ML17209A414: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/13/1980
| issue date = 11/13/1980
| title = Submits Final Response to IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Neutral Position Contact Is Not Wired to Any Circuit.Bulletin Not Applicable to Facility
| title = Submits Final Response to IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Neutral Position Contact Is Not Wired to Any Circuit.Bulletin Not Applicable to Facility
| author name = UHRIG R E
| author name = Uhrig R
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name = OREILLY J P
| addressee name = Oreilly J
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| docket = 05000389
| docket = 05000389
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CeL~AlgIP.O.BOX5+100MIAMIT,F33152~~666!UE'5l7/P@pili
{{#Wiki_filter:Ce            L~AlgI P.O. BOX 5+100 MIAMI T,F 33152~~
'~.EIX~gg~EEFLO/PLOWERBLIGHTGROANYNovember,1980L-55-379Mr.JamesP.O'Reilly,
666! UE'5            l7/P@pili         '
: Director, RegionIIOfficeofInspection andEnforcement U.S.NuclearRegulatory Commission 101MariettaStreet,Suite3100Atlanta,Georgia30303
                                                                                                ~ .E IX~
gg ~EE FLO
                                                                      /PLOWER      BLIGH T  GROAN Y November        , 1980 L-55-379 Mr. James P. O'Reilly, Director,   Region  II Office of Inspection      and Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303


==DearMr.O'Reilly:==
==Dear Mr. O'Reilly:==


Re:RII:JPO50-389IEBulletin80-20Ref:FPLLetterL-80-305DatedSeptember 15,1980FloridaPower8LightCompanyhasreviewedIEBulletin80-20regarding afailureofWestinghouse TypeW-2springreturntoneutralcontrolswitches.
Re:   RII:JPO 50-389 IE Bulletin 80-20 Ref: FPL  Letter L-80-305    Dated September  15, 1980 Florida  Power  8 Light  Company has reviewed IE Bulletin 80-20 regarding a failure of Westinghouse Type W-2 spring return to neutral control switches.
Inthereferenced letter,FPLadvisedtheNRCthatafinalresponsewouldbeissueduponreceiptofinformation fromallourvendors.Thatinfor-mationisnowcomplete.
In the referenced    letter, FPL advised the NRC that a final response would be issued upon receipt      of information from  all  our vendors. That infor-mation is now complete. Although        one vendor,   Westinghouse,   uses the Westinghouse Type    W-2  switch in safety  related  circuits, the    neutral position contact that is of concern in the Bulletin is not wired to any circuit. Therefore, IE Bulletin 80-20 is not applicable to St.
Althoughonevendor,Westinghouse, usestheWestinghouse TypeW-2switchinsafetyrelatedcircuits, theneutralpositioncontactthatisofconcernintheBulletinisnotwiredtoanycircuit.Therefore, IEBulletin80-20isnotapplicable toSt.LucieUnit2.WeconsiderthisBulletinclosed.Verytrulyyours,RobertE.UhrigVicePresident AdvancedSystems8Technology REU/TCG/ah cc:U.S.NuclearRegulatory Commission OfficeofInspection andEnforcement DivisionofReactorOperations Inspection Washington, D.C.20555HaroldF.Reis,Esquire80%8080ggpPEOPLE...
Lucie Unit 2.
SERVINGPEOPLE h0t0f$~CJfig}}
We  consider this Bulletin closed.
Very  truly yours, Robert E. Uhrig Vice President Advanced Systems    8  Technology REU/TCG/ah cc:   U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D. C. 20555 Harold F. Reis, Esquire 80%8080        ggp                                PEOPLE... SERVING PEOPLE
 
h 0 t 0 f $ ~
C J fig}}

Latest revision as of 00:10, 30 October 2019

Submits Final Response to IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Neutral Position Contact Is Not Wired to Any Circuit.Bulletin Not Applicable to Facility
ML17209A414
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/13/1980
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-80-20, L-80-379, NUDOCS 8012080588
Download: ML17209A414 (2)


Text

Ce L~AlgI P.O. BOX 5+100 MIAMI T,F 33152~~

666! UE'5 l7/P@pili '

~ .E IX~

gg ~EE FLO

/PLOWER BLIGH T GROAN Y November , 1980 L-55-379 Mr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Re: RII:JPO 50-389 IE Bulletin 80-20 Ref: FPL Letter L-80-305 Dated September 15, 1980 Florida Power 8 Light Company has reviewed IE Bulletin 80-20 regarding a failure of Westinghouse Type W-2 spring return to neutral control switches.

In the referenced letter, FPL advised the NRC that a final response would be issued upon receipt of information from all our vendors. That infor-mation is now complete. Although one vendor, Westinghouse, uses the Westinghouse Type W-2 switch in safety related circuits, the neutral position contact that is of concern in the Bulletin is not wired to any circuit. Therefore, IE Bulletin 80-20 is not applicable to St.

Lucie Unit 2.

We consider this Bulletin closed.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/TCG/ah cc: U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D. C. 20555 Harold F. Reis, Esquire 80%8080 ggp PEOPLE... SERVING PEOPLE

h 0 t 0 f $ ~

C J fig