ML16197A176: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(12 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16197A176
| number = ML16197A176
| issue date = 07/19/2016
| issue date = 07/19/2016
| title = Summary of June 30, 2016, Pre-Application Teleconference with NextEra Energy Duane Arnold, LLC, for License Amendment Request for Change in Duane Arnold Energy Center Emergency Plan Staff Augmentation Response Times (CAC No. MF7797)
| title = Summary of June 30, 2016, Pre-Application Teleconference with NextEra Energy Duane Arnold, LLC, for License Amendment Request for Change in Duane Arnold Energy Center Emergency Plan Staff Augmentation Response Times
| author name = Chawla M L
| author name = Chawla M
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000331
| docket = 05000331
| license number = DPR-049
| license number = DPR-049
| contact person = Chawla M L
| contact person = Chawla M
| case reference number = CAC MF7797
| case reference number = CAC MF7797
| document type = Meeting Summary
| document type = Meeting Summary
| page count = 4
| page count = 4
| project = CAC:MF7797
| stage = Meeting
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 19, 2016 LICENSEE:      NEXTERA ENERGY DUANE ARNOLD, LLC FACILITY:      DUANE ARNOLD ENERGY CENTER
==SUBJECT:==
==SUMMARY==
OF JUNE 30, 2016, PRE-APPLICATION TELECONFERENCE WITH NEXTERA ENERGY DUANE ARNOLD, LLC, FOR LICENSE AMENDMENT REQUEST FOR CHANGE IN DUANE ARNOLD ENERGY CENTER EMERGENCY PLAN STAFF AUGMENTATION RESPONSE TIMES (CAC NO. MF7797)
On June 30, 2016, a Category 1 public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of NextEra Energy Duane Arnold, LLC at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the teleconference was to discuss a license amendment request (LAR) for change in Duane Arnold Energy Center (DAEC) Emergency Plan (EP) staff augmentation response times.
The licensee provided slides (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16167A025) for this pre-application teleconference. The slides were published as part of the meeting notice (ADAMS Accession No. ML16168A085), dated June 15, 2016.
The licensee provided the outline of the proposed submittal to change the DAEC EP augmentation response times. It was pointed out during the meeting that not all augmentation time changes will be requested in the respective manner from 30 to 60, and from 60 to 90 minutes. The licensee will review the other similar changes to E-plans previously approved by the NRC. The NRC staff asked several clarifying questions and provided their insights into the several existing guidance documents and other aspects for consideration, prior to the submittal. The licensee provided their schedule for submittal as prior to end of September 2016, with requested approval by end of 2017.
There were members of the public who participated in the conference. Public Meeting Feedback forms were offered but not requested by anyone.
A list of attendees is provided as Enclosure 1.
Please direct any inquiries to me at 301-415-8371, or Mahesh.chawla@nrc.gov.
Mahesh Chawla, Project Manager Plant Licensing Branch LPL 3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331
==Enclosure:==
List of Attendees cc: Distribution via Listserv
LIST OF ATTENDEES JUNE 30, 2016, PRE-APPLICATION TELECONFERENCE WITH NEXTERA ENERGY DUANE ARNOLD, LLC REGARDING DUANE ARNOLD ENERGY CENTER EP STAFF AUGMENTATION RESPONSE TIMES NAME                                                    ORGANIZATION NUCLEAR REGULATORY COMMISSION Mahesh Chawla                                            NRC/NRR/DORL/LPL3-1 1 David Wrona Michael Norris                                          NRC/NSIR/DPR/ORLOB2 Don Johnson Richard Kinard NEXTERA ENERGY DUANE ARNOLD, LLC Michael Davis                                            DAEC LicensinQ ManaQer Mark Fritz                                              DAEC EP Manager Tracy Weaver                                            Fleet EP Manager Peter Polfleit                                          DAEC LicensinQ EnQineer Monica Ray                                              Energy Compliance Consultants Nichole Knapp MEMBERS OF PUBLIC Barbara Brown                                            None Gregory Richardson                                      Engineering Planning and Management (EPM),
Inc.
1 Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing. Plant Licensing Branch 111-1 2 Office of Nuclear Security and Incident Response, Division of Preparedness and Response, Operating Reactor Licensing and Outreach Branch
Meeting Notice: ML16168A085 Meeting Summary: ML16197A176 Handouts: ML16167A025                                                              *via email OFFICE        NRR/DORL/LPL3-1 /PM      NRR/DORL/LPL3-1 /LA        NSIR/DPR/ORLOB/BC NAME          MChawla                  SRohrer                    JAnderson (MNorris for)
DATE          07/18/16                  07/18/16                    07/07/16 OFFICE        N RR/DORL/LPL3-1 /BC      NRR/DORL/LPL3-1 /PM NAME          DWrona                    MChawla DATE          07/19/16                  07/19/16}}

Latest revision as of 16:48, 30 October 2019

Summary of June 30, 2016, Pre-Application Teleconference with NextEra Energy Duane Arnold, LLC, for License Amendment Request for Change in Duane Arnold Energy Center Emergency Plan Staff Augmentation Response Times
ML16197A176
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 07/19/2016
From: Mahesh Chawla
Plant Licensing Branch III
To:
NextEra Energy Duane Arnold
Chawla M
References
CAC MF7797
Download: ML16197A176 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 19, 2016 LICENSEE: NEXTERA ENERGY DUANE ARNOLD, LLC FACILITY: DUANE ARNOLD ENERGY CENTER

SUBJECT:

SUMMARY

OF JUNE 30, 2016, PRE-APPLICATION TELECONFERENCE WITH NEXTERA ENERGY DUANE ARNOLD, LLC, FOR LICENSE AMENDMENT REQUEST FOR CHANGE IN DUANE ARNOLD ENERGY CENTER EMERGENCY PLAN STAFF AUGMENTATION RESPONSE TIMES (CAC NO. MF7797)

On June 30, 2016, a Category 1 public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of NextEra Energy Duane Arnold, LLC at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the teleconference was to discuss a license amendment request (LAR) for change in Duane Arnold Energy Center (DAEC) Emergency Plan (EP) staff augmentation response times.

The licensee provided slides (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16167A025) for this pre-application teleconference. The slides were published as part of the meeting notice (ADAMS Accession No. ML16168A085), dated June 15, 2016.

The licensee provided the outline of the proposed submittal to change the DAEC EP augmentation response times. It was pointed out during the meeting that not all augmentation time changes will be requested in the respective manner from 30 to 60, and from 60 to 90 minutes. The licensee will review the other similar changes to E-plans previously approved by the NRC. The NRC staff asked several clarifying questions and provided their insights into the several existing guidance documents and other aspects for consideration, prior to the submittal. The licensee provided their schedule for submittal as prior to end of September 2016, with requested approval by end of 2017.

There were members of the public who participated in the conference. Public Meeting Feedback forms were offered but not requested by anyone.

A list of attendees is provided as Enclosure 1.

Please direct any inquiries to me at 301-415-8371, or Mahesh.chawla@nrc.gov.

Mahesh Chawla, Project Manager Plant Licensing Branch LPL 3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331

Enclosure:

List of Attendees cc: Distribution via Listserv

LIST OF ATTENDEES JUNE 30, 2016, PRE-APPLICATION TELECONFERENCE WITH NEXTERA ENERGY DUANE ARNOLD, LLC REGARDING DUANE ARNOLD ENERGY CENTER EP STAFF AUGMENTATION RESPONSE TIMES NAME ORGANIZATION NUCLEAR REGULATORY COMMISSION Mahesh Chawla NRC/NRR/DORL/LPL3-1 1 David Wrona Michael Norris NRC/NSIR/DPR/ORLOB2 Don Johnson Richard Kinard NEXTERA ENERGY DUANE ARNOLD, LLC Michael Davis DAEC LicensinQ ManaQer Mark Fritz DAEC EP Manager Tracy Weaver Fleet EP Manager Peter Polfleit DAEC LicensinQ EnQineer Monica Ray Energy Compliance Consultants Nichole Knapp MEMBERS OF PUBLIC Barbara Brown None Gregory Richardson Engineering Planning and Management (EPM),

Inc.

1 Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing. Plant Licensing Branch 111-1 2 Office of Nuclear Security and Incident Response, Division of Preparedness and Response, Operating Reactor Licensing and Outreach Branch

Meeting Notice: ML16168A085 Meeting Summary: ML16197A176 Handouts: ML16167A025 *via email OFFICE NRR/DORL/LPL3-1 /PM NRR/DORL/LPL3-1 /LA NSIR/DPR/ORLOB/BC NAME MChawla SRohrer JAnderson (MNorris for)

DATE 07/18/16 07/18/16 07/07/16 OFFICE N RR/DORL/LPL3-1 /BC NRR/DORL/LPL3-1 /PM NAME DWrona MChawla DATE 07/19/16 07/19/16