Line 2: Line 2:
| number = ML17018A371
| number = ML17018A371
| issue date = 01/17/2017
| issue date = 01/17/2017
| title = Project Electric Generating Station, Units 1 and 2 - NRC Emergency Preparedness Annual Inspection Report 05000498/2016501 and 05000499/2016501
| title = NRC Emergency Preparedness Annual Inspection Report 05000498/2016501 and 05000499/2016501
| author name = Gepford H J
| author name = Gepford H
| author affiliation = NRC/RGN-IV/DRS/PSB-2
| author affiliation = NRC/RGN-IV/DRS/PSB-2
| addressee name = Koehl D
| addressee name = Koehl D
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES ary 17, 2017
[[Issue date::January 17, 2017]]


Mr. Dennis Koehl President and CEO STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483
==SUBJECT:==
 
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000498/2016501 AND 05000499/2016501
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000498/2016501 AND 05000499/2016501


==Dear Mr. Koehl:==
==Dear Mr. Koehl:==
On December 31, 2016, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the South Texas Project Electric Generating Station, Units 1 and 2. This inspection began on January 1, 2016. Issuance of this letter closes NRC Inspection Report 05000498/2016501 and 05000499/2016501. The inspection results associated with the 2016-501 reports are documented in Integrated Resident Inspector Reports 2016-001, 2016-002, 2016-003, and 2016-004.
On December 31, 2016, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the South Texas Project Electric Generating Station, Units 1 and 2. This inspection began on January 1, 2016. Issuance of this letter closes NRC Inspection Report 05000498/2016501 and 05000499/2016501. The inspection results associated with the 2016-501 reports are documented in Integrated Resident Inspector Reports 2016-001, 2016-002, 2016-003, and 2016-004.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,/RA/ Heather J. Gepford, PhD, CHP Chief, Plant Support Branch 2


Division of Reactor Safety Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80  
Sincerely,
/RA/
Heather J. Gepford, PhD, CHP Chief, Plant Support Branch 2 Division of Reactor Safety Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80 cc: Electronic Distribution


cc: Electronic Distribution ML17018A371 SUNSI Review By: PElkmann ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE SEPI:PSB2 BC:PSB NAME PElkmann HGepford SIGNATURE /RA/ /RA/ DATE 1/17/17 1/17/17
ML17018A371 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: PElkmann Yes No Non-Publicly Available Sensitive RGN-002 OFFICE SEPI:PSB2 BC:PSB NAME PElkmann HGepford SIGNATURE /RA/ /RA/
DATE 1/17/17 1/17/17
}}
}}

Latest revision as of 09:22, 30 October 2019

NRC Emergency Preparedness Annual Inspection Report 05000498/2016501 and 05000499/2016501
ML17018A371
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/17/2017
From: Heather Gepford
NRC/RGN-IV/DRS/PSB-2
To: Koehl D
South Texas
References
IR 2016501
Download: ML17018A371 (2)


Text

UNITED STATES ary 17, 2017

SUBJECT:

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000498/2016501 AND 05000499/2016501

Dear Mr. Koehl:

On December 31, 2016, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the South Texas Project Electric Generating Station, Units 1 and 2. This inspection began on January 1, 2016. Issuance of this letter closes NRC Inspection Report 05000498/2016501 and 05000499/2016501. The inspection results associated with the 2016-501 reports are documented in Integrated Resident Inspector Reports 2016-001, 2016-002, 2016-003, and 2016-004.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Heather J. Gepford, PhD, CHP Chief, Plant Support Branch 2 Division of Reactor Safety Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80 cc: Electronic Distribution

ML17018A371 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: PElkmann Yes No Non-Publicly Available Sensitive RGN-002 OFFICE SEPI:PSB2 BC:PSB NAME PElkmann HGepford SIGNATURE /RA/ /RA/

DATE 1/17/17 1/17/17