Line 2: Line 2:
| number = ML16007A764
| number = ML16007A764
| issue date = 01/06/2016
| issue date = 01/06/2016
| title = Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - NRC Emergency Preparedness Annual Inspection Report 05000528/2015501, 05000529/2015501, and 05000530/2015501
| title = NRC Emergency Preparedness Annual Inspection Report 05000528/2015501, 05000529/2015501, and 05000530/2015501
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Edington R K
| addressee name = Edington R
| addressee affiliation = Arizona Public Service Co
| addressee affiliation = Arizona Public Service Co
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES ary 6, 2016
[[Issue date::January 6, 2016]]


Mr. Randall K. Edington, Executive Vice President, Nuclear/CNO Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034
==SUBJECT:==
 
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000528/2015501, 05000529/2015501, AND 05000530/2015501
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000528/2015501, 05000529/2015501, AND 05000530/2015501
 
==Dear Mr. Edington:==
On December 31, 2015, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. This inspection began on January 1, 2015. Issuance of this letter closes NRC Inspection Report 05000528/2015501, 05000529/2015501, and 05000530/2015501. The inspection results associated with the 2015-501 reports are documented in integrated Resident Inspector Reports 2015-001, 2015-002, 2015-003, and 2015-004.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety
 
Docket Nos. 50-528, 50-529, and 50-530 License Nos. NPF-41, NPF-51, and NPF-74 cc: Electronic Distribution January 6, 2016 Mr. Randall K. Edington, Executive Vice President, Nuclear/CNO Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034
 
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000528/2015501, 05000529/2015501, AND 05000530/2015501


==Dear Mr. Edington:==
==Dear Mr. Edington:==
On December 31, 2015, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. This inspection began on January 1, 2015. Issuance of this letter closes NRC Inspection Report 05000528/2015501, 05000529/2015501, and 05000530/2015501. The inspection results associated with the 2015-501 reports are documented in integrated Resident Inspector Reports 2015-001, 2015-002, 2015-003, and 2015-004.
On December 31, 2015, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. This inspection began on January 1, 2015. Issuance of this letter closes NRC Inspection Report 05000528/2015501, 05000529/2015501, and 05000530/2015501. The inspection results associated with the 2015-501 reports are documented in integrated Resident Inspector Reports 2015-001, 2015-002, 2015-003, and 2015-004.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA/
Sincerely,
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-528, 50-529, and 50-530 License Nos. NPF-41, NPF-51, and NPF-74  
/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-528, 50-529, and 50-530 License Nos. NPF-41, NPF-51, and NPF-74 cc: Electronic Distribution


cc: Electronic Distribution Distribution: See next page ADAMS ACCESSION NUMBER: ML16007A764 SUNSI Review By: PElkmann ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann MHaire SIGNATURE /RA/ /RA/ DATE 12/14/15 1/6/16 OFFICIAL RECORD COPY Letter to Randall from Mark S. Haire, dated January 6, 2016
ML16007A764 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: PElkmann Yes No Non-Publicly Available Sensitive RGN-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann MHaire SIGNATURE /RA/ /RA/
DATE 12/14/15 1/6/16


SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000528/2015501, 05000529/2015501, AND 05000530/2015501 DISTRIBUTION: Regional Administrator (Marc.Dapas@nrc.gov)
Letter to Randall from Mark S. Haire, dated January 6, 2016 SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000528/2015501, 05000529/2015501, AND 05000530/2015501 DISTRIBUTION:
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov)
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Charles.Peabody@nrc.gov) Resident Inspector (David.You@nrc.gov) Resident Inspector (Dustin.Reinert@nrc.gov)
Senior Resident Inspector (Charles.Peabody@nrc.gov)
Resident Inspector (David.You@nrc.gov)
Resident Inspector (Dustin.Reinert@nrc.gov)
PV Administrative Assistant (Yvonne.Dubay@nrc.gov)
PV Administrative Assistant (Yvonne.Dubay@nrc.gov)
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)
Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov) Project Engineer, DRP/D (Jan.Tice@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)
Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Margaret.Watford@nrc.gov)
Project Manager (Margaret.Watford@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)
}}
}}

Latest revision as of 02:24, 31 October 2019

NRC Emergency Preparedness Annual Inspection Report 05000528/2015501, 05000529/2015501, and 05000530/2015501
ML16007A764
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/06/2016
From: Mark Haire
Plant Support Branch-1
To: Edington R
Arizona Public Service Co
References
IR 2015501
Download: ML16007A764 (3)


Text

UNITED STATES ary 6, 2016

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000528/2015501, 05000529/2015501, AND 05000530/2015501

Dear Mr. Edington:

On December 31, 2015, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. This inspection began on January 1, 2015. Issuance of this letter closes NRC Inspection Report 05000528/2015501, 05000529/2015501, and 05000530/2015501. The inspection results associated with the 2015-501 reports are documented in integrated Resident Inspector Reports 2015-001, 2015-002, 2015-003, and 2015-004.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-528, 50-529, and 50-530 License Nos. NPF-41, NPF-51, and NPF-74 cc: Electronic Distribution

ML16007A764 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: PElkmann Yes No Non-Publicly Available Sensitive RGN-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann MHaire SIGNATURE /RA/ /RA/

DATE 12/14/15 1/6/16

Letter to Randall from Mark S. Haire, dated January 6, 2016 SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000528/2015501, 05000529/2015501, AND 05000530/2015501 DISTRIBUTION:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Charles.Peabody@nrc.gov)

Resident Inspector (David.You@nrc.gov)

Resident Inspector (Dustin.Reinert@nrc.gov)

PV Administrative Assistant (Yvonne.Dubay@nrc.gov)

Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)

Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov)

Project Engineer, DRP/D (Jan.Tice@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Margaret.Watford@nrc.gov)

Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)