval necessary2015: Entergy determined ChemTech trainingnot consistent with July 14, 2006 letterImmediate actions; RP Tech added back to shifts;4 Problem StatementLevel of training for ChemTechs acting for RPTechs described in July 14, 2006 letter exceedsactual requirements of the ERO function.5 July 14, 2006 Letter: ChemTech Training6 Proposed ResolutionEntergy proposal:oReturn to onshiftChemTechs fulfilling the RP TechERO function for first 30 minutes of ERO initiationoReduce the scope of ChemTech trainingoSubmittal to NRC for review and approval prior toimplementationEntergy has concluded this change is acceptable7 Basis for ChangeReduced level of training -consistent with limitedspecific actions of the ChemTechs within 30 minutesSpecific on-shift staffing study supports limited scopeof responsibilities of ChemTech for RP TechsOE review identified similar implementationsFebruary 5, 2007 NRC Staff letter concluded:oPrevious Entergy proposal met requirements of:10CFR50.47(b)(2) -adequate staffing provided10CFR50, App E, IV.A -organization for copingoChemTech training considered an enhancementoNo decrease in effectiveness / no NRC approval required8 Intended ActionsConference call with NRC StaffPreparation and submittal of request for priorNRC Staff review and approvalRevise trainingRevise ERO staffing9 NRC Staff Questions and Perspective10 Conclusions11Proposed change in Chemistry Technician isappropriate based on ERO assignmentsProposed change is justified by staffing studyEntergy intends on submitting the proposedchange for prior NRC review and approval}} | | {{#Wiki_filter:Pilgrim Nuclear Power Station ERO Staffing and Training Teleconference with NRC Staff October 20, 2015 10/15/15 1400 |
| | |
| | Agenda |
| | * Introduction of Participants |
| | * Background and History |
| | * Problem Statement |
| | * Proposed Resolution |
| | * Basis for Change |
| | * Intended Actions |
| | * NRC Staff Questions and Perspective |
| | * Conclusions 2 |
| | |
| | Introduction of Participants |
| | * NRC Staff |
| | * Entergy - Pilgrim 3 |
| | |
| | Background and History |
| | * July 14, 2006 letter from Entergy to NRC Staff o ERO substitution: Chem Tech for RP Tech o Training for Chem Techs described |
| | * Feb 5, 2007 letter from NRC Staff to Entergy o Change does not decrease effectiveness of plan o No NRC approval necessary |
| | * 2015: Entergy determined Chem Tech training not consistent with July 14, 2006 letter |
| | * Immediate actions; RP Tech added back to shifts; 4 |
| | |
| | Problem Statement |
| | * Level of training for Chem Techs acting for RP Techs described in July 14, 2006 letter exceeds actual requirements of the ERO function. |
| | 5 |
| | |
| | July 14, 2006 Letter: Chem Tech Training 6 |
| | |
| | Proposed Resolution |
| | * Entergy proposal: |
| | o Return to onshift Chem Techs fulfilling the RP Tech ERO function for first 30 minutes of ERO initiation o Reduce the scope of Chem Tech training o Submittal to NRC for review and approval prior to implementation |
| | * Entergy has concluded this change is acceptable 7 |
| | |
| | Basis for Change |
| | * Reduced level of training - consistent with limited specific actions of the Chem Techs within 30 minutes |
| | * Specific on-shift staffing study supports limited scope of responsibilities of Chem Tech for RP Techs |
| | * OE review identified similar implementations |
| | * February 5, 2007 NRC Staff letter concluded: |
| | o Previous Entergy proposal met requirements of: |
| | 10CFR50.47(b)(2) - adequate staffing provided 10CFR50, App E, IV.A - organization for coping o Chem Tech training considered an enhancement o No decrease in effectiveness / no NRC approval required 8 |
| | |
| | Intended Actions |
| | * Conference call with NRC Staff |
| | * Preparation and submittal of request for prior NRC Staff review and approval |
| | * Revise training |
| | * Revise ERO staffing 9 |
| | |
| | NRC Staff Questions and Perspective 10 |
| | |
| | Conclusions |
| | * Proposed change in Chemistry Technician is appropriate based on ERO assignments |
| | * Proposed change is justified by staffing study |
| | * Entergy intends on submitting the proposed change for prior NRC review and approval 11 |
| | |
| | Pilgrim Nuclear Power Station ERO Staffing and Training Teleconference with NRC Staff October 20, 2015 10/15/15 1400 |
| | |
| | Agenda |
| | * Introduction of Participants |
| | * Background and History |
| | * Problem Statement |
| | * Proposed Resolution |
| | * Basis for Change |
| | * Intended Actions |
| | * NRC Staff Questions and Perspective |
| | * Conclusions 2 |
| | |
| | Introduction of Participants |
| | * NRC Staff |
| | * Entergy - Pilgrim 3 |
| | |
| | Background and History |
| | * July 14, 2006 letter from Entergy to NRC Staff o ERO substitution: Chem Tech for RP Tech o Training for Chem Techs described |
| | * Feb 5, 2007 letter from NRC Staff to Entergy o Change does not decrease effectiveness of plan o No NRC approval necessary |
| | * 2015: Entergy determined Chem Tech training not consistent with July 14, 2006 letter |
| | * Immediate actions; RP Tech added back to shifts; 4 |
| | |
| | Problem Statement |
| | * Level of training for Chem Techs acting for RP Techs described in July 14, 2006 letter exceeds actual requirements of the ERO function. |
| | 5 |
| | |
| | July 14, 2006 Letter: Chem Tech Training 6 |
| | |
| | Proposed Resolution |
| | * Entergy proposal: |
| | o Return to onshift Chem Techs fulfilling the RP Tech ERO function for first 30 minutes of ERO initiation o Reduce the scope of Chem Tech training o Submittal to NRC for review and approval prior to implementation |
| | * Entergy has concluded this change is acceptable 7 |
| | |
| | Basis for Change |
| | * Reduced level of training - consistent with limited specific actions of the Chem Techs within 30 minutes |
| | * Specific on-shift staffing study supports limited scope of responsibilities of Chem Tech for RP Techs |
| | * OE review identified similar implementations |
| | * February 5, 2007 NRC Staff letter concluded: |
| | o Previous Entergy proposal met requirements of: |
| | 10CFR50.47(b)(2) - adequate staffing provided 10CFR50, App E, IV.A - organization for coping o Chem Tech training considered an enhancement o No decrease in effectiveness / no NRC approval required 8 |
| | |
| | Intended Actions |
| | * Conference call with NRC Staff |
| | * Preparation and submittal of request for prior NRC Staff review and approval |
| | * Revise training |
| | * Revise ERO staffing 9 |
| | |
| | NRC Staff Questions and Perspective 10 |
| | |
| | Conclusions |
| | * Proposed change in Chemistry Technician is appropriate based on ERO assignments |
| | * Proposed change is justified by staffing study |
| | * Entergy intends on submitting the proposed change for prior NRC review and approval 11}} |
Letter Sequence Request |
---|
|
|
MONTHYEARML15292A0132015-10-20020 October 2015 ERO Staffing and Training Teleconference with NRC Staff Project stage: Request ML15306A0122015-11-0505 November 2015 Summary of October 20, 2015, Teleconference with Entergy Nuclear Operations to Discuss Proposed Changes to Emergency Response Organization Training for Pilgrim Nuclear Power Station Project stage: Meeting 2015-10-20
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML23113A0232023-04-11011 April 2023 NRC Presentation: Overview of Pilgrim Liquid Discharge Considerations for the North Atlantic Right Whale Recovery Plan Northeast U.S. Implementation Team (Neit) ML22227A0742022-08-10010 August 2022 Overview of Pilgrim Liquid Discharge Considerations NOAA ML22124A3012022-04-25025 April 2022 Dialog Presentation for Mashpee Wampanoag Tribe Regarding Pilgrim Liquid Effluent Discharges, April 25, 2022 ML20045D1092020-01-31031 January 2020 PSP Pre-Submittal Meeting Jan 31 2020 Hdi ML19248C2392019-09-11011 September 2019 NEIMA Section 108 Public Meeting Slides - Pilgrim September 11, 2019 ML19119A0882019-04-29029 April 2019 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML19009A3432019-01-15015 January 2019 Holtec Slides PSDAR Meeting 1-15-19 ML19009A1712019-01-15015 January 2019 Post-Shutdown Decommissioning Activities Report, NRC Public Meeting January 15, 2019 ML19008A4942019-01-15015 January 2019 Post-Shutdown Decommissioning Activities Report - NRC Presentation at Public Meeting on January 15, 2019 ML18262A1352018-09-25025 September 2018 NRC License Transfer Application 9/25/2018 Pre-Submittal Meeting Presentation Slides ML18127A0282018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides ML18127A0272018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML17296A2162017-10-18018 October 2017 Presentations on Reactor Decommissioning at Ma Ndcap at Plymouth Ma Public Meeting Oct 18, 2017 ML17166A2892017-06-20020 June 2017 Entergy Slides for 06/20/2017 Public Meeting, Licensing Action Submittal Plan - Decommissioning. ML17150A0012017-06-20020 June 2017 6/20/2017 Meeting Slides - Entergy Nuclear Operations, Inc. - Licensing Action Submittal Plan - Decommissioning (CAC Nos. MF9624, MF9625, MF9626, MF9627, and MF9628) ML17086A3802017-03-21021 March 2017 3/21/2017 - Annual Assessment & IP 95003 Exit Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML17086A3882017-03-21021 March 2017 3/21/2017 - Annual Assessment & 95003 Exit Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides ML16112A1562016-04-13013 April 2016 4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - Entergy Presentation Slides ML16111A8892016-04-13013 April 2016 4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - NRC Presentation Slides ML15292A0132015-10-20020 October 2015 ERO Staffing and Training Teleconference with NRC Staff ML15208A4602015-07-0808 July 2015 Slides of Regulatory Conference for July 8, 2015 ML15084A0532015-03-18018 March 2015 3/18/2015 - Pilgrim 2014 Annual Assessment Meeting - NRC Presentation (w/95002 Inspection Results) ML14136A3502014-05-14014 May 2014 Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station on 5/1/2014 (W/Nrc Presentation Slides) ML14015A1702013-12-12012 December 2013 Pilgrim Dry Cask Presentation - Dec. 12, 2013 ML14006A2732013-12-12012 December 2013 NRC Webinar Dry Cask Storage of Nuclear Fuel at Pilgrim Nuclear Power Plant ML13130A1542013-05-10010 May 2013 Slides for ISFSI Briefing for Town of Plymouth ML13130A1232013-05-10010 May 2013 2012 Annual Assessment Meeting Slides ML12101A2852012-04-10010 April 2012 Annual Assessment Meeting Slides ML11188A0192011-07-0606 July 2011 NRC Meeting with NEI Workshop June 28-29, 2011 Enhancements ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML1009900312010-04-13013 April 2010 Entergy Nuclear Operations (Entergy): Meeting Presentation 2009 Nuclear Safety Culture Assessment Meeting ML0906906982009-03-20020 March 2009 NRC Presentation Slides for Pilgrim Nuclear Power Plant Annual Assessment Meeting to Be Held 3/26/09 ML0809403832008-03-26026 March 2008 Attendance List for Pilgrim Annual Assessment Meeting ML0731902202007-11-0707 November 2007 Meeting Handout Fitzpatrick GNF2 Introduction at Entergy ML0726400222007-09-0606 September 2007 License Renewal ACRS Full Committee Brief of September 6, 2007 ML0712807662007-04-26026 April 2007 E-mail: (NPA-PD) Link to Rutgers Slides on Wrf Calcs - Pilgrim ML0705106742007-02-21021 February 2007 NMC Slides for Public Meeting, Conduct of Operations Action Plan Update. ML0704403232007-01-30030 January 2007 License Renewal Inspection Exit Meeting Slides ML0715700492007-01-16016 January 2007 Budget Presentation,Town of Plymouth Fiscal Year 2008 Budget Primer. ML0614201642006-05-17017 May 2006 Pilgrim Nuclear Power Station Environmental Scoping Meeting Handouts ML0507500022005-03-16016 March 2005 NRC Slides - Pilgrim Annual Assessment Meeting ML0309001032003-03-26026 March 2003 Annual Assessment Meeting Slides ML0225302662002-09-0909 September 2002 Attachment 2 to Summary of 07/24/2002 Meeting with Entergy Nuclear Operations, Inc., Regarding Pilgrim Nuclear Power Station Proposed Safety-Relief Valve Seismic Analysis Methodology ML0210802402002-03-28028 March 2002 Annual Assessment Meeting Slides ML0212004532002-03-28028 March 2002 Entergy Nuclear Generation Company - Pilgrim Nuclear Power Station Annual Assessment Meeting Slides ML17252A1571977-09-14014 September 1977 Summary of Meeting Held with Representatives of the Mark I Owner'S Group to Discuss the Structural Acceptance Criteria for the Mark I Containment Long Term Program 2023-04-11
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23113A0232023-04-11011 April 2023 NRC Presentation: Overview of Pilgrim Liquid Discharge Considerations for the North Atlantic Right Whale Recovery Plan Northeast U.S. Implementation Team (Neit) ML22227A0742022-08-10010 August 2022 Overview of Pilgrim Liquid Discharge Considerations NOAA ML22124A3012022-04-25025 April 2022 Dialog Presentation for Mashpee Wampanoag Tribe Regarding Pilgrim Liquid Effluent Discharges, April 25, 2022 ML22088A2172022-03-16016 March 2022 Liquid Effluent Discharge Presentation ML20045D1092020-01-31031 January 2020 PSP Pre-Submittal Meeting Jan 31 2020 Hdi ML19248C2392019-09-11011 September 2019 NEIMA Section 108 Public Meeting Slides - Pilgrim September 11, 2019 ML19119A0882019-04-29029 April 2019 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML19009A3432019-01-15015 January 2019 Holtec Slides PSDAR Meeting 1-15-19 ML19008A4942019-01-15015 January 2019 Post-Shutdown Decommissioning Activities Report - NRC Presentation at Public Meeting on January 15, 2019 ML18262A1352018-09-25025 September 2018 NRC License Transfer Application 9/25/2018 Pre-Submittal Meeting Presentation Slides ML18127A0282018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides ML18127A0272018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18075A1232018-03-20020 March 2018 Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change Considerations ML17296A2162017-10-18018 October 2017 Presentations on Reactor Decommissioning at Ma Ndcap at Plymouth Ma Public Meeting Oct 18, 2017 ML17191A7872017-07-13013 July 2017 Regulatory Conference Presentation 07-13-17 ML17086A3802017-03-21021 March 2017 3/21/2017 - Annual Assessment & IP 95003 Exit Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides ML17086A3882017-03-21021 March 2017 3/21/2017 - Annual Assessment & 95003 Exit Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides ML16112A1562016-04-13013 April 2016 4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - Entergy Presentation Slides ML16111A8892016-04-13013 April 2016 4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - NRC Presentation Slides ML15292A0132015-10-20020 October 2015 ERO Staffing and Training Teleconference with NRC Staff ML15208A4602015-07-0808 July 2015 Slides of Regulatory Conference for July 8, 2015 ML15084A0532015-03-18018 March 2015 3/18/2015 - Pilgrim 2014 Annual Assessment Meeting - NRC Presentation (w/95002 Inspection Results) ML14136A3502014-05-14014 May 2014 Summary of Annual Assessment Meeting for Pilgrim Nuclear Power Station on 5/1/2014 (W/Nrc Presentation Slides) ML14015A1702013-12-12012 December 2013 Pilgrim Dry Cask Presentation - Dec. 12, 2013 ML14006A2732013-12-12012 December 2013 NRC Webinar Dry Cask Storage of Nuclear Fuel at Pilgrim Nuclear Power Plant ML13130A1542013-05-10010 May 2013 Slides for ISFSI Briefing for Town of Plymouth ML13130A1232013-05-10010 May 2013 2012 Annual Assessment Meeting Slides ML12262A3282012-09-13013 September 2012 9/13/2012 Pilgrim Watch Final Presentation NUREG-0654 Public Mtg ML12101A2852012-04-10010 April 2012 Annual Assessment Meeting Slides ML11188A0192011-07-0606 July 2011 NRC Meeting with NEI Workshop June 28-29, 2011 Enhancements ML1118105122011-06-30030 June 2011 Aam Slides ML0909702992009-04-13013 April 2009 Annual Assessment Meeting Summary, Slides, Sign-in Sheet, Misc Documents, for 3/26/09 Meeting ML0906906982009-03-20020 March 2009 NRC Presentation Slides for Pilgrim Nuclear Power Plant Annual Assessment Meeting to Be Held 3/26/09 ML0807011352008-03-10010 March 2008 Slides for the Pilgrim Station Annual Assessment Meeting CY2007 - ROP8 - 03/26/2008 ML0731902202007-11-0707 November 2007 Meeting Handout Fitzpatrick GNF2 Introduction at Entergy ML0726400222007-09-0606 September 2007 License Renewal ACRS Full Committee Brief of September 6, 2007 ML0712807662007-04-26026 April 2007 E-mail: (NPA-PD) Link to Rutgers Slides on Wrf Calcs - Pilgrim ML0710102652007-04-11011 April 2007 Slides for 2006 Annual Assessment Meeting, NRC Annual Performance Assessment of Pilgrim ML0705106742007-02-21021 February 2007 NMC Slides for Public Meeting, Conduct of Operations Action Plan Update. ML0704403232007-01-30030 January 2007 License Renewal Inspection Exit Meeting Slides ML0704304762007-01-30030 January 2007 License Renewal Inspection Exit Meeting - Slides with Notes ML0703305622007-01-24024 January 2007 Dseis Meeting Presentation, Preliminary Results of Environmental Review Pilgrim Nuclear Power Station ML0715700492007-01-16016 January 2007 Budget Presentation,Town of Plymouth Fiscal Year 2008 Budget Primer. ML0634800262006-12-0606 December 2006 Drop-In Visit (Entergy) Slides ML0609404082006-04-0404 April 2006 NRC Slides for Annual Assessment Public Meeting with Entergy (Pilgrim Station) Reference CY2005 Performance ML0617802712006-03-0707 March 2006 RIC 2006 Presentation - T2E - Vincent Coulehan - Use of Operating Experience (Regulator/Operator/Licensee) ML0615902322006-03-0707 March 2006 2006/03/07- - RIC 2006 Presentation - T1F - Garry G. Young - License Renewal ML0615901582006-03-0707 March 2006 03/07/2006 - RIC 2006 Presentation - T1E - John F. Mccann - License Renewal ML0632802522005-07-18018 July 2005 Briefing Slides for 07/18/2005, Pilgrim Station Force-on-Force Inspection 2023-04-11
[Table view] |
Text
Pilgrim Nuclear Power Station ERO Staffing and Training Teleconference with NRC Staff October 20, 2015 10/15/15 1400
Agenda
- Introduction of Participants
- NRC Staff Questions and Perspective
Introduction of Participants
Background and History
- July 14, 2006 letter from Entergy to NRC Staff o ERO substitution: Chem Tech for RP Tech o Training for Chem Techs described
- Feb 5, 2007 letter from NRC Staff to Entergy o Change does not decrease effectiveness of plan o No NRC approval necessary
- 2015: Entergy determined Chem Tech training not consistent with July 14, 2006 letter
- Immediate actions; RP Tech added back to shifts; 4
Problem Statement
- Level of training for Chem Techs acting for RP Techs described in July 14, 2006 letter exceeds actual requirements of the ERO function.
5
July 14, 2006 Letter: Chem Tech Training 6
Proposed Resolution
o Return to onshift Chem Techs fulfilling the RP Tech ERO function for first 30 minutes of ERO initiation o Reduce the scope of Chem Tech training o Submittal to NRC for review and approval prior to implementation
- Entergy has concluded this change is acceptable 7
Basis for Change
- Reduced level of training - consistent with limited specific actions of the Chem Techs within 30 minutes
- Specific on-shift staffing study supports limited scope of responsibilities of Chem Tech for RP Techs
- OE review identified similar implementations
- February 5, 2007 NRC Staff letter concluded:
o Previous Entergy proposal met requirements of:
10CFR50.47(b)(2) - adequate staffing provided 10CFR50, App E, IV.A - organization for coping o Chem Tech training considered an enhancement o No decrease in effectiveness / no NRC approval required 8
Intended Actions
- Conference call with NRC Staff
- Preparation and submittal of request for prior NRC Staff review and approval
NRC Staff Questions and Perspective 10
Conclusions
- Proposed change in Chemistry Technician is appropriate based on ERO assignments
- Proposed change is justified by staffing study
- Entergy intends on submitting the proposed change for prior NRC review and approval 11
Pilgrim Nuclear Power Station ERO Staffing and Training Teleconference with NRC Staff October 20, 2015 10/15/15 1400
Agenda
- Introduction of Participants
- NRC Staff Questions and Perspective
Introduction of Participants
Background and History
- July 14, 2006 letter from Entergy to NRC Staff o ERO substitution: Chem Tech for RP Tech o Training for Chem Techs described
- Feb 5, 2007 letter from NRC Staff to Entergy o Change does not decrease effectiveness of plan o No NRC approval necessary
- 2015: Entergy determined Chem Tech training not consistent with July 14, 2006 letter
- Immediate actions; RP Tech added back to shifts; 4
Problem Statement
- Level of training for Chem Techs acting for RP Techs described in July 14, 2006 letter exceeds actual requirements of the ERO function.
5
July 14, 2006 Letter: Chem Tech Training 6
Proposed Resolution
o Return to onshift Chem Techs fulfilling the RP Tech ERO function for first 30 minutes of ERO initiation o Reduce the scope of Chem Tech training o Submittal to NRC for review and approval prior to implementation
- Entergy has concluded this change is acceptable 7
Basis for Change
- Reduced level of training - consistent with limited specific actions of the Chem Techs within 30 minutes
- Specific on-shift staffing study supports limited scope of responsibilities of Chem Tech for RP Techs
- OE review identified similar implementations
- February 5, 2007 NRC Staff letter concluded:
o Previous Entergy proposal met requirements of:
10CFR50.47(b)(2) - adequate staffing provided 10CFR50, App E, IV.A - organization for coping o Chem Tech training considered an enhancement o No decrease in effectiveness / no NRC approval required 8
Intended Actions
- Conference call with NRC Staff
- Preparation and submittal of request for prior NRC Staff review and approval
NRC Staff Questions and Perspective 10
Conclusions
- Proposed change in Chemistry Technician is appropriate based on ERO assignments
- Proposed change is justified by staffing study
- Entergy intends on submitting the proposed change for prior NRC review and approval 11