ML17228A921: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/23/1994
| issue date = 11/23/1994
| title = Advises That Based on Results of Svc Water Sys Operational Performance Insp Re Mid Cycle Maint of CCW HXs Was Implemented for Facility
| title = Advises That Based on Results of Svc Water Sys Operational Performance Insp Re Mid Cycle Maint of CCW HXs Was Implemented for Facility
| author name = SAGER D A
| author name = Sager D
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:PRI(3RIEY(ACCELERATEDRIDSPROCESSIiREGULATORYINFORMATIONDISTRIBUTIONSYSTEM(RIDS)ACCESSIONNBR:9411300326DOC.DATE:94/11/23NOTARIZED:NOFACIL:50-335St.LuciePlant,Unit1,FloridaPower6LightCo.50-389St.LuciePlant,Unit2,FloridaPower&LightCo.AUTH.NAMEAUTHORAFFILIATIONSAGER,D.A.FloridaPower6LightCo.RECXP.NAMERECIPIENTAFFILIATIONDocumentControlBranch(DocumentControlDesk)
{{#Wiki_filter:PRI(3RI EY (ACCELERATED RIDS PROCESSIi REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9411300326                DOC.DATE: 94/11/23        NOTARIZED: NO        DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power 6 Light Co.                       05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co.                       05000389 AUTH. NAME            AUTHOR AFFILIATION SAGER,D.A.           Florida      Power 6 Light Co.                                           P RECXP.NAME            RECIPIENT AFFILIATION Document Control Branch (Document              Control Desk)


==SUBJECT:==
==SUBJECT:==
AdvisesthatbasedonresultsofsvcwatersysoperationalperformanceinspremidcyclemaintofCCWHXswasimplementedforfacility.DISTRISUTIONCODE:AOOIDCOPIESRECEIVED:LTRjENCL+SIZE:TITLE:ORSubmittal:GeneralDistributionNOTESDOCKET0500033505000389PRECIPIENTIDCODE/NAMEPD2-2LANORRIS,JINTERNAL:ACRSNRR/DE/EELBNRR/DRPWNRR/DSSA/SRXBOGC/HDS3EXTERNAL'OACCOPIESLTTRENCLRECIPIENTIDCODE/NAMEPD2-2PDFILCSNTZR~ONRR/DRCH/HICBNRR/DSSA/SPLBNUDOCS-ABSTRACTNRCPDRCOPIESLTTRENCLDUNNOTETOALL"RIDS"RECIPIENTS:PLEASEHELPUSTOREDUCEiVASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMPl-37(EXT.504-2083)TOELDIINATEYOURNAMEFROW!DISTRIBUTIONLISTSI'ORDOCUMENTSYOUDON"I'L'ED!TOTALNUMBEROFCOPIESREQUIRED:LTTR19ENCL FloridaPower8cLightCompany,P.O.Box128,FortPierce,FL34954-0128APLNovember23,1994L-94-29710CFR50.90U.S.NuclearRegulatoryCommissionAttn:DocumentControlDeskWashington,D.C.20555RE:St.LucieUnit1andUnit2DocketNos.50-335and50-389ProposedLicenseAmendmentsContainmentSraandCoolinSstemsByletterL-94-260datedNovember2,1995,FloridaPower&LightCompany(FPL)submittedproposedrevisionstotheSt.LuciePlantTechnicalSpecifications(TS)forContainmentSprayandCoolingSystems.AsaresultofdiscussionsbetweenFPLandReactorProjects(J.A.Norris),thefollowinginformationisprovidedtodocumentFPL'sneedforatimelyreviewofthatsubmittal.TheSt.LuciePlantTSrequirefourOPERABLEcontainmentfancoolersduringoperationalMODES1,2,and3.ThecurrentLCOdoesnotprovideanACTIONstatementformorethanoneinoperablefancooler.Therefore,ifanytwofancoolersbecomeinoperable,aplantshutdownandcooldownisrequiredpursuanttoTS3.0.3.TheTSupgradeproposedinL-94-260addressesseveralsituationsinvolvinginoperablecontainmentsprayandcoolingsystemequipmentforwhichcontinuedplantoperationwithinspecifiedACTIONcompletionintervalswouldbeacceptable.Theseconditionsaresupportedbythecontainmentsafetyanalyses,andincludethecaseofaninoperablesprayandcoolingtrain(2fancoolers).Underaccident,conditions,eachcontainmentsprayandcoolingtrainissupportedbyoneComponentCoolingWater(CCW)heatexchanger.Althoughcross-trainmixingofcoolingwateroccurswhentheCCWsystemisinitsnormal(non-accident)configuration,operabilityofthetwoassociatedfancoolersiscalledintoquestionwhenseawatertoaCCWheatexchangerisisolated.~~QOOQQ9411300326941123PDRADQCK050003359PDRanFPLGroupcompany,oX t~~~r7I
Advises that based on results of svc water sys operational performance insp re mid cycle maint of CCW HXs was TITLE:
~~L-94-297Page2of2BasedontheresultsofaServiceWaterSystemOperationalPerformanceInspection(NRCInspectionReport50-389/91-201;50-389/91-201),mid-cyclemaintenanceofCCWheatexchangerswasimplementedforbothSt.Lucieunits.Thismaintenanceincludesisolatingseawatertotheheatexchanger,andisrequiredforUnit2duringJanuary,1995.IftheproposedamendmentsareapprovedandissuedbyJanuary15,1995,therequiredmaintenancecanbeperformedwithouttheneedforaplantshutdownandcooldown,whichmayotherwiseberequiredduetotheformoftheexistingTS.Pleasecontactusifthereareanyquestionsaboutthissubmittal.Verytrulyyours,D.A.agerViceesidentSt.ciePlantDAS/RLDcc:StewartD.Ebneter,RegionalAdministrator,RegionII,USNRC.0SeniorResidentInspector,USNRC,St.LuciePlant.Mr.W.A.Passetti,FloridaDepartmentofHealthandRehabilitativeServices.  
NOTES OR implemented DISTRISUTION CODE: AOOID for facility.
}}
COPIES RECEIVED:LTR Submittal: General Distribution                    j  ENCL  +   SIZE:
RECIPIENT                COPIES              RECIPIENT          COPIES ID  CODE/NAME              LTTR ENCL        ID  CODE/NAME      LTTR ENCL PD2-2 LA                                      PD2-2 PD NORRIS,J INTERNAL: ACRS                                          FIL CSNTZR~O NRR/DE/EELB                                  NRR/DRCH/HICB NRR/DRPW                                    NRR/DSSA/SPLB NRR/DSSA/SRXB                                NUDOCS-ABSTRACT OGC/HDS3 EXTERNAL'OAC                                            NRC PDR D
U N
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELDIINATE YOUR NAME FROW!
DISTRIBUTION LISTS I'OR DOCUMENTS YOU DON "I'L'ED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                  19  ENCL
 
Florida Power 8c Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128 November 23, 1994                    L-94-297 APL                                                                      10 CFR 50.90 U. S.     Nuclear Regulatory Commission Attn:       Document Control Desk Washington,         D. C. 20555 RE:       St. Lucie Unit    1 and  Unit    2 Docket Nos. 50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin              S  stems By letter L-94-260 dated November 2, 1995, Florida Power & Light Company (FPL) submitted proposed revisions to the St. Lucie Plant Technical Specifications (TS) for Containment Spray and Cooling Systems.           As a result of discussions between FPL and Reactor Projects        (J.A. Norris), the following information is provided to document FPL's need          for a timely review of that submittal.
The St. Lucie Plant TS require four OPERABLE containment fan coolers during operational MODES 1, 2, and 3. The current LCO does not provide an ACTION statement for more than one inoperable fan cooler. Therefore,           if  any two fan coolers become inoperable, a plant shutdown and cooldown is required pursuant to TS 3.0.3. The TS upgrade          proposed in L-94-260 addresses                      several situations involving inoperable containment spray and cooling system equipment for which continued plant operation within specified ACTION completion intervals would be acceptable.                             These conditions are supported by the containment safety analyses, and include the case of an inoperable spray and cooling train (2 fan coolers).
Under accident, conditions, each containment spray and cooling train is supported by one Component Cooling Water (CCW) heat exchanger.
Although cross-train mixing of cooling water occurs when the CCW system is in its normal (non-accident) configuration, operability of the two associated fan coolers is called into question when seawater to a CCW heat exchanger is isolated.
        ~~QOOQQ 9411300326 941123 PDR      ADQCK 05000335 9                                                                  ,oX PDR an FPL Group company
 
t
      ~ ~ ~
r 7
I
 
      ~~
L-94-297 Page 2  of  2 Based    on  the results of a Service Water System Operational Performance      Inspection (NRC Inspection Report 50-389/91-201; 50-389/91-201), mid-cycle maintenance of CCW heat exchangers was implemented for both St. Lucie units. This maintenance includes isolating seawater to the heat exchanger, and is required for Unit 2 during January,       1995. If the proposed amendments are approved and issued by January 15, 1995, the required maintenance can be performed without the need for a plant shutdown and cooldown, which may otherwise be required due to the form of the existing TS.
Please contact us      if there  are any questions about this submittal.
Very  truly    yours, D. A. ager Vice      esident St.     cie Plant DAS/RLD cc:   Stewart D. Ebneter, Regional Administrator, Region 0
II, USNRC.
Senior Resident Inspector,       USNRC, St. Lucie Plant.
Mr. W.A. Passetti, Florida Department of Health and Rehabilitative Services.}}

Latest revision as of 21:08, 29 October 2019

Advises That Based on Results of Svc Water Sys Operational Performance Insp Re Mid Cycle Maint of CCW HXs Was Implemented for Facility
ML17228A921
Person / Time
Site: Saint Lucie, Three Mile Island  Constellation icon.png
Issue date: 11/23/1994
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-297, NUDOCS 9411300326
Download: ML17228A921 (4)


Text

PRI(3RI EY (ACCELERATED RIDS PROCESSIi REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9411300326 DOC.DATE: 94/11/23 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power 6 Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION SAGER,D.A. Florida Power 6 Light Co. P RECXP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Advises that based on results of svc water sys operational performance insp re mid cycle maint of CCW HXs was TITLE:

NOTES OR implemented DISTRISUTION CODE: AOOID for facility.

COPIES RECEIVED:LTR Submittal: General Distribution j ENCL + SIZE:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA PD2-2 PD NORRIS,J INTERNAL: ACRS FIL CSNTZR~O NRR/DE/EELB NRR/DRCH/HICB NRR/DRPW NRR/DSSA/SPLB NRR/DSSA/SRXB NUDOCS-ABSTRACT OGC/HDS3 EXTERNAL'OAC NRC PDR D

U N

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELDIINATE YOUR NAME FROW!

DISTRIBUTION LISTS I'OR DOCUMENTS YOU DON "I'L'ED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL

Florida Power 8c Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128 November 23, 1994 L-94-297 APL 10 CFR 50.90 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 RE: St. Lucie Unit 1 and Unit 2 Docket Nos. 50-335 and 50-389 Proposed License Amendments Containment S ra and Coolin S stems By letter L-94-260 dated November 2, 1995, Florida Power & Light Company (FPL) submitted proposed revisions to the St. Lucie Plant Technical Specifications (TS) for Containment Spray and Cooling Systems. As a result of discussions between FPL and Reactor Projects (J.A. Norris), the following information is provided to document FPL's need for a timely review of that submittal.

The St. Lucie Plant TS require four OPERABLE containment fan coolers during operational MODES 1, 2, and 3. The current LCO does not provide an ACTION statement for more than one inoperable fan cooler. Therefore, if any two fan coolers become inoperable, a plant shutdown and cooldown is required pursuant to TS 3.0.3. The TS upgrade proposed in L-94-260 addresses several situations involving inoperable containment spray and cooling system equipment for which continued plant operation within specified ACTION completion intervals would be acceptable. These conditions are supported by the containment safety analyses, and include the case of an inoperable spray and cooling train (2 fan coolers).

Under accident, conditions, each containment spray and cooling train is supported by one Component Cooling Water (CCW) heat exchanger.

Although cross-train mixing of cooling water occurs when the CCW system is in its normal (non-accident) configuration, operability of the two associated fan coolers is called into question when seawater to a CCW heat exchanger is isolated.

~~QOOQQ 9411300326 941123 PDR ADQCK 05000335 9 ,oX PDR an FPL Group company

t

~ ~ ~

r 7

I

~~

L-94-297 Page 2 of 2 Based on the results of a Service Water System Operational Performance Inspection (NRC Inspection Report 50-389/91-201; 50-389/91-201), mid-cycle maintenance of CCW heat exchangers was implemented for both St. Lucie units. This maintenance includes isolating seawater to the heat exchanger, and is required for Unit 2 during January, 1995. If the proposed amendments are approved and issued by January 15, 1995, the required maintenance can be performed without the need for a plant shutdown and cooldown, which may otherwise be required due to the form of the existing TS.

Please contact us if there are any questions about this submittal.

Very truly yours, D. A. ager Vice esident St. cie Plant DAS/RLD cc: Stewart D. Ebneter, Regional Administrator, Region 0

II, USNRC.

Senior Resident Inspector, USNRC, St. Lucie Plant.

Mr. W.A. Passetti, Florida Department of Health and Rehabilitative Services.