CCN:23-09, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information

From kanterella
Jump to navigation Jump to search
Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information
ML23317A108
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/10/2023
From: David Helker
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
CCN:23-093
Download: ML23317A108 (1)


Text

200 Exelon Way Kennett Square, PA 19348 www.constellation.com 10 CFR 73.5 CCN: 23-093 November 10, 2023 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Peach Bottom Atomic Power Station, Units 2 and 3 Subsequent Renewed Facility Operating Licensee Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278

Subject:

Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information

References:

1. Letter from D. Gudger (Constellation Energy Generation, LLC) to U.S.

Nuclear Regulatory Commission, "Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation," dated October 16, 2023 (ML23289A121)

2. Email from Scott Wall (NRC Senior Project Manager) to Ron Reynolds (Constellation Energy Generation, LLC), "Final RCI - Constellation Energy Generation, LLC - Peach Bottom 2 & 3 - Exemption from Security Rule,"

dated October 30, 2023 (ML23304A018)

By letter dated October 16, 2023 (Reference 1), Constellation Energy Generation, LLC (CEG) requested an exemption for Peach Bottom Atomic Power Station (Peach Bottom), Units 2 and 3, from the compliance date of January 8, 2024, for the new security Rule, "Enhanced Weapons, Firearms Background Checks, and Security Event Notifications." The requested exemption was based on the NRC's projected timeline for completion of revision to the applicable Regulatory Guides associated with the new rule, and the time necessary for Peach Bottom to process change management adequately to include the number of training weeks that will be required to implement the Rule. Peach Bottom requested a new compliance date of December 31, 2024, or 180 days after publication of final Regulatory Guides, whichever is later.

On October 24, 2023, the NRC issued, via email, a draft Request for Confirmatory Information (RCI) for the Byron Station. A clarification call with the NRC and CEG was held on October 25, 2023, resulting in a formal RCI request for Byron and the NRC also issuing a formal RCI on October 30, 2023, for Peach Bottom (Reference 2).

U.S. Nuclear Regulatory Commission Supplemental Information Letter Responses to Request for Confirmatory Information NRC Docket Nos. 50-277 and 50-278 November 10, 2023 Page 2 The Attachment to this supplemental information letter provides responses to the RCI provided in Reference 2.

There are no regulatory commitments contained in this supplement.

If you should have any questions concerning this submittal, please contact Richard Gropp at (267) 533-5642.

Respectfully, David P. Helker Sr. Manager, Licensing Constellation Energy Generation, LLC

Attachment:

Supplemental Information Letter cc: w/ Attachment NRC Region I Administrator Senior Resident Inspector - PBAPS NRC Project Manager - PBAPS Scott Wall, NRC Fleet Project Manager Director, Bureau of Radiation Protection - Pennsylvania Department of Environmental Resources W. DeHass - Commonwealth of Pennsylvania Bureau of Radiation Protection S. Seaman - State of Maryland

Supplemental Information Letter Attachment Responses to Request for Confirmatory Information Page 1 of 3 NRC Docket Nos. 50-277 and 50-278 SUPPLEMENTAL INFORMATION This Supplemental Information provides responses to the Request for Confirmatory Information (RCI) provided by the NRC in Reference 2. Each confirmatory request is provided below followed by CEG's response.

1. Regarding CEGs request for exemption from the January 8, 2024, compliance date, please confirm the following:

o CEG is requesting an exemption for Peach Bottom from specific requirements, as described below, associated with the final rule for Enhanced Weapons, Firearms Background Checks, and Security Event Notifications, as identified in your submission; that would defer compliance with those provisions until December 31, 2024, or 180 days after publication of final Regulatory Guides, whichever is later.

CEG Response:

Yes, CEG is requesting an exemption for Peach Bottom from specific requirements, as described below, associated with the final rule for Enhanced Weapons, Firearms Background Checks, and Security Event Notifications, as identified in Peach Bottom's submittal dated October 16, 2023 (ML23289A121), that would defer compliance with those provisions until December 31, 2024, or 180 days after publication of final Regulatory Guides, whichever is later.

o CEG is not requesting an extension to the compliance date for Peach Bottom for specific requirements in Title 10 of the Code of Federal Regulations (10 CFR) Part 73, Subpart B, "Enhanced Weapons, Preemption, and Firearms Background Checks," described in 10 CFR 73.15, "Authorization for Use of Enhanced Weapons and Preemption of Firearms Laws," and 10 CFR 73.17, "Firearms Background Checks for Armed Security Personnel."

CEG Response:

Correct, CEG is not requesting an extension to the compliance date for Peach Bottom for specific requirements in Title 10 of the Code of Federal Regulations (10 CFR) Part 73, Subpart B, "Enhanced Weapons, Preemption, and Firearms Background Checks,"

described in 10 CFR 73.15, "Authorization for Use of Enhanced Weapons and Preemption of Firearms Laws," and 10 CFR 73.17, "Firearms Background Checks for Armed Security Personnel."

o CEG is requesting an exemption for Peach Bottom from specific requirements in 10 CFR Part 73, Subpart T, "Security Notifications, Reports, and Recordkeeping," 10 CFR 73.1200(a) through 10 CFR 73.1200(t), "Notification of Physical Security Events," 10 CFR 73.1205(a)(1) through 10 CFR 73.1205(e), "Written Follow-up Reports of Physical Security Events," 10 CFR 73.1210(a)(1) through10 CFR 73.1210(h), "Recordkeeping of Physical Security Events," and "Suspicious Activity Reports," 10 CFR 73.1215(a) through 10 CFR 73.1215(f) until the later of December 31, 2024, or 180 days after publication of the final Regulatory Guides.

CEG Response:

Yes, CEG is requesting an exemption for Peach Bottom from specific requirements in 10 CFR Part 73, Subpart T, "Security Notifications, Reports, and Recordkeeping," 10 CFR

Supplemental Information Letter Attachment Responses to Request for Confirmatory Information Page 2 of 3 NRC Docket Nos. 50-277 and 50-278 73.1200(a) through 10 CFR 73.1200(t), "Notification of Physical Security Events," 10 CFR 73.1205(a)(1) through 10 CFR 73.1205(e), "Written Follow-up Reports of Physical Security Events," 10 CFR 73.1210(a)(1) through10 CFR 73.1210(h), "Recordkeeping of Physical Security Events," and 10 CFR 73.1215(a) through 10 CFR 73.1215(f), "Suspicious Activity Reports," until the later of December 31, 2024, or 180 days after publication of the final Regulatory Guides.

o CEG is requesting an exemption for Peach Bottom from using the definitions for the terms "Contraband," and "Time of Discovery" as recently revised in 10 CFR 73.2, "Definitions," until the later of December 31, 2024, or 180 days after publication of the final Regulatory Guides. The exemption would not apply to the definitions of those terms that were in effect prior to the issuance of the 2023 revisions.

CEG Response:

Yes, CEG is requesting an exemption for Peach Bottom from using the definitions for the terms "Contraband," and "Time of Discovery" as recently revised in 10 CFR 73.2, "Definitions," until the later of December 31, 2024, or 180 days after publication of the final Regulatory Guides. The exemption would not apply to the definitions of those terms that were in effect prior to the issuance of the 2023 revisions.

2. Confirm that the current Peach Bottom site security plan implements the requirements of 10 CFR 73.71, "Reporting of Safeguards Events" for reporting the suspension of security measures.

CEG Response:

CEG confirms that the current Peach Bottom site security plan implements the requirements of 10 CFR 73.71, "Reporting of Safeguards Events" for reporting the suspension of security measures.

o Confirm that Peach Bottom will continue to comply with security event reporting, as previously required in 10 CFR 73.71, "Reporting of Safeguards Events," and Appendix G to Part 73, "Reportable Safeguards Events."

CEG Response:

CEG confirms that Peach Bottom will continue to comply with security event reporting, as previously required in 10 CFR 73.71, "Reporting of Safeguards Events," and Appendix G to Part 73, "Reportable Safeguards Events."

o Confirm that Peach Bottom will use the definitions for the terms "Contraband" and "Discovery (time of)" in its site security plan consistent with how these terms are currently defined in Regulatory Guide 5.76, Revision 1, "Physical Protection Programs at Nuclear Power Reactors."

CEG Response:

CEG confirms that Peach Bottom will use the definitions for the terms "Contraband" and "Discovery (time of)" in its site security plan consistent with how these terms are currently defined in Regulatory Guide 5.76, Revision 1, "Physical Protection Programs at Nuclear Power Reactors."

Supplemental Information Letter Attachment Responses to Request for Confirmatory Information Page 3 of 3 NRC Docket Nos. 50-277 and 50-278

3. Confirm that when Peach Bottom states that it is implementing the new Access Authorization Rule it actually means that it is implementing the new 2022 10 CFR Part 26 Fitness for Duty Rule (87 FR 71422, November 22, 2022)?

CEG Response:

CEG confirms that the statement in its exemption request that "CEG is in the process of implementing the new Access Authorization Rule" was made in error. What the statement intended to say is that CEG is in the process of implementing the new 2022 10 CFR Part 26 Fitness for Duty Rule (87 FR 71422, November 22, 2022).