| {{#Wiki_filter:200 Exelon Way Exelon Generation Kennett Square, PA 19348 www.exeloncorp.com 10 CFR 50.90 August 11, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 | | {{#Wiki_filter:200 Exelon Way Kennett Square, PA 19348 Exelon Generation www.exeloncorp.com 10 CFR 50.90 August 11, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Response to Request for Additional Information Regarding Proposed License Amendment concerning Diesel Generator Lube Oil Inventory (TSTF-501-A) for Peach Bottom Atomic Power Station, Units 2 and 3 | | Response to Request for Additional Information Regarding Proposed License Amendment concerning Diesel Generator Lube Oil Inventory (TSTF-501-A) for Peach Bottom Atomic Power Station, Units 2 and 3 |
|
| |
|
| ==References:== | | ==References:== |
| : 1) Letter from J. Barstow (Exelon Generation Company, LLC) to the U.S. Nuclear Regulatory Commission, .. Application to Revise Technical Specifications to Adopt TSTF-501-A, 'Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control,' Revision 1, using the Consolidated Line Item Improvement Process (ML 16173A371 ), .. dated June 20, 2016. 2) E-mail correspondence from R. Ennis (U.S. Nuclear Regulatory Commission) to S. J. Hanson (Exelon Generation Company, LLC), .. Peach Bottom Atomic Power Station -Request for Additional Information Regarding Proposed License Amendment concerning Diesel Generator Lube Oil Inventory (TSTF-501-A) (ML16221A680)," dated July 26, 2016. By application dated June 20, 2016, Exelon Generation Company, LLC (Exelon) submitted a license amendment request (LAR) for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 (Reference 1 ). The amendments would revise the Technical Specification (TS) 3.8.3, .. Diesel Fuel Oil, Lube Oil, and Starting Air, .. requirements associated with the stored inventory of lube oil for the diesel generators (DGs). Specifically, the TS inventory requirements for stored lube oil (currently specified in number of gallons) would be replaced with inventory requirements based on DG operating time (specified in number of days). The proposed changes are based on Revision 1 to Technical Specifications Task Force (TSTF) Improved Standard Technical Specifications Change Traveler TSTF-501, .. Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control .. (ADAMS Accession No. ML09051 0686). | | : 1) Letter from J. Barstow (Exelon Generation Company, LLC) to the U.S. |
| U.S. Nuclear Regulatory Commission Response to Request for Additional Information TSTF-501-A DG Lube Oil Inventory Requirements August 11, 2016 Page 2 In the Reference 2 e-mail correspondence, the U.S. Nuclear Regulatory Commission (NRC) requested additional information. Attachment 1 contains Exelon's response to the NRC request for additional information. Attachment 2 provides a copy of the marked up TS Bases pages that reflect the proposed change (information only). Attachment 2 replaces the TS Bases markups submitted in Reference 1. The TS page markups submitted in Reference 1 are not affected by this response. Exelon has reviewed the information supporting a finding of no significant hazards consideration and the environmental consideration provided to the U.S. NRC in Reference 1. The additional information provided in this response does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. Furthermore, the additional information provided in this response does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment. There are no regulatory commitments in this response. If you have any questions concerning this response, please contact Stephanie J. Hanson at 610-765-5143. I declare under penalty of perjury that the foregoing is true and correct. Executed on the 11 lh day of August 2016. Respectfully, James Barstow Director, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments: 1. Response to Draft Request for Additional Information Regarding the Proposed License Amendment Request concerning Diesel Generator Lube Oil Inventory Requirements (TSTF-501-A) for Peach Bottom Atomic Power Station, Units 2 and 3 2. Markup of Proposed Technical Specifications Bases Pages (Information Only) cc: USNRC Region I, Regional Administrator USNRC Senior Resident Inspector, PBAPS USNRC Project Manager, PBAPS R. R. Janati, Pennsylvania Bureau of Radiation Protection S. T. Gray, State of Maryland ATTACHMENT 1 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 Docket Nos. 5Q-277 and 50-278 Response to Draft Request for Additional Information Regarding the Proposed License Amendment Request concerning Diesel Generator Lube Oil Inventory Requirements (TSTF-501-A) for Peach Bottom Atomic Power Station, Units 2 and 3 Response to Request for Additional Information TSTF-501-A DG Lube Oil Inventory Requirements Docket Nos. 50-277 and 50-278 Attachment 1 Page 1 of 3 By application dated June 20, 2016, Exelon Generation Company, LLC (Exelon) submitted a license amendment request (LAR) for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The amendments would revise the Technical Specification (TS} 3.8.3, .. Diesel Fuel Oil, Lube Oil, and Starting Air, .. requirements associated with the stored inventory of lube oil for the diesel generators (DGs). Specifically, the TS inventory requirements for stored lube oil (currently specified in number of gallons) would be replaced with inventory requirements based on DG operating time (specified in number of days). The proposed changes are based on Revision 1 to Technical Specifications Task Force (TSTF} Improved Standard Technical Specifications Change Traveler TSTF-501, .. Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control .. (ADAMS Accession No. ML090510686). The NRC staff has determined that additional information is needed to complete its review. The specific requests for additional information (RAI) questions are restated below along with Exelon*s response. Question 1 (DORL-RAI-1 ): Attachment 3 to the licensee*s application dated June 20, 2016, provided marked up TS Bases pages (for information only) which would be implemented, in accordance with the TS Bases Control Program, as part of the proposed amendment. The proposed markup for the Bases for TS 3.8.3, Limiting Condition for Operation (LCO), Action B.1 is not consistent with the BWR/4 STS Bases markup included in TSTF-501, Revision 1. Specifically, the licensee did not propose any changes to the first sentence in this section. In addition, TSTF-501, Revision 1, includes changes to the TS Bases for SR 3.8.3.2. The licensee did not propose any Bases changes for PBAPS SR 3.8.3.2. The licensee's application did not identify these differences as proposed deviations to the TSTF. Please provide justifications for these deviations or provide a supplement with proposed TS Bases changes consistent with TSTF-501, Revision 1. Response: Exelon proposes to revise the TS Bases to be consistent with the BWR/4 STS Bases markup included in TSTF-501, Revision 1. For information, a copy of the revised marked up TS Bases pages that reflect the proposed change are provided in Attachment 2. Question 2 (DORL-RAI-2): The NRC's model safety evaluation for TSTF-501, Revision 1, explains the reason why licensees would want to adopt this TSTF. Specifically, the DG fuel oil numerical volume inventory requirement (in gallons) may need to be modified in order to take into account changes to the energy content (BTU/gallon) of available fuels in the market. Replacing the TS inventory requirements for stored fuel oil in gallons with inventory requirements specified in number of days of DG operating time could allow the licensee to make changes to the required number of gallons under licensee control, and therefore, may not require NRC prior approval. Since the fuel oil inventory is based on 7 -days of DG operating time, the 7 -day inventory requirement also applies to the DG lube oil supply. | | Nuclear Regulatory Commission, .. Application to Revise Technical Specifications to Adopt TSTF-501-A, 'Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control,' Revision 1, using the Consolidated Line Item Improvement Process (ML16173A371 ), .. dated June 20, 2016. |
| Response to Request for Additional Information TSTF-501-A DG Lube Oil Inventory Requirements Docket Nos. 50-277 and 50-278 Attachment 1 Page 2 of 3 As discussed in the licensee's application, Exelon is only proposing to adopt the TSTF-501 changes pertaining to lube oil (i.e., fuel oil changes are not proposed). The licensee's application indicated that the technical justifications in the NRC staff's model SE are applicable to the proposed changes to the lube oil requirements for PBAPS. However, given that the model SE focuses on the reasons for potential changes in fuel oil volume requirements, the NRC staff concludes that the model SE is not sufficient to address the reason for changing only the lube oil requirements. Since the nature of consumption of fuel oil and lube oil are different, it is not clear of the reason for the proposed amendment. Please provide additional justification for the reasons for the proposed amendment request (e.g., reasons why the number of gallons of lube oil, currently required in the TSs for the 7-day DG operating period, may change). Response: The diesel generator lubrication system is designed to provide sufficient lubrication to permit proper operation of its associated diesel generator under all loading conditions. The system is required to circulate the lube oil to the diesel engine working surfaces and to remove excess heat generated by friction during operation. Each diesel generator has a lube oil inventory capable of supporting a minimum of 7 days of operation. The stored inventory ensures 7 days of operation with manual replenishment as needed. In order to meet a 7-day supply of stored lube oil for each diesel generator, TS 3.8.3, 11Diesel Fuel Oil, Lube Oil, and Starting Air,11 currently contains numerical volume requirements associated with a 7-day supply for each diesel generator. PBAPS TS Bases currently discuss that the numerical volume requirements are based on meeting a 7-day supply. The proposed change revises TS 3.8.3 by relocating the current stored diesel lube oil numerical volume requirements from the TS to the TS Bases so that it may be modified under licensee control. The TS are modified so that the stored diesel lube oil inventory will require that a 7 -day supply be available for each diesel generator. Additionally, NRC Information Notice 96-67, 11Vulnerability of Emergency Diesel Generators to Fuel Oil/Lubricating Oil Incompatibility, II noted that the reduced amount of sulfur in Ultra Low Sulfur Diesel (ULSD) will result in more unreacted additive in the lubricating oil. This may result in the formation of deposits when some of the oil is burned, which may affect the volume of lube oil required to support 7-day operation. Relocating the specific volume of lube oil equivalent to a 7-day supply to licensee control will allow licensees to adjust the required volume without submitting a license amendment request to the NRC. No changes to the current plant configuration, current numerical volume requirements, or current 7-day basis are proposed in the application; PBAPS proposes to relocate the current numerical volume requirements from the TS to the TS Bases and relocate the associated current 7 -day basis from the TS Bases to the TS. Currently, Condition B is entered when the stored diesel lube oil numerical volume requirements are not met. As discussed in the current TS Bases, the numerical volume requirements in Condition B are based on volumes less than a 7 -day supply, but greater than a 6-day supply. The proposed amendment will relocate the volumetric requirements from the TS and place them in the TS Bases. The TS are modified so that Condition B is entered when the stored diesel lube oil inventory is less than a 7-day supply, but greater than a 6-day supply for one or more diesel generators. | | : 2) E-mail correspondence from R. Ennis (U.S. Nuclear Regulatory Commission) to S. J. Hanson (Exelon Generation Company, LLC), |
| Response to Request for Additional Information TSTF*501-A DG Lube Oil Inventory Requirements Docket Nos. 50-277 and 50-278 Attachment 1 Page 3 of 3 No other parts of Condition B (i.e., Required Actions or Completion Times) are proposed to be modified in the application; PBAPS proposes to relocate the current numerical volume requirements that dictate Condition entry from the TS to the TS Bases and relocate the associated current less than 7 -day but greater than 6-day basis for Condition entry from the TS Bases to the TS. No other parts of the SRs (i.e., Frequencies) are proposed to be modified in the application; PBAPS proposes to relocate the current numerical volume requirement verification from the TS to the TS Bases and relocate the associated current 7-day basis for verification from the TS Bases to the TS. The lube oil inventory equivalent to a ?*day supply, as well as the 6-day supply associated with Condition B, is based on the diesel generator manufacturer's consumption values for the run time of the diesel generator. The above method still provides assurance that the necessary quality of systems and components are maintained, that facility operation will be within safety limits, and that the LCOs will be met. Therefore, the proposed change to SR 3.8.3.2 is acceptable. | | .. Peach Bottom Atomic Power Station - Request for Additional Information Regarding Proposed License Amendment concerning Diesel Generator Lube Oil Inventory (TSTF-501-A) (ML16221A680)," |
| ATIACHMENT2 Markup of Technical Specifications Bases Pages (For Information Only) Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 Docket Nos. 50-2n and 50-278 Response to Draft Request for Additional Information Regarding the Proposed License Amendment Request concerning Diesel Generator Lube Oil Inventory Requirements (TSTF-501-A) for Peach Bottom Atomic Power Station, Units 2 and 3 Unit 2 TS Bases Pages B 3.8-51 B 3.8-53 Unit 3 TS Bases Pages B 3.8-51 B 3.8-53 BASES ACTIONS (continued) Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 With fuel oil level < 33,000 gal in a storage tank (which includes margin for the unusable volume of oil), the 7 day fuel oil supply for a DG is not available. However, the Condition is restricted to fuel oil level reductions that maintain at least a 6 day supply (with fuel oil transfer between storage tanks). These circumstances may be caused by events such as: a. Full load operation required for an inadvertent start while at minimum required level; or b. Feed and bleed operations that may be necessitated by increasing particulate levels or any number of other oil quality degradations. This restriction allows sufficient time for obtaining the requisite replacement volume and performing the analyses required prior to addition of the fuel oil to the tank. A period of 48 hours is considered sufficient to complete restoration of the required level prior to declaring the DG inoperable. This period is acceptable based on the remaining capacity (> 6 days), the fact that procedures will be initiated to obtain replenishment, and the low probability of an event during this brief period. In this condition, the 7 day inventory < 350 gal, sufficient lube oil to The lube oil inventory equivalent to a 6 day supply is 300 gallons. PBAPS UNIT 2 support 7 day of continuous DG operation at full load not ee available. However, the Condition is restricted to lube oil volume reductions that maintain at least a 6 day su This restriction allows sufficient o aining requisite replacement volume. A period of 48 hours is considered sufficient to complete restoration of the required volume prior to declaring the DG inoperable. This period is acceptable based on the remaining capacity (> 6 days), the low rate of usage, the fact that procedures will be initiated to obtain replenishment, and the low probability of an event during this brief period. (continued) B 3.8-51 Revision No. 114 BASES ACTIONS SURVEILLANCE REQUIREMENTS The lube oil inventory equivalent to a 7 day supply is 350 gallons and is based on PBAPS UNIT 2 .L1 (continued) Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 the air receiver pressure is restored to the required limit. A period of 48 hours is considered sufficient to complete restoration to the required pressure prior to declaring the DG inoperable. This period is acceptable based on the remaining air start capacity, the fact that most DG starts are accomplished on the first attempt, and the low probability of an event during this brief period. With a Required Action and associated Completion Time of Condition A, B, C, D, or E not met, or the stored diesel fuel oil , 1 ube oil , or starting air subsystem not within limits for reasons other than addressed by Conditions A through E, the associated DG may be incapable of performing its intended function and must be immediately declared inoperable. SR 3.8.3.1 This SR provides verification that there is an adequate useable inventory of fuel oil in the storage tanks to support each DG's operation of all four DGs for 7 days at the worst case post accident time-dependent load profile. The 7 day period is sufficient time to place both Unit 2 and Unit 3 in a safe shutdown condition and to bring in replenishment fuel from an offsite location. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program. SR 3.8.3.2 This Surveillance ensures that sufficient lubricating oil inventory (combined inventory in the DG lube oil sump, lube oil storage tank, and in a seismically qualified structure) is available to support at least 7 days of full load operation for each DG. 350 §alloA exceeds the DG rna cturer's consumption values for the run time of the , inventory of lube oil required by Technical Specifi tions shall be stored in a location which is seismic Class I and is protected against other natural phenomena. Implicit in this SR is the requirement to verify the B 3.8-53 Revision No. 122 BASES ACTIONS (continued) Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 With fuel oil level < 33,000 gal in a storage tank (which includes margin for the unusable volume of oil), the 7 day fuel oil supply for a DG is not available. However, the Condition is restricted to fuel oil level reductions that maintain at least a 6 day supply (with fuel oil transfer between storage tanks). These circumstances may be caused by events such as: a. Full load operation required for an inadvertent start while at minimum required level; or b. Feed and bleed operations that may be necessitated by increasing particulate levels or any number of other oil quality degradations. This restriction allows sufficient time for obtaining the requisite replacement volume and performing the analyses required prior to addition of the fuel oil to the tank. A period of 48 hours is considered sufficient to complete restoration of the required level prior to declaring the DG inoperable. This period is acceptable based on the remaining capacity (> 6 days), the fact that procedures will be initiated to obtain replenishment, and the low probability of an event during this brief period. ,...l_n_t_h.-ls_c_o_n_d-it-io_n_, 1 u oi 1 inventory sufficient 1 ube oi 1 to the7day support days of continuous DG operation at full load The lube oil inventory equivalent to a 6 day supply is 300 gallons. PBAPS UNIT 3 condition ffitt1 not fre available. However, the Condition is restricted to lube oil volume reductions that maintain at least a 6 day suppl This restriction allows sufficient time for obt * | | dated July 26, 2016. |
| * g the requisite replacement volume. A perio hours is considered sufficient to complete storation of the required volume prior to declaring the DG inoperable. This period is acceptable based on the remaining capacity (> 6 days), the low rate of usage, the fact that procedures will be initiated to obtain replenishment, and the low probability of an event during this brief period. (continued) B 3.8-51 Revision No. 119 BASES ACTIONS SURVEILLANCE REQUIREMENTS The lube oil inventory equivalent to a 7 day supply is 350 gallons and is based on PBAPS UNIT 3 .Ll (continued) Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 the air receiver pressure is restored to the required limit. A period of 48 hours is considered sufficient to complete restoration to the required pressure prior to declaring the DG inoperable. This period is acceptable based on the remaining air start capacity, the fact that most DG starts are accomplished on the first attempt, and the low probability of an event during this brief period. With a Required Action and associated Completion Time of Condition A, B, C, D, or E not met, or the stored diesel fuel oil, lube oil, or starting air subsystem not within limits for reasons other than addressed by Conditions A through E, the associated DG may be incapable of performing its intended function and must be immediately declared inoperable. SR 3.8.3.1 This SR provides verification that there is an adequate useable inventory of fuel oil in the storage tanks to support each DGis operation of all four DGs for 7 days at the worst case post accident time-dependent load profile. The 7 day period is sufficient time to place both Unit 2 and Unit 3 in a safe shutdown condition and to bring in replenishment fuel from an offsite location. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program. SR 3.8.3.2 This Surveillance ensures that sufficient lubricating oil inventory (combined inventory in the DG lube oil sump, lube oil storage tank, and in a seismically qualified structure) is available to support at least 7 days of full load operation for each D 350 §alloA requireffieAt exceeds the DG acturerls consumption values for the run time of the , tfie entire inventory of lube oil required by Technical Spe 'fications shall be stored in a location which is seismic Class I and is protected against other natural pheonomena. Impl *cit in this SR is the requirement to verify the B 3.8-53 Revision No. 124}} | | By application dated June 20, 2016, Exelon Generation Company, LLC (Exelon) submitted a license amendment request (LAR) for Peach Bottom Atomic Power Station (PBAPS), |
| | Units 2 and 3 (Reference 1). The amendments would revise the Technical Specification (TS) 3.8.3, .. Diesel Fuel Oil, Lube Oil, and Starting Air, .. requirements associated with the stored inventory of lube oil for the diesel generators (DGs). Specifically, the TS inventory requirements for stored lube oil (currently specified in number of gallons) would be replaced with inventory requirements based on DG operating time (specified in number of days). The proposed changes are based on Revision 1 to Technical Specifications Task Force (TSTF) Improved Standard Technical Specifications Change Traveler TSTF-501, |
| | .. Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control .. (ADAMS Accession No. ML090510686). |
| | |
| | U.S. Nuclear Regulatory Commission Response to Request for Additional Information TSTF-501-A DG Lube Oil Inventory Requirements August 11, 2016 Page 2 In the Reference 2 e-mail correspondence, the U.S. Nuclear Regulatory Commission (NRC) requested additional information. Attachment 1 contains Exelon's response to the NRC request for additional information. Attachment 2 provides a copy of the marked up TS Bases pages that reflect the proposed change (information only). Attachment 2 replaces the TS Bases markups submitted in Reference 1. The TS page markups submitted in Reference 1 are not affected by this response. |
| | Exelon has reviewed the information supporting a finding of no significant hazards consideration and the environmental consideration provided to the U.S. NRC in Reference |
| | : 1. The additional information provided in this response does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. Furthermore, the additional information provided in this response does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment. |
| | There are no regulatory commitments in this response. |
| | If you have any questions concerning this response, please contact Stephanie J. Hanson at 610-765-5143. |
| | I declare under penalty of perjury that the foregoing is true and correct. Executed on the 11 lh day of August 2016. |
| | Respectfully, |
| | ~~~ |
| | James Barstow Director, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments: |
| | : 1. Response to Draft Request for Additional Information Regarding the Proposed License Amendment Request concerning Diesel Generator Lube Oil Inventory Requirements (TSTF-501-A) for Peach Bottom Atomic Power Station, Units 2 and 3 |
| | : 2. Markup of Proposed Technical Specifications Bases Pages (Information Only) cc: USNRC Region I, Regional Administrator USNRC Senior Resident Inspector, PBAPS USNRC Project Manager, PBAPS R. R. Janati, Pennsylvania Bureau of Radiation Protection S. T. Gray, State of Maryland |
| | |
| | ATTACHMENT 1 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 Docket Nos. 5Q-277 and 50-278 Response to Draft Request for Additional Information Regarding the Proposed License Amendment Request concerning Diesel Generator Lube Oil Inventory Requirements (TSTF-501-A) for Peach Bottom Atomic Power Station, Units 2 and 3 |
| | |
| | Response to Request for Additional Information Attachment 1 TSTF-501-A DG Lube Oil Inventory Requirements Page 1 of 3 Docket Nos. 50-277 and 50-278 By application dated June 20, 2016, Exelon Generation Company, LLC (Exelon) submitted a license amendment request (LAR) for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The amendments would revise the Technical Specification (TS} 3.8.3, .. Diesel Fuel Oil, Lube Oil, and Starting Air, .. requirements associated with the stored inventory of lube oil for the diesel generators (DGs). Specifically, the TS inventory requirements for stored lube oil (currently specified in number of gallons) would be replaced with inventory requirements based on DG operating time (specified in number of days). The proposed changes are based on Revision 1 to Technical Specifications Task Force (TSTF} Improved Standard Technical Specifications Change Traveler TSTF-501, .. Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control .. (ADAMS Accession No. ML090510686). |
| | The NRC staff has determined that additional information is needed to complete its review. The specific requests for additional information (RAI) questions are restated below along with Exelon*s response. |
| | Question 1 (DORL-RAI-1 ): |
| | Attachment 3 to the licensee*s application dated June 20, 2016, provided marked up TS Bases pages (for information only) which would be implemented, in accordance with the TS Bases Control Program, as part of the proposed amendment. The proposed markup for the Bases for TS 3.8.3, Limiting Condition for Operation (LCO), Action B.1 is not consistent with the BWR/4 STS Bases markup included in TSTF-501, Revision 1. Specifically, the licensee did not propose any changes to the first sentence in this section. In addition, TSTF-501, Revision 1, includes changes to the TS Bases for SR 3.8.3.2. The licensee did not propose any Bases changes for PBAPS SR 3.8.3.2. The licensee's application did not identify these differences as proposed deviations to the TSTF. Please provide justifications for these deviations or provide a supplement with proposed TS Bases changes consistent with TSTF-501, Revision 1. |
| | |
| | ===Response=== |
| | Exelon proposes to revise the TS Bases to be consistent with the BWR/4 STS Bases markup included in TSTF-501, Revision 1. |
| | For information, a copy of the revised marked up TS Bases pages that reflect the proposed change are provided in Attachment 2. |
| | Question 2 (DORL-RAI-2): |
| | The NRC's model safety evaluation for TSTF-501, Revision 1, explains the reason why licensees would want to adopt this TSTF. Specifically, the DG fuel oil numerical volume inventory requirement (in gallons) may need to be modified in order to take into account changes to the energy content (BTU/gallon) of available fuels in the market. Replacing the TS inventory requirements for stored fuel oil in gallons with inventory requirements specified in number of days of DG operating time could allow the licensee to make changes to the required number of gallons under licensee control, and therefore, may not require NRC prior approval. |
| | Since the fuel oil inventory is based on 7-days of DG operating time, the 7-day inventory requirement also applies to the DG lube oil supply. |
| | |
| | Response to Request for Additional Information Attachment 1 TSTF-501-A DG Lube Oil Inventory Requirements Page 2 of 3 Docket Nos. 50-277 and 50-278 As discussed in the licensee's application, Exelon is only proposing to adopt the TSTF-501 changes pertaining to lube oil (i.e., fuel oil changes are not proposed). The licensee's application indicated that the technical justifications in the NRC staff's model SE are applicable to the proposed changes to the lube oil requirements for PBAPS. However, given that the model SE focuses on the reasons for potential changes in fuel oil volume requirements, the NRC staff concludes that the model SE is not sufficient to address the reason for changing only the lube oil requirements. Since the nature of consumption of fuel oil and lube oil are different, it is not clear of the reason for the proposed amendment. Please provide additional justification for the reasons for the proposed amendment request (e.g., reasons why the number of gallons of lube oil, currently required in the TSs for the 7-day DG operating period, may change). |
| | |
| | ===Response=== |
| | The diesel generator lubrication system is designed to provide sufficient lubrication to permit proper operation of its associated diesel generator under all loading conditions. The system is required to circulate the lube oil to the diesel engine working surfaces and to remove excess heat generated by friction during operation. Each diesel generator has a lube oil inventory capable of supporting a minimum of 7 days of operation. The stored inventory ensures 7 days of operation with manual replenishment as needed. |
| | In order to meet a 7-day supply of stored lube oil for each diesel generator, TS 3.8.3, 11 Diesel Fuel Oil, Lube Oil, and Starting Air, 11 currently contains numerical volume requirements associated with a 7-day supply for each diesel generator. PBAPS TS Bases currently discuss that the numerical volume requirements are based on meeting a 7-day supply. The proposed change revises TS 3.8.3 by relocating the current stored diesel lube oil numerical volume requirements from the TS to the TS Bases so that it may be modified under licensee control. |
| | The TS are modified so that the stored diesel lube oil inventory will require that a 7-day supply be available for each diesel generator. Additionally, NRC Information Notice 96-67, 11 Vulnerability of Emergency Diesel Generators to Fuel Oil/Lubricating Oil Incompatibility, II noted that the reduced amount of sulfur in Ultra Low Sulfur Diesel (ULSD) will result in more unreacted additive in the lubricating oil. This may result in the formation of deposits when some of the oil is burned, which may affect the volume of lube oil required to support 7-day operation. |
| | Relocating the specific volume of lube oil equivalent to a 7-day supply to licensee control will allow licensees to adjust the required volume without submitting a license amendment request to the NRC. No changes to the current plant configuration, current numerical volume requirements, or current 7-day basis are proposed in the application; PBAPS proposes to relocate the current numerical volume requirements from the TS to the TS Bases and relocate the associated current 7-day basis from the TS Bases to the TS. |
| | Currently, Condition B is entered when the stored diesel lube oil numerical volume requirements are not met. As discussed in the current TS Bases, the numerical volume requirements in Condition B are based on volumes less than a 7 -day supply, but greater than a 6-day supply. |
| | The proposed amendment will relocate the volumetric requirements from the TS and place them in the TS Bases. The TS are modified so that Condition B is entered when the stored diesel lube oil inventory is less than a 7-day supply, but greater than a 6-day supply for one or more diesel generators. |
| | |
| | Response to Request for Additional Information Attachment 1 TSTF*501-A DG Lube Oil Inventory Requirements Page 3 of 3 Docket Nos. 50-277 and 50-278 No other parts of Condition B (i.e., Required Actions or Completion Times) are proposed to be modified in the application; PBAPS proposes to relocate the current numerical volume requirements that dictate Condition entry from the TS to the TS Bases and relocate the associated current less than 7 -day but greater than 6-day basis for Condition entry from the TS Bases to the TS. |
| | No other parts of the SRs (i.e., Frequencies) are proposed to be modified in the application; PBAPS proposes to relocate the current numerical volume requirement verification from the TS to the TS Bases and relocate the associated current 7-day basis for verification from the TS Bases to the TS. |
| | The lube oil inventory equivalent to a ?*day supply, as well as the 6-day supply associated with Condition B, is based on the diesel generator manufacturer's consumption values for the run time of the diesel generator. |
| | The above method still provides assurance that the necessary quality of systems and components are maintained, that facility operation will be within safety limits, and that the LCOs will be met. Therefore, the proposed change to SR 3.8.3.2 is acceptable. |
| | |
| | ATIACHMENT2 Markup of Technical Specifications Bases Pages (For Information Only) |
| | Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 Docket Nos. 50-2n and 50-278 Response to Draft Request for Additional Information Regarding the Proposed License Amendment Request concerning Diesel Generator Lube Oil Inventory Requirements (TSTF-501-A) for Peach Bottom Atomic Power Station, Units 2 and 3 Unit 2 TS Bases Pages B 3.8-51 B 3.8-53 Unit 3 TS Bases Pages B 3.8-51 B 3.8-53 |
| | |
| | Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 BASES ACTIONS (continued) |
| | With fuel oil level < 33,000 gal in a storage tank (which includes margin for the unusable volume of oil), the 7 day fuel oil supply for a DG is not available. However, the Condition is restricted to fuel oil level reductions that maintain at least a 6 day supply (with fuel oil transfer between storage tanks). These circumstances may be caused by events such as: |
| | : a. Full load operation required for an inadvertent start while at minimum required level; or |
| | : b. Feed and bleed operations that may be necessitated by increasing particulate levels or any number of other oil quality degradations. |
| | This restriction allows sufficient time for obtaining the requisite replacement volume and performing the analyses required prior to addition of the fuel oil to the tank. A period of 48 hours is considered sufficient to complete restoration of the required level prior to declaring the DG inoperable. This period is acceptable based on the remaining capacity (> 6 days), the fact that procedures will be initiated to obtain replenishment, and the low probability of an event during this brief period. |
| | In this condition, |
| | ~u |
| | ~-/~ ~ |
| | ~ |
| | inventory < 350 gal , sufficient lube oil to the 7 day support 7 day of continuous DG operation at full load conditions ~ not ee available. However, the Condition is restricted to lube oil volume reductions that maintain at least a 6 day su This restriction allows sufficient o aining requisite replacement volume. A period of 48 hours is considered sufficient to complete restoration of the required volume prior to declaring the DG The lube oil inoperable. This period is acceptable based on the inventory remaining capacity (> 6 days), the low rate of usage, the equivalent to a 6 fact that procedures will be initiated to obtain replenishment, and the low probability of an event during day supply is 300 this brief period. |
| | gallons. |
| | (continued) |
| | PBAPS UNIT 2 B 3.8-51 Revision No. 114 |
| | |
| | Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 BASES ACTIONS .L1 (continued) the air receiver pressure is restored to the required limit. |
| | A period of 48 hours is considered sufficient to complete restoration to the required pressure prior to declaring the DG inoperable. This period is acceptable based on the remaining air start capacity, the fact that most DG starts are accomplished on the first attempt, and the low probability of an event during this brief period. |
| | With a Required Action and associated Completion Time of Condition A, B, C, D, or E not met, or the stored diesel fuel oil , 1 ube oil , or starting air subsystem not within limits for reasons other than addressed by Conditions A through E, the associated DG may be incapable of performing its intended function and must be immediately declared inoperable. |
| | SURVEILLANCE SR 3.8.3.1 REQUIREMENTS This SR provides verification that there is an adequate useable inventory of fuel oil in the storage tanks to support each DG's operation of all four DGs for 7 days at the worst case post accident time-dependent load profile. |
| | The 7 day period is sufficient time to place both Unit 2 and Unit 3 in a safe shutdown condition and to bring in replenishment fuel from an offsite location. |
| | The Surveillance Frequency is controlled under the Surveillance Frequency Control Program. |
| | SR 3.8.3.2 This Surveillance ensures that sufficient lubricating oil inventory (combined inventory in the DG lube oil sump, lube oil storage tank, and in a seismically qualified structure) is available to support at least 7 days of full load operation for each DG. Alt~o~§~ t~c 350 §alloA rcq~ircfficAt exceeds the DG rna cturer's consumption values for the run time of the The lube oil , ~ entire inventory of lube oil required by Technical Specifi tions shall be stored in a location which is seismic inventory equivalent Class I and is protected against other natural phenomena. |
| | to a 7 day supply is Implicit in this SR is the requirement to verify the 350 gallons and is based on PBAPS UNIT 2 B 3.8-53 Revision No. 122 |
| | |
| | Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 BASES ACTIONS (continued) |
| | With fuel oil level < 33,000 gal in a storage tank (which includes margin for the unusable volume of oil), the 7 day fuel oil supply for a DG is not available. However, the Condition is restricted to fuel oil level reductions that maintain at least a 6 day supply (with fuel oil transfer between storage tanks). These circumstances may be caused by events such as: |
| | : a. Full load operation required for an inadvertent start while at minimum required level; or |
| | : b. Feed and bleed operations that may be necessitated by increasing particulate levels or any number of other oil quality degradations. |
| | This restriction allows sufficient time for obtaining the requisite replacement volume and performing the analyses required prior to addition of the fuel oil to the tank. A period of 48 hours is considered suffic i ent to complete restoration of the required level prior to declaring the DG inoperable. This period is acceptable based on the remaining capacity (> 6 days), the fact that procedures will be initiated to obtain replenishment, and the low probability of an event during this brief period. |
| | ,...l_n_t_h.-ls_c_o_n_d-it-io_n_, |
| | the7day |
| | -.~----7~ ~ 1u support oi 1 inventory ~ sufficient 1 ube oi 1 to days of continuous DG operation at full load condition ffitt1 not fre available. However, the Condition is restricted to lube oil volume reductions that maintain at least a 6 day suppl This restriction allows sufficient The lube oil time for obt * |
| | * g the requisite replacement volume. A inventory perio ~8 hours is considered sufficient to complete equivalent to a 6 storation of the required volume prior to declaring the DG inoperable. This period is acceptable based on the day supply is 300 remaining capacity (> 6 days), the low rate of usage, the gallons. fact that procedures will be initiated to obtain replenishment, and the low probability of an event during this brief period. |
| | (continued) |
| | PBAPS UNIT 3 B 3.8-51 Revision No. 119 |
| | |
| | Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 BASES ACTIONS .Ll (continued) the air receiver pressure is restored to the required limit. |
| | A period of 48 hours is considered sufficient to complete restoration to the required pressure prior to declaring the DG inoperable. This period is acceptable based on the remaining air start capacity, the fact that most DG starts are accomplished on the first attempt, and the low probability of an event during this brief period. |
| | With a Required Action and associated Completion Time of Condition A, B, C, D, or E not met, or the stored diesel fuel oil, lube oil, or starting air subsystem not within limits for reasons other than addressed by Conditions A through E, the associated DG may be incapable of performing its intended function and must be immediately declared inoperable. |
| | SURVEILLANCE SR 3.8.3.1 REQUIREMENTS This SR provides verification that there is an adequate useable inventory of fuel oil in the storage tanks to support each DGis operation of all four DGs for 7 days at the worst case post accident time-dependent load profile. |
| | The 7 day period is sufficient time to place both Unit 2 and Unit 3 in a safe shutdown condition and to bring in replenishment fuel from an offsite location. |
| | The Surveillance Frequency is controlled under the Surveillance Frequency Control Program. |
| | SR 3.8.3.2 This Surveillance ensures that sufficient lubricating oil inventory (combined inventory in the DG lube oil sump, lube oil storage tank, and in a seismically qualified structure) is available to support at least 7 days of full load operation for each D A l t~ou§~ t~e 350 §alloA requireffieAt exceeds the DG acturerls consumption values for the run time of the The lube oil , tfie entire inventory of lube oil required by Technical inventory equivalent Spe 'fications shall be stored in a location which is seismic Class I and is protected against other natural pheonomena. |
| | to a 7 day supply is Impl *cit in this SR is the requirement to verify the 350 gallons and is based on PBAPS UNIT 3 B 3.8-53 Revision No. 124}} |
Letter Sequence Response to RAI |
---|
CAC:MF8010, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (Approved, Closed) |
|
MONTHYEARML16175A3732016-06-23023 June 2016 Acceptance Review - Peach Bottom 2 & 3 - Emergency Diesel Generator Lube Oil Requirements (CACs MF8010 & MF8011) Project stage: Acceptance Review ML16221A6802016-08-0808 August 2016 Draft Request for Additional Information Project stage: Draft RAI ML16224A3422016-08-11011 August 2016 Response to Request for Additional Information Regarding Proposed License Amendment Concerning Diesel Generator Lube Oil Inventory (TSTF-501-A) for Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Response to RAI ML16235A4052016-10-14014 October 2016 Issuance of Amendments Diesel Generator Lube Oil Inventory Requirements Project stage: Approval 2016-06-23
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000277/20244012024-10-17017 October 2024 Security Baseline Inspection Report 05000277/2024401 and 05000278/2024401 (Cover Letter Only) RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 05000277/LER-2024-003, (Pbaps), Unit 2, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 (Pbaps), Unit 2, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24227A5492024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval ML24099A0012024-04-0808 April 2024 (PBAPS) Units 2 and 3, Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. 05000277/LER-2024-001, Submittal of LER 2024-001-00 for Peach Bottom Atomic Power Station (PBAPS) Unit 2, Automatic Reactor Scram Due to an Invalid Generator Lockout2024-03-21021 March 2024 Submittal of LER 2024-001-00 for Peach Bottom Atomic Power Station (PBAPS) Unit 2, Automatic Reactor Scram Due to an Invalid Generator Lockout IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) 2024-09-06
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations CCN:23-09, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML22312A3642022-11-0808 November 2022 Response to NRC Inspection Report and Preliminary White Finding ML22145A0852022-05-25025 May 2022 Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P NMP1L3447, Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2022-02-0202 February 2022 Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0032, Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2021-04-20020 April 2021 Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting ML21035A0332021-02-0404 February 2021 Response to Request for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative ML21029A1662021-01-29029 January 2021 Response to Request for Additional Information - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative RS-20-112, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-5682020-09-0303 September 2020 Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-568 ML20224A5302020-08-11011 August 2020 Response to the Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for Wolf Creek Operating Corporation Independent Spent Fuel Storage Installation ML20188A2642020-07-0606 July 2020 Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information ML19276F2812019-10-0303 October 2019 Supplemental Response to Request for Additional Information (RAl-1) License Amendment Request to Revise Technical Specifications 3.8.4, DC Sources-Operating ML19241A4652019-08-29029 August 2019 Response to Request for Additional Information (RAl-1) License Amendment Request to Revise Technical Specifications 3.8.4, DC Sources-Operating ML19225B9762019-08-13013 August 2019 Response to NRC Request for Clarification of Information, Dated August 1, 2019 Related to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application ML19206A0562019-07-24024 July 2019 Stations, Units 2 and 3 - Response to Request for Additional Information - License Amendment Request to Revise Technical Specifications 3.8.1, Required Action A.3, for Temporary One-Time Extension of Completion Time ML19163A2232019-06-12012 June 2019 Revised Response to NRC Request for Additional Information, Core Shroud Support Fatigue Analysis Reevaluation, Related to the Subsequent License Renewal Application ML19157A0092019-06-0606 June 2019 Response to NRC Request for Additional Information, Dated May 15, 2019 Related to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application JAFP-19-0057, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-06-0404 June 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 ML19150A2972019-05-30030 May 2019 Revised Responses to NRC Requests for Additional Information, Fire Water System, Related to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application ML19122A2892019-05-0202 May 2019 Response to NRC Requests for Additional Information, Set 1, Dated April 10, 2019 Related to Plant Subsequent License Renewal Application NMP1L3279, Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants2019-05-0101 May 2019 Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants ML19085A3852019-03-26026 March 2019 Response to Second Request for Additional Information - License Amendment Request to Reduce High Pressure Service Water System Design Pressure and Revise Technical Specifications ... ML19065A0082019-03-0505 March 2019 Response to Nrg Audit Review Information Request - Application for Subsequent Renewed Operating Licenses Section 4.6 Primary Containment Fatigue Analyses ML19046A1292019-02-15015 February 2019 Response to RAI - License Amendment Request to Reduce High Pressure Service Water System Design Pressure and Revise Technical Specifications 3.6.2.3, 3.6.2.4, 3.6.2.5, and 3.7.1 for Temporary Extension of Completion Times ML19028A2802019-01-28028 January 2019 Response to NRC Request for Additional Information, Dated December 13, 2018, Regarding Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Severe Accident Mitigation Alternatives Requests for Additional Information JAFP-19-0006, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-01-0808 January 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 ML19007A3262019-01-0707 January 2019 Response to Request Dated December 7, 2018 for Docketing of Additional Documents to Support Nrc'S Environmental Review of the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application ML18354B0612018-12-20020 December 2018 Response to NRC Request for Additional Information, Dated November 23, 2018, Regarding the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application, Environmental Requests for Additional Information ML18340A1852018-12-0606 December 2018 Response to Request for Additional Information License Amendment Request - Revise Technical Specifications to Allow Two Safety Relief Valves/Safety Valves to Be Out-of-Service with Increased Reactor Pressure Safety Limit RS-18-143, Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing Requirements2018-11-29029 November 2018 Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing Requirements ML18337A2402018-11-28028 November 2018 Response to Request for Additional Information - Relief Requests Associated with the Fifth Inservice Inspection Interval ML18305B2702018-11-0101 November 2018 Response to Request for Additional Information - License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements ML18257A0172018-09-14014 September 2018 Response to Request for Additional Information Application to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite Update to ... ML18222A3872018-08-10010 August 2018 Response to Request for Additional Information and Supplemental Information - Application to Adopt 1 O CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components ... ML18128A0092018-05-0707 May 2018 Response to Request for Additional Information Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Plants. RS-18-061, Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2018-05-0202 May 2018 Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) ML17354A3812017-12-20020 December 2017 Supplemental Response Concerning License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 RS-17-149, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.2017-12-15015 December 2017 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The. ML17241A1942017-08-29029 August 2017 License Amendment Request - Revise Technical Specifications Section 3.4.3 (Srvs/Svs) for the Remainder of the Current Operating Cycle for Unit 2 - Supplement 1 Response to Request for Additional Information ML17223A6262017-08-11011 August 2017 Response to Request for Additional Information Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 ML17220A2142017-08-0808 August 2017 Measurement Uncertainty Recapture License Amendment Request - Supplement 3 Response to Request for Additional Information ML17195A2852017-07-13013 July 2017 Measurement Uncertainty Recapture License Amendment Request - Supplement 2 Response to Request for Additional Information RS-17-044, Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-03-13013 March 2017 Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML16224A3422016-08-11011 August 2016 Response to Request for Additional Information Regarding Proposed License Amendment Concerning Diesel Generator Lube Oil Inventory (TSTF-501-A) for Peach Bottom Atomic Power Station, Units 2 and 3 2024-08-09
[Table view] Category:Technical Specification
MONTHYEARML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23103A3302023-04-13013 April 2023 Submittal of Changes to Technical Specifications Bases JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls ML19158A3122019-06-0707 June 2019 License Amendment Request to Revise Technical Specifications 3.8.4, DC Sources - Operating ML19141A1012019-05-21021 May 2019 Summary of Exelon'S Proposal for Implementation of TSTF-500-Technical Specification Changes ML18213A2712018-08-0101 August 2018 Application to Revise Technical Specifications to Adopt TSTF-500, Revision 2, DC Electrical Rewrite Update to TSTF-360, - Supplement 1, Revision of Implementation Dates. ML18172A2832018-06-21021 June 2018 Emergency License Amendment Request - One-Time Change Suspending Emergency Diesel Generator Surveillance Test Completion Requirements ML17030A3022017-01-30030 January 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 ML16224A3422016-08-11011 August 2016 Response to Request for Additional Information Regarding Proposed License Amendment Concerning Diesel Generator Lube Oil Inventory (TSTF-501-A) for Peach Bottom Atomic Power Station, Units 2 and 3 ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. ML15357A2502015-12-23023 December 2015 Application to Revise Technical Specifications to Adopt TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities, Revision 0, Using the Consolidated Line Item Improvement Process ML15349A8002015-12-15015 December 2015 License Amendment Request to Reduce Steam Dome Pressure Specified in the Reactor Core Safety Limits ML15337A4132015-12-0303 December 2015 License Amendment Request to Revise Surveillance Requirement 3.8.1.6 Involving EDG Fuel Oil Transfer ML15299A0842015-10-26026 October 2015 PBAPS MELLLA License Amendment Request - Supplement 7 Revision Regarding Proposed Technical Specifications ML15224B5722015-08-12012 August 2015 Submits Supplement to License Amendment Request Proposed Changes to the Technical Specifications to Address Administrative Control of Secondary Containment Access Openings ML15222B1712015-08-10010 August 2015 License Amendment Request to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML15133A5002015-04-14014 April 2015 Technical Specifications Bases ML15133A5032015-04-14014 April 2015 Technical Specifications Bases ML15082A2552015-03-23023 March 2015 Response to Request for Additional Information Regarding Proposed License Amendment to Revise Technical Specifications to Adopt TSTF-523 ML15041A3512015-02-0909 February 2015 Response to Request for Additional Information Revise Technical Specifications to Eliminate Main Steam Line Radiation Monitor Trip and Isolation Function ML14211A0192014-07-25025 July 2014 License Amendment Request Revise Technical Specifications Definition for Recently Irradiated Fuel ML14171A4092014-06-20020 June 2014 Extended Power Uprate License Amendment Request - Supplement 28 Supplemental Information ML14128A1322014-04-10010 April 2014 License No. DPR-56, Technical Specifications Bases, Page Revision Listing ML14128A1312014-04-10010 April 2014 License No. DPR-44, Technical Specifications Bases, Page Revision Listing ML13121A3792013-04-10010 April 2013 Technical Specifications Bases ML13121A3782013-04-10010 April 2013 Technical Specifications Bases ML12124A0922012-04-12012 April 2012 PBAPS Unit 3 - License No. DPR-56 Technical Specifications Bases ML12124A0912012-04-12012 April 2012 PBAPS Unit 2 - License No. DPR-44 Technical Specifications Bases ML1115401222011-06-0202 June 2011 License Amendment Request - Reactivity Anomalies Surveillance ML11126A3102011-04-15015 April 2011 Unit Unit 3 Technical Specifications Bases, Page B 3.3-66, Through Page B 3.10-36 ML11126A3092011-04-15015 April 2011 Technical Specifications Bases, Cover Page Through Unit 3 Technical Specifications Bases, Page B 3.3-65 ML1109700672011-04-0606 April 2011 License Amendment Request to Revise Operability Requirements and Actions for RCS Leakage Instrumentation ML1025004972010-04-22022 April 2010 Changes to Technical Specifications Bases ML1025004952010-04-22022 April 2010 Changes to Technical Specifications Bases ML1008407522010-03-24024 March 2010 Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. ML0924400532009-08-28028 August 2009 License Amendment Request - Type a Test Extension ML0922200452009-07-30030 July 2009 License Amendment Request for Adoption of TSTF-478-A, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Using the Consolidated Line Item Improvement Process ML0912806092009-04-17017 April 2009 Changes to Technical Specifications Bases, Including Changes Through 04/08/2009 ML0912806082009-04-17017 April 2009 Changes to Technical Specifications Bases, Including Changes Through 04/08/2009 ML0824908352008-09-0505 September 2008 Amendment 273 Application of Alternative Source Term Methodology ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses ML0819704612008-07-14014 July 2008 AST Response - Reconciliation of Technical Specifications Page Changes RA-08-047, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item I2008-06-0909 June 2008 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item Im ML0813503632008-04-28028 April 2008 Changes to Technical Specifications Bases ML0813503662008-04-28028 April 2008 Changes to Technical Specifications Bases ML0735400492007-12-19019 December 2007 Letter to C. Pardee Correction of Administrative Error in Amendment - the Consistency of TSs to Exelon Generation Company Quality Assurance TR (Tac. MD3937 Thru MD3940 and MD3943 Thru MD3948). - Rplacement Pages 2024-04-15
[Table view] Category:Bases Change
MONTHYEARML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML23103A3302023-04-13013 April 2023 Submittal of Changes to Technical Specifications Bases JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML19158A3122019-06-0707 June 2019 License Amendment Request to Revise Technical Specifications 3.8.4, DC Sources - Operating ML19141A1012019-05-21021 May 2019 Summary of Exelon'S Proposal for Implementation of TSTF-500-Technical Specification Changes ML18213A2712018-08-0101 August 2018 Application to Revise Technical Specifications to Adopt TSTF-500, Revision 2, DC Electrical Rewrite Update to TSTF-360, - Supplement 1, Revision of Implementation Dates. ML17030A3022017-01-30030 January 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 ML16224A3422016-08-11011 August 2016 Response to Request for Additional Information Regarding Proposed License Amendment Concerning Diesel Generator Lube Oil Inventory (TSTF-501-A) for Peach Bottom Atomic Power Station, Units 2 and 3 ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. ML15357A2502015-12-23023 December 2015 Application to Revise Technical Specifications to Adopt TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities, Revision 0, Using the Consolidated Line Item Improvement Process ML15349A8002015-12-15015 December 2015 License Amendment Request to Reduce Steam Dome Pressure Specified in the Reactor Core Safety Limits ML15337A4132015-12-0303 December 2015 License Amendment Request to Revise Surveillance Requirement 3.8.1.6 Involving EDG Fuel Oil Transfer ML15299A0842015-10-26026 October 2015 PBAPS MELLLA License Amendment Request - Supplement 7 Revision Regarding Proposed Technical Specifications ML15133A5002015-04-14014 April 2015 Technical Specifications Bases ML15133A5032015-04-14014 April 2015 Technical Specifications Bases ML14211A0192014-07-25025 July 2014 License Amendment Request Revise Technical Specifications Definition for Recently Irradiated Fuel ML14171A4092014-06-20020 June 2014 Extended Power Uprate License Amendment Request - Supplement 28 Supplemental Information ML14128A1322014-04-10010 April 2014 License No. DPR-56, Technical Specifications Bases, Page Revision Listing ML14128A1312014-04-10010 April 2014 License No. DPR-44, Technical Specifications Bases, Page Revision Listing ML13121A3792013-04-10010 April 2013 Technical Specifications Bases ML13121A3782013-04-10010 April 2013 Technical Specifications Bases ML12124A0922012-04-12012 April 2012 PBAPS Unit 3 - License No. DPR-56 Technical Specifications Bases ML12124A0912012-04-12012 April 2012 PBAPS Unit 2 - License No. DPR-44 Technical Specifications Bases ML1115401222011-06-0202 June 2011 License Amendment Request - Reactivity Anomalies Surveillance ML11126A3102011-04-15015 April 2011 Unit Unit 3 Technical Specifications Bases, Page B 3.3-66, Through Page B 3.10-36 ML11126A3092011-04-15015 April 2011 Technical Specifications Bases, Cover Page Through Unit 3 Technical Specifications Bases, Page B 3.3-65 ML1109700672011-04-0606 April 2011 License Amendment Request to Revise Operability Requirements and Actions for RCS Leakage Instrumentation ML1025004952010-04-22022 April 2010 Changes to Technical Specifications Bases ML1025004972010-04-22022 April 2010 Changes to Technical Specifications Bases ML0912806082009-04-17017 April 2009 Changes to Technical Specifications Bases, Including Changes Through 04/08/2009 ML0912806092009-04-17017 April 2009 Changes to Technical Specifications Bases, Including Changes Through 04/08/2009 ML0813503662008-04-28028 April 2008 Changes to Technical Specifications Bases ML0813503632008-04-28028 April 2008 Changes to Technical Specifications Bases RS-07-044, Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program2007-08-0808 August 2007 Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program ML0713602242007-04-27027 April 2007 Technical Specifications Bases - License No DPR-44 ML0713602352007-04-27027 April 2007 Technical Specifications Bases - License No. DPR-56 RS-07-020, Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-04-12012 April 2007 Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0612804782006-04-24024 April 2006 PBAPS Unit 3 - Technical Specifications Bases Page Revision Listing ML0612805382006-04-24024 April 2006 PBAPS Unit 2 - Technical Specifications Bases Page Revision Listing ML0514004382005-05-0202 May 2005 Improved Technical Specifications (Unit 3 Bases) ML0514004362005-05-0202 May 2005 Improved Technical Specifications (Unit 2 Bases) ML0504000832005-01-21021 January 2005 Supplement to the Request for License Amendments Related to Application of Alternative Source Term, Dated July 14, 2003 ML0413800892004-04-30030 April 2004 Submittal of Changes to Technical Specifications Gases ML0211902302002-04-19019 April 2002 Part H - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 ML0211901742002-04-19019 April 2002 Part G - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 ML0211901312002-04-19019 April 2002 Part F - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 ML0211901172002-04-19019 April 2002 Part E - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 ML0211901072002-04-19019 April 2002 Part D - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 ML0211900622002-04-19019 April 2002 Part C - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 ML0211900242002-04-19019 April 2002 Part B - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 2024-04-15
[Table view] |
Text
200 Exelon Way Kennett Square, PA 19348 Exelon Generation www.exeloncorp.com 10 CFR 50.90 August 11, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278
Subject:
Response to Request for Additional Information Regarding Proposed License Amendment concerning Diesel Generator Lube Oil Inventory (TSTF-501-A) for Peach Bottom Atomic Power Station, Units 2 and 3
References:
- 1) Letter from J. Barstow (Exelon Generation Company, LLC) to the U.S.
Nuclear Regulatory Commission, .. Application to Revise Technical Specifications to Adopt TSTF-501-A, 'Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control,' Revision 1, using the Consolidated Line Item Improvement Process (ML16173A371 ), .. dated June 20, 2016.
- 2) E-mail correspondence from R. Ennis (U.S. Nuclear Regulatory Commission) to S. J. Hanson (Exelon Generation Company, LLC),
.. Peach Bottom Atomic Power Station - Request for Additional Information Regarding Proposed License Amendment concerning Diesel Generator Lube Oil Inventory (TSTF-501-A) (ML16221A680),"
dated July 26, 2016.
By application dated June 20, 2016, Exelon Generation Company, LLC (Exelon) submitted a license amendment request (LAR) for Peach Bottom Atomic Power Station (PBAPS),
Units 2 and 3 (Reference 1). The amendments would revise the Technical Specification (TS) 3.8.3, .. Diesel Fuel Oil, Lube Oil, and Starting Air, .. requirements associated with the stored inventory of lube oil for the diesel generators (DGs). Specifically, the TS inventory requirements for stored lube oil (currently specified in number of gallons) would be replaced with inventory requirements based on DG operating time (specified in number of days). The proposed changes are based on Revision 1 to Technical Specifications Task Force (TSTF) Improved Standard Technical Specifications Change Traveler TSTF-501,
.. Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control .. (ADAMS Accession No. ML090510686).
U.S. Nuclear Regulatory Commission Response to Request for Additional Information TSTF-501-A DG Lube Oil Inventory Requirements August 11, 2016 Page 2 In the Reference 2 e-mail correspondence, the U.S. Nuclear Regulatory Commission (NRC) requested additional information. Attachment 1 contains Exelon's response to the NRC request for additional information. Attachment 2 provides a copy of the marked up TS Bases pages that reflect the proposed change (information only). Attachment 2 replaces the TS Bases markups submitted in Reference 1. The TS page markups submitted in Reference 1 are not affected by this response.
Exelon has reviewed the information supporting a finding of no significant hazards consideration and the environmental consideration provided to the U.S. NRC in Reference
- 1. The additional information provided in this response does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. Furthermore, the additional information provided in this response does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
There are no regulatory commitments in this response.
If you have any questions concerning this response, please contact Stephanie J. Hanson at 610-765-5143.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 11 lh day of August 2016.
Respectfully,
~~~
James Barstow Director, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments:
- 1. Response to Draft Request for Additional Information Regarding the Proposed License Amendment Request concerning Diesel Generator Lube Oil Inventory Requirements (TSTF-501-A) for Peach Bottom Atomic Power Station, Units 2 and 3
- 2. Markup of Proposed Technical Specifications Bases Pages (Information Only) cc: USNRC Region I, Regional Administrator USNRC Senior Resident Inspector, PBAPS USNRC Project Manager, PBAPS R. R. Janati, Pennsylvania Bureau of Radiation Protection S. T. Gray, State of Maryland
ATTACHMENT 1 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 Docket Nos. 5Q-277 and 50-278 Response to Draft Request for Additional Information Regarding the Proposed License Amendment Request concerning Diesel Generator Lube Oil Inventory Requirements (TSTF-501-A) for Peach Bottom Atomic Power Station, Units 2 and 3
Response to Request for Additional Information Attachment 1 TSTF-501-A DG Lube Oil Inventory Requirements Page 1 of 3 Docket Nos. 50-277 and 50-278 By application dated June 20, 2016, Exelon Generation Company, LLC (Exelon) submitted a license amendment request (LAR) for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The amendments would revise the Technical Specification (TS} 3.8.3, .. Diesel Fuel Oil, Lube Oil, and Starting Air, .. requirements associated with the stored inventory of lube oil for the diesel generators (DGs). Specifically, the TS inventory requirements for stored lube oil (currently specified in number of gallons) would be replaced with inventory requirements based on DG operating time (specified in number of days). The proposed changes are based on Revision 1 to Technical Specifications Task Force (TSTF} Improved Standard Technical Specifications Change Traveler TSTF-501, .. Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control .. (ADAMS Accession No. ML090510686).
The NRC staff has determined that additional information is needed to complete its review. The specific requests for additional information (RAI) questions are restated below along with Exelon*s response.
Question 1 (DORL-RAI-1 ):
Attachment 3 to the licensee*s application dated June 20, 2016, provided marked up TS Bases pages (for information only) which would be implemented, in accordance with the TS Bases Control Program, as part of the proposed amendment. The proposed markup for the Bases for TS 3.8.3, Limiting Condition for Operation (LCO), Action B.1 is not consistent with the BWR/4 STS Bases markup included in TSTF-501, Revision 1. Specifically, the licensee did not propose any changes to the first sentence in this section. In addition, TSTF-501, Revision 1, includes changes to the TS Bases for SR 3.8.3.2. The licensee did not propose any Bases changes for PBAPS SR 3.8.3.2. The licensee's application did not identify these differences as proposed deviations to the TSTF. Please provide justifications for these deviations or provide a supplement with proposed TS Bases changes consistent with TSTF-501, Revision 1.
Response
Exelon proposes to revise the TS Bases to be consistent with the BWR/4 STS Bases markup included in TSTF-501, Revision 1.
For information, a copy of the revised marked up TS Bases pages that reflect the proposed change are provided in Attachment 2.
Question 2 (DORL-RAI-2):
The NRC's model safety evaluation for TSTF-501, Revision 1, explains the reason why licensees would want to adopt this TSTF. Specifically, the DG fuel oil numerical volume inventory requirement (in gallons) may need to be modified in order to take into account changes to the energy content (BTU/gallon) of available fuels in the market. Replacing the TS inventory requirements for stored fuel oil in gallons with inventory requirements specified in number of days of DG operating time could allow the licensee to make changes to the required number of gallons under licensee control, and therefore, may not require NRC prior approval.
Since the fuel oil inventory is based on 7-days of DG operating time, the 7-day inventory requirement also applies to the DG lube oil supply.
Response to Request for Additional Information Attachment 1 TSTF-501-A DG Lube Oil Inventory Requirements Page 2 of 3 Docket Nos. 50-277 and 50-278 As discussed in the licensee's application, Exelon is only proposing to adopt the TSTF-501 changes pertaining to lube oil (i.e., fuel oil changes are not proposed). The licensee's application indicated that the technical justifications in the NRC staff's model SE are applicable to the proposed changes to the lube oil requirements for PBAPS. However, given that the model SE focuses on the reasons for potential changes in fuel oil volume requirements, the NRC staff concludes that the model SE is not sufficient to address the reason for changing only the lube oil requirements. Since the nature of consumption of fuel oil and lube oil are different, it is not clear of the reason for the proposed amendment. Please provide additional justification for the reasons for the proposed amendment request (e.g., reasons why the number of gallons of lube oil, currently required in the TSs for the 7-day DG operating period, may change).
Response
The diesel generator lubrication system is designed to provide sufficient lubrication to permit proper operation of its associated diesel generator under all loading conditions. The system is required to circulate the lube oil to the diesel engine working surfaces and to remove excess heat generated by friction during operation. Each diesel generator has a lube oil inventory capable of supporting a minimum of 7 days of operation. The stored inventory ensures 7 days of operation with manual replenishment as needed.
In order to meet a 7-day supply of stored lube oil for each diesel generator, TS 3.8.3, 11 Diesel Fuel Oil, Lube Oil, and Starting Air, 11 currently contains numerical volume requirements associated with a 7-day supply for each diesel generator. PBAPS TS Bases currently discuss that the numerical volume requirements are based on meeting a 7-day supply. The proposed change revises TS 3.8.3 by relocating the current stored diesel lube oil numerical volume requirements from the TS to the TS Bases so that it may be modified under licensee control.
The TS are modified so that the stored diesel lube oil inventory will require that a 7-day supply be available for each diesel generator. Additionally, NRC Information Notice 96-67, 11 Vulnerability of Emergency Diesel Generators to Fuel Oil/Lubricating Oil Incompatibility, II noted that the reduced amount of sulfur in Ultra Low Sulfur Diesel (ULSD) will result in more unreacted additive in the lubricating oil. This may result in the formation of deposits when some of the oil is burned, which may affect the volume of lube oil required to support 7-day operation.
Relocating the specific volume of lube oil equivalent to a 7-day supply to licensee control will allow licensees to adjust the required volume without submitting a license amendment request to the NRC. No changes to the current plant configuration, current numerical volume requirements, or current 7-day basis are proposed in the application; PBAPS proposes to relocate the current numerical volume requirements from the TS to the TS Bases and relocate the associated current 7-day basis from the TS Bases to the TS.
Currently, Condition B is entered when the stored diesel lube oil numerical volume requirements are not met. As discussed in the current TS Bases, the numerical volume requirements in Condition B are based on volumes less than a 7 -day supply, but greater than a 6-day supply.
The proposed amendment will relocate the volumetric requirements from the TS and place them in the TS Bases. The TS are modified so that Condition B is entered when the stored diesel lube oil inventory is less than a 7-day supply, but greater than a 6-day supply for one or more diesel generators.
Response to Request for Additional Information Attachment 1 TSTF*501-A DG Lube Oil Inventory Requirements Page 3 of 3 Docket Nos. 50-277 and 50-278 No other parts of Condition B (i.e., Required Actions or Completion Times) are proposed to be modified in the application; PBAPS proposes to relocate the current numerical volume requirements that dictate Condition entry from the TS to the TS Bases and relocate the associated current less than 7 -day but greater than 6-day basis for Condition entry from the TS Bases to the TS.
No other parts of the SRs (i.e., Frequencies) are proposed to be modified in the application; PBAPS proposes to relocate the current numerical volume requirement verification from the TS to the TS Bases and relocate the associated current 7-day basis for verification from the TS Bases to the TS.
The lube oil inventory equivalent to a ?*day supply, as well as the 6-day supply associated with Condition B, is based on the diesel generator manufacturer's consumption values for the run time of the diesel generator.
The above method still provides assurance that the necessary quality of systems and components are maintained, that facility operation will be within safety limits, and that the LCOs will be met. Therefore, the proposed change to SR 3.8.3.2 is acceptable.
ATIACHMENT2 Markup of Technical Specifications Bases Pages (For Information Only)
Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 Docket Nos. 50-2n and 50-278 Response to Draft Request for Additional Information Regarding the Proposed License Amendment Request concerning Diesel Generator Lube Oil Inventory Requirements (TSTF-501-A) for Peach Bottom Atomic Power Station, Units 2 and 3 Unit 2 TS Bases Pages B 3.8-51 B 3.8-53 Unit 3 TS Bases Pages B 3.8-51 B 3.8-53
Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 BASES ACTIONS (continued)
With fuel oil level < 33,000 gal in a storage tank (which includes margin for the unusable volume of oil), the 7 day fuel oil supply for a DG is not available. However, the Condition is restricted to fuel oil level reductions that maintain at least a 6 day supply (with fuel oil transfer between storage tanks). These circumstances may be caused by events such as:
- a. Full load operation required for an inadvertent start while at minimum required level; or
- b. Feed and bleed operations that may be necessitated by increasing particulate levels or any number of other oil quality degradations.
This restriction allows sufficient time for obtaining the requisite replacement volume and performing the analyses required prior to addition of the fuel oil to the tank. A period of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> is considered sufficient to complete restoration of the required level prior to declaring the DG inoperable. This period is acceptable based on the remaining capacity (> 6 days), the fact that procedures will be initiated to obtain replenishment, and the low probability of an event during this brief period.
In this condition,
~u
~-/~ ~
~
inventory < 350 gal , sufficient lube oil to the 7 day support 7 day of continuous DG operation at full load conditions ~ not ee available. However, the Condition is restricted to lube oil volume reductions that maintain at least a 6 day su This restriction allows sufficient o aining requisite replacement volume. A period of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> is considered sufficient to complete restoration of the required volume prior to declaring the DG The lube oil inoperable. This period is acceptable based on the inventory remaining capacity (> 6 days), the low rate of usage, the equivalent to a 6 fact that procedures will be initiated to obtain replenishment, and the low probability of an event during day supply is 300 this brief period.
gallons.
(continued)
PBAPS UNIT 2 B 3.8-51 Revision No. 114
Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 BASES ACTIONS .L1 (continued) the air receiver pressure is restored to the required limit.
A period of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> is considered sufficient to complete restoration to the required pressure prior to declaring the DG inoperable. This period is acceptable based on the remaining air start capacity, the fact that most DG starts are accomplished on the first attempt, and the low probability of an event during this brief period.
With a Required Action and associated Completion Time of Condition A, B, C, D, or E not met, or the stored diesel fuel oil , 1 ube oil , or starting air subsystem not within limits for reasons other than addressed by Conditions A through E, the associated DG may be incapable of performing its intended function and must be immediately declared inoperable.
SURVEILLANCE SR 3.8.3.1 REQUIREMENTS This SR provides verification that there is an adequate useable inventory of fuel oil in the storage tanks to support each DG's operation of all four DGs for 7 days at the worst case post accident time-dependent load profile.
The 7 day period is sufficient time to place both Unit 2 and Unit 3 in a safe shutdown condition and to bring in replenishment fuel from an offsite location.
The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.
SR 3.8.3.2 This Surveillance ensures that sufficient lubricating oil inventory (combined inventory in the DG lube oil sump, lube oil storage tank, and in a seismically qualified structure) is available to support at least 7 days of full load operation for each DG. Alt~o~§~ t~c 350 §alloA rcq~ircfficAt exceeds the DG rna cturer's consumption values for the run time of the The lube oil , ~ entire inventory of lube oil required by Technical Specifi tions shall be stored in a location which is seismic inventory equivalent Class I and is protected against other natural phenomena.
to a 7 day supply is Implicit in this SR is the requirement to verify the 350 gallons and is based on PBAPS UNIT 2 B 3.8-53 Revision No. 122
Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 BASES ACTIONS (continued)
With fuel oil level < 33,000 gal in a storage tank (which includes margin for the unusable volume of oil), the 7 day fuel oil supply for a DG is not available. However, the Condition is restricted to fuel oil level reductions that maintain at least a 6 day supply (with fuel oil transfer between storage tanks). These circumstances may be caused by events such as:
- a. Full load operation required for an inadvertent start while at minimum required level; or
- b. Feed and bleed operations that may be necessitated by increasing particulate levels or any number of other oil quality degradations.
This restriction allows sufficient time for obtaining the requisite replacement volume and performing the analyses required prior to addition of the fuel oil to the tank. A period of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> is considered suffic i ent to complete restoration of the required level prior to declaring the DG inoperable. This period is acceptable based on the remaining capacity (> 6 days), the fact that procedures will be initiated to obtain replenishment, and the low probability of an event during this brief period.
,...l_n_t_h.-ls_c_o_n_d-it-io_n_,
the7day
-.~----7~ ~ 1u support oi 1 inventory ~ sufficient 1 ube oi 1 to days of continuous DG operation at full load condition ffitt1 not fre available. However, the Condition is restricted to lube oil volume reductions that maintain at least a 6 day suppl This restriction allows sufficient The lube oil time for obt *
- g the requisite replacement volume. A inventory perio ~8 hours is considered sufficient to complete equivalent to a 6 storation of the required volume prior to declaring the DG inoperable. This period is acceptable based on the day supply is 300 remaining capacity (> 6 days), the low rate of usage, the gallons. fact that procedures will be initiated to obtain replenishment, and the low probability of an event during this brief period.
(continued)
PBAPS UNIT 3 B 3.8-51 Revision No. 119
Diesel Fuel Oil, Lube Oil, and Starting Air B 3.8.3 BASES ACTIONS .Ll (continued) the air receiver pressure is restored to the required limit.
A period of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> is considered sufficient to complete restoration to the required pressure prior to declaring the DG inoperable. This period is acceptable based on the remaining air start capacity, the fact that most DG starts are accomplished on the first attempt, and the low probability of an event during this brief period.
With a Required Action and associated Completion Time of Condition A, B, C, D, or E not met, or the stored diesel fuel oil, lube oil, or starting air subsystem not within limits for reasons other than addressed by Conditions A through E, the associated DG may be incapable of performing its intended function and must be immediately declared inoperable.
SURVEILLANCE SR 3.8.3.1 REQUIREMENTS This SR provides verification that there is an adequate useable inventory of fuel oil in the storage tanks to support each DGis operation of all four DGs for 7 days at the worst case post accident time-dependent load profile.
The 7 day period is sufficient time to place both Unit 2 and Unit 3 in a safe shutdown condition and to bring in replenishment fuel from an offsite location.
The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.
SR 3.8.3.2 This Surveillance ensures that sufficient lubricating oil inventory (combined inventory in the DG lube oil sump, lube oil storage tank, and in a seismically qualified structure) is available to support at least 7 days of full load operation for each D A l t~ou§~ t~e 350 §alloA requireffieAt exceeds the DG acturerls consumption values for the run time of the The lube oil , tfie entire inventory of lube oil required by Technical inventory equivalent Spe 'fications shall be stored in a location which is seismic Class I and is protected against other natural pheonomena.
to a 7 day supply is Impl *cit in this SR is the requirement to verify the 350 gallons and is based on PBAPS UNIT 3 B 3.8-53 Revision No. 124