{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
{{#Wiki_filter:ust 28, 2017


KING OF PRUSSIA, PA 19406-2713 August 28, 2017 Mr. Bryan Hanson Senior Vice President, Exelon Generation, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: UPDATED INSPECTION PLAN FOR PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 (REPORT 05000277/2017005 AND 05000278/2017005)
==SUBJECT:==
UPDATED INSPECTION PLAN FOR PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 (REPORT 05000277/2017005 AND 05000278/2017005)


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==
The enclosed inspection plan lists the inspections scheduled through June 30, 20 19 for Peach Bottom Atomic Power Station Units 2 and 3. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
The enclosed inspection plan lists the inspections scheduled through June 30, 2019 for Peach Bottom Atomic Power Station Units 2 and 3. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.


In addition to planned baseline inspections, the NRC plans to conduct IP 60855.1, "Operation of an Independent Spent Fuels Storage Installation at Operating Plants" during the second quarter of 2018. See the attached Inspection Plan for specific dates.
In addition to planned baseline inspections, the NRC plans to conduct IP 60855.1, Operation of an Independent Spent Fuels Storage Installation at Operating Plants during the second quarter of 2018. See the attached Inspection Plan for specific dates.


Please contact me at 610-337-5262 with any questions that you may have regarding this letter.
Please contact me at 610-337-5262 with any questions that you may have regarding this letter.
Line 31: Line 32:
Sincerely,
Sincerely,
/RA/
/RA/
Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects
Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects Docket Nos. 50-277 and 50-278 License Nos. DPR-44 and DPR-56 Enclosure:
Inspection Plan cc: Distribution via ListServ


Docket Nos.
ML17236A030 Non-Sensitive Publicly Available SUNSI Review    Non-Publicly Available Sensitive OFFICE RI/DRP RI/DRP NAME SBarber/SB DLSchroeder/DLS DATE 08/22/17 08/28/17
 
50-277 and 50-278 License Nos.
 
DPR-44 and DPR-56 Enclosure: Inspection Plan
 
cc: Distribution via ListServ
 
ML17236A030 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SBarber/SB DLSchroeder/DLS DATE 08/22/17 08/28/17
}}
}}

Latest revision as of 21:35, 29 October 2019

Updated Inspection Plan Letter 05000277/2017005 and 05000278/2017005 with Rpt. 22
ML17236A030
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/28/2017
From: Daniel Schroeder
Reactor Projects Region 1 Branch 4
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Schroeder D
References
IR 2017005
Download: ML17236A030 (4)


Text

ust 28, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 (REPORT 05000277/2017005 AND 05000278/2017005)

Dear Mr. Hanson:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019 for Peach Bottom Atomic Power Station Units 2 and 3. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

In addition to planned baseline inspections, the NRC plans to conduct IP 60855.1, Operation of an Independent Spent Fuels Storage Installation at Operating Plants during the second quarter of 2018. See the attached Inspection Plan for specific dates.

Please contact me at 610-337-5262 with any questions that you may have regarding this letter.

Sincerely,

/RA/

Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects Docket Nos. 50-277 and 50-278 License Nos. DPR-44 and DPR-56 Enclosure:

Inspection Plan cc: Distribution via ListServ