ML16197A176: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 19, 2016 LICENSEE: | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 19, 2016 LICENSEE: NEXTERA ENERGY DUANE ARNOLD, LLC FACILITY: DUANE ARNOLD ENERGY CENTER | ||
NEXTERA ENERGY DUANE ARNOLD, LLC FACILITY: | |||
DUANE ARNOLD ENERGY CENTER | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF JUNE 30, 2016, PRE-APPLICATION TELECONFERENCE WITH NEXTERA ENERGY DUANE ARNOLD, LLC, FOR LICENSE AMENDMENT REQUEST FOR CHANGE IN DUANE ARNOLD ENERGY CENTER EMERGENCY PLAN STAFF AUGMENTATION RESPONSE TIMES (CAC NO. MF7797) On June 30, 2016, a Category 1 public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of NextEra Energy Duane Arnold, LLC at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. | OF JUNE 30, 2016, PRE-APPLICATION TELECONFERENCE WITH NEXTERA ENERGY DUANE ARNOLD, LLC, FOR LICENSE AMENDMENT REQUEST FOR CHANGE IN DUANE ARNOLD ENERGY CENTER EMERGENCY PLAN STAFF AUGMENTATION RESPONSE TIMES (CAC NO. MF7797) | ||
The purpose of the teleconference was to discuss a license amendment request (LAR) for change in Duane Arnold Energy Center (DAEC) Emergency Plan (EP) staff augmentation response times. The licensee provided slides (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16167A025) for this pre-application teleconference. | On June 30, 2016, a Category 1 public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of NextEra Energy Duane Arnold, LLC at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the teleconference was to discuss a license amendment request (LAR) for change in Duane Arnold Energy Center (DAEC) Emergency Plan (EP) staff augmentation response times. | ||
The slides were published as part of the meeting notice (ADAMS Accession No. ML16168A085), dated June 15, 2016. The licensee provided the outline of the proposed submittal to change the DAEC EP augmentation response times. It was pointed out during the meeting that not all augmentation time changes will be requested in the respective manner from 30 to 60, and from 60 to 90 minutes. The licensee will review the other similar changes to E-plans previously approved by the NRC. The NRC staff asked several clarifying questions and provided their insights into the several existing guidance documents and other aspects for consideration, prior to the submittal. | The licensee provided slides (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16167A025) for this pre-application teleconference. The slides were published as part of the meeting notice (ADAMS Accession No. ML16168A085), dated June 15, 2016. | ||
The licensee provided their schedule for submittal as prior to end of September 2016, with requested approval by end of 2017. There were members of the public who participated in the conference. | The licensee provided the outline of the proposed submittal to change the DAEC EP augmentation response times. It was pointed out during the meeting that not all augmentation time changes will be requested in the respective manner from 30 to 60, and from 60 to 90 minutes. The licensee will review the other similar changes to E-plans previously approved by the NRC. The NRC staff asked several clarifying questions and provided their insights into the several existing guidance documents and other aspects for consideration, prior to the submittal. The licensee provided their schedule for submittal as prior to end of September 2016, with requested approval by end of 2017. | ||
Public Meeting Feedback forms were offered but not requested by anyone. A list of attendees is provided as Enclosure | There were members of the public who participated in the conference. Public Meeting Feedback forms were offered but not requested by anyone. | ||
A list of attendees is provided as Enclosure 1. | |||
Docket No. 50-331 | |||
Please direct any inquiries to me at 301-415-8371, or Mahesh.chawla@nrc.gov. | |||
Mahesh Chawla, Project Manager Plant Licensing Branch LPL 3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331 | |||
==Enclosure:== | ==Enclosure:== | ||
List of Attendees cc: Distribution via Listserv | List of Attendees cc: Distribution via Listserv | ||
LIST OF ATTENDEES JUNE 30, 2016, PRE-APPLICATION TELECONFERENCE WITH NEXTERA ENERGY DUANE ARNOLD, LLC REGARDING DUANE ARNOLD ENERGY CENTER EP STAFF AUGMENTATION RESPONSE TIMES NAME ORGANIZATION NUCLEAR REGULATORY COMMISSION Mahesh Chawla NRC/NRR/DORL/LPL3-1 1 David Wrona Michael Norris NRC/NSIR/DPR/ORLOB2 Don Johnson Richard Kinard NEXTERA ENERGY DUANE ARNOLD, LLC Michael Davis DAEC LicensinQ ManaQer Mark Fritz DAEC EP Manager Tracy Weaver Fleet EP Manager Peter Polfleit DAEC LicensinQ EnQineer Monica Ray Energy Compliance Consultants Nichole Knapp MEMBERS OF PUBLIC Barbara Brown None Gregory Richardson Engineering Planning and Management (EPM), | |||
Inc. | |||
1 Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing. Plant Licensing Branch 111-1 2 Office of Nuclear Security and Incident Response, Division of Preparedness and Response, Operating Reactor Licensing and Outreach Branch | |||
Meeting Notice: ML16168A085 Meeting Summary: ML16197A176 Handouts: ML16167A025 *via email OFFICE NRR/DORL/LPL3-1 /PM NRR/DORL/LPL3-1 /LA NSIR/DPR/ORLOB/BC NAME MChawla SRohrer JAnderson (MNorris for) | |||
DATE 07/18/16 07/18/16 07/07/16 OFFICE N RR/DORL/LPL3-1 /BC NRR/DORL/LPL3-1 /PM NAME DWrona MChawla DATE 07/19/16 07/19/16}} | |||
ML16167A025 OFFICE NRR/DORL/LPL3-1 | |||
/PM | |||
/LA NSIR/DPR/ORLOB/BC SRohrer JAnderson (MNorris for) 07/18/16 07/07/16 NRR/DORL/LPL3-1 | |||
/PM MChawla 07/19/16 |
Latest revision as of 17:48, 30 October 2019
ML16197A176 | |
Person / Time | |
---|---|
Site: | Duane Arnold |
Issue date: | 07/19/2016 |
From: | Mahesh Chawla Plant Licensing Branch III |
To: | NextEra Energy Duane Arnold |
Chawla M | |
References | |
CAC MF7797 | |
Download: ML16197A176 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 19, 2016 LICENSEE: NEXTERA ENERGY DUANE ARNOLD, LLC FACILITY: DUANE ARNOLD ENERGY CENTER
SUBJECT:
SUMMARY
OF JUNE 30, 2016, PRE-APPLICATION TELECONFERENCE WITH NEXTERA ENERGY DUANE ARNOLD, LLC, FOR LICENSE AMENDMENT REQUEST FOR CHANGE IN DUANE ARNOLD ENERGY CENTER EMERGENCY PLAN STAFF AUGMENTATION RESPONSE TIMES (CAC NO. MF7797)
On June 30, 2016, a Category 1 public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of NextEra Energy Duane Arnold, LLC at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the teleconference was to discuss a license amendment request (LAR) for change in Duane Arnold Energy Center (DAEC) Emergency Plan (EP) staff augmentation response times.
The licensee provided slides (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16167A025) for this pre-application teleconference. The slides were published as part of the meeting notice (ADAMS Accession No. ML16168A085), dated June 15, 2016.
The licensee provided the outline of the proposed submittal to change the DAEC EP augmentation response times. It was pointed out during the meeting that not all augmentation time changes will be requested in the respective manner from 30 to 60, and from 60 to 90 minutes. The licensee will review the other similar changes to E-plans previously approved by the NRC. The NRC staff asked several clarifying questions and provided their insights into the several existing guidance documents and other aspects for consideration, prior to the submittal. The licensee provided their schedule for submittal as prior to end of September 2016, with requested approval by end of 2017.
There were members of the public who participated in the conference. Public Meeting Feedback forms were offered but not requested by anyone.
A list of attendees is provided as Enclosure 1.
Please direct any inquiries to me at 301-415-8371, or Mahesh.chawla@nrc.gov.
Mahesh Chawla, Project Manager Plant Licensing Branch LPL 3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331
Enclosure:
List of Attendees cc: Distribution via Listserv
LIST OF ATTENDEES JUNE 30, 2016, PRE-APPLICATION TELECONFERENCE WITH NEXTERA ENERGY DUANE ARNOLD, LLC REGARDING DUANE ARNOLD ENERGY CENTER EP STAFF AUGMENTATION RESPONSE TIMES NAME ORGANIZATION NUCLEAR REGULATORY COMMISSION Mahesh Chawla NRC/NRR/DORL/LPL3-1 1 David Wrona Michael Norris NRC/NSIR/DPR/ORLOB2 Don Johnson Richard Kinard NEXTERA ENERGY DUANE ARNOLD, LLC Michael Davis DAEC LicensinQ ManaQer Mark Fritz DAEC EP Manager Tracy Weaver Fleet EP Manager Peter Polfleit DAEC LicensinQ EnQineer Monica Ray Energy Compliance Consultants Nichole Knapp MEMBERS OF PUBLIC Barbara Brown None Gregory Richardson Engineering Planning and Management (EPM),
Inc.
1 Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing. Plant Licensing Branch 111-1 2 Office of Nuclear Security and Incident Response, Division of Preparedness and Response, Operating Reactor Licensing and Outreach Branch
Meeting Notice: ML16168A085 Meeting Summary: ML16197A176 Handouts: ML16167A025 *via email OFFICE NRR/DORL/LPL3-1 /PM NRR/DORL/LPL3-1 /LA NSIR/DPR/ORLOB/BC NAME MChawla SRohrer JAnderson (MNorris for)
DATE 07/18/16 07/18/16 07/07/16 OFFICE N RR/DORL/LPL3-1 /BC NRR/DORL/LPL3-1 /PM NAME DWrona MChawla DATE 07/19/16 07/19/16