Person / Time | |
---|---|
Site: | Peach Bottom |
Issue date: | 04/13/2023 |
From: | David Helker Constellation Energy Generation |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
References | |
Download: ML23103A330 (1) | |
Similar Documents at Peach Bottom | |
---|---|
Category:Letter
MONTHYEARIR 05000277/20240032024-11-0404 November 2024
[Table view]Integrated Inspection Report 05000277/2024003 and 05000278/2024003 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 IR 05000277/20240022024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval 05000277/LER-2024-002, Uncoordinated DC Circuits Cause Unanalyzed Condition2024-04-0808 April 2024 Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24060A1192024-02-29029 February 2024 Notification of Conduct of a Fire Protection Team Inspection 2024-09-06 Category:Technical Specification MONTHYEARML24107A2462024-04-15015 April 2024
[Table view]Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23103A3302023-04-13013 April 2023 Submittal of Changes to Technical Specifications Bases JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls ML19158A3122019-06-0707 June 2019 License Amendment Request to Revise Technical Specifications 3.8.4, DC Sources - Operating ML19141A1012019-05-21021 May 2019 Summary of Exelon'S Proposal for Implementation of TSTF-500-Technical Specification Changes ML18213A2712018-08-0101 August 2018 Application to Revise Technical Specifications to Adopt TSTF-500, Revision 2, DC Electrical Rewrite Update to TSTF-360, - Supplement 1, Revision of Implementation Dates. ML18172A2832018-06-21021 June 2018 Emergency License Amendment Request - One-Time Change Suspending Emergency Diesel Generator Surveillance Test Completion Requirements ML17030A3022017-01-30030 January 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 ML16224A3422016-08-11011 August 2016 Response to Request for Additional Information Regarding Proposed License Amendment Concerning Diesel Generator Lube Oil Inventory (TSTF-501-A) for Peach Bottom Atomic Power Station, Units 2 and 3 ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. ML15357A2502015-12-23023 December 2015 Application to Revise Technical Specifications to Adopt TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities, Revision 0, Using the Consolidated Line Item Improvement Process ML15349A8002015-12-15015 December 2015 License Amendment Request to Reduce Steam Dome Pressure Specified in the Reactor Core Safety Limits ML15337A4132015-12-0303 December 2015 License Amendment Request to Revise Surveillance Requirement 3.8.1.6 Involving EDG Fuel Oil Transfer ML15299A0842015-10-26026 October 2015 PBAPS MELLLA License Amendment Request - Supplement 7 Revision Regarding Proposed Technical Specifications ML15224B5722015-08-12012 August 2015 Submits Supplement to License Amendment Request Proposed Changes to the Technical Specifications to Address Administrative Control of Secondary Containment Access Openings ML15222B1712015-08-10010 August 2015 License Amendment Request to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML15133A5002015-04-14014 April 2015 Technical Specifications Bases ML15133A5032015-04-14014 April 2015 Technical Specifications Bases ML15082A2552015-03-23023 March 2015 Response to Request for Additional Information Regarding Proposed License Amendment to Revise Technical Specifications to Adopt TSTF-523 ML15041A3512015-02-0909 February 2015 Response to Request for Additional Information Revise Technical Specifications to Eliminate Main Steam Line Radiation Monitor Trip and Isolation Function ML14211A0192014-07-25025 July 2014 License Amendment Request Revise Technical Specifications Definition for Recently Irradiated Fuel ML14171A4092014-06-20020 June 2014 Extended Power Uprate License Amendment Request - Supplement 28 Supplemental Information ML14128A1322014-04-10010 April 2014 License No. DPR-56, Technical Specifications Bases, Page Revision Listing ML14128A1312014-04-10010 April 2014 License No. DPR-44, Technical Specifications Bases, Page Revision Listing ML13121A3792013-04-10010 April 2013 Technical Specifications Bases ML13121A3782013-04-10010 April 2013 Technical Specifications Bases ML12124A0922012-04-12012 April 2012 PBAPS Unit 3 - License No. DPR-56 Technical Specifications Bases ML12124A0912012-04-12012 April 2012 PBAPS Unit 2 - License No. DPR-44 Technical Specifications Bases ML1115401222011-06-0202 June 2011 License Amendment Request - Reactivity Anomalies Surveillance ML11126A3102011-04-15015 April 2011 Unit Unit 3 Technical Specifications Bases, Page B 3.3-66, Through Page B 3.10-36 ML11126A3092011-04-15015 April 2011 Technical Specifications Bases, Cover Page Through Unit 3 Technical Specifications Bases, Page B 3.3-65 ML1109700672011-04-0606 April 2011 License Amendment Request to Revise Operability Requirements and Actions for RCS Leakage Instrumentation ML1025004972010-04-22022 April 2010 Changes to Technical Specifications Bases ML1025004952010-04-22022 April 2010 Changes to Technical Specifications Bases ML1008407522010-03-24024 March 2010 Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. ML0924400532009-08-28028 August 2009 License Amendment Request - Type a Test Extension ML0922200452009-07-30030 July 2009 License Amendment Request for Adoption of TSTF-478-A, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Using the Consolidated Line Item Improvement Process ML0912806092009-04-17017 April 2009 Changes to Technical Specifications Bases, Including Changes Through 04/08/2009 ML0912806082009-04-17017 April 2009 Changes to Technical Specifications Bases, Including Changes Through 04/08/2009 ML0824908352008-09-0505 September 2008 Amendment 273 Application of Alternative Source Term Methodology ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses ML0819704612008-07-14014 July 2008 AST Response - Reconciliation of Technical Specifications Page Changes RA-08-047, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item I2008-06-0909 June 2008 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item Im ML0813503632008-04-28028 April 2008 Changes to Technical Specifications Bases ML0813503662008-04-28028 April 2008 Changes to Technical Specifications Bases ML0735400492007-12-19019 December 2007 Letter to C. Pardee Correction of Administrative Error in Amendment - the Consistency of TSs to Exelon Generation Company Quality Assurance TR (Tac. MD3937 Thru MD3940 and MD3943 Thru MD3948). - Rplacement Pages 2024-04-15 Category:Bases Change MONTHYEARML24107A2462024-04-15015 April 2024
[Table view]Submittal of Changes to Technical Specifications Bases ML23103A3302023-04-13013 April 2023 Submittal of Changes to Technical Specifications Bases JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML19158A3122019-06-0707 June 2019 License Amendment Request to Revise Technical Specifications 3.8.4, DC Sources - Operating ML19141A1012019-05-21021 May 2019 Summary of Exelon'S Proposal for Implementation of TSTF-500-Technical Specification Changes ML18213A2712018-08-0101 August 2018 Application to Revise Technical Specifications to Adopt TSTF-500, Revision 2, DC Electrical Rewrite Update to TSTF-360, - Supplement 1, Revision of Implementation Dates. ML17030A3022017-01-30030 January 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 ML16224A3422016-08-11011 August 2016 Response to Request for Additional Information Regarding Proposed License Amendment Concerning Diesel Generator Lube Oil Inventory (TSTF-501-A) for Peach Bottom Atomic Power Station, Units 2 and 3 ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. ML15357A2502015-12-23023 December 2015 Application to Revise Technical Specifications to Adopt TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities, Revision 0, Using the Consolidated Line Item Improvement Process ML15349A8002015-12-15015 December 2015 License Amendment Request to Reduce Steam Dome Pressure Specified in the Reactor Core Safety Limits ML15337A4132015-12-0303 December 2015 License Amendment Request to Revise Surveillance Requirement 3.8.1.6 Involving EDG Fuel Oil Transfer ML15299A0842015-10-26026 October 2015 PBAPS MELLLA License Amendment Request - Supplement 7 Revision Regarding Proposed Technical Specifications ML15133A5002015-04-14014 April 2015 Technical Specifications Bases ML15133A5032015-04-14014 April 2015 Technical Specifications Bases ML14211A0192014-07-25025 July 2014 License Amendment Request Revise Technical Specifications Definition for Recently Irradiated Fuel ML14171A4092014-06-20020 June 2014 Extended Power Uprate License Amendment Request - Supplement 28 Supplemental Information ML14128A1322014-04-10010 April 2014 License No. DPR-56, Technical Specifications Bases, Page Revision Listing ML14128A1312014-04-10010 April 2014 License No. DPR-44, Technical Specifications Bases, Page Revision Listing ML13121A3792013-04-10010 April 2013 Technical Specifications Bases ML13121A3782013-04-10010 April 2013 Technical Specifications Bases ML12124A0922012-04-12012 April 2012 PBAPS Unit 3 - License No. DPR-56 Technical Specifications Bases ML12124A0912012-04-12012 April 2012 PBAPS Unit 2 - License No. DPR-44 Technical Specifications Bases ML1115401222011-06-0202 June 2011 License Amendment Request - Reactivity Anomalies Surveillance ML11126A3102011-04-15015 April 2011 Unit Unit 3 Technical Specifications Bases, Page B 3.3-66, Through Page B 3.10-36 ML11126A3092011-04-15015 April 2011 Technical Specifications Bases, Cover Page Through Unit 3 Technical Specifications Bases, Page B 3.3-65 ML1109700672011-04-0606 April 2011 License Amendment Request to Revise Operability Requirements and Actions for RCS Leakage Instrumentation ML1025004952010-04-22022 April 2010 Changes to Technical Specifications Bases ML1025004972010-04-22022 April 2010 Changes to Technical Specifications Bases ML0912806082009-04-17017 April 2009 Changes to Technical Specifications Bases, Including Changes Through 04/08/2009 ML0912806092009-04-17017 April 2009 Changes to Technical Specifications Bases, Including Changes Through 04/08/2009 ML0813503662008-04-28028 April 2008 Changes to Technical Specifications Bases ML0813503632008-04-28028 April 2008 Changes to Technical Specifications Bases RS-07-044, Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program2007-08-0808 August 2007 Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program ML0713602242007-04-27027 April 2007 Technical Specifications Bases - License No DPR-44 ML0713602352007-04-27027 April 2007 Technical Specifications Bases - License No. DPR-56 RS-07-020, Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-04-12012 April 2007 Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0612804782006-04-24024 April 2006 PBAPS Unit 3 - Technical Specifications Bases Page Revision Listing ML0612805382006-04-24024 April 2006 PBAPS Unit 2 - Technical Specifications Bases Page Revision Listing ML0514004382005-05-0202 May 2005 Improved Technical Specifications (Unit 3 Bases) ML0514004362005-05-0202 May 2005 Improved Technical Specifications (Unit 2 Bases) ML0504000832005-01-21021 January 2005 Supplement to the Request for License Amendments Related to Application of Alternative Source Term, Dated July 14, 2003 ML0413800892004-04-30030 April 2004 Submittal of Changes to Technical Specifications Gases ML0211902302002-04-19019 April 2002 Part H - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 ML0211901742002-04-19019 April 2002 Part G - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 ML0211901312002-04-19019 April 2002 Part F - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 ML0211901172002-04-19019 April 2002 Part E - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 ML0211901072002-04-19019 April 2002 Part D - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 ML0211900622002-04-19019 April 2002 Part C - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 ML0211900242002-04-19019 April 2002 Part B - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 2024-04-15 |