| issue date = 01/24/1986
| issue date = 01/24/1986
| title = Rev 7 to QA Manual,App C, Ginna Station Inservice Pump & Valve Testing Program for 810101-891231 Period.
| title = Rev 7 to QA Manual,App C, Ginna Station Inservice Pump & Valve Testing Program for 810101-891231 Period.
| author name = ANDERSON C R, WILKINS P C
| author name = Anderson C, Wilkins P
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:REY.PAGEQUALITYASSURANCE MANUALGINNASTATIONROCHESTER GAS&ELECTRICCORPORATION EFFECTIVE DATE:January30,1986SIGNATURE OFDATETITLE:AppendixC-GinnaStationInservice PumpandValveTestingProgram'or theJanuary1,1981throughDecember31,1989PeriodREVIEWigg-tCAPPROVEDBY:Q/(~/zYPREPAREDBT:(,/7L'[/~/gProramTableofContentsIntroduction:
{{#Wiki_filter:RE Y.       PAGE QUALITY ASSURANCE MANUAL                                                OF GINNA STATION EFFECTIVE DATE:
Definitions:
ROCHESTER GAS & ELECTRIC CORPORATION                January 30, 1986 SIGNATURE          DATE TITLE:                                   PREPARED BT: (, /7    L'           [   /~/g Appendix C  Ginna Station Inservice Pump and Valve Testing Program'or the January 1, 1981 through December 31, 1989 Period REVIEW APPROVED BY:
Program:Discussion PVTl.0ScopeandResponsibility PVT2.0CodeEditionandTestingIntervalPVT3.0Inservice PumpTestingProgramPVT4.0Inservice ValveTestingProgramPVT5.0Recordssa02OS0>0S aaozasPDRADOCK05000244PPDR 40tK QUAIITYASSURANCEMANUAIGINNASTATIONTITLKsAPPENDIXCPumpandValveTestingProgramDATEPAGE1/30/862DP40Introduction ThisappendixtotheQualityAssurance ManualdefinestheInservice PumpandValveTestingProgramforthetenyearperiodstartingJanuary1,1981throughDecember31,1989.IncludedinthisprogramaretheQualityGroupsA,BandCPumpswhichareprovidedwithanemergency powersourceandthoseQualityGroupsA,BandCValveswhicharerequiredtoshutdownthereactorortomitigatetheconsequences ofanaccidentandmaintainthereactorinasafeshutdowncondition.
Q /(   ~            /
"Thisprogramhasbeendeveloped asrequiredbySection50.55a(g) of10CFRSOfollowing theguidanceoftheASMEBoilerandPressureVesselCodeSectionXI-"RulesforInservice Inspection ofNuclearPowerPlantComponents,"
i z
(hereafter referredtoasthe"Code")excluding thecontrolsoftheAuthorized Inspector, Enforcement Authority, Reporting SystemsandN-StampSymbol.Theinservice testingprogramshallbecontrolled bytheGinnaStationQualityAssurance ProgramforStationOperation.
gg-tC Y
QualityGroupsA,BandCcomponents correspond tothosedefinedinNRC-Regulatory Guide1.26.FurtheraddendaandeditionsofSectionXIoftheCodeshall'beusedforclarification oftest.requirements andperformance.
Pro ram Table  of Contents
TheInservice PumpandValveTestingProgramsubstantially augmentsbutdoesnotaffectthepumpandvalvesurveillance programrequiredbyTechnical Specifications.
Technical Specification requirements associated withpumpandvalvesurveillance, shallcontinuetobeimplemented asspecified.
QUALITYASSURANCE MANUAIGINNASTATIONTITLEsAPPENDIXCPumpandValveTestingProgramDATEPACE42i52C1/30/863DP40Definitions AFPAOVAPVBACodeAuxiliary Feedwater PumpAirOperatedValveAirOperatedPistonValveBoricAcidAmericanSocietyofMechanical Engineers CCCSCSPCVC/R,ECCSFCVGAGDTHCVHXLCVMMAFP'OVPCVPORVPRTPRVPVTQRRCDTRCPRCVRHRRMWRVRWSTRXS/GSAFWPSISOVSWBoilerandPressureVesselCodeComponent CoolingContainment SprayContainment SprayPumpCheckValveColdShutdownandRefueling Emergency CoreCoolingSystemFlowControlValveGasAnalyzerGasDecayTankHandControlValveHeatExchanger LevelControlValveMonthlyMotorDrivenAuxiliary Feedwater MotorOperatedValveManualValvePressureControlValvePowerOperatedReliefValvePressurizer ReliefTankPressureReliefValvePumpandValveTestingQuarterly Refueling OutageReactorCoolantDrainTankReactorCoolantPumpRadiation ControlValveResidualHeatRemovalReactorMakeupWaterReliefValveRefueling WaterStorageTankReactorVesselSteamGenerator StandbyAuxiliary Feedwater PumpSafetyInjection SolenoidOperatedValveServiceWaterPump 4,Sri.
QUALITYASSURANCE MANUALGINNASTATIONTITLE<APPENDIXCPumpandValveTestingProgram42i5tCDATE1/30/86PAGE4DF40Definitions TAFPVCVCTVHTurbineDrivenAuxiliary Feedwater PumpVolumeControlVolumeControlTankVentHeaderCATAVALVE-Valvesforwhichseatleakageislimitedtoaspecificmaximumamountintheclosedpositionoffullfillment of'theirfunction.
CATBVALVE-Valvesforwhichseatleakageintheclosedpositionisinconsequential forfullfillment oftheirfunction.
CATCVALVE-Valveswhichareself-actuating inresponsetosomecharacteristic, suchaspressure(reliefvalves)orflowdirection (checkvalves).
tJrze QUALITYASSURANCEMANUALGINNASTATIONTITLEcAPPENDIXCPumpandValveTestingProgramDATEPAGE1/30/865DF40PumandValveTestinProramPVT1.0ScoeandResonsibilit 1.21.3PVT2.0Theinservice testingprogramdefinesthetestingprogramforQualityGroupsA,BandCPumpsandValvesinaccordance withtherequirements ofArticlesIWPandIWVofSectionXIoftheCode.Theresultsofthesetestsaretoassuretheoperational readiness ofpumpsandvalves.Itistheresponsibility oftheGinnaStationTestandResultsSupervisor toimplement thistestprogramanddevelopinservice testproce-dureswhichwilloutlinethespecifictestforeachpumpandvalveincludedintheprogram.Whenavalve,pumporitscontrolsystemhasbeenreplacedorrepairedorhasundergone maintenance thatcouldaffectitsperformance, andpriortothetimeitisreturnedtoservice,itshallbetestedasnecessary todemonstrate thattheper-formanceparameters whichcouldhavebeenaffectedbythereplacement, repair,ormaintenance arewithinacceptable limits.CodeEditionandTestinInterval2.1PVT3.03.1TheInservice PumpandValveTestingProgramfortheten(10)yearperiodstartingJanuary1,1981throughDecember31,1989wasdeveloped utilizing the1977EditionofSectionXIoftheCodethroughtheSummer1978Addenda.Inservice PumTestinProramTheInservice PumpTestingProgramwasdeveloped inaccordance withtherequirements ofArticleIWPofSectionXIoftheCode.ThisprogramincludesallQualityGroupA,BandCpumpswhichareprovidedwithanemergency powersourceandarerequiredtoperformaspecificfunctioninshuttingdownareactororinmitigating theconsequences ofanaccidentandmaintainthereactorinasafeshutdowncondition.
QUALITYASSURANCE MANUALGINNASTATIONTITLE<APPENDIXCPumpandValveTestingProgramDATEPAGE1/30/866OF403.2Thefollowing pumpsshallbetestedinaccordance withArticleIWPofSectionXI:3.3(a)lAComponent Cooling(b)lBComponent Cooling(c)1ASafetyInjection (d)lBSafety1njection (e)lCSafetyInjection (f)lAResidualHeatRemoval(g)1BResidualHeatRemoval(h)lAContainment Spray(i)1BContainment Spray(j)lAMotorDrivenAuxiliary Feedwater (k)lBMotorDrivenAuxiliary Feedwater (1)TurbineDrivenAuxiliary Feedwater (m)lAServiceWater(n)lBServiceWater(o)1CServiceWater(p)lDServiceWater(q)1CStandbyAuxiliary Feedwater (r)1DStandbyAuxiliary Feedwater Withoneexception, testparameters thatshallbemeasuredorobservedduringinservice testingofeachpumparethoselistedinTableIWP-3100-1 ofSectionXIandincludeinletpressure, differential
: pressure, flowrate,vibration amplitude, andproperlubricant levelorpressure.
Theexception isforthemeasurement ofpumpbearingtemperatures andthereareseveralreasonswhythismeasurement iseitherundesirable orinconclusive.
Specifically, fortheservicewaterpumps,thebearingsaresubmersed inuptofortyfeetofwatermakingbearingtemperatures closelyapproximate thesurrounding watertemperature andmeasurement oftemperatures almostimpossible.
Fortheauxiliary andstandbyauxiliary feedwater pumpsthetestconditions requirethedischarge ofambienttemperature waterintothe400degreeFfeedwater lines.Sinceitcantypically takeinexcessofanhourtostabilize bearingtemperatures thiscausesanunnecessary extendedtemperature trans-ient,inthefeedwater line.Fortheresidualheatremovalandsafetyinjection pumpsthesystemconfigurations donotallowtestingthepumpsatactualpumpserviceconditions duringlantoeration.Insteadthetestsmustbe QUALITYASSURANCE MANUALGINNASTATIONTITLE<APPENDIXCPumpandValveTestingProgramDATEl/30/86PAGE7OF404iAC3.4performed atanoff-design flowcondition whichresultsinhigherbearingtemperatures thannormal.Thisistobeexpectedsincehigherthannormalthrustloadsareplacedonthepumpbearingsduringthisreducedflowtestcondition.
Theextendedtimerequiredforbearingtemperatures tostabilize subjectsthepumptolengthyperiodsofunnecessarily highloads.Thepumpvendorsdonotconsiderthemeasurement ofbearingtemperature inthistypeofoff-design condition tobeagoodindication ofbearingconditions.
Thevendorsrecommended bearingtemperature limitsarebasedonnormaloperating conditions anddonotapplytothistypeoftesting.Ingeneral,vibration isconsidered-to beabetterindication ofbearingcondition sinceasignificant increaseinbearingtemperature willnormallyonlyoccurifbearingfailureisimminent.
Finally,testconditions cannotbeeasilycontrolled toproducetemperature repeatability sincereadingsaresubjecttoalargenumberofvariables suchasambientairtemperature, coolingwatertemperature (whereapplicable),
locationoftemperature probeattach-ment,temperature ofthefluidpumpedandquantityofthefluidpumped.Oneorbothresidualheatremovalpumpsmayberequiredtobeoperable, bytheplantTechnical Specifications, whentheaveragereactorcoolanttemperature isbetween350degreesF.and200degreesF.ortheplantisatcoldorrefueling shutdown.
Typically, inthiscase,atleastoneresidualheatremovalpumpwillbeinoperation.
Testingwillbeperformed inaccordance withIWP-3400, which,includesoperating thepumpatreference conditions, ifpracticable, andproviding alogwhichshowsthattheparameters monitored duringnormalplantoperation weremeasured, recordedandanalyzed.
Thepracticability ofduplicating coldshutdownreference conditions maybeimpactedbyrefueling waterlevelduringrefueling andinservice reactorinspections aswellasdecayheatremovalrate.Thetestfrequency forthepumpsshallbeasfollows:a.Component coolingwaterpumpsshallbetestedmonthl
.Ip QUALITYASSURANCE MANUALGINNASTATIONAPPENDIXCPumpandValveTestingProgramPACE1/30/868DF40b.Safetyinjection pumpsshallbetestedmonthlyexceptduringcoldorrefueling shutdowns.
Thepumpsshallbetestedpriortostartupifthetimesincethelasttestexceedsonemonth.C.d.Residualheatremovalpumpsshallbetestedmonthlyexceptduringcoldorrefueling shutdown.
Thepumpsshallbetestedpriortostartupifthetimesincethelasttestexceedsonemonth.Whenthereactorcoolantsystemtemperature isbetween350'Fand200'Fortheplantisatcoldorrefueling shutdowntheplantTechnical Specifications mayrequireoneorbothresidualheatremovalpumpstobeoperable.
Ifthisisthecase,thentherequiredpumpsshallbetestedmonthly.Containment spraypumpsshallbetestedmonthlyexceptduringcoldorrefueling shutdown.
Thepumpsshallbetestedpriortostartupifthetimesincethelasttestexceedsonemonth.e.Motordrivenauxiliary feedwater pumps,turbinedrivenauxiliary feedwater pump,andthestandbyauxiliary feedwater pumpsshallbetestedmonthlyexceptduringcoldorrefueling shutdowns.
Thepumpsshallbetestedpriortoexceeding 5%powerifthetimesincethelasttestexceedsonemonth.Servicewaterpumpsshallbetestedmonthly.Testingofapumpneednotbeperformed ifthatpumpisdeclaredinoperable withoutthetesting.Consistent withplantTechnical Specifications, specified intervals maybeextendedby25%toaccommodate normaltestschedules.
0 QUALITYASSURANCE MANUALGINNASTATIONTITI.KsAPPENDIXCPumpandValveTestingProgramDATE1/30/869DF40PVT4.04.14.24.3Inservice ValveTestinProramIITheInservice ValveTestingProgramwasdeveloped inaccordance withtherequirements ofArticleIWVofSectionXIoftheCode.All,those valvesthatarerequiredtoperformaspecificfunctioneithertoshutdownthereactortothecoldshut-downcondition orinmitigating theconsequences
-'fanaccidentandmaintainthereactorinasafeshutdowncondition areincludedintheprogram.TheInservice ValveTestingProgramRequirements forCategoryAandBValvesareinTablesPVT4.7and4.8,respectively.
CategoryCValvesarebrokendownintotwocategories, CheckValvesandReliefValves,whichareinTablesPVT4.9and4.10,respectively.
CategoryDValvesarenotincludedinthistestingprogrambecausetherearenoneincludedinGinnaStationdesign.Someexceptions andexemptions tothetestingre-quirements ofArticleIWVhavebeentakenbasedonoperational interference, placingtheplantinanunsafecondition andTechnical Specification requirements.
Allexceptions andexemptions arelistedonthevalvetablesandexplained inthereferenced notes,PVT4.12.4,44.5Theexercising programfor'Category AandBValves,withtheexception ofcheckvalves,shallrequireacompletestrokingofeachvalveperthevalvetestingtables.Exceptwhereoperational constraints prevailandexceptions havebeenauthorized allcheckvalves,including CategoryCValves,shallbeexercised tothepositionrequiredtofulfilltheirfunction.
Thesefunctional
'estsshallbeverifiedbytheoperation oftherequiredsystem.Valveswhichmalfunction duringstrokingwillnotbeconsidered inoperable asdefinedbyTechnical Specifications, whenthemalfunction doesnotpreventthevalvesfromperforming itssafetyfunction.
CategoryAandBvalvesoperation shallbetimedeachtimetheyarestrokedutilizing switchinitiation andthepositionindicators, whichareaccessible durinlantoeration.Durineach


QUALITYASSURANCE MANUALGINNASTATIONTITI.EaAPPENDIXCPumpandValveTestingProgramDATEPAGE1/30/8610DP404.6refueling outageavisualverification shallbemadetoconfirmdirectcorrespondence betweenvalveoperators andthepositionindicators.
==
Foravalveinasystemdeclaredinoperable ornotrequiredtobeoperabletheexercising testscheduleneednotbefollowed.
Introduction:==
Within30dayspriortoreturnofthesystemtooperablestatus,thevalvesshallbeexercised andthescheduleresumed.4.74.8Thetestingofvalvesrequiredatcoldshutdownandrefueling outageswillnormallytakefour(4)daystocomplete.
Discussion Definitions:
Whencoldshutdowns areofashorterduration(2-3days),testpersonnel shallattempttotestasmanyvalvesaspossiblewithoutholdingupthestartupoftheunitwithtestingbeginning nolater.than48hoursaftertheplantreachescoldshutdown(asdefinedinTechnical Specification 1.2).Forveryshortcoldshutdowns (lessthan48hours),itwouldbeimpossible tomobilizetestpersonnel toimplement thetestingprogramundertherequiredprocedural
Program:       PVT  l.0  Scope and  Responsibility PVT  2.0 Code Edition and Testing Interval PVT  3.0 Inservice Pump Testing Program PVT  4.0 Inservice Valve Testing Program PVT  5.0  Records sa02OS0>0S  aaozas PDR  ADOCK  05000244 P                  PDR
: controls, therefore novalveswouldbetested.Itispossiblethat,duringafour(4)daycoldshut-down,theworkloadontestpersonnel mayprecludetheircompletion ofalltherequiredvalvetestspriortostartup.Anytestingnotcompleted atonecoldshutdownduetooutagedurationshallbeperformed duringanysubsequent coldshutdowns thatmayoccurbeforethenextrefueling outagetomeetthespecified testingfrequency.
Valvetestingduringcoldshutdowns neednotbemorefrequentthanonetestperquarterforeachvalveinthetestprogram.)CategoryAValvesValve5~TeDescritionNoteTest~Fre204A304A304BMVLetdowntoNRHXCV1-ARCPSealInjection CV1-BRCPSealInjection StrokeC/RLeakRStrokeC/RLeakRStrokeC/RLeakR QUALITYASSURANCE MANUALGINNASTATIONTITL,KaAPPENDIXCPumpandValveTestingProgramGATEPAGE1/30/8611gf:40Valve5~Te.NoteTest~Fre313370B371383B508528529539546547743745749A749B750AMOVSealWaterReturnIsolation CVChargingLineIsolation AOVLetdownIsolation CVAlternate ChargingIineAOVRMWtoContainment VesselStopCVN2SupplytoPRTCVRMWtoPRTAOVPRTStopValvetoGasAnalyzerMVPRTtoGasAnalyzerMVNitrogentoPRTCVCCFromExcessLetdownHX.AOVReturnFromExcessLet-downHX.MOVCCWtoARCPMOVCCWtoBRCPCVCCtoARCPStrokeLeakStrokeLeakStroke.LeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakC/RRC/RRC/RRC/RRQRQRQRQRQRQRQRC/RRC/RRC/RR QUALITYASSURANCE'ANUAL GINNASTATIONTITLE)APPENDIXCPumpandValveTestingProgramDATEPAGE1/30/8612DF40Valve4T~e750BCVCCtoBRCPNoteTestStrokeLeak~FreC/RR759A759B813814820842A842B846853A853B862A862BMOVContainment StopCCFromLoopARCPMOVContainment StopCCFromIoopBRCPMOVCCSupplytoRXSupportCoolersMOVCCReturntoRXSupportCoolersMVLetdowntoNRHXCVLoopAAccumulator DumpLineCheckValveCVLoopBAccumulator DumpLineCheckValveAOVN2SupplytoAccumulators CVCoreDelugeCheckCVCoreDelugeCheckCV1-ACSPDischCVl-BCSPDisch57282810101010StrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakC/RRC/RRC/RRC/RRC/RC/RC/RC/RQRC/RC/RC/RC/RQRQR867A867BCVAccumulator DumpandSItoColdLegLoopBCVAccumulator DumpandSItoColdLegLoopA13Stroke13Leak13Stroke13LeakRC/RR.C/R QUALITYASSURANCE MANUALGINNASTATIONTITI.EcAPPENDIXCPumpandValveTestingProgramDATE1/30/86PAGE13DP40870BCVl-Bto1-CSIPumpDischValve0~Te870ACV1-Ato1-CSIPumpDischNoteTestFree{StrokeQLeakRStrokeQLeakR877A877B878F878G878H878J879889A889B921922923924CVHighSafetyInjection LoopBHotLegCVHighSafetyInjection LoopAHotLegCVHighSafetyInjection LoopBHotLegCV1-ASIPumptoColdLegLoopBCVHighSafetyInjection LoopAHotLegCV1-BSIPumptoColdLegZoopAMVSITestLineIsolation CVl-ASIPumpDischCVl-BSIPumpDischSOVLoopAHydrogenMonitorInletSOVZoopAHydrogenMonitorOutletSOVLoopBHydrogenMonitorInletSOVLoopBHydrogenMonitorOutlet11291129ll-29131311291313StrokeLeak40Mo.StrokeLeak40Mo.StrokeZ,eak40Mo.StrokeRLeakC/RStrokeLeak40Mo.StrokeRLeakC/RStrokeLeakRStrokeQLeakRStrokeQLeakRStrokeQLeakRStrokeQZeakRStrokeQZ,eakRStrokeQLeakR QUAZITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramDATEPAGE1/30/8614DF40Valve0~eDescritionNoteTest~Fre956D956E956F966A966B966C1003AHotLegLoopSampleContainment Isolation PRZRLiquidSpaceSampleContainment Isolation AOVAOVAOVPRZRSteamSpaceSampleContainment Isolation Pressurizer SteamSpaceContainment Isolation Pressurizer LiquidSpaceContainment Isolation LoopAandBHotLegContainment Isolation LCVl-ARCDTPumpSuctionStrokeQLeakRStrokeQLeakRStrokeQLeakRStrokeQLeakRStrokeQZeakRStrokeQZeakRStrokeQLeakR1003B1076AIV-3A1076BIV-3B1080AIV-2AIV-2BLCVl-BRCDTPumpSuctionMVHydrogento"A"Recombiner 11PilotContainment Isolation SOVHydrogento"A"Recombiner llPilotContainment Isolation MVHydrogento"B"Recombiner llPilotContainment Isolation SOVHydrogento"B"Recombiner llPilotContainment Isolation MVOxygenMakeUptoContain-llment,Isolation.
OxygenMakeUptoContain-llmentIsolation (ARecombiner)
OxygenMakeUptoContain-11ment,Isolation (BRecombiner)
StrokeZeakStrokeLeakStrokeZeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakQRR QUALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramDATEPAGE1/30/8615OF40Valve5~e1084AMVHydrogento"A"Recombiner MainBurnerContainment Isolation NoteTestStrokeLeak~FreIV-5A1084BIV-5B1554155615571559156015621563156515661568SOVHydrogento"A"Recombiner MainBurnerContainment Isolation MVHydrogento"B"Recombiner MainBurnerContainment Isolation SOVHydrogento"B"Recombiner MainBurnerContainment Isolation MVDRecirc.FanAirSampleIsolation MVDRecirc.FanAirSampleIsolation MVARecirc.FanAirSampleIsolation MVARecirc.FanAirSampleIsolation MVASDReturnIineIsolation MVA6DReturnLineIsolation MVBRecirc.FanAirSampleIsolation MVBRecirc.FanAirSampleIsolation MVBRecirc.FanAirSampleReturnLineIsolation MVBRecirc.FanAirSampleReturnLineIsolation StrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakR
'J QUALITYASSURANCE MANUALGINNASTATIONTITLEiAPPENDIXCPumpandValveTestingProgramDATEPAGEi2QC1/30/86'6 DF40Valve4~Te1569157115721574CRecirc.FanAirSampleIsolation CRecirc.FanAirSampleIsolation CRecirc.FanAirSampleReturnLineIsolation CRecirc.FanAirSampleReturnLineIsolation NoteTest~FreStrokeLeakRStrokeLeakRStrokeLeakRStrokeLeakR15961597159815991655l7l3172l1723172817861787MVRadiation MonitorSupplyAOVRadiation MonitorSupplyAOVRadiation MonitorExhaustAOVRadiation MonitorExhaustMVRCDTtoGasAnalyzerCVN2toRCDTAOVSuctionlinetoRCDTAOVAContainment SumpDischtoWasteHoldupTankAOVAContainment SumpDischtoWasteHoldupTankAOVRCDTtoVHIsolation AOVRCDTtoVHIsolation StrokeQLeakRStrokeQLeakR'trokeQLeakRStrokeQLeakRStrokeQLeakRStrokeQLeakRStrokeQLeakRStrokeQLeakRStrokeQLeakRStrokeQ'eakRStrokeQLeakR QUALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramDATE1/30/86PAGE1740Valve4~TeNoteTest~Fze1793MVN2toRCDTIsolation l789AOVRCDTtoGAContainment Isolation 11*StrokeLeakStrokeLeakQR1819AMVContainment PressureTransmitter 945Isolation 21StrokeLeakC/RR1819BMVContainment PressureTransmitter 946Isolation 21StrokeC/RLeakR1819CMVContainment PressureTransmitter 947Isolation 21StrokeLeakC/RR1819DMVContainment PressureTransmitter 948Isolation 21StrokeC/RLeakR1819E1819FMVContainment PressureTransmitter 949Isolation MVContainment PressureTransmitter 950Isolation 2121StrokeLeak'troke LeakC/RRC/RR1819GMVContainment Piessure21Transmitter 944Isolation StrokeLeakC/RR46014602CV1AServiceWaterPump31Discharge 31CV1BServiceWaterPump31Discharge 31StrokeLeakStrokeLeakQRQR4603CV1CServiceWaterPumpDischarge 3131StrokeLeakQR460451295392CV1DServiceWaterPump31Discharge 31MVConstruction FireService11WaterContainment Isolation AOVInstrument AirtoContain-19mentIsolation StrokeLeakStrokeLeakStrokeLeakQRRR TITLEsDATEQUAIITYASSURANCE MANUALGINNASTATIONAPPENDIXCPumpandValveTestingProgram1/30/86PAGE18pp40Valve4~TeNoteTest~Fre5393570157025733CVInstrument AirtoContainment Isolation MVA-S/GBlowdownIsolation MVB-S/GBlowdownIsolation MVA-S/GSampleIsolation 19StrokeRLeakRStrokeQLeakRStrokeQLeakRStrokeQLeakR57345735MVB-S/GSampleIsolation AOV"A"S/GBlowdownSampleIsolation StrokeQLeakRStrokeQLeak'573657375738586958705878587961516152AOV"B"S/GBlowdownSampleIsolation AOV"B"S/GBlowdownIsolation AOV"A"S/GBlowdownIsolation APVContainment PurgeSupplyIsolation APVContainment PurgeSupplyIsolation APV.Containment PurgeExhaustIsolation APVContainment PurgeExhaustIsolation MVAuxiliary SteamSupplytoContainment MVCondensate ReturnfromContainment
*-SeeNote2222222222StrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeLeakStrokeIeakQRQRQR QUAIITYASSURANCE MANUALGINNASTATIONTITLEsAPPENDIXCPumpandValveTestingProgramDATE1/30/86PAGE19DP40Valve8~Te6165Aux.SteamSupplytoContainment NoteTestFree{StrokeLeak6175714172267443CVMOVCondensate ReturnfromContainment ServiceAirIsolation OutsideContainment ServiceAirIsolation InsideContainment Containment AirTestSupplyStrokeLeakStrokeLeakStrokeLeakllStrokeLeakR74447445744874527456797079718418MOVContainment AirTestVentMOVContainment AirTestVentMVIsolation ValvefromContainment toLocalPressureIndicator forContainment AirTestMVIsolation ValvefromContainment toLocalPressureIndicator forContainment AirTestMVIsolation ValvefromContainment toIocalPressureIndicator forContainment AirTestAOVContainment Depressuri-zationValveAOVContainment Depressuri-zationValveAOVDemin.WatertoContain-mentIsolation llStrokeLeakR11StrokeLeakR11StrokeIeakR11StrokeLeakRllStrokeLeakRStrokeQLeakRStrokeQLeak-RStrokeLeakR QUALITYASSURANCE MANUALGINNASTATIONTITLE)APPENDIXCPumpandValveTestingProgramDATE1/30/86PAGE20DF40Valve4~TeNoteTest~Fre84198623922792294.9CV.Demin.WatertoContain-mentIsolation CVNitrogentoAccumulators Isolation AOVFireServiceWaterContainment Isolation CVFireServiceWaterContainment Isolation CategoryBValvesStrokeLeakStrokeLeakStrokeLeakStrokeIeakValve0~Te014017RCVAuxBuildingGDTReleaseRCVComponent, CoolingSurgeTankVentNoteTestFree{StrokeQStrokeQ081082083084085086ll2B112CAPVControlRoomVentilation DamperAPVControlRoomVentilation DamperAPVControlRoomVentilation DamperAPVControlRoomVentilation DamperAPVControlRoomVentilation DamperAPVControlRoomVentilation DamperLCVEmergency MakeupRWSTtoChargingPumpLCVVCTOutletStrokeQStrokeQStrokeQStrokeQStrokeQStroke.QStrokeQStrokeQ


QUALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramDATE1/30/86PAGE21DF40Valve5~TeDescrition427430AOVLetdownFromLoopBPORVPressurizer PowerOperatedReliefNoteTest~Fre3StrokeC/R16StrokeC/R431CPORVPressurizer PowerOperatedRelief16StrokeC/R515516MOVMOVPressurizer PORVBlockValvePressurizer PORVBlockValve23StrokeQ23StrokeQ590591592593624625626700MOVRHRInletIsolation FromLoopASOVReactorHeadVentSOVReactorHeadVentSOVReactorHeadVentSOVReactorHeadVentHCVl-BRHRHXOutletHCV1-ARHRHXOutletFCVRHRLoopReturnRecirc.26StrokeC/RStrokeQStroke'/R 32StrokeR32StrokeR32StrokeR32StrokeR26StrokeC/R701MOVRHRInletIsolation FromLoopA8StrokeC/R704A704B720MOVRHRReturnIsolation toLoopBMOVSuctionl-ARHRPumpMOVSuctionl-BRHRPump24StrokeQ24StrokeQ8StrokeC/R72lMOVRHRReturnIsolation toLoopB8StrokeC/R QUALITYASSURANCE MANUALGINNASTATIONTITLE<APPENDIXCPumpandValveTestingProgramDATEPAGE1/30/8622PP40Valve4~TeNote.Test~Fre738A738B825A825BMOVCCto1-ARHRHXMOVCCtol-BRHRHXMOVSIPumpSuctionFromRWSTMOVSIPumpSuctionFromRWSTStrokeQStrokeQ9StrokeC/R9StrokeC/R826AMOVSIPumpSuctionFromBATank25StrokeQ826BMOVSIPumpSuctionFromBATank25StrokeQ826C826D836A836BMOVSIPumpSuctionFromBATankMOVSIPumpSuctionFromBATankHCVSprayAdditiveTankDis-chargeHCVSprayAdditiveTankDis-charge25StrokeQ25StrokeQ17/24StrokeQ17/24StrokeQ850A850B851A851B852A852BMOVSumpBtoRHRPumpsMOVSumpBtoRHRPumpsMOVSumpBtoRHRIsolation MOVSumpBtoRHRIsolation 24StrokeQ24StrokeQStrokeStrokeStrokeC/RStrokeC/R3030MOVRHRPumpstoReactorVessel18MOVRHRPumpstoReactorVessel18856MOVRWSTtoRHRPumps9StrokeC/R857AMOVlBRHRHXtoCSandSIPumpIsolation 27StrokeC/R iI'4 QUALITYASSURANCE MANUALGINNASTATIONAPPENDIXCPumpandValveTestingProgramDATEPAGE1/30/8623pp40857BMOVValve4T~e1ARHRHXtoCSandSIPumpIsolation NoteTest~Fre27StrokeC/R857CMOVlARHRHXtoCSandSIPumpIsolation 27StrokeC/R860A860B860C860D871AMOV1-Ato1-CSIPumpDischarge MOV1-ACSPDischarge MOV1-ACSPDischarge MOV1-BCSPDischarge MOV1-BCSPDischarge 24StrokeQ24StrokeQ24StrokeQ24StrokeQ24.StrokeQ871BQ75A875B876A876BMOVMOVMOVMOVMOV1-Btol-CSIPumpDischarge CSPumpDischarge to1ACharcoalFilterDelugeCSPumpDischarge to1ACharcoalFilterDelugeCSPumpDischarge to1BCharcoalFilterDeluge-CSPumpDischarge to1BCharcoalFilterDeluge24StrokeQStrokeQStrokeQStroke,QStrokeQ896A896B897898951AOVPressurizer SteamSpaceSampleMOVRWSTtoCSandSIPumpsMOVRWSTtoCSandSIPumpsAOVSIPumpRecirc.toRWSTAOVSIPumpRecirc.toRWST9StrokeC/R9StrokeC/R27StrokeC/R27StrokeC/R33Stroke TITLEiDATE1/30/86QUALITYASSURANCE MANUALGINNASTATIONAPPENDIXCPumpandValveTestingProgramPAGE24op40Valve5~TeNoteTest~Fre9539559591811A1811B1815A1815B3504A3505A365239964000A4000B4007400840134027Pressurizer LiquidSpace33Sample'OVAOV"B"LoopHotLegSampleAOVRHRLoopSample20ReactorCoolantDrainTankllIsolation toRHRSystemReactorCoolantDrainTank11Isolation toRHRSystemMOVC-SIPumpSuctionFromRWST24MOVC-SIPumpSuctionFromRWST24MainSteamtoTAFPFrom1-BS/GMOVMainSteamtoTAFPFrom1-AS/GMOVMainSteamThrottleValvetoTAFPMOVTAFPDischarge MOVCrossOverValveForMAFPMOVCrossOverValveForMAFPMOV1-AMAFPDischarge MOV1-BMAFPDischarge TAFPServiceWaterSupplyIsolation MOV1-AMAFPServiceWaterIsolation MOVStrokeStrokeQStrokeC/RStrokeQStrokeQStrokeQStrokeQStrokeQStrokeMStrokeMStrokeMStrokeMStrokeMStrokeMStrokeM 0J~
4 0
QUALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramDATEPAGE1/30/8625DP40Valve0~Te4028MOV1-BMAFPServiceWaterIsolation NoteTest~FreStrokeM42914297429843044310456145624609461346144615461646274628AOVTAFPRecir.LineAOVTAFPDischarge to1-AS/GAOVTAFPDischarge to1-.BS/GAOV1-AMAFPRecirculation ControlAOV1-BMAFPRecirculation ControlAOVContainment VentRecirc.FansDischarge FlowCon-trolIAOVContainment VentRecirc.FansDischarge FlowCon-trolBypassMOVlAlScreenHouseSWIsolation MOV1B2TurbineBuildingSWIsolation MOVlA1TurbineBuildingSWIsolation MOV1BlAux.BuildingSWIsolation MOVlA1Aux.BuildingSWIsolation MVServiceWatertoAFanCoolerIsolation MVServiceWatertoBFanCoolerIsolation StrokeMStrokeMStrokeMStrokeMStrokeMStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQStroke.QStrokeQ
t K
'0'J QUALITYASSURANCE MANUALGINNASTATIONTITLE<APPENDIXCPumpandValveTestingProgramDATE1/30/86PAGE26OF40Valve4~TeDescrition4629MVServiceWaterfromAFanCoolerIsolation NoteTest~FreStrokeQ4630MVServiceWaterfromBFanCoolerIsolation StrokeQ4635MVReactorCompartment Cooling-.StrokeQUnitAInletIsolation 4636MVReactorCompartment, Cooling-Stroke'UnitAOutletIsolation 4641464246434644MVServiceWatertoCFanCoolerIsolation MVServiceWatertoDFanCoolerIsolation MVServiceWaterfromCFanCoolerIsolation MVServiceWaterfromDFanCoolerIsolation StrokeQStrokeQStrokeQStrokeQ4663MOV1AlAirCond.ChillersSW-StrokeQIsolation 46644670MOV1A2TurbineBuildingSWIsolation MOV1B1TurbineBuildingSWIsolation StrokeQStrokeQ4733MOV1A2AirCond.ChillersSW-StrokeQIsolation 47354757MOV1B2Aux.Build.SWIsolation-MOV1A2Aux.Build.SWIsolation-MVReactorCompartment CoolingUnitBInletIsolation StrokeQStrokeQStrokeQ QUALITYASSURANCE MANUALGINNASTATIONTITLE<APPENDIXCPumpandValveTestingProgramDATEPAGE1/30/8627pF40Valve4~Te4758NoteReactorCompartment CoolingUnitBOutletIsolation Test~FreStrokeQ47805171587l5872MOVMOV1A2ScreenHouseSWIsolation TurbineBuild.FireWaterLoopSupplyIsolation Containment PostAccidentFilterDamperContainment PostAccidentFilterDamperStrokeQStrokeQStrokeQStrokeQ5873APVContainment PostAccidentFilterDamperStrokeQ5874587558769629AAPVMOVContainment PostAccidentFilterDamperContainment PostAccidentFilterDamperContainment PostAccidentFilterDamper1CSAFPServiceWaterIsolation StrokeQStrokeQStrokeQStrokeQ9629B9701A9701B9703A9703B9704AMOV1DSAFPServiceWaterIsolation MOV1CSAFPDischarge MOV1DSAFPDischarge MOVSAFPCrossOverMOVSAFPCrossOverMOV1CSAFPContainment Isolation StrokeQStrokeQStrokeQStrokeQStrokeQStrokeQ 0
 
QUALITYASSURANCEMANUALGINNASTATIONAPPENDIXCPumpandValveTestingProgramDATEPAGE1/30/8628oF40Valve4~Te9704B9710A9710B4.10MOV1DSAFPContainment Isolation AOV1CSAFPRecirc.ControlAOV1DSAFPRecirc.ControlCategoryCCheckValvesNoteTest~FreStrokeQStrokeQStrokeQValve5~TeNoteTest~Fre710A710B723A723B847A847B854866A866B3516351739984000C4000DCV1-ARHRPumpDischarge CV1-BRHRPumpDischarge CV1-ACCPumpDischarge CV1-BCCPumpDischarge CVA-CSPFromSprayAdditiveTanktoEductorCVB-CSPFromSprayAdditiveTanktoEductorCVRWSTtoRHRPumpCheckCVCSPump.l-AtoCharcoalFilterDelugeCVCSPump1-BtoCharcoalFilterDelugeCVlBMainSteamIsolation CV1AMainSteamIsolation CVTAFPDischarge CheckCVlAMAFPDischarge CheckCVlBMAFPDischarge CheckStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQ12StrokeC/RStrokeQStrokeRStrokeRStrokeMStrokeMStrokeM TITLE:DATEQUALITYASSURANCE MANUALGINNASTATIONAPPENDIXCPumpandValveTestingProgram1/30/86PAGE29OP40Valve0~TeNoteTest~Fre40034004400940104014401640174023513351369627A9627B9700A9700B9705A9705BCVTAFPtoS/GlACVTAFPtoS/GlBCVlAMAFPtoS/GlACVlBMAFPtoS/GlBCVTAFPSuctionCV1BMAFPSuctionCVlAMAFPSuctionCVTAFPRecirculation CVDieselFirePumpDisch.CVMotorFirePumpDischarge CV1CSAFPSWSuctionCV1DSAFPSWSuctionCV1CSAFPDischarge CV1DSAFPDischarge CV1CSAFPtoS/G1ACV1DSAFPtoS/G1B4.11CategoryCReliefValveStrokeMStrokeMStrokeMStrokeMStrokeMStrokeMStrokeMStrokeMStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQStrokeQValve4~TeNoteTest~Fre203209RVLetdownHighPressureSafetyReliefRVLetdownLowPressureSafetyRelief1515434RVPressurizer SafetyRelief15 TITLEcDATE1/30/86QUALITYASSURANCE MANUALGINNASTATIONAPPENDIXCPumpandValveTestingProgramPAGE30OP40DescritionValve0~Te435732755A755B758A758B818861887181735083509351035113512.351335143515NoteTest~FreRVPressurizer SafetyRelief15RVCCSurgeTankRelief15CCFromExcessLetdownHeatExchanger 15RVCCFromARCPThermalBarrierCCFromBRCPThermalBarrier15RV15RVRVCCFromA-RCPOilCoolers15RVCCFromB-RCPOilCoolers15CCFromReactorSupportCoolers15RVRV1-BCSPumpSuctionRelief15SITestZineReliefValveInsideContainment 15RVAlternate SuctionFromRHRPumptoCSIPump15RVRV1-BS/GPRVRV1-AS/GPRVRV1-BS/GPRVRV1-AS/GPRVRV1-AS/GPRVRV1-AS/GPRVRV1-BS/GPRVRV1-AS/GPRV1515151515151515 QUALITYASSURANCE MANUALGINNASTATIONTITLEtAPPENDIXCPumpandValveTestingProgramDATEPAGEl/30/8631OF40Valve5T~e4653RV.ServiceWaterReliefNoteTest~Fre154654RVServiceWaterRelief1546575134RVServiceWaterReliefRVDieselFirePumpDischRelief15155135RVMotor'Fire PumpDischRelief154.12Inservice ValveTestingNotesNote1-Valves304A,304Band313cannotbestrokedduringnormalplantoperation onaquarterly basisbecausetheywouldinterrupt coolantflowtothereactorcoolantpumpseals.Thesevalveswillbestrokedatcoldshutdowns andrefuel-ingoutages.Note2-Valve370Bcannotbestrokedduringnormalplantoperation onaquarterly basisbecausethistestwouldinterrupt chargingpumpflow.Thisvalvewillbestrokedatcoldshutdowns andrefueling outages.Note3-Valves204A,371and427cannotbestrokedduringnormalplantoperation onaquarterly basisbecausethistestwouldinterrupt theletdown(CVCS)system.Thesevalveswillbestrokedatcoldshutdowns andrefueling outages.Note4-Valve383Bcannotbestrokedduringnormalplantoperation onaquarterly basisbecausethistestwouldresultinsubstantial radiation exposuretotestpersonnel.
TITLKs                          DATE QUAI ITY                                            1/30/86 AS SURANCE                APPENDIX C            PAGE MANUAI                Pump and Valve GINNA STATION            Testing Program                2  DP 40 Introduction This appendix to the Quality Assurance Manual defines the Inservice Pump and Valve Testing Program for the ten year period starting January 1, 1981 through December 31, 1989.
Surveys.intheareaofthetestconnection duringplantoperation indicateneutronfieldsofapproximately 500mr/hrandagammafieldsof250mr/hr.
Included in this program are the Quality Groups A, B and C Pumps which are provided with an emergency power source and those Quality Groups A, B and C Valves which are required to shut down the reactor or to mitigate the consequences of an accident and maintain the reactor in a safe shutdown condition.
QUALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramDATE1/30/86PAGE32DF40Totalwholebodydosagetotestpersonnel isestimated tobe375mrem.Thisvalvewillbestrokedatcoldshutdowns andrefueling outages.Note5-Valves749A,749B,750A,750B,759Aand759Bcannotbestrokedduringnormalplantoperation onaquarterly basisbecausethistestwouldrequirethereactorcoolantpumpstobeshutdowntoeliminate theflowthroughthesechecksandMOVs.Thesevalveswillbestrokedatcoldshutdowns andrefueling outages.Note6-Valves813and814cannotbestrokedduringnormalplantoperation onaquarterly basisbecausethistestwouldremovethecoolanttothereactorvesselsupportsandcavitywall.Thesevalveswillbestrokedatcoldshutdowns andrefueling outages.Note7-Valve879isamanualvalveinthesafetyinjection testlineandiskeptlockedshut.Thisvalveisnotrequiredtochangepositiontoperformasafetyfunc-,tion.Theonlyrequirement isthatleak-agethroughvalve879beacceptably low.Therefore, thequarterly stroke,testhasbeendeleted.Thispassivevalvewillbeonlyleaktestedatrefueling outagesconsistent withIWV-3700-1.
    "This program has been developed as required by Section 50.55a(g) of 10CFRSO following the guidance of the ASME Boiler and Pressure Vessel Code Section XI  "Rules for Inservice Inspection of Nuclear Power Plant Components," (hereafter referred to as the "Code" ) excluding the controls of the Authorized Inspector, Enforcement Authority, Reporting Systems and N-Stamp Symbol. The inservice testing program shall be controlled by the Ginna Station Quality Assurance Program for Station Operation. Quality Groups A, B and C components correspond to those defined in NRC- Regulatory Guide 1.26.
Note8-Valves700and721cannotbestrokedduringnormalplantoperation onaquarterly basisbecausethereisaninterlock systemwhichpreventsthesevalvesfromopeningwhentheprimarysystemisatoperating pressure.
Further addenda and editions of Section XI of the Code shall'be used for clarification of test. requirements and performance.
Valves700,701,720and721separateahighpressuresystemfromalowpressuresystem.Thesevalveswillbestrokedatcoldshutdowns andrefueling outages.
The  Inservice Pump and Valve Testing Program substantially augments  but does not affect the pump and valve surveillance program required by Technical Specifications. Technical Specification requirements associated with pump and valve surveillance, shall continue to be implemented as specified.
QUALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramDATEPAGE1/30/86OFNote9-Valves825A,825B,856,896A,and896Bshouldnotbestrokedduringnormalopera-tiononaquarterly basisbecause-thiswouldcauseatemporary lossofsystemfunctionoftheECCS.Thesevalvespro-videthesuctionfromtherefueling waterstoragetanktothesafetyinjection andresidualheatremovalpumps.Thesevalveswillbestrokedatcoldshutdowns andre-fuelingoutages.Note10-Valves853Aand853Bcannotbestrokedduringnormalplantoperation onaquarterly basisbecausethistestrequirespressurizing theRHRsystemtotheprimarysystemoperation pressure.
 
Thesevalveswillbestrokedatrefueling outages.Leakagetestingofcheckvalves853Aand853Bshallbeaccomplished priortocriticality following (1)refueling, (2)coldshutdown, and(3)maintenance, repairorreplacement workonthevalves.Leakagemaybemeasuredindirectly fromtheperformance ofpressureindicators, systemvolumemeasuurements orbydirectmeasurement.
42i52 C TITLEs                            DATE QUALITY                                            1/30/86 ASSURANCE                APPENDIX  C          PACE MANUAI                Pump and  Valve GINNA STATION            Testing Program                3  DP  40 Definitions AFP          Auxiliary Feedwater Pump AOV          Air Operated Valve APV          Air Operated Piston Valve BA          Boric Acid Code        American Society of Mechanical Engineers Boiler and Pressure Vessel Code CC          Component Cooling CS          Containment Spray CSP          Containment Spray Pump CV          Check Valve C/R,         Cold Shutdown and Refueling ECCS        Emergency Core Cooling System FCV          Flow Control Valve GA          Gas Analyzer GDT          Gas Decay Tank HCV          Hand    Control Valve HX          Heat Exchanger LCV          Level Control Valve M            Monthly MAFP        Motor Driven Auxiliary Feedwater  Pump
Minimumtestdifferential shallbegreaterthan150psid.Technical Specification 4.3.3.4definestheallowable leakagerates.Notell-Valves820,877A,877B,878F,878H,1076A,1076B~1080Ag1084Ag1084BgIV3AgIV3BgIV5AgIV5BgIV2AgIV2Bg1554g1556g1557~1579g1560'562'563'565'566/
        'OV Motor Operated Valve Manual Valve PCV          Pressure Control Valve PORV        Power Operated Relief Valve PRT          Pressurizer Relief Tank PRV          Pressure Relief Valve PVT          Pump and Valve Testing Q            Quarterly R            Refueling Outage RCDT        Reactor Coolant Drain Tank RCP          Reactor Coolant Pump RCV          Radiation Control Valve RHR          Residual Heat Removal RMW          Reactor Makeup Water RV          Relief Valve RWST        Refueling Water Storage Tank RX          Reactor Vessel S/G          Steam Generator SAFWP        Standby  Auxiliary Feedwater Pump SI          Safety Injection SOV          Solenoid Operated Valve SW          Service Water
1568g1569~157115721574g1793g1811Ag1811Bg5129g6151'152@
 
6155'175@
4    r i.
7141@7226g7443g7444g7445g7448g7452g7456/8418,8419,8623,9227and9229arecon-sideredpassivevalveswhicharenotrequiredtochangepositiontoacccomplish theirspecificfunction.
    ,S
Strokingthesevalveswouldservenousefulfunctionandwilltherefore notbedoneasperIWV-3700-1.
 
QUALITYASSURANCE MANUALGINNASTATIONTITLEiAPPENDIXCPumpandValveTestingProgramDATEPAGE1/30/8634DP40Note12-NoteNote14-Note15-Valve866Acannotbestroketestedduringnormalplantoperation onaquarterly basisbecausethistestwouldresultinasub-stantialradiation exposuretotestper-sonnel.Stroketestingatthislocationresultedinapproximately 400-mremwholebodyexposuretothetestpersonnel.
42i5t C TITLE<                            DATE QUALITY                                              1/30/86 ASSURANCE                APPENDIX  C PAGE MANUAL                Pump and Valve GINNA STATION            Testing Program                4  DF 40 Definitions TAFP          Turbine Driven Auxiliary Feedwater  Pump VC            Volume Control VCT            Volume Control Tank VH            Vent Header CAT A VALVE  Valves  for which seat leakage is limited to a  specific maximum amount in the closed position of fullfillment of'their function.
Thisvalve'willbestrokedatcoldshutdowns andrefueling outages.Valves867A,867B,878G,and878Jcannotbestrokedduringnormaloperation onaquarterly basisoratcoldshutdowncondition whentheprimarysystemisfull.Thistestmayonlybedonewhentheplant.isinarefueling shutdowncondition withapartially fullprimarysysteminordertopreventanover-pressurization.
CAT B VALVE  Valves for which seat leakage in the closed position is inconsequential for fullfillment of their function.
Leakage,testingofcheckvalves867A,867B,878Gand878Jshallbeaccomplished priortocriticality, exceptforlowpowerphysicstesting,following (1)refueling, (2)coldshutdown, and(3)maintenance, repairorreplacement workonthevalves.Leakagemaybemeasuredindirectly fromtheperformance ofpressureindicators, systemvolumemeasurements orbydirectmeasurement.
CAT C VALVE  - Valves which are self-actuating in response to some characteristic, such as pressure (relief valves) or flow direction (check valves).
Checkvalves878Gand878Jshallalsobetestedforleakagefollowing eachsafetyinjection flowtest.Minimumtestdifferential shallbegreaterthan150psid.Technical Specification 4.3.3.4definestheallowable leakagerates.Valves3516and3517cannotbestrokedduringnormalplantoperation onaquar-terlybasisbecausetheyarethemainsteamisolation valves.Thesevalves,arestrokedduringeachplantrefueling.
 
CategoryCReliefValvesshallbetestedinaccordance withtheextentandfre-quencyrequirements ofParagraph IWV-3510ofArticleIWVofSectionXIoftheCode.  
ze t J r
~T'J QUALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramDATEPAGE1/30/8635Op40Note16-Valves430and431Carethepoweroperatedreliefvalvesassociated withtheoverpressurization system.Thesevalvesshallnotbestrokedquarterly asanunplanned pressuretransient couldresult,fromaleakyblockvalve.Operability ofthesevalvesshallbeverifiedasfollows:(1)Fullstrokeexercising duringcooldownpriortoachieving watersolidcondition inthepressurizer andduringcoldshutdownpriortoheatup.(2)Stroketimingtobeperformed asaminimumonceeachrefueling cycleasapartofthechannelcalibration specified byTechnical Specifications 4.16.lb.(3)Failsafeactuation testingispermitted bythecodetobeper-formedateachcoldshutdownifvalvecannotbetestedduringpoweroperation.
 
(4)Technical specification 4.16.1aand4.16.1cdelineate additional re-quirements foroperability verifi-cationofthePORVactuation channelandvalveposition.
TITLEc                              DATE QUALITY                                                  1/30/86 AS SURANCE                    APPENDIX C              PAGE MANUAL                    Pump and Valve GINNA STATION                Testing Program                  5  DF 40 Pum    and Valve  Testin  Pro ram PVT  1.0      Sco e and Res    onsibilit The  inservice testing program defines the testing program for Quality Groups A, B and C Pumps and Valves in accordance with the requirements of Articles IWP and IWV of Section XI of the Code.
Note17-Additional strokingwillbeconsistent withTechnical Specifications.
The results of these tests are to assure the operational readiness of pumps and valves.
Note18-Valves852Aand852Bcannotbestrokedduringnormalplantoperation asthesevalves,whencycled,couldsubjecttheResidualHeatRemovalSystemtoapressureinexcessofitsdesignpressure.
1.2      It is the responsibility of the Ginna Station Test and Results Supervisor to implement this test program and develop inservice test proce-dures which will outline the specific test for each pump and valve included      in the program.
Thesevalveswillbestrokedatcoldshutdowns andrefueling outages.Note19-StrokingValves5392and5393duringoperation andcoldshutdownwouldinter-ruptinstrument airtocontainment and QUALITYASSURANCE MANUALGINNASTATIONTITLE:APPENDIXCPumpandValveTestingProgramDATE1/30/86PAGE36DF40Not.eNote20-21-bedisruptive toairoperatedvalvesinside.'hese valveswillbestrokedatrefueling outages.Valve959isnormallyclosedandinthecontainment isolating positionduringnormaloperation.
1.3      When a  valve, pump or its control system has been replaced or repaired or has undergone maintenance that could affect its performance, and prior to the time    it is returned to service,  it  shall be tested as necessary to demonstrate that the per-formance parameters which could have been affected by the replacement, repair, or maintenance are within acceptable limits.
Thesevalveswillbestrokedatcoldshutdownandrefueling outages.Valves1819A,B,C,D,E,FandGcannotbestrokedduringnormalplantoperation asthistestwouldinterrupt containment pressuremonitoring transmitters fromperforming theirintendedfunction.
PVT  2.0       Code  Edition and Testin Interval 2.1      The Inservice Pump and Valve Testing Program for the ten (10) year period starting January 1, 1981 through December 31, 1989 was developed utilizing the 1977 Edition of Section XI of the Code through the    Summer 1978 Addenda.
Thesevalveswillbestrokedatcoldandrefueling outages.NoteNoteNote22-23-CategoryAvalves5869,5870,5878and5879arenormallyclosedandinthecontainment isolating positionduringnormaloperation.
PVT  3.0      Inservice Pum Testin Pro ram 3.1      The Inservice Pump Testing Program was developed in accordance with the requirements of Article IWP of Section XI of the Code.       This program includes all Quality Group A, B and C pumps which are provided with an emergency power source and are required to perform a specific function in shutting down a reactor or in mitigating the consequences of an accident and maintain the reactor in a safe shutdown condition.
Leaktightness ofthesevalvesisreverified following
 
.reclosure aftereachuseinaccordance withSection4.4.2.4ofTechnical Speci-fications.
TITLE<                             DATE QUALITY                                              1/30/86 ASSURANCE                  APPENDIX C            PAGE MANUAL                  Pump and Valve GINNA STATION            Testing Program                6  OF 40 3.2      The following pumps shall be tested in accordance with Article IWP of Section XI:
Thevalvesshallbestrokedat.leasteachcoldshutdown.
(a)  lA Component Cooling (b)  lB Component Cooling (c) 1A Safety Injection (d) lB Safety 1njection (e) lC Safety Injection (f) lA Residual Heat Removal (g) 1B Residual Heat Removal (h) lA Containment Spray (i) 1B Containment Spray (j) lA    Motor Driven Auxiliary Feedwater (k) lB Motor Driven Auxiliary Feedwater (1) Turbine Driven Auxiliary Feedwater (m) lA Service Water (n)  lB Service Water (o)  1C  Service Water (p)  lD Service Water (q)  1C  Standby  Auxiliary Feedwater (r)  1D  Standby  Auxiliary Feedwater 3.3      With one exception, test parameters that shall be measured or observed during inservice testing of each pump are those listed in Table IWP-3100-1 of Section XI and include inlet pressure, differential pressure, flow rate, vibration amplitude, and proper lubricant level or pressure. The exception is for the measurement of pump bearing temperatures and there are several reasons why this measurement is either undesirable or inconclusive. Specifically, for the service water pumps, the bearings are submersed in up to forty feet of water making bearing temperatures closely approximate the surrounding water temperature and measurement of temperatures almost impossible. For the auxiliary and standby auxiliary feedwater pumps the test conditions require the discharge of ambient temperature water into the 400 degree F feedwater lines. Since it can typically take in excess of an hour to stabilize bearing temperatures this causes an unnecessary extended temperature trans-ient, in the feedwater line. For the residual heat removal and safety injection pumps the system configurations do not allow testing the pumps at actual pump service conditions during lant o eration. Instead the tests must be
Inaddition, ifthevalvesareopenedforpurging,-theyshallbestrokedatleastonceeachquarterduringwhichtheyhavebeenopened.Valves515and516strokedquarterly exceptifalreadyclosedorduringcoldandrefueling shutdowns'.
 
Nottobedoneduringtimethatredundant valveisinoperable perTechnical Speci-fication.
4i AC TITLE<                            DATE QUALITY                                              l/30/86 ASSURANCE                  APPENDIX C            PAGE MANUAL                  Pump and Valve GINNA STATION            Testing Program                  7  OF 40 performed at an off-design flow condition which results in higher bearing temperatures than normal. This is to be expected since higher than normal thrust loads are placed on the pump bearings during this reduced flow test condition. The extended time required for bearing temperatures to stabilize subjects the pump to lengthy periods of unnecessarily high loads. The pump vendors do not consider the measurement of bearing temperature in this type of off-design condition to be a good indication of bearing conditions. The vendors recommended bearing temperature limits are based on normal operating conditions and do not apply to this type of testing. In general, vibration is considered-to be a better indication of bearing condition since a significant increase in bearing temperature will normally only occur failure is imminent. Finally,    test if  bearing conditions cannot be easily controlled to produce temperature repeatability since readings are subject to a large number of variables such as ambient air temperature, cooling water temperature (where applicable), location of temperature probe attach-ment, temperature of the fluid pumped and quantity of the fluid pumped. One or both residual heat removal pumps may be required to be operable, by the plant Technical Specifications, when the average reactor coolant temperature is between 350 degrees F. and 200 degrees F. or the plant is at cold or refueling shutdown. Typically, in this case, at least one residual heat removal pump will be in operation. Testing will be performed in accordance with IWP-3400, which, includes operating the pump at reference conditions, if  practicable, and providing a log which shows that the parameters monitored during normal plant operation were measured, recorded and analyzed.
Note25-AsperTechnical Specifications 3.3.1.2.f, nocyclingshallbedoneifnormallyopenvalveinotherflowpathisinop'erable intheopenposition.
The practicability of duplicating cold shutdown reference conditions may be impacted by refueling water level during refueling and inservice reactor inspections as well as decay heat removal rate.
QUALITYASSURANCE MANUALGINNASTATIONTITLEcAPPENDIXCPumpandValveTestingProgramDATEPAGE1/30/8637OF40Note26-AsperTechnical Specifications3.3.1.2.e,failureofvalves624and625duringquarterly strokingintheclosedpositioncandegradeLPSIsystemfunction.
3.4      The test frequency for the pumps shall be as follows:
How-ever,thesevalvesshallbestrokedatcoldshutdownandrefueling outages.Note27-AsperTechnical Specifications 3.3.1.2.e,
: a. Component cooling water  pumps  shall  be tested monthl
~failureofvalves857A,857B,857C,897and898duringquarterly strokingcandegradetheinjection phaseoftheSIpumps.However,-
 
thesevalvesshallbestrokedatcoldshutdownandrefueling outages.Note28-Checkvalves842Aand842B(accumulator checkvalves)cannotandshouldnotbeexercised duringplantoperation.
.I p QUALITY                                                  1/30/86 ASSURANCE                  APPENDIX  C              PACE MANUAL                  Pump and  Valve GINNA STATION            Testing Program                    8    DF 40
Exercising ofthesevalvesrequiresthereactorcoolantsystempressuretobereducedtobelowaccumulator pressure.
: b. Safety injection pumps shall be tested monthly except during cold or refueling shutdowns. The pumps shall be tested      prior to startup exceeds if the time since the last one month.
Therefore testingofthesevalveswill'eperformed afterrefueling andcold'hutdowns, andaftermaintenance, repairorreplacement.
test C. Residual heat removal pumps shall be tested monthly except during cold or refueling shutdown. The pumps shall be tested prior to startup    if the time since the last test exceeds one month. When the reactor coolant system temperature is between 350'F and 200'F or the plant is at cold or refueling shutdown the plant Technical Specifications may require one or both residual heat removal pumps to be operable.       If this is the case, then the required pumps shall be tested monthly.
Fullstroketesting,whichinvolvesdischarge oftheaccumu-latorthroughthevalvetoapartially-filledreactorcoolantsystemwillnotbeutilizedsincethistestmodeisconsidered impractical andunsafe.Valveoperability fromthenormalclosed.position willbeverifiedbypartialstrokingpriortoleaktestingwithflowthroughthesafetyinjection testline.Leaktestingwillbeperformed toassureprimarysystemintegrity following eachcoldandrefueling shutdownafterachieving normalreactorcoolantsystempressureandpriortoreactorcriticality.
: d. Containment spray pumps shall be tested monthly except during cold or refueling shutdown. The pumps shall be tested prior to startup exceeds if the time since the last test one month.
Testingwillbeperformed byeither(1)closingeachaccumulator motoroperateddischarge valve,pressuring thelinedownstream ofthecheckvalvesandmeasuring theupstreamleakage,or(2)bymeasuring 1IP+'
: e. Motor driven    auxiliary feedwater pumps, turbine driven auxiliary feedwater pump, and the standby auxiliary feedwater pumps shall be tested monthly except during cold or refueling shutdowns.
QUALITYASSURANCE MANUALGINNASTATIONAPPENDIXCPumpandValveTestingProgram1/30/86PAGE38PP40accumulator in-leakage bypressurizing thelinedownstream ofthe842valves.ThesevalvesarenoteventV-checkvalves'.Therefore, thetestacceptance criterion shallbethatofTechnical Specification 3.1.5.Note29-Valves877A,877B,878Fand878Harecurrently notlistedinourvalvetestprogram,however,apairofthesevalvesineachhotleghighheadsafetyinjec-tionline(877And878FinloopBhotlegand877Band878HinloopAhotleg)togetherformoneofthetwopressureboundaries requiredtobetestedbyTechnical Specification 4.3.3.3.Becausethesevalvesarenormallyclosedandthepipingcontainsmotoroperatedvalves(MOV's)whicharealsoclosedanddeener-gized,thecheckvalveswillnot.movewiththepossibleexception ofwhentheMOVsarerequiredtobeopenedtotestthecheckvalves.Thus,oncetestedthecheckvalveswillremainclosed.AnNRCorderdatedApril20,1981established anappropriate testfrequency forthesevalvestobeonceevery40monthsoraftereachopeningoftheMOVs.ThesevalvesarelistedaspassivevalvesinourvalvetestingprogramwithtestingrequiredtomeetTechnical Specification 4.3.3.3.Note30-Valves851Aand851Bare'otqualified tooperateinthepost-accident containment environment andtherefore notrequiredtoperformapost-accident function.
The pumps shall be tested prior to exceeding 5% power  if the time since the exceeds one month.
Sincethevalvesarenormallyopen,andintheirpost-accident
last test Service water  pumps  shall be tested monthly.
: position, strokingofthesevalveswillnotbeperformed.
Testing of a pump need not be performed pump if is declared inoperable without the testing.
Note31-Valves4601,4602,4603and4604shallbeleaktestedeachrefueling outageusingabackflowtestmethodtodetermine QUAJITYASSURANCEMANUAZGINNASTATIONTITI.KcAPPENDIXCPumpandValveTestingProgramDATE1/30/86PAGE39DF40if'ackflowtothecorresponding idlepumpisminimal(i.e.2psidasmonitored bypressurechangeinthedischarge headerbetweenpumpdischarge isolatedandunisolated).
that Consistent with plant Technical Specifications, specified intervals    may be extended  by  25%  to accommodate  normal  test schedules.
Quarterly valvestrokingshallbelimitedtoverifying thatanormallyclosedvalvewillopenconcurrent withthestartofanidlepump.Anopencheckvalveforapumpalreadyinservicewillbedeemedoperablewithout'havingtostopandrestartthepumpsincetheopenvalveisconsidered tobeperforming itsnormalsafetyfunction.
 
NoteNote32-33-Valves590,591,592and593shallnot,bestrokedquarterly asanunplanned pressuretransient couldresultfromaleakyalternate isolation valve.Thesevalveswillbestrokedatrefueling outagesSamplingvalves951and.953neednotbestrokedaspartofthisprogramastheyarenotrequiredtoperformasafetyfunction.
0 TITI.Ks                            DATE QUALITY                                                1/30/86 ASSURANCE                  APPENDIX  C MANUAL                  Pump and  Valve GINNA STATION              Testing Program                  9  DF  40 PVT 4.0      Inservice Valve Testin Pro ram                      II 4.1      The Inservice Valve Testing Program was developed in accordance with the requirements of Article IWV of Section XI of the Code. All,those valves that are required to perform a specific function either to shut down the reactor to the cold shut-down condition or in mitigating the consequences
Althoughconsidered tobepartofthereactorcoolantsystemboundary, 10CFR50.55a(c)(2) specifies thatcomponents whichareconnected tothereactorcoolantsystemandare.partoftheboundaryasdefinedin50.2(v)ofthispartneednotmeettherequirements ofparagraph (c)(1)ofthissection,provided:
            -'f  an accident and maintain the reactor in a safe shutdown condition are included in the program.
Intheeventofpostulated failureofthecomponent, duringnormalreactoroperation, thereactorcanbeshutdownandcooleddowninanorderlymanner,assumingmakeupisprovidedbythereactorcoolantmakeupsystem.Thevalvesareexercised duringroutine.samplingoperations.
4.2      The Inservice Valve Testing Program Requirements for Category A and B Valves are in Tables PVT 4.7 and 4.8, respectively. Category C Valves are broken down into two categories, Check Valves and Relief Valves, which are in Tables PVT 4.9 and 4.10, respectively. Category D Valves are not included in this testing program because there are none included in Ginna Station design.
PVT5.0Records5.1RecordsfortheInservice PumpTestingProgramshallbedeveloped andmaintained inaccordance withArticleIWP-6000ofSectionXIoftheCode.
4.3      Some exceptions and exemptions to the testing re-quirements of Article IWV have been taken based on operational interference, placing the plant in an unsafe condition and Technical Specification requirements. All exceptions and exemptions are listed on the valve tables and explained in the referenced notes, PVT 4.12.
QUALITYASSURANCE MANUALGINNASTATIONTITLEsAPPENDIXCPumpandValveTestingProgramDATEPAGE1/30/8640DP405.2RecordsfortheInservice ValveTestingProgramshallbedeveloped andmaintained inaccordance withArticleIWV-6000ofSectionXIoftheCode.  
4,4      The exercising program for 'Category A and B Valves, with the exception of check valves, shall require a complete stroking of each valve per the valve testing tables. Except where operational constraints prevail and exceptions have been authorized all check valves, including Category C Valves, shall be exercised to the position required to fulfill
~~agWl}}
            'ests shall their    function. These functional be verified by the operation of the required system.      Valves which malfunction during stroking will not be considered inoperable as defined by Technical Specifications, when the malfunction does not prevent the valves from performing its safety function.
4.5      Category A and B valves operation shall be timed each time they are stroked utilizing switch initiation and the position indicators, which are accessible durin lant o eration. Durin each
 
TITI.Ea                              DATE QUALITY                                                    1/30/86 ASSURANCE                    APPENDIX  C            PAGE MANUAL                    Pump and  Valve GINNA STATION                Testing Program                  10 DP    40 refueling outage a visual verification shall be made  to confirm direct correspondence between valve operators and the position indicators.
4.6      For a valve in a system declared inoperable or not required to be operable the exercising test schedule need not be followed. Within 30 days prior to return of the system to operable status, the valves shall be exercised and the schedule resumed.
4.7      The testing of valves required at cold shutdown and refueling outages will normally take four (4) days to complete.        When cold shutdowns are of a shorter duration (2-3 days), test personnel shall attempt to test as many valves as possible without holding up the startup of the unit with testing beginning no later .than 48 hours after the plant reaches cold shutdown (as defined in Technical Specification 1.2). For very short cold shutdowns (less than 48 hours), it would be impossible to mobilize test personnel to implement the testing program under the required procedural controls, therefore no valves would be tested. It is possible that, during a four (4) day cold shut-down, the work load on test personnel may preclude their completion of all the required valve tests prior to startup. Any testing not completed at one cold shutdown due to outage duration shall be performed during any subsequent cold shutdowns that may occur before the next refueling outage to meet the specified testing frequency. Valve testing during cold shutdowns need not be more frequent than one test per quarter for each valve in  the    test program.
                                  )
4.8      Category A Valves Valve 5    ~Te              Descri tion          Note    Test    ~Fre 204A      MV    Letdown    to NRHX                      Stroke    C/R Leak        R 304A      CV    1-A    RCP Seal  Injection            Stroke    C/R Leak        R 304B      CV    1-B    RCP Seal  Injection            Stroke    C/R Leak        R
 
TITL,Ka                          GATE QUALITY                                              1/30/86 ASSURANCE                      APPENDIX  C      PAGE MANUAL                    Pump  and Valve GINNA STATION                Testing Program            11 gf:    40 Valve 5    ~Te .                             Note  Test    ~Fre 313        MOV Seal Water Return                  Stroke    C/R Isolation                          Leak        R 370B      CV  Charging Line      Isolation      Stroke    C/R Leak        R 371        AOV Letdown      Isolation              Stroke    C/R
                                                  .Leak        R 383B      CV  Alternate Charging Iine            Stroke    C/R Leak        R 508        AOV RMW    to Containment Vessel      Stroke      Q Stop                                Leak        R 528        CV  N2    Supply to    PRT              Stroke      Q Leak        R 529        CV  RMW    to  PRT                    Stroke      Q Leak        R 539        AOV PRT    Stop Valve    to Gas        Stroke      Q Analyzer                            Leak        R 546        MV  PRT    to  Gas  Analyzer          Stroke      Q Leak        R 547        MV  Nitrogen to      PRT              Stroke Leak 743        CV  CC    From Excess Letdown HX.       Stroke      Q Leak        R 745        AOV Return From Excess Let-             Stroke      Q down HX.                           Leak        R 749A      MOV CCW    to  A RCP                  Stroke    C/R Leak        R 749B      MOV CCW    to  B RCP                  Stroke    C/R Leak        R 750A      CV  CC    to  A RCP                    Stroke    C/R Leak        R
 
TITLE)                            DATE QUALITY                                                  1/30/86 ASSURANCE'ANUAL APPENDIX  C          PAGE Pump  and Valve GINNA STATION                  Testing Program              12  DF    40 Valve 4         T~e                            Note    Test    ~Fre 750B            CV  CC  to B RCP                      Stroke    C/R Leak        R 759A            MOV Containment Stop    CC From  5    Stroke    C/R Loop A  RCP                    7 Leak        R 759B            MOV Containment Stop    CC From        Stroke    C/R Ioop B RCP                        Leak        R 813              MOV CC  Supply to  RX Support        Stroke    C/R Coolers                            Leak        R 814              MOV CC  Return to  RX Support        Stroke    C/R Coolers                            Leak        R 820              MV  Letdown  to NRHX                  Stroke Leak 842A            CV  Loop A Accumulator Dump      28    Stroke    C/R Line Check Valve                  Leak      C/R 842B            CV  Loop B Accumulator Dump      28    Stroke    C/R Line Check Valve                  Leak      C/R 846              AOV N2  Supply to Accumulators        Stroke      Q Leak        R 853A            CV  Core Deluge Check            10    Stroke    C/R 10    Leak      C/R 853B            CV  Core Deluge Check            10    Stroke    C/R 10    Leak      C/R 862A            CV  1-A  CSP  Disch                    Stroke      Q Leak        R 862B            CV  l-B  CSP  Disch                    Stroke      Q Leak        R 867A            CV  Accumulator Dump and SI      13    Stroke      R to Cold Leg Loop B          13    Leak      C/R 867B            CV  Accumulator Dump and SI      13    Stroke      R.
to Cold Leg Loop A          13    Leak      C/R
 
TITI.Ec                          DATE QUALITY                                              1/30/86 ASSURANCE                    APPENDIX  C PAGE MANUAL                  Pump and  Valve GINNA STATION              Testing Program              13  DP    40 Valve 0    ~Te                              Note  Test    Free{
870A      CV  1-A to 1-C SI    Pump  Disch      Stroke      Q Leak          R 870B      CV  l-B to    1-C SI Pump Disch        Stroke      Q Leak          R 877A      CV  High Safety Injection          11  Stroke Loop B Hot Leg                29  Leak    40 Mo.
877B      CV  High Safety Injection          11  Stroke Loop A Hot Leg                29  Leak    40 Mo.
878F      CV  High Safety Injection          ll- Stroke Loop B Hot Leg                29  Z,eak    40 Mo.
878G      CV  1-A SI Pump to Cold Leg        13  Stroke      R Loop B                        13  Leak      C/R 878H      CV  High Safety Injection          11  Stroke Loop A Hot Leg                29  Leak    40 Mo.
878J      CV  1-B SI Pump    to Cold  Leg  13  Stroke      R Zoop A                        13  Leak      C/R 879        MV  SI Test Line    Isolation        Stroke Leak        R 889A      CV  l-A SI    Pump  Disch              Stroke      Q Leak        R 889B      CV  l-B    SI Pump Disch              Stroke      Q Leak        R 921        SOV Loop A Hydrogen Monitor            Stroke      Q Inlet                              Leak        R 922        SOV Zoop A Hydrogen    Monitor        Stroke      Q Outlet                            Zeak        R 923        SOV Loop B Hydrogen    Monitor        Stroke      Q Inlet                              Z,eak        R 924        SOV Loop B Hydrogen    Monitor        Stroke      Q Outlet                            Leak        R
 
TITLE:                              DATE QUAZ ITY                                                1/30/86 ASSURANCE                    APPENDIX C            PAGE MANUAL                  Pump and Valve GINNA STATION              Testing Program                  14  DF    40 Valve 0    ~e            Descri tion          Note  Test    ~Fre 956D          Hot Leg Loop Sample                    Stroke      Q Containment Isolation                  Leak        R 956E          PRZR    Liquid  Space Sample          Stroke      Q Containment      Isolation            Leak        R 956F          PRZR Steam    Space Sample            Stroke      Q Containment      Isolation            Leak        R 966A      AOV Pressurizer      Steam Space          Stroke      Q Containment      Isolation            Leak        R 966B      AOV Pressurizer Liquid        Space        Stroke      Q Containment      Isolation            Zeak        R 966C      AOV Loop A and    B  Hot Leg              Stroke      Q Containment      Isolation            Zeak        R 1003A      LCV l-A RCDT    Pump    Suction            Stroke      Q Leak        R 1003B      LCV l-B  RCDT Pump    Suction            Stroke      Q Zeak        R 1076A      MV  Hydrogen to "A" Recombiner 11          Stroke Pilot Containment Isolation            Leak IV-3A      SOV Hydrogen to "A" Recombiner Pilot Containment Isolation ll  Stroke Zeak 1076B      MV  Hydrogen to "B" Recombiner ll          Stroke Pilot Containment Isolation          Leak IV-3B      SOV Hydrogen to "B" Recombiner ll          Stroke Pilot Containment Isolation          Leak 1080A      MV  Oxygen Make    Up  to Contain- ll    Stroke ment, Isolation.                     Leak          R IV-2A          Oxygen Make    Up  to Contain- ll    Stroke ment Isolation (A Recombiner)        Leak IV-2B          Oxygen Make Up      to Contain-   11  Stroke ment,  Isolation    (B Recombiner)  Leak
 
TITLE:                         DATE QUALITY                                            1/3 0/86 ASSURANCE                  APPENDIX C        PAGE MANUAL                  Pump and  Valve GINNA STATION              Testing Program              15  OF    40 Valve 5    ~e                             Note  Test    ~Fre 1084A      MV  Hydrogen to "A" Recombiner        Stroke Main Burner Containment          Leak Isolation IV-5A      SOV Hydrogen to "A" Recombiner        Stroke Main Burner Containment          Leak Isolation 1084B      MV  Hydrogen to "B" Recombiner      Stroke Main Burner Containment          Leak Isolation IV-5B      SOV Hydrogen to "B" Recombiner      Stroke Main Burner Containment          Leak Isolation 1554      MV  D  Recirc. Fan  Air Sample      Stroke Isolation                        Leak 1556      MV  D  Recirc. Fan  Air Sample      Stroke Isolation                        Leak 1557      MV  A  Recirc. Fan  Air Sample      Stroke Isolation                        Leak          R 1559      MV  A  Recirc. Fan  Air Sample      Stroke Isolation                        Leak 1560      MV  A  S D  Return Iine              Stroke Isolation                        Leak 1562      MV  A 6 D  Return Line              Stroke Isolation                        Leak 1563      MV  B  Recirc. Fan  Air Sample      Stroke Isolation                        Leak 1565      MV  B  Recirc. Fan  Air Sample      Stroke Isolation                        Leak 1566      MV  B  Recirc. Fan Air Sample      Stroke Return Line Isolation            Leak 1568      MV  B  Recirc. Fan Air Sample      Stroke Return Line Isolation            Leak
 
'J i2 QC TITLEi                            DATE QUALITY                                              1/30/86'6 ASSURANCE                  APPENDIX  C          PAGE MANUAL                  Pump and  Valve GINNA STATION            Testing Program                        DF    40 Valve 4    ~Te                              Note    Test          ~Fre 1569          C  Recirc. Fan Air    Sample        Stroke Isolation                          Leak              R 1571          C  Recirc. Fan  Air Sample        Stroke Isolation                          Leak              R 1572          C  Recirc. Fan Air Sample        Stroke Return Line Isolation              Leak              R 1574          C  Recirc. Fan Air Sample        Stroke Return Line Isolation              Leak              R 1596      MV  Radiation Monitor Supply            Stroke            Q Leak              R 1597      AOV Radiation Monitor Supply            Stroke            Q Leak              R 1598      AOV Radiation Monitor Exhaust        'troke              Q Leak              R 1599      AOV Radiation Monitor Exhaust          Stroke            Q Leak              R 1655      MV  RCDT  to Gas  Analyzer            Stroke            Q Leak              R l7l3      CV  N2  to  RCDT                        Stroke            Q Leak              R 172l      AOV Suction line to    RCDT            Stroke            Q Leak              R 1723      AOV A  Containment Sump Disch          Stroke            Q to  Waste Holdup Tank              Leak              R 1728      AOV A  Containment Sump Disch          Stroke            Q to  Waste Holdup Tank              Leak              R 1786      AOV RCDT  to VH  Isolation            Stroke            Q
                                                  'eak                R 1787      AOV RCDT  to VH  Isolation            Stroke            Q Leak              R
 
TITLE:                                DATE QUALITY                                                  1/30/86 ASSURANCE                  APPENDIX C MANUAL                  Pump and  Valve            PAGE GINNA STATION            Testing Program                    17  40 Valve 4    ~Te                                Note    Test    ~Fze l789      AOV RCDT  to GA Containment              Stroke        Q Isolation                            Leak          R 1793      MV  N2 to RCDT Isolation            11
* Stroke Leak 1819A      MV  Containment Pressure            21    Stroke    C/R Transmitter    945 Isolation          Leak          R 1819B      MV  Containment Pressure            21    Stroke    C/R Transmitter    946 Isolation          Leak          R 1819C      MV  Containment Pressure            21    Stroke    C/R Transmitter    947 Isolation          Leak          R 1819D      MV  Containment Pressure            21    Stroke    C/R Transmitter    948 Isolation          Leak          R 1819E      MV  Containment Pressure            21    Stroke    C/R Transmitter    949 Isolation                        R Leak'troke 1819F      MV  Containment Pressure            21              C/R Transmitter    950 Isolation          Leak          R 1819G      MV  Containment Piessure            21    Stroke    C/R Transmitter    944 Isolation          Leak          R 4601      CV  1A Service Water    Pump        31    Stroke        Q Discharge                      31    Leak          R 4602      CV  1B Service Water    Pump        31    Stroke        Q Discharge                      31    Leak          R 4603      CV  1C Service Water    Pump        31    Stroke        Q Discharge                      31    Leak          R 4604      CV  1D Service Water Pump          31    Stroke        Q Discharge                      31    Leak          R 5129      MV  Construction Fire Service      11    Stroke Water Containment    Isolation        Leak 5392      AOV Instrument Air to Contain-      19    Stroke        R ment  Isolation                      Leak          R
 
TITLEs                            DATE QUAI ITY                                              1/30/86 ASSURANCE                    APPENDIX  C PAGE MANUAL                    Pump and  Valve GINNA STATION              Testing Program                18 pp    40 Valve 4    ~Te                                Note  Test    ~Fre 5393        CV  Instrument Air to            19  Stroke        R Containment    Isolation          Leak          R 5701        MV  A-S/G    Blowdown Isolation          Stroke      Q Leak          R 5702        MV  B-S/G Blowdown    Isolation        Stroke      Q Leak          R 5733        MV  A-S/G Sample    Isolation          Stroke      Q Leak        R 5734        MV  B-S/G Sample    Isolation          Stroke      Q Leak        R 5735        AOV  "A" S/G Blowdown Sample            Stroke'      Q Isolation                          Leak 5736        AOV  "B" S/G Blowdown Sample            Stroke      Q Isolation                          Leak        R 5737        AOV  "B" S/G Blowdown    Isolation      Stroke      Q Leak        R 5738        AOV  "A" S/G Blowdown    Isolation      Stroke      Q Leak        R 5869        APV  Containment Purge Supply      22  Stroke Isolation                          Leak 5870        APV  Containment Purge Supply      22  Stroke Isolation                          Leak 5878        APV .Containment Purge Exhaust      22  Stroke Isolation                          Leak 5879        APV  Containment Purge Exhaust      22  Stroke Isolation                          Leak 6151        MV  Auxiliary Steam Supply to          Stroke Containment                        Leak 6152        MV  Condensate    Return from          Stroke Containment                        Ieak
* See Note 22
 
TITLEs                            DATE QUAI ITY                                            1/30/86 ASSURANCE                  APPENDIX  C          PAGE MANUAL                  Pump and Valve GINNA STATION            Testing Program                19  DP    40 Valve 8    ~Te                              Note  Test      Free{
6165          Aux. Steam Supply  to              Stroke Containment                        Leak 6175          Condensate  Return from            Stroke Containment                        Leak 7141          Service Air Isolation              Stroke Outside Containment                Leak 7226      CV  Service Air Isolation              Stroke Inside Containment                  Leak 7443      MOV Containment Supply Air Test        ll  Stroke Leak        R 7444      MOV Containment  Air Test  Vent  ll  Stroke Leak        R 7445      MOV Containment  Air Test  Vent  11  Stroke Leak          R 7448      MV  Isolation Valve from          11  Stroke Containment to Local                Ieak          R Pressure Indicator for Containment Air Test 7452      MV  Isolation Valve from          11  Stroke Containment to Local                Leak          R Pressure Indicator for Containment Air Test 7456      MV  Isolation Valve from Containment to Iocal ll  Stroke Leak          R Pressure Indicator for Containment Air Test 7970      AOV Containment Depressuri-            Stroke        Q zation Valve                      Leak          R 7971      AOV Containment Depressuri-            Stroke        Q zation Valve                        Leak R
8418      AOV Demin. Water to Contain-            Stroke ment Isolation                    Leak          R
 
TITLE)                            DATE QUALITY                                              1/30/86 ASSURANCE                    APPENDIX C          PAGE MANUAL                  Pump and Valve GINNA STATION              Testing Program              20  DF    40 Valve 4    ~Te                                Note  Test    ~Fre 8419      CV  .Demin. Water    to Contain-        Stroke ment    Isolation                  Leak 8623      CV  Nitrogen to Accumulators            Stroke Isolation                          Leak 9227      AOV  Fire Service Water                Stroke Containment Isolation            Leak 9229      CV    Fire Service Water                Stroke Containment Isolation            Ieak 4.9    Category    B Valves Valve 0    ~Te                                Note  Test    Free{
014        RCV  Aux  Building  GDT Release      Stroke        Q 017        RCV  Component,  Cooling Surge        Stroke        Q Tank Vent 081        APV  Control  Room  Ventilation      Stroke        Q Damper 082        APV  Control  Room  Ventilation      Stroke        Q Damper 083        APV  Control  Room  Ventilation      Stroke        Q Damper 084        APV  Control    Room  Ventilation      Stroke        Q Damper 085        APV  Control    Room  Ventilation      Stroke        Q Damper 086        APV  Control    Room  Ventilation      Stroke      .
Q Damper ll2B      LCV  Emergency Makeup    RWST  to      Stroke        Q Charging    Pump 112C      LCV  VCT  Outlet                        Stroke        Q
 
TITLE:                          DATE QUALITY                                            1/30/86 ASSURANCE                  APPENDIX  C        PAGE MANUAL                  Pump and  Valve GINNA STATION            Testing Program              21  DF    40 Valve 5    ~Te          Descri tion        Note  Test    ~Fre 427        AOV  Letdown From Loop  B        3  Stroke    C/R 430        PORV Pressurizer Power            16  Stroke    C/R Operated  Relief 431C      PORV Pressurizer Power            16  Stroke    C/R Operated  Relief 515        MOV  Pressurizer  PORV  Block    23  Stroke      Q Valve 516        MOV  Pressurizer  PORV  Block    23  Stroke      Q Valve 590        SOV  Reactor Head Vent            32  Stroke      R 591        SOV  Reactor Head Vent            32  Stroke      R 592        SOV  Reactor Head Vent            32  Stroke      R 593        SOV  Reactor Head Vent            32  Stroke      R 624        HCV  l-B  RHR HX Outlet          26  Stroke    C/R 625        HCV  1-A  RHR HX Outlet          26  Stroke    C/R 626        FCV  RHR  Loop Return  Recirc.        Stroke      Q 700        MOV  RHR  Inlet Isolation  From      Stroke'/R Loop A 701        MOV  RHR  Inlet Isolation  From  8  Stroke    C/R Loop A 704A      MOV  Suction l-A RHR  Pump      24  Stroke      Q 704B      MOV  Suction l-B  RHR Pump      24  Stroke      Q 720        MOV  RHR  Return Isolation to      8  Stroke    C/R Loop B 72l        MOV  RHR  Return Isolation to      8  Stroke    C/R Loop B
 
TITLE<                                DATE QUALITY                                                  1/30/86 ASSURANCE                  APPENDIX C              PAGE MANUAL                  Pump and Valve GINNA STATION              Testing Program                  22  PP    40 Valve 4    ~Te                                Note  . Test    ~Fre 738A      MOV CC  to 1-A  RHR HX                    Stroke      Q 738B      MOV CC  to l-B  RHR HX                    Stroke      Q 825A      MOV SI Pump Suction From    RWST    9      Stroke    C/R 825B      MOV SI Pump Suction From      RWST  9      Stroke    C/R 826A      MOV SI Pump Suction From            25      Stroke      Q BA  Tank 826B      MOV SI Pump Suction From            25      Stroke      Q BA  Tank 826C      MOV SI Pump Suction From            25      Stroke      Q BA  Tank 826D      MOV SI Pump Suction From            25      Stroke      Q BA  Tank 836A      HCV Spray Additive Tank Dis-        17/24 Stroke        Q charge 836B      HCV Spray Additive Tank Dis-        17/24 Stroke        Q charge 850A      MOV Sump B    to RHR Pumps          24      Stroke      Q 850B      MOV Sump B    to RHR Pumps          24      Stroke      Q 851A      MOV Sump B    to RHR  Isolation    30      Stroke 851B      MOV Sump B    to RHR  Isolation    30      Stroke 852A      MOV RHR Pumps    to Reactor Vessel  18      Stroke    C/R 852B      MOV RHR Pumps    to Reactor Vessel  18      Stroke    C/R 856        MOV RWST  to  RHR Pumps            9      Stroke    C/R 857A      MOV lB  RHR HX  to CS  and SI      27      Stroke    C/R Pump  Isolation
 
i I
  '4
 
DATE QUALITY                                              1/30/86 ASSURANCE                  APPENDIX    C PAGE MANUAL                  Pump and    Valve GINNA STATION            Testing Program                  23 pp    40 Valve 4    T~e                                Note  Test    ~Fre 857B      MOV 1A RHR HX    to  CS  and SI    27  Stroke    C/R Pump  Isolation 857C      MOV lA RHR HX to CS      and SI    27  Stroke    C/R Pump Isolation 860A      MOV 1-A  CSP Discharge              24  Stroke      Q 860B      MOV 1-A  CSP Discharge              24  Stroke      Q 860C      MOV 1-B  CSP Discharge              24  Stroke      Q 860D      MOV 1-B  CSP Discharge              24  Stroke      Q 871A      MOV 1-A to 1-C SI    Pump          24  .Stroke      Q Discharge 871B      MOV 1-B  to l-C SI    Pump          24  Stroke      Q Discharge Q75A      MOV CS Pump  Discharge to      1A      Stroke      Q Charcoal  Filter    Deluge 875B      MOV CS Pump  Discharge to      1A      Stroke      Q Charcoal  Filter    Deluge 876A      MOV CS Pump  Discharge to 1B            Stroke      ,Q Charcoal  Filter Deluge-876B      MOV CS Pump  Discharge to      1B      Stroke      Q Charcoal  Filter    Deluge 896A      MOV RWST  to  CS  and SI Pumps      9  Stroke    C/R 896B      MOV RWST  to  CS  and SI Pumps      9  Stroke    C/R 897        AOV SI Pump Recirc. to      RWST  27  Stroke    C/R 898        AOV SI Pump Recirc.      to  RWST  27  Stroke    C/R 951        AOV Pressurizer    Steam Space    33  Stroke Sample
 
TIT LE i                                DATE QUALITY                                                    1/30/86 ASSURANCE                      APPENDIX C            PAGE MANUAL                      Pump and Valve GINNA STATION                  Testing Program                24  op    40 Valve 5    ~Te                                    Note  Test    ~Fre 953            Pressurizer Liquid
                          'OV Space    33  Stroke Sample 955        AOV "B" Loop Hot Leg Sample                  Stroke      Q 959        AOV RHR    Loop Sample                  20  Stroke    C/R 1811A          Reactor Coolant Drain Tank Isolation to        RHR System ll 1811B          Reactor Coolant Drain Tank          11 Isolation to        RHR System 1815A      MOV C-SI Pump Suction From          RWST 24  Stroke      Q 1815B      MOV C-SI    Pump    Suction From  RWST 24  Stroke      Q 3504A      MOV Main Steam to        TAFP From  1-B      Stroke      Q S/G 3505A      MOV Main Steam to        TAFP From  1-A      Stroke      Q S/G 3652          Main Steam        Throttle Valve          Stroke      Q to  TAFP 3996      MOV TAFP    Discharge                        Stroke      M 4000A      MOV Cross Over Valve For          MAFP        Stroke      M 4000B      MOV Cross Over Valve For          MAFP        Stroke      M 4007      MOV 1-A    MAFP    Discharge                Stroke      M 4008      MOV 1-B    MAFP    Discharge                Stroke      M 4013      MOV TAFP    Service Water Supply            Stroke      M Isolation 4027      MOV 1-A    MAFP    Service Water            Stroke      M Isolation
 
0 J ~
 
TITLE:                                DATE QUALITY                                                1/30/86 ASSURANCE                  APPENDIX    C          PAGE MANUAL                Pump and  Valve GINNA STATION            Testing Program                  25  DP    40 Valve 0    ~Te                                  Note  Test    ~Fre 4028      MOV 1-B  MAFP  Service Water              Stroke      M Isolation 4291      AOV TAFP  Recir. Line                    Stroke      M 4297      AOV TAFP  Discharge to 1-A      S/G      Stroke      M 4298      AOV TAFP  Discharge to  1-.B S/G          Stroke      M 4304      AOV 1-A  MAFP  Recirculation              Stroke      M Control 4310      AOV 1-B  MAFP  Recirculation              Stroke      M Control 4561      AOV Containment Vent Recirc.              Stroke      Q Fans Discharge Flow Con-trol                  I 4562      AOV Containment Vent Recirc.              Stroke      Q Fans Discharge Flow Con-trol  Bypass 4609      MOV lAl Screen    House SW                Stroke      Q Isolation 4613      MOV 1B2  Turbine Building      SW        Stroke      Q Isolation 4614      MOV lA1 Turbine Building        SW        Stroke      Q Isolation 4615      MOV 1Bl Aux. Building    SW              Stroke      Q Isolation 4616      MOV lA1 Aux. Building    SW              Stroke      Q Isolation 4627      MV  Service Water to    A Fan              Stroke.      Q Cooler Isolation 4628      MV  Service Water to    B    Fan          Stroke      Q Cooler Isolation
 
'0 'J TITLE<                            DATE QUALITY                                              1/30/86 ASSURANCE                  APPENDIX  C          PAGE MANUAL                  Pump and  Valve GINNA STATION            Testing Program                26  OF    40 Valve 4    ~Te          Descri tion        Note  Test    ~Fre 4629      MV  Service Water from    A Fan        Stroke      Q Cooler Isolation 4630      MV  Service Water from    B Fan        Stroke      Q Cooler Isolation 4635      MV  Reactor Compartment Cooling    . Stroke      Q Unit  A Inlet Isolation 4636      MV  Reactor Compartment, Cooling      Stroke' Unit  A Outlet Isolation 4641      MV  Service Water to C Fan              Stroke      Q Cooler Isolation 4642      MV  Service Water to    D Fan          Stroke      Q Cooler Isolation 4643      MV  Service Water from    C  Fan      Stroke      Q Cooler Isolation 4644      MV  Service Water from    D  Fan      Stroke      Q Cooler Isolation 4663      MOV 1Al  Air Cond. Chillers SW        Stroke      Q Isolation 4664      MOV 1A2 Turbine Building SW            Stroke      Q Isolation 4670      MOV 1B1  Turbine Building    SW        Stroke      Q Isolation 4733      MOV 1A2 Air Cond. Chillers SW          Stroke      Q Isolation MOV 1B2 Aux. Build. SW Isolation-      Stroke      Q 4735      MOV 1A2 Aux. Build. SW Isolation      Stroke      Q 4757      MV  Reactor Compartment Cooling        Stroke      Q Unit  B Inlet Isolation
 
TITLE<                          DATE QUALITY                                            1/30/86 ASSURANCE                  APPENDIX  C        PAGE MANUAL                  Pump and  Valve GINNA STATION            Testing Program              27 pF    40 Valve 4    ~Te                            Note  Test    ~Fre 4758          Reactor Compartment Cooling      Stroke      Q Unit  B Outlet Isolation 4780      MOV 1A2  Screen House  SW            Stroke      Q Isolation 5171      MOV Turbine Build. Fire Water        Stroke      Q Loop Supply    Isolation 587l          Containment Post Accident        Stroke      Q Filter  Damper 5872          Containment Post Accident        Stroke      Q Filter  Damper 5873      APV Containment Post Accident        Stroke      Q Filter  Damper 5874      APV Containment Post Accident        Stroke      Q Filter  Damper 5875          Containment Post Accident        Stroke      Q Filter  Damper 5876          Containment Post Accident        Stroke      Q Filter  Damper 9629A      MOV 1C SAFP  Service Water          Stroke      Q Isolation 9629B      MOV 1D SAFP  Service Water          Stroke      Q Isolation 9701A      MOV 1C SAFP  Discharge              Stroke      Q 9701B      MOV 1D SAFP  Discharge              Stroke      Q 9703A      MOV SAFP  Cross Over                Stroke      Q 9703B      MOV SAFP  Cross Over                Stroke      Q 9704A      MOV 1C SAFP  Containment            Stroke      Q Isolation
 
0 DATE QUALITY                                              1/30/86 AS SURANCE                    APPENDIX C          PAGE MANUAL                    Pump and Valve GINNA STATION              Testing Program              28 oF    40 Valve 4    ~Te                              Note  Test    ~Fre 9704B      MOV  1D SAFP  Containment              Stroke      Q Isolation 9710A      AOV  1C SAFP  Recirc. Control          Stroke      Q 9710B      AOV  1D SAFP  Recirc. Control          Stroke      Q 4.10    Category  C  Check Valves Valve 5    ~Te                              Note  Test    ~Fre 710A        CV  1-A  RHR Pump  Discharge          Stroke      Q 710B        CV  1-B  RHR Pump  Discharge          Stroke      Q 723A        CV  1-A  CC Pump  Discharge          Stroke      Q 723B        CV  1-B  CC Pump  Discharge          Stroke      Q 847A        CV  A-CSP From Spray    Additive      Stroke      Q Tank  to Eductor 847B        CV  B-CSP From Spray    Additive      Stroke      Q Tank  to Eductor 854        CV  RWST  to RHR Pump  Check          Stroke      Q 866A        CV  CS  Pump.l-A to Charcoal      12  Stroke    C/R Filter  Deluge 866B        CV  CS Pump  1-B to Charcoal          Stroke      Q Filter  Deluge 3516        CV  lB Main  Steam  Isolation        Stroke      R 3517        CV  1A  Main Steam  Isolation        Stroke      R 3998        CV  TAFP  Discharge Check              Stroke      M 4000C      CV  lA  MAFP  Discharge Check          Stroke      M 4000D      CV  lB  MAFP  Discharge Check          Stroke      M
 
TITLE:                        DATE QUALITY                                            1/30/86 ASSURANCE                    APPENDIX C      PAGE MANUAL                    Pump and Valve GINNA STATION              Testing Program            29  OP    40 Valve 0    ~Te                            Note  Test    ~Fre 4003      CV  TAFP    to S/G  lA              Stroke        M 4004      CV  TAFP    to S/G  lB              Stroke        M 4009      CV  lA MAFP to S/G lA              Stroke        M 4010      CV  lB MAFP to S/G lB              Stroke        M 4014      CV  TAFP Suction                    Stroke        M 4016      CV  1B MAFP    Suction              Stroke        M 4017      CV  lA MAFP Suction                Stroke        M 4023      CV  TAFP    Recirculation          Stroke        M 5133      CV  Diesel Fire Pump Disch.        Stroke        Q 5136      CV  Motor Fire Pump Discharge      Stroke        Q 9627A      CV  1C SAFP SW    Suction          Stroke        Q 9627B      CV  1D SAFP SW    Suction          Stroke        Q 9700A      CV  1C SAFP    Discharge            Stroke        Q 9700B      CV  1D SAFP    Discharge            Stroke        Q 9705A      CV  1C SAFP    to S/G 1A            Stroke        Q 9705B      CV  1D SAFP    to S/G 1B            Stroke        Q 4.11  Category    C Relief Valve Valve 4    ~Te                            Note  Test    ~Fre 203        RV  Letdown High Pressure      15 Safety Relief 209        RV  Letdown Low Pressure        15 Safety Relief 434        RV  Pressurizer Safety Relief  15
 
TITLEc                            DATE QUALITY                                            1/30/86 ASSURANCE                  APPENDIX C          PAGE MANUAL                Pump and Valve GINNA STATION            Testing Program                30 OP    40 Valve 0    ~Te          Descri tion        Note  Test    ~Fre 435        RV  Pressurizer Safety Relief 15 732        RV  CC  Surge Tank  Relief        15 RV  CC From Excess Letdown        15 Heat Exchanger 755A      RV  CC  From A RCP Thermal        15 Barrier 755B      RV  CC  From B RCP Thermal        15 Barrier 758A      RV  CC  From A-RCP  Oil Coolers  15 758B      RV  CC  From B-RCP  Oil Coolers  15 818        RV  CC  From Reactor Support      15 Coolers 861        RV  1-B  CS Pump  Suction Relief  15 887        RV  SI  Test Zine Relief Valve    15 Inside Containment 1817      RV  Alternate Suction From        15 RHR Pump  to  C SI Pump 3508      RV  1-B S/G PRV                  15 3509      RV  1-A S/G PRV                  15 3510      RV  1-B S/G PRV                  15 3511      RV  1-A S/G  PRV                  15 3512.      RV  1-A S/G PRV                  15 3513      RV  1-A S/G PRV                  15 3514      RV  1-B S/G PRV                  15 3515      RV  1-A S/G PRV                  15
 
TITLEt                                DATE QUALITY                                                    l/30/86 ASSURANCE                    APPENDIX  C              PAGE MANUAL                    Pump and  Valve GINNA STATION              Testing Program                    31  OF    40 Valve 5    T~e                                  Note    Test    ~Fre 4653      RV    .Service Water Relief            15 4654      RV    Service Water Relief            15 4657      RV    Service Water Relief            15 5134      RV    Diesel Fire    Pump  Disch      15 Relief 5135      RV    Motor'Fire    Pump  Disch        15 Relief 4.12    Inservice Valve Testing Notes Note    1  Valves 304A, 304B and 313 cannot be stroked during normal plant operation on a quarterly basis because they would interrupt coolant flow to the reactor coolant pump seals. These valves will be stroked at cold shutdowns and refuel-ing outages.
Note  2 - Valve  370B cannot be  stroked during normal  plant operation on a quarterly basis because this test would interrupt charging pump flow. This valve will be stroked at cold shutdowns and refueling outages.
Note  3 - Valves 204A, 371 and 427 cannot be stroked during normal plant operation on a quarterly basis because this test would interrupt the letdown (CVCS) system. These valves will be stroked at cold shutdowns and refueling outages.
Note 4  - Valve 383B cannot be stroked during normal plant operation on a quarterly basis because this test would result in substantial radiation exposure to test personnel. Surveys. in the area of the test connection during plant operation indicate neutron fields of approximately 500 mr/hr and a gamma fields of 250 mr/hr.
 
TITLE:                              DATE QUALITY                                                1/30/86 ASSURANCE                  APPENDIX C PAGE MANUAL                  Pump and Valve GINNA STATION            Testing Program                  32  DF  40 Total whole body dosage to test personnel is estimated to be 375 mrem. This valve will be stroked at cold shutdowns and refueling outages.
Note  5  Valves 749A, 749B, 750A, 750B, 759A and 759B cannot be stroked during normal plant operation on a quarterly basis because this test would require the reactor coolant pumps to be shut down to eliminate the flow through these checks and MOVs. These valves will be stroked at cold shutdowns and refueling outages.
Note  6  Valves 813 and 814 cannot be stroked during normal plant operation on a quarterly basis because this test would remove the coolant to the reactor vessel supports and cavity wall. These valves will be stroked at cold shutdowns and refueling outages.
Note  7  Valve 879  is a manual valve in the safety injection test line and is kept locked shut. This valve is not required to change position to perform a safety func-,
tion. The only requirement is that leak-age through valve 879 be acceptably low.
Therefore, the quarterly stroke, test has been deleted. This passive valve will be only leak tested at refueling outages consistent with IWV-3700-1.
Note 8    Valves 700 and 721 cannot be stroked during normal plant operation on a quarterly basis because there is an interlock system which prevents these valves from opening when the primary system is at operating pressure.      Valves 700, 701, 720 and 721 separate a high pressure system from a low pressure system. These valves will be stroked at cold shutdowns and refueling outages.
 
TITLE:                                  DATE QUALITY                                                    1/30/86 ASSURANCE                    APPENDIX    C MANUAL                    Pump and    Valve          PAGE GINNA STATION              Testing Program                      OF Note  9  Valves    825A, 825B, 856, 896A, and 896B should not be stroked during normal opera-tion on a quarterly basis because- this would cause a temporary loss of system function of the ECCS. These valves pro-vide the suction from the refueling water storage tank to the safety injection and residual heat removal pumps. These valves will be    stroked at cold shutdowns and re-fueling outages.
Note 10- Valves 853A and 853B cannot be stroked during normal plant operation on a quarterly basis because this test requires pressurizing the RHR system to the primary system operation pressure.        These valves will be    stroked at refueling outages.
Leakage testing of check valves 853A and 853B  shall  be accomplished  prior to criticality following      (1) refueling, (2) cold shutdown, and (3) maintenance, repair or replacement work on the valves. Leakage may be measured indirectly from the performance of pressure indicators, system volume measuurements or by direct measurement.
Minimum test differential shall be greater than 150 psid. Technical Specification 4.3.3.4 defines the allowable leakage rates.
Note  ll- Valves    820, 877A, 877B, 878F, 878H, 1076A, 1076B  ~ 1 080Ag 1084Ag 1 084B g IV 3Ag IV 3B g IV  5Ag IV 5B g IV 2Ag IV 2B g 1554 g 1556 g 1557~ 1579 g    1560'562'563'565'566/
1568 g 1569 ~ 1571 1572 1574 g 1793 g 181 1Ag 1811Bg 5129    g  6151'152@ 6155'175@ 7141@
7226 g 7443 g 7444 g 7445 g 7448 g 7452 g 7456/
8418, 8419, 8623, 9227 and 9229 are con-sidered passive valves which are not required to change position to acccomplish their specific function. Stroking these valves would serve no useful function and will therefore not be done as per IWV-3700-1.
 
TIT LE i                              DATE QUALITY                                                  1/30/86 ASSURANCE                    APPENDIX C            PAGE MANUAL                    Pump and Valve GINNA STATION                Testing Program                34  DP  40 Note 12- Valve 866A cannot be stroke tested during normal plant operation on a quarterly basis because this test would result in a sub-stantial radiation exposure to test per-sonnel. Stroke testing at this location resulted in approximately 400- mrem whole body exposure to the test personnel.      This valve 'will be stroked at cold shutdowns and  refueling outages.
Note        Valves 867A, 867B, 878G, and 878J cannot be stroked during normal operation on a quarterly basis or at cold shutdown condition when the primary system is full. This test may only be done when the plant. is in a refueling shutdown condition with a partially full primary system in order to prevent an over-pressurization. Leakage, testing of check valves 867A, 867B, 878G and 878J shall be accomplished prior to criticality, except for low power physics testing, following (1) refueling, (2) cold shutdown, and (3) maintenance, repair or replacement work on the valves. Leakage may be measured indirectly from the performance of pressure indicators, system volume measurements or by direct measurement.
Check valves 878G and 878J shall also be tested for leakage following each safety injection flow test. Minimum test differential shall be greater than 150 psid. Technical Specification 4.3.3.4 defines the allowable leakage rates.
Note 14- Valves 3516 and 3517 cannot be stroked during normal plant operation on a quar-terly basis because they are the main steam isolation valves. These valves, are stroked during each plant refueling.
Note 15- Category C Relief Valves shall be tested in accordance with the extent and fre-quency requirements of Paragraph IWV-3510 of Article IWV of Section XI of the Code.
 
  ~ T
'J
 
TITLE:                                DATE QUALITY                                                  1/30/86 ASSURANCE                    APPENDIX  C            PAGE MANUAL                    Pump and  Valve GINNA STATION              Testing Program                  35  Op    40 Note 16- Valves 430 and 431C are the power operated relief valves associated with the overpressurization system. These valves shall not be stroked quarterly as an unplanned pressure transient could result, from a leaky block valve.
Operability of these valves shall be verified as follows:
(1) Full stroke exercising during cool down prior to achieving water solid condition in the pressurizer and during cold shutdown prior to heat up.
(2)    Stroke timing to be performed as    a minimum once each refueling cycle as a part of the channel calibration specified by Technical Specifications 4.16.lb.
(3) Fail safe actuation testing is permitted by the code to be per-formed at each cold shutdown    if valve cannot be tested during power operation.
(4) Technical specification 4.16.1a and 4.16.1c delineate additional re-quirements for operability verifi-cation of the PORV actuation channel and valve position.
Note 17- Additional stroking will be consistent with Technical Specifications.
Note 18- Valves 852A and 852B cannot be stroked during normal plant operation as these valves, when cycled, could subject the Residual Heat Removal System to a pressure in excess of its design pressure. These valves will be stroked at cold shutdowns and    refueling outages.
Note 19- Stroking Valves 5392 and 5393 during operation and cold shutdown would inter-rupt instrument air to containment      and
 
TITLE:                                  DATE QUALITY                                                      1/30/86 ASSURANCE                      APPENDIX  C              PAGE MANUAL                      Pump and  Valve GINNA STATION                Testing Program                    36  DF  40 be  disruptive to air operated valves inside.'hese      valves will be stroked at refueling outages.
Not.e  20- Valve 959 is normally closed and in the containment isolating position during normal operation. These valves will be stroked at cold shutdown and refueling outages.
Note 21- Valves 1819A, B, C, D, E, F and G cannot be stroked during normal plant operation as this test would interrupt containment pressure monitoring transmitters from performing their intended function.
These valves will be stroked at cold and refueling outages.
Note 22- Category A valves 5869, 5870, 5878 and 5879 are normally closed and in the containment isolating position during normal operation. Leak tightness of these valves is reverified following        .
reclosure after each use in accordance with Section 4.4.2.4 of Technical Speci-fications. The valves shall be stroked at. least each cold shutdown.      In addition, if  the valves are opened for purging,
                        - they shall be stroked at least once each quarter during which they have been opened.
Note 23- Valves 515 and 516 stroked quarterly except and if already closed or during cold refueling shutdowns'.
Note          Not to be done during time that redundant valve is inoperable per Technical Speci-fication.
Note 25- As per Technical Specifications            3.3.1.2.f, no  cycling shall be done  if  normally open valve in other flow path is inop'erable in the open position.
 
TITLEc                                DATE QUALITY                                                  1/30/86 ASSURANCE                    APPENDIX  C            PAGE MANUAL                    Pump and  Valve GINNA STATION              Testing Program                  37        OF            40 Note 26- As per Technical Speci failure of valves ficationsduring 624 and 625
: 3. 3.1.2. e, quarterly stroking in the closed position can degrade LPSI system function. How-ever, these valves shall be stroked at cold shutdown and refueling outages.
Note 27- As per Technical Specifications 3.3.1.2.e,
                    ~
failure of valves 857A, 857B, 857C, 897 and 898 during quarterly stroking can degrade the injection phase of the SI pumps. However,- these valves shall be stroked at cold shutdown and refueling outages.
Note 28- Check valves 842A and 842B (accumulator check valves) cannot and should not be exercised during plant operation.
Exercising of these valves requires the reactor coolant system pressure to be reduced to below accumulator pressure.
Therefore testing of these valves performed after refueling and cold will'e and after maintenance, repair        'hutdowns, or replacement. Full stroke testing, which involves discharge of the accumu-lator through the valve to a partially-filled reactor coolant system will not be utilized since this test mode is considered impractical and unsafe.
Valve operability from the normal closed
                        .position will be verified by partial stroking prior to leak testing with flow through the safety injection test line.
Leak  testing will be performed to assure primary system integrity following each cold and refueling shutdown after achieving normal reactor coolant system pressure and prior to reactor criticality. Testing will be performed by either (1) closing each accumulator motor operated discharge valve, pressuring the line downstream of the check valves and measuring the upstream leakage, or (2) by measuring
 
1I P+ '
 
QUALITY                                              1/30/86 ASSURANCE                APPENDIX C            PAGE MANUAL                Pump and Valve GINNA STATION            Testing Program                38  PP 40 accumulator in-leakage by pressurizing the line downstream of the 842 valves.
These valves are not event V-check valves'.
Therefore, the test acceptance criterion shall be that of Technical Specification 3.1.5.
Note 29- Valves 877A, 877B, 878F and 878H are currently not listed in our valve test program, however, a pair of these valves in each hot leg high head safety injec-tion line (877A nd 878F in loop B hot leg and 877B and 878H in loop A hot leg) together form one of the two pressure boundaries required to be tested by Technical Specification 4.3.3.3. Because these valves are normally closed and the piping contains motor operated valves (MOV's) which are also closed and deener-gized, the check valves will not. move with the possible exception of when the MOVs are required to be opened to test the check valves. Thus, once tested the check valves will remain closed. An NRC order dated April 20, 1981 established an appropriate test frequency for these valves to be once every 40 months or after each opening of the MOVs. These valves are listed as passive valves in our valve testing program with testing required to meet Technical Specification 4.3.3.3.
Note 30- Valves 851A and 851B  are'ot qualified to operate in the post-accident containment environment and therefore not required to perform a post-accident function. Since the valves are normally open, and in their post-accident position, stroking of these valves will not be performed.
Note 31- Valves 4601, 4602, 4603 and 4604 shall be leak tested each refueling outage using a back flow test method to determine
 
TITI.Kc                              DATE QUAJ ITY                                                  1/30/86 AS SURANCE                    APPENDIX C              PAGE MANUAZ                    Pump and Valve GINNA STATION                Testing Program                  39  DF 40 if'ack    flow to the corresponding idle pump  is minimal (i.e. 2 psid as monitored by pressure change in the discharge header between pump discharge isolated and  unisolated). Quarterly valve stroking shall be limited to verifying that a normally closed valve will open concurrent with the start of an idle pump. An open check valve for a pump already in service will be deemed operable without 'having to stop and restart the pump since the open valve is considered to be performing its normal safety function.
Note 32- Valves 590, 591, 592 and 593 shall not, be stroked quarterly as an unplanned pressure transient could result from a leaky alternate isolation valve. These valves will be stroked at refueling outages Note 33- Sampling valves 951 and .953 need not be stroked as part of this program as they are not required to perform a safety function.
Although considered to be part of the reactor coolant system boundary, 10CFR50.55a(c)(2) specifies that components which are connected to the reactor coolant system and are. part of the boundary as defined in 50.2(v) of this part need not meet the requirements of paragraph (c)(1) of this section, provided: In the event of postulated failure of the component, during normal reactor operation, the reactor can be shut down and cooled down in an orderly manner, assuming makeup is provided by the reactor coolant makeup system. The valves are exercised during routine. sampling operations.
PVT 5.0      Records 5.1      Records for the Inservice Pump Testing Program shall be developed and maintained in accordance with Article IWP-6000 of Section XI of the Code.
 
TITLEs                          DATE QUALITY                                            1/30/86 ASSURANCE                APPENDIX C            PAGE MANUAL                Pump and  Valve GINNA STATION          Testing Program                40 DP  40 5.2      Records for the Inservice Valve Testing Program shall be developed and maintained in accordance with Article IWV-6000 of Section XI of the Code.
 
~~a gW l}}

Latest revision as of 19:53, 29 October 2019

Rev 7 to QA Manual,App C, Ginna Station Inservice Pump & Valve Testing Program for 810101-891231 Period.
ML17254A743
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/24/1986
From: Anderson C, Wilkins P
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17254A742 List:
References
NUDOCS 8602050105
Download: ML17254A743 (55)


Text

RE Y. PAGE QUALITY ASSURANCE MANUAL OF GINNA STATION EFFECTIVE DATE:

ROCHESTER GAS & ELECTRIC CORPORATION January 30, 1986 SIGNATURE DATE TITLE: PREPARED BT: (, /7 L' [ /~/g Appendix C Ginna Station Inservice Pump and Valve Testing Program'or the January 1, 1981 through December 31, 1989 Period REVIEW APPROVED BY:

Q /( ~ /

i z

gg-tC Y

Pro ram Table of Contents

==

Introduction:==

Discussion Definitions:

Program: PVT l.0 Scope and Responsibility PVT 2.0 Code Edition and Testing Interval PVT 3.0 Inservice Pump Testing Program PVT 4.0 Inservice Valve Testing Program PVT 5.0 Records sa02OS0>0S aaozas PDR ADOCK 05000244 P PDR

4 0

t K

TITLKs DATE QUAI ITY 1/30/86 AS SURANCE APPENDIX C PAGE MANUAI Pump and Valve GINNA STATION Testing Program 2 DP 40 Introduction This appendix to the Quality Assurance Manual defines the Inservice Pump and Valve Testing Program for the ten year period starting January 1, 1981 through December 31, 1989.

Included in this program are the Quality Groups A, B and C Pumps which are provided with an emergency power source and those Quality Groups A, B and C Valves which are required to shut down the reactor or to mitigate the consequences of an accident and maintain the reactor in a safe shutdown condition.

"This program has been developed as required by Section 50.55a(g) of 10CFRSO following the guidance of the ASME Boiler and Pressure Vessel Code Section XI "Rules for Inservice Inspection of Nuclear Power Plant Components," (hereafter referred to as the "Code" ) excluding the controls of the Authorized Inspector, Enforcement Authority, Reporting Systems and N-Stamp Symbol. The inservice testing program shall be controlled by the Ginna Station Quality Assurance Program for Station Operation. Quality Groups A, B and C components correspond to those defined in NRC- Regulatory Guide 1.26.

Further addenda and editions of Section XI of the Code shall'be used for clarification of test. requirements and performance.

The Inservice Pump and Valve Testing Program substantially augments but does not affect the pump and valve surveillance program required by Technical Specifications. Technical Specification requirements associated with pump and valve surveillance, shall continue to be implemented as specified.

42i52 C TITLEs DATE QUALITY 1/30/86 ASSURANCE APPENDIX C PACE MANUAI Pump and Valve GINNA STATION Testing Program 3 DP 40 Definitions AFP Auxiliary Feedwater Pump AOV Air Operated Valve APV Air Operated Piston Valve BA Boric Acid Code American Society of Mechanical Engineers Boiler and Pressure Vessel Code CC Component Cooling CS Containment Spray CSP Containment Spray Pump CV Check Valve C/R, Cold Shutdown and Refueling ECCS Emergency Core Cooling System FCV Flow Control Valve GA Gas Analyzer GDT Gas Decay Tank HCV Hand Control Valve HX Heat Exchanger LCV Level Control Valve M Monthly MAFP Motor Driven Auxiliary Feedwater Pump

'OV Motor Operated Valve Manual Valve PCV Pressure Control Valve PORV Power Operated Relief Valve PRT Pressurizer Relief Tank PRV Pressure Relief Valve PVT Pump and Valve Testing Q Quarterly R Refueling Outage RCDT Reactor Coolant Drain Tank RCP Reactor Coolant Pump RCV Radiation Control Valve RHR Residual Heat Removal RMW Reactor Makeup Water RV Relief Valve RWST Refueling Water Storage Tank RX Reactor Vessel S/G Steam Generator SAFWP Standby Auxiliary Feedwater Pump SI Safety Injection SOV Solenoid Operated Valve SW Service Water

4 r i.

,S

42i5t C TITLE< DATE QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 4 DF 40 Definitions TAFP Turbine Driven Auxiliary Feedwater Pump VC Volume Control VCT Volume Control Tank VH Vent Header CAT A VALVE Valves for which seat leakage is limited to a specific maximum amount in the closed position of fullfillment of'their function.

CAT B VALVE Valves for which seat leakage in the closed position is inconsequential for fullfillment of their function.

CAT C VALVE - Valves which are self-actuating in response to some characteristic, such as pressure (relief valves) or flow direction (check valves).

ze t J r

TITLEc DATE QUALITY 1/30/86 AS SURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 5 DF 40 Pum and Valve Testin Pro ram PVT 1.0 Sco e and Res onsibilit The inservice testing program defines the testing program for Quality Groups A, B and C Pumps and Valves in accordance with the requirements of Articles IWP and IWV of Section XI of the Code.

The results of these tests are to assure the operational readiness of pumps and valves.

1.2 It is the responsibility of the Ginna Station Test and Results Supervisor to implement this test program and develop inservice test proce-dures which will outline the specific test for each pump and valve included in the program.

1.3 When a valve, pump or its control system has been replaced or repaired or has undergone maintenance that could affect its performance, and prior to the time it is returned to service, it shall be tested as necessary to demonstrate that the per-formance parameters which could have been affected by the replacement, repair, or maintenance are within acceptable limits.

PVT 2.0 Code Edition and Testin Interval 2.1 The Inservice Pump and Valve Testing Program for the ten (10) year period starting January 1, 1981 through December 31, 1989 was developed utilizing the 1977 Edition of Section XI of the Code through the Summer 1978 Addenda.

PVT 3.0 Inservice Pum Testin Pro ram 3.1 The Inservice Pump Testing Program was developed in accordance with the requirements of Article IWP of Section XI of the Code. This program includes all Quality Group A, B and C pumps which are provided with an emergency power source and are required to perform a specific function in shutting down a reactor or in mitigating the consequences of an accident and maintain the reactor in a safe shutdown condition.

TITLE< DATE QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 6 OF 40 3.2 The following pumps shall be tested in accordance with Article IWP of Section XI:

(a) lA Component Cooling (b) lB Component Cooling (c) 1A Safety Injection (d) lB Safety 1njection (e) lC Safety Injection (f) lA Residual Heat Removal (g) 1B Residual Heat Removal (h) lA Containment Spray (i) 1B Containment Spray (j) lA Motor Driven Auxiliary Feedwater (k) lB Motor Driven Auxiliary Feedwater (1) Turbine Driven Auxiliary Feedwater (m) lA Service Water (n) lB Service Water (o) 1C Service Water (p) lD Service Water (q) 1C Standby Auxiliary Feedwater (r) 1D Standby Auxiliary Feedwater 3.3 With one exception, test parameters that shall be measured or observed during inservice testing of each pump are those listed in Table IWP-3100-1 of Section XI and include inlet pressure, differential pressure, flow rate, vibration amplitude, and proper lubricant level or pressure. The exception is for the measurement of pump bearing temperatures and there are several reasons why this measurement is either undesirable or inconclusive. Specifically, for the service water pumps, the bearings are submersed in up to forty feet of water making bearing temperatures closely approximate the surrounding water temperature and measurement of temperatures almost impossible. For the auxiliary and standby auxiliary feedwater pumps the test conditions require the discharge of ambient temperature water into the 400 degree F feedwater lines. Since it can typically take in excess of an hour to stabilize bearing temperatures this causes an unnecessary extended temperature trans-ient, in the feedwater line. For the residual heat removal and safety injection pumps the system configurations do not allow testing the pumps at actual pump service conditions during lant o eration. Instead the tests must be

4i AC TITLE< DATE QUALITY l/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 7 OF 40 performed at an off-design flow condition which results in higher bearing temperatures than normal. This is to be expected since higher than normal thrust loads are placed on the pump bearings during this reduced flow test condition. The extended time required for bearing temperatures to stabilize subjects the pump to lengthy periods of unnecessarily high loads. The pump vendors do not consider the measurement of bearing temperature in this type of off-design condition to be a good indication of bearing conditions. The vendors recommended bearing temperature limits are based on normal operating conditions and do not apply to this type of testing. In general, vibration is considered-to be a better indication of bearing condition since a significant increase in bearing temperature will normally only occur failure is imminent. Finally, test if bearing conditions cannot be easily controlled to produce temperature repeatability since readings are subject to a large number of variables such as ambient air temperature, cooling water temperature (where applicable), location of temperature probe attach-ment, temperature of the fluid pumped and quantity of the fluid pumped. One or both residual heat removal pumps may be required to be operable, by the plant Technical Specifications, when the average reactor coolant temperature is between 350 degrees F. and 200 degrees F. or the plant is at cold or refueling shutdown. Typically, in this case, at least one residual heat removal pump will be in operation. Testing will be performed in accordance with IWP-3400, which, includes operating the pump at reference conditions, if practicable, and providing a log which shows that the parameters monitored during normal plant operation were measured, recorded and analyzed.

The practicability of duplicating cold shutdown reference conditions may be impacted by refueling water level during refueling and inservice reactor inspections as well as decay heat removal rate.

3.4 The test frequency for the pumps shall be as follows:

a. Component cooling water pumps shall be tested monthl

.I p QUALITY 1/30/86 ASSURANCE APPENDIX C PACE MANUAL Pump and Valve GINNA STATION Testing Program 8 DF 40

b. Safety injection pumps shall be tested monthly except during cold or refueling shutdowns. The pumps shall be tested prior to startup exceeds if the time since the last one month.

test C. Residual heat removal pumps shall be tested monthly except during cold or refueling shutdown. The pumps shall be tested prior to startup if the time since the last test exceeds one month. When the reactor coolant system temperature is between 350'F and 200'F or the plant is at cold or refueling shutdown the plant Technical Specifications may require one or both residual heat removal pumps to be operable. If this is the case, then the required pumps shall be tested monthly.

d. Containment spray pumps shall be tested monthly except during cold or refueling shutdown. The pumps shall be tested prior to startup exceeds if the time since the last test one month.
e. Motor driven auxiliary feedwater pumps, turbine driven auxiliary feedwater pump, and the standby auxiliary feedwater pumps shall be tested monthly except during cold or refueling shutdowns.

The pumps shall be tested prior to exceeding 5% power if the time since the exceeds one month.

last test Service water pumps shall be tested monthly.

Testing of a pump need not be performed pump if is declared inoperable without the testing.

that Consistent with plant Technical Specifications, specified intervals may be extended by 25% to accommodate normal test schedules.

0 TITI.Ks DATE QUALITY 1/30/86 ASSURANCE APPENDIX C MANUAL Pump and Valve GINNA STATION Testing Program 9 DF 40 PVT 4.0 Inservice Valve Testin Pro ram II 4.1 The Inservice Valve Testing Program was developed in accordance with the requirements of Article IWV of Section XI of the Code. All,those valves that are required to perform a specific function either to shut down the reactor to the cold shut-down condition or in mitigating the consequences

-'f an accident and maintain the reactor in a safe shutdown condition are included in the program.

4.2 The Inservice Valve Testing Program Requirements for Category A and B Valves are in Tables PVT 4.7 and 4.8, respectively. Category C Valves are broken down into two categories, Check Valves and Relief Valves, which are in Tables PVT 4.9 and 4.10, respectively. Category D Valves are not included in this testing program because there are none included in Ginna Station design.

4.3 Some exceptions and exemptions to the testing re-quirements of Article IWV have been taken based on operational interference, placing the plant in an unsafe condition and Technical Specification requirements. All exceptions and exemptions are listed on the valve tables and explained in the referenced notes, PVT 4.12.

4,4 The exercising program for 'Category A and B Valves, with the exception of check valves, shall require a complete stroking of each valve per the valve testing tables. Except where operational constraints prevail and exceptions have been authorized all check valves, including Category C Valves, shall be exercised to the position required to fulfill

'ests shall their function. These functional be verified by the operation of the required system. Valves which malfunction during stroking will not be considered inoperable as defined by Technical Specifications, when the malfunction does not prevent the valves from performing its safety function.

4.5 Category A and B valves operation shall be timed each time they are stroked utilizing switch initiation and the position indicators, which are accessible durin lant o eration. Durin each

TITI.Ea DATE QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 10 DP 40 refueling outage a visual verification shall be made to confirm direct correspondence between valve operators and the position indicators.

4.6 For a valve in a system declared inoperable or not required to be operable the exercising test schedule need not be followed. Within 30 days prior to return of the system to operable status, the valves shall be exercised and the schedule resumed.

4.7 The testing of valves required at cold shutdown and refueling outages will normally take four (4) days to complete. When cold shutdowns are of a shorter duration (2-3 days), test personnel shall attempt to test as many valves as possible without holding up the startup of the unit with testing beginning no later .than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after the plant reaches cold shutdown (as defined in Technical Specification 1.2). For very short cold shutdowns (less than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />), it would be impossible to mobilize test personnel to implement the testing program under the required procedural controls, therefore no valves would be tested. It is possible that, during a four (4) day cold shut-down, the work load on test personnel may preclude their completion of all the required valve tests prior to startup. Any testing not completed at one cold shutdown due to outage duration shall be performed during any subsequent cold shutdowns that may occur before the next refueling outage to meet the specified testing frequency. Valve testing during cold shutdowns need not be more frequent than one test per quarter for each valve in the test program.

)

4.8 Category A Valves Valve 5 ~Te Descri tion Note Test ~Fre 204A MV Letdown to NRHX Stroke C/R Leak R 304A CV 1-A RCP Seal Injection Stroke C/R Leak R 304B CV 1-B RCP Seal Injection Stroke C/R Leak R

TITL,Ka GATE QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 11 gf: 40 Valve 5 ~Te . Note Test ~Fre 313 MOV Seal Water Return Stroke C/R Isolation Leak R 370B CV Charging Line Isolation Stroke C/R Leak R 371 AOV Letdown Isolation Stroke C/R

.Leak R 383B CV Alternate Charging Iine Stroke C/R Leak R 508 AOV RMW to Containment Vessel Stroke Q Stop Leak R 528 CV N2 Supply to PRT Stroke Q Leak R 529 CV RMW to PRT Stroke Q Leak R 539 AOV PRT Stop Valve to Gas Stroke Q Analyzer Leak R 546 MV PRT to Gas Analyzer Stroke Q Leak R 547 MV Nitrogen to PRT Stroke Leak 743 CV CC From Excess Letdown HX. Stroke Q Leak R 745 AOV Return From Excess Let- Stroke Q down HX. Leak R 749A MOV CCW to A RCP Stroke C/R Leak R 749B MOV CCW to B RCP Stroke C/R Leak R 750A CV CC to A RCP Stroke C/R Leak R

TITLE) DATE QUALITY 1/30/86 ASSURANCE'ANUAL APPENDIX C PAGE Pump and Valve GINNA STATION Testing Program 12 DF 40 Valve 4 T~e Note Test ~Fre 750B CV CC to B RCP Stroke C/R Leak R 759A MOV Containment Stop CC From 5 Stroke C/R Loop A RCP 7 Leak R 759B MOV Containment Stop CC From Stroke C/R Ioop B RCP Leak R 813 MOV CC Supply to RX Support Stroke C/R Coolers Leak R 814 MOV CC Return to RX Support Stroke C/R Coolers Leak R 820 MV Letdown to NRHX Stroke Leak 842A CV Loop A Accumulator Dump 28 Stroke C/R Line Check Valve Leak C/R 842B CV Loop B Accumulator Dump 28 Stroke C/R Line Check Valve Leak C/R 846 AOV N2 Supply to Accumulators Stroke Q Leak R 853A CV Core Deluge Check 10 Stroke C/R 10 Leak C/R 853B CV Core Deluge Check 10 Stroke C/R 10 Leak C/R 862A CV 1-A CSP Disch Stroke Q Leak R 862B CV l-B CSP Disch Stroke Q Leak R 867A CV Accumulator Dump and SI 13 Stroke R to Cold Leg Loop B 13 Leak C/R 867B CV Accumulator Dump and SI 13 Stroke R.

to Cold Leg Loop A 13 Leak C/R

TITI.Ec DATE QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 13 DP 40 Valve 0 ~Te Note Test Free{

870A CV 1-A to 1-C SI Pump Disch Stroke Q Leak R 870B CV l-B to 1-C SI Pump Disch Stroke Q Leak R 877A CV High Safety Injection 11 Stroke Loop B Hot Leg 29 Leak 40 Mo.

877B CV High Safety Injection 11 Stroke Loop A Hot Leg 29 Leak 40 Mo.

878F CV High Safety Injection ll- Stroke Loop B Hot Leg 29 Z,eak 40 Mo.

878G CV 1-A SI Pump to Cold Leg 13 Stroke R Loop B 13 Leak C/R 878H CV High Safety Injection 11 Stroke Loop A Hot Leg 29 Leak 40 Mo.

878J CV 1-B SI Pump to Cold Leg 13 Stroke R Zoop A 13 Leak C/R 879 MV SI Test Line Isolation Stroke Leak R 889A CV l-A SI Pump Disch Stroke Q Leak R 889B CV l-B SI Pump Disch Stroke Q Leak R 921 SOV Loop A Hydrogen Monitor Stroke Q Inlet Leak R 922 SOV Zoop A Hydrogen Monitor Stroke Q Outlet Zeak R 923 SOV Loop B Hydrogen Monitor Stroke Q Inlet Z,eak R 924 SOV Loop B Hydrogen Monitor Stroke Q Outlet Leak R

TITLE: DATE QUAZ ITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 14 DF 40 Valve 0 ~e Descri tion Note Test ~Fre 956D Hot Leg Loop Sample Stroke Q Containment Isolation Leak R 956E PRZR Liquid Space Sample Stroke Q Containment Isolation Leak R 956F PRZR Steam Space Sample Stroke Q Containment Isolation Leak R 966A AOV Pressurizer Steam Space Stroke Q Containment Isolation Leak R 966B AOV Pressurizer Liquid Space Stroke Q Containment Isolation Zeak R 966C AOV Loop A and B Hot Leg Stroke Q Containment Isolation Zeak R 1003A LCV l-A RCDT Pump Suction Stroke Q Leak R 1003B LCV l-B RCDT Pump Suction Stroke Q Zeak R 1076A MV Hydrogen to "A" Recombiner 11 Stroke Pilot Containment Isolation Leak IV-3A SOV Hydrogen to "A" Recombiner Pilot Containment Isolation ll Stroke Zeak 1076B MV Hydrogen to "B" Recombiner ll Stroke Pilot Containment Isolation Leak IV-3B SOV Hydrogen to "B" Recombiner ll Stroke Pilot Containment Isolation Leak 1080A MV Oxygen Make Up to Contain- ll Stroke ment, Isolation. Leak R IV-2A Oxygen Make Up to Contain- ll Stroke ment Isolation (A Recombiner) Leak IV-2B Oxygen Make Up to Contain- 11 Stroke ment, Isolation (B Recombiner) Leak

TITLE: DATE QUALITY 1/3 0/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 15 OF 40 Valve 5 ~e Note Test ~Fre 1084A MV Hydrogen to "A" Recombiner Stroke Main Burner Containment Leak Isolation IV-5A SOV Hydrogen to "A" Recombiner Stroke Main Burner Containment Leak Isolation 1084B MV Hydrogen to "B" Recombiner Stroke Main Burner Containment Leak Isolation IV-5B SOV Hydrogen to "B" Recombiner Stroke Main Burner Containment Leak Isolation 1554 MV D Recirc. Fan Air Sample Stroke Isolation Leak 1556 MV D Recirc. Fan Air Sample Stroke Isolation Leak 1557 MV A Recirc. Fan Air Sample Stroke Isolation Leak R 1559 MV A Recirc. Fan Air Sample Stroke Isolation Leak 1560 MV A S D Return Iine Stroke Isolation Leak 1562 MV A 6 D Return Line Stroke Isolation Leak 1563 MV B Recirc. Fan Air Sample Stroke Isolation Leak 1565 MV B Recirc. Fan Air Sample Stroke Isolation Leak 1566 MV B Recirc. Fan Air Sample Stroke Return Line Isolation Leak 1568 MV B Recirc. Fan Air Sample Stroke Return Line Isolation Leak

'J i2 QC TITLEi DATE QUALITY 1/30/86'6 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program DF 40 Valve 4 ~Te Note Test ~Fre 1569 C Recirc. Fan Air Sample Stroke Isolation Leak R 1571 C Recirc. Fan Air Sample Stroke Isolation Leak R 1572 C Recirc. Fan Air Sample Stroke Return Line Isolation Leak R 1574 C Recirc. Fan Air Sample Stroke Return Line Isolation Leak R 1596 MV Radiation Monitor Supply Stroke Q Leak R 1597 AOV Radiation Monitor Supply Stroke Q Leak R 1598 AOV Radiation Monitor Exhaust 'troke Q Leak R 1599 AOV Radiation Monitor Exhaust Stroke Q Leak R 1655 MV RCDT to Gas Analyzer Stroke Q Leak R l7l3 CV N2 to RCDT Stroke Q Leak R 172l AOV Suction line to RCDT Stroke Q Leak R 1723 AOV A Containment Sump Disch Stroke Q to Waste Holdup Tank Leak R 1728 AOV A Containment Sump Disch Stroke Q to Waste Holdup Tank Leak R 1786 AOV RCDT to VH Isolation Stroke Q

'eak R 1787 AOV RCDT to VH Isolation Stroke Q Leak R

TITLE: DATE QUALITY 1/30/86 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program 17 40 Valve 4 ~Te Note Test ~Fze l789 AOV RCDT to GA Containment Stroke Q Isolation Leak R 1793 MV N2 to RCDT Isolation 11

  • Stroke Leak 1819A MV Containment Pressure 21 Stroke C/R Transmitter 945 Isolation Leak R 1819B MV Containment Pressure 21 Stroke C/R Transmitter 946 Isolation Leak R 1819C MV Containment Pressure 21 Stroke C/R Transmitter 947 Isolation Leak R 1819D MV Containment Pressure 21 Stroke C/R Transmitter 948 Isolation Leak R 1819E MV Containment Pressure 21 Stroke C/R Transmitter 949 Isolation R Leak'troke 1819F MV Containment Pressure 21 C/R Transmitter 950 Isolation Leak R 1819G MV Containment Piessure 21 Stroke C/R Transmitter 944 Isolation Leak R 4601 CV 1A Service Water Pump 31 Stroke Q Discharge 31 Leak R 4602 CV 1B Service Water Pump 31 Stroke Q Discharge 31 Leak R 4603 CV 1C Service Water Pump 31 Stroke Q Discharge 31 Leak R 4604 CV 1D Service Water Pump 31 Stroke Q Discharge 31 Leak R 5129 MV Construction Fire Service 11 Stroke Water Containment Isolation Leak 5392 AOV Instrument Air to Contain- 19 Stroke R ment Isolation Leak R

TITLEs DATE QUAI ITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 18 pp 40 Valve 4 ~Te Note Test ~Fre 5393 CV Instrument Air to 19 Stroke R Containment Isolation Leak R 5701 MV A-S/G Blowdown Isolation Stroke Q Leak R 5702 MV B-S/G Blowdown Isolation Stroke Q Leak R 5733 MV A-S/G Sample Isolation Stroke Q Leak R 5734 MV B-S/G Sample Isolation Stroke Q Leak R 5735 AOV "A" S/G Blowdown Sample Stroke' Q Isolation Leak 5736 AOV "B" S/G Blowdown Sample Stroke Q Isolation Leak R 5737 AOV "B" S/G Blowdown Isolation Stroke Q Leak R 5738 AOV "A" S/G Blowdown Isolation Stroke Q Leak R 5869 APV Containment Purge Supply 22 Stroke Isolation Leak 5870 APV Containment Purge Supply 22 Stroke Isolation Leak 5878 APV .Containment Purge Exhaust 22 Stroke Isolation Leak 5879 APV Containment Purge Exhaust 22 Stroke Isolation Leak 6151 MV Auxiliary Steam Supply to Stroke Containment Leak 6152 MV Condensate Return from Stroke Containment Ieak

  • See Note 22

TITLEs DATE QUAI ITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 19 DP 40 Valve 8 ~Te Note Test Free{

6165 Aux. Steam Supply to Stroke Containment Leak 6175 Condensate Return from Stroke Containment Leak 7141 Service Air Isolation Stroke Outside Containment Leak 7226 CV Service Air Isolation Stroke Inside Containment Leak 7443 MOV Containment Supply Air Test ll Stroke Leak R 7444 MOV Containment Air Test Vent ll Stroke Leak R 7445 MOV Containment Air Test Vent 11 Stroke Leak R 7448 MV Isolation Valve from 11 Stroke Containment to Local Ieak R Pressure Indicator for Containment Air Test 7452 MV Isolation Valve from 11 Stroke Containment to Local Leak R Pressure Indicator for Containment Air Test 7456 MV Isolation Valve from Containment to Iocal ll Stroke Leak R Pressure Indicator for Containment Air Test 7970 AOV Containment Depressuri- Stroke Q zation Valve Leak R 7971 AOV Containment Depressuri- Stroke Q zation Valve Leak R

8418 AOV Demin. Water to Contain- Stroke ment Isolation Leak R

TITLE) DATE QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 20 DF 40 Valve 4 ~Te Note Test ~Fre 8419 CV .Demin. Water to Contain- Stroke ment Isolation Leak 8623 CV Nitrogen to Accumulators Stroke Isolation Leak 9227 AOV Fire Service Water Stroke Containment Isolation Leak 9229 CV Fire Service Water Stroke Containment Isolation Ieak 4.9 Category B Valves Valve 0 ~Te Note Test Free{

014 RCV Aux Building GDT Release Stroke Q 017 RCV Component, Cooling Surge Stroke Q Tank Vent 081 APV Control Room Ventilation Stroke Q Damper 082 APV Control Room Ventilation Stroke Q Damper 083 APV Control Room Ventilation Stroke Q Damper 084 APV Control Room Ventilation Stroke Q Damper 085 APV Control Room Ventilation Stroke Q Damper 086 APV Control Room Ventilation Stroke .

Q Damper ll2B LCV Emergency Makeup RWST to Stroke Q Charging Pump 112C LCV VCT Outlet Stroke Q

TITLE: DATE QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 21 DF 40 Valve 5 ~Te Descri tion Note Test ~Fre 427 AOV Letdown From Loop B 3 Stroke C/R 430 PORV Pressurizer Power 16 Stroke C/R Operated Relief 431C PORV Pressurizer Power 16 Stroke C/R Operated Relief 515 MOV Pressurizer PORV Block 23 Stroke Q Valve 516 MOV Pressurizer PORV Block 23 Stroke Q Valve 590 SOV Reactor Head Vent 32 Stroke R 591 SOV Reactor Head Vent 32 Stroke R 592 SOV Reactor Head Vent 32 Stroke R 593 SOV Reactor Head Vent 32 Stroke R 624 HCV l-B RHR HX Outlet 26 Stroke C/R 625 HCV 1-A RHR HX Outlet 26 Stroke C/R 626 FCV RHR Loop Return Recirc. Stroke Q 700 MOV RHR Inlet Isolation From Stroke'/R Loop A 701 MOV RHR Inlet Isolation From 8 Stroke C/R Loop A 704A MOV Suction l-A RHR Pump 24 Stroke Q 704B MOV Suction l-B RHR Pump 24 Stroke Q 720 MOV RHR Return Isolation to 8 Stroke C/R Loop B 72l MOV RHR Return Isolation to 8 Stroke C/R Loop B

TITLE< DATE QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 22 PP 40 Valve 4 ~Te Note . Test ~Fre 738A MOV CC to 1-A RHR HX Stroke Q 738B MOV CC to l-B RHR HX Stroke Q 825A MOV SI Pump Suction From RWST 9 Stroke C/R 825B MOV SI Pump Suction From RWST 9 Stroke C/R 826A MOV SI Pump Suction From 25 Stroke Q BA Tank 826B MOV SI Pump Suction From 25 Stroke Q BA Tank 826C MOV SI Pump Suction From 25 Stroke Q BA Tank 826D MOV SI Pump Suction From 25 Stroke Q BA Tank 836A HCV Spray Additive Tank Dis- 17/24 Stroke Q charge 836B HCV Spray Additive Tank Dis- 17/24 Stroke Q charge 850A MOV Sump B to RHR Pumps 24 Stroke Q 850B MOV Sump B to RHR Pumps 24 Stroke Q 851A MOV Sump B to RHR Isolation 30 Stroke 851B MOV Sump B to RHR Isolation 30 Stroke 852A MOV RHR Pumps to Reactor Vessel 18 Stroke C/R 852B MOV RHR Pumps to Reactor Vessel 18 Stroke C/R 856 MOV RWST to RHR Pumps 9 Stroke C/R 857A MOV lB RHR HX to CS and SI 27 Stroke C/R Pump Isolation

i I

'4

DATE QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 23 pp 40 Valve 4 T~e Note Test ~Fre 857B MOV 1A RHR HX to CS and SI 27 Stroke C/R Pump Isolation 857C MOV lA RHR HX to CS and SI 27 Stroke C/R Pump Isolation 860A MOV 1-A CSP Discharge 24 Stroke Q 860B MOV 1-A CSP Discharge 24 Stroke Q 860C MOV 1-B CSP Discharge 24 Stroke Q 860D MOV 1-B CSP Discharge 24 Stroke Q 871A MOV 1-A to 1-C SI Pump 24 .Stroke Q Discharge 871B MOV 1-B to l-C SI Pump 24 Stroke Q Discharge Q75A MOV CS Pump Discharge to 1A Stroke Q Charcoal Filter Deluge 875B MOV CS Pump Discharge to 1A Stroke Q Charcoal Filter Deluge 876A MOV CS Pump Discharge to 1B Stroke ,Q Charcoal Filter Deluge-876B MOV CS Pump Discharge to 1B Stroke Q Charcoal Filter Deluge 896A MOV RWST to CS and SI Pumps 9 Stroke C/R 896B MOV RWST to CS and SI Pumps 9 Stroke C/R 897 AOV SI Pump Recirc. to RWST 27 Stroke C/R 898 AOV SI Pump Recirc. to RWST 27 Stroke C/R 951 AOV Pressurizer Steam Space 33 Stroke Sample

TIT LE i DATE QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 24 op 40 Valve 5 ~Te Note Test ~Fre 953 Pressurizer Liquid

'OV Space 33 Stroke Sample 955 AOV "B" Loop Hot Leg Sample Stroke Q 959 AOV RHR Loop Sample 20 Stroke C/R 1811A Reactor Coolant Drain Tank Isolation to RHR System ll 1811B Reactor Coolant Drain Tank 11 Isolation to RHR System 1815A MOV C-SI Pump Suction From RWST 24 Stroke Q 1815B MOV C-SI Pump Suction From RWST 24 Stroke Q 3504A MOV Main Steam to TAFP From 1-B Stroke Q S/G 3505A MOV Main Steam to TAFP From 1-A Stroke Q S/G 3652 Main Steam Throttle Valve Stroke Q to TAFP 3996 MOV TAFP Discharge Stroke M 4000A MOV Cross Over Valve For MAFP Stroke M 4000B MOV Cross Over Valve For MAFP Stroke M 4007 MOV 1-A MAFP Discharge Stroke M 4008 MOV 1-B MAFP Discharge Stroke M 4013 MOV TAFP Service Water Supply Stroke M Isolation 4027 MOV 1-A MAFP Service Water Stroke M Isolation

0 J ~

TITLE: DATE QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 25 DP 40 Valve 0 ~Te Note Test ~Fre 4028 MOV 1-B MAFP Service Water Stroke M Isolation 4291 AOV TAFP Recir. Line Stroke M 4297 AOV TAFP Discharge to 1-A S/G Stroke M 4298 AOV TAFP Discharge to 1-.B S/G Stroke M 4304 AOV 1-A MAFP Recirculation Stroke M Control 4310 AOV 1-B MAFP Recirculation Stroke M Control 4561 AOV Containment Vent Recirc. Stroke Q Fans Discharge Flow Con-trol I 4562 AOV Containment Vent Recirc. Stroke Q Fans Discharge Flow Con-trol Bypass 4609 MOV lAl Screen House SW Stroke Q Isolation 4613 MOV 1B2 Turbine Building SW Stroke Q Isolation 4614 MOV lA1 Turbine Building SW Stroke Q Isolation 4615 MOV 1Bl Aux. Building SW Stroke Q Isolation 4616 MOV lA1 Aux. Building SW Stroke Q Isolation 4627 MV Service Water to A Fan Stroke. Q Cooler Isolation 4628 MV Service Water to B Fan Stroke Q Cooler Isolation

'0 'J TITLE< DATE QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 26 OF 40 Valve 4 ~Te Descri tion Note Test ~Fre 4629 MV Service Water from A Fan Stroke Q Cooler Isolation 4630 MV Service Water from B Fan Stroke Q Cooler Isolation 4635 MV Reactor Compartment Cooling . Stroke Q Unit A Inlet Isolation 4636 MV Reactor Compartment, Cooling Stroke' Unit A Outlet Isolation 4641 MV Service Water to C Fan Stroke Q Cooler Isolation 4642 MV Service Water to D Fan Stroke Q Cooler Isolation 4643 MV Service Water from C Fan Stroke Q Cooler Isolation 4644 MV Service Water from D Fan Stroke Q Cooler Isolation 4663 MOV 1Al Air Cond. Chillers SW Stroke Q Isolation 4664 MOV 1A2 Turbine Building SW Stroke Q Isolation 4670 MOV 1B1 Turbine Building SW Stroke Q Isolation 4733 MOV 1A2 Air Cond. Chillers SW Stroke Q Isolation MOV 1B2 Aux. Build. SW Isolation- Stroke Q 4735 MOV 1A2 Aux. Build. SW Isolation Stroke Q 4757 MV Reactor Compartment Cooling Stroke Q Unit B Inlet Isolation

TITLE< DATE QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 27 pF 40 Valve 4 ~Te Note Test ~Fre 4758 Reactor Compartment Cooling Stroke Q Unit B Outlet Isolation 4780 MOV 1A2 Screen House SW Stroke Q Isolation 5171 MOV Turbine Build. Fire Water Stroke Q Loop Supply Isolation 587l Containment Post Accident Stroke Q Filter Damper 5872 Containment Post Accident Stroke Q Filter Damper 5873 APV Containment Post Accident Stroke Q Filter Damper 5874 APV Containment Post Accident Stroke Q Filter Damper 5875 Containment Post Accident Stroke Q Filter Damper 5876 Containment Post Accident Stroke Q Filter Damper 9629A MOV 1C SAFP Service Water Stroke Q Isolation 9629B MOV 1D SAFP Service Water Stroke Q Isolation 9701A MOV 1C SAFP Discharge Stroke Q 9701B MOV 1D SAFP Discharge Stroke Q 9703A MOV SAFP Cross Over Stroke Q 9703B MOV SAFP Cross Over Stroke Q 9704A MOV 1C SAFP Containment Stroke Q Isolation

0 DATE QUALITY 1/30/86 AS SURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 28 oF 40 Valve 4 ~Te Note Test ~Fre 9704B MOV 1D SAFP Containment Stroke Q Isolation 9710A AOV 1C SAFP Recirc. Control Stroke Q 9710B AOV 1D SAFP Recirc. Control Stroke Q 4.10 Category C Check Valves Valve 5 ~Te Note Test ~Fre 710A CV 1-A RHR Pump Discharge Stroke Q 710B CV 1-B RHR Pump Discharge Stroke Q 723A CV 1-A CC Pump Discharge Stroke Q 723B CV 1-B CC Pump Discharge Stroke Q 847A CV A-CSP From Spray Additive Stroke Q Tank to Eductor 847B CV B-CSP From Spray Additive Stroke Q Tank to Eductor 854 CV RWST to RHR Pump Check Stroke Q 866A CV CS Pump.l-A to Charcoal 12 Stroke C/R Filter Deluge 866B CV CS Pump 1-B to Charcoal Stroke Q Filter Deluge 3516 CV lB Main Steam Isolation Stroke R 3517 CV 1A Main Steam Isolation Stroke R 3998 CV TAFP Discharge Check Stroke M 4000C CV lA MAFP Discharge Check Stroke M 4000D CV lB MAFP Discharge Check Stroke M

TITLE: DATE QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 29 OP 40 Valve 0 ~Te Note Test ~Fre 4003 CV TAFP to S/G lA Stroke M 4004 CV TAFP to S/G lB Stroke M 4009 CV lA MAFP to S/G lA Stroke M 4010 CV lB MAFP to S/G lB Stroke M 4014 CV TAFP Suction Stroke M 4016 CV 1B MAFP Suction Stroke M 4017 CV lA MAFP Suction Stroke M 4023 CV TAFP Recirculation Stroke M 5133 CV Diesel Fire Pump Disch. Stroke Q 5136 CV Motor Fire Pump Discharge Stroke Q 9627A CV 1C SAFP SW Suction Stroke Q 9627B CV 1D SAFP SW Suction Stroke Q 9700A CV 1C SAFP Discharge Stroke Q 9700B CV 1D SAFP Discharge Stroke Q 9705A CV 1C SAFP to S/G 1A Stroke Q 9705B CV 1D SAFP to S/G 1B Stroke Q 4.11 Category C Relief Valve Valve 4 ~Te Note Test ~Fre 203 RV Letdown High Pressure 15 Safety Relief 209 RV Letdown Low Pressure 15 Safety Relief 434 RV Pressurizer Safety Relief 15

TITLEc DATE QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 30 OP 40 Valve 0 ~Te Descri tion Note Test ~Fre 435 RV Pressurizer Safety Relief 15 732 RV CC Surge Tank Relief 15 RV CC From Excess Letdown 15 Heat Exchanger 755A RV CC From A RCP Thermal 15 Barrier 755B RV CC From B RCP Thermal 15 Barrier 758A RV CC From A-RCP Oil Coolers 15 758B RV CC From B-RCP Oil Coolers 15 818 RV CC From Reactor Support 15 Coolers 861 RV 1-B CS Pump Suction Relief 15 887 RV SI Test Zine Relief Valve 15 Inside Containment 1817 RV Alternate Suction From 15 RHR Pump to C SI Pump 3508 RV 1-B S/G PRV 15 3509 RV 1-A S/G PRV 15 3510 RV 1-B S/G PRV 15 3511 RV 1-A S/G PRV 15 3512. RV 1-A S/G PRV 15 3513 RV 1-A S/G PRV 15 3514 RV 1-B S/G PRV 15 3515 RV 1-A S/G PRV 15

TITLEt DATE QUALITY l/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 31 OF 40 Valve 5 T~e Note Test ~Fre 4653 RV .Service Water Relief 15 4654 RV Service Water Relief 15 4657 RV Service Water Relief 15 5134 RV Diesel Fire Pump Disch 15 Relief 5135 RV Motor'Fire Pump Disch 15 Relief 4.12 Inservice Valve Testing Notes Note 1 Valves 304A, 304B and 313 cannot be stroked during normal plant operation on a quarterly basis because they would interrupt coolant flow to the reactor coolant pump seals. These valves will be stroked at cold shutdowns and refuel-ing outages.

Note 2 - Valve 370B cannot be stroked during normal plant operation on a quarterly basis because this test would interrupt charging pump flow. This valve will be stroked at cold shutdowns and refueling outages.

Note 3 - Valves 204A, 371 and 427 cannot be stroked during normal plant operation on a quarterly basis because this test would interrupt the letdown (CVCS) system. These valves will be stroked at cold shutdowns and refueling outages.

Note 4 - Valve 383B cannot be stroked during normal plant operation on a quarterly basis because this test would result in substantial radiation exposure to test personnel. Surveys. in the area of the test connection during plant operation indicate neutron fields of approximately 500 mr/hr and a gamma fields of 250 mr/hr.

TITLE: DATE QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 32 DF 40 Total whole body dosage to test personnel is estimated to be 375 mrem. This valve will be stroked at cold shutdowns and refueling outages.

Note 5 Valves 749A, 749B, 750A, 750B, 759A and 759B cannot be stroked during normal plant operation on a quarterly basis because this test would require the reactor coolant pumps to be shut down to eliminate the flow through these checks and MOVs. These valves will be stroked at cold shutdowns and refueling outages.

Note 6 Valves 813 and 814 cannot be stroked during normal plant operation on a quarterly basis because this test would remove the coolant to the reactor vessel supports and cavity wall. These valves will be stroked at cold shutdowns and refueling outages.

Note 7 Valve 879 is a manual valve in the safety injection test line and is kept locked shut. This valve is not required to change position to perform a safety func-,

tion. The only requirement is that leak-age through valve 879 be acceptably low.

Therefore, the quarterly stroke, test has been deleted. This passive valve will be only leak tested at refueling outages consistent with IWV-3700-1.

Note 8 Valves 700 and 721 cannot be stroked during normal plant operation on a quarterly basis because there is an interlock system which prevents these valves from opening when the primary system is at operating pressure. Valves 700, 701, 720 and 721 separate a high pressure system from a low pressure system. These valves will be stroked at cold shutdowns and refueling outages.

TITLE: DATE QUALITY 1/30/86 ASSURANCE APPENDIX C MANUAL Pump and Valve PAGE GINNA STATION Testing Program OF Note 9 Valves 825A, 825B, 856, 896A, and 896B should not be stroked during normal opera-tion on a quarterly basis because- this would cause a temporary loss of system function of the ECCS. These valves pro-vide the suction from the refueling water storage tank to the safety injection and residual heat removal pumps. These valves will be stroked at cold shutdowns and re-fueling outages.

Note 10- Valves 853A and 853B cannot be stroked during normal plant operation on a quarterly basis because this test requires pressurizing the RHR system to the primary system operation pressure. These valves will be stroked at refueling outages.

Leakage testing of check valves 853A and 853B shall be accomplished prior to criticality following (1) refueling, (2) cold shutdown, and (3) maintenance, repair or replacement work on the valves. Leakage may be measured indirectly from the performance of pressure indicators, system volume measuurements or by direct measurement.

Minimum test differential shall be greater than 150 psid. Technical Specification 4.3.3.4 defines the allowable leakage rates.

Note ll- Valves 820, 877A, 877B, 878F, 878H, 1076A, 1076B ~ 1 080Ag 1084Ag 1 084B g IV 3Ag IV 3B g IV 5Ag IV 5B g IV 2Ag IV 2B g 1554 g 1556 g 1557~ 1579 g 1560'562'563'565'566/

1568 g 1569 ~ 1571 1572 1574 g 1793 g 181 1Ag 1811Bg 5129 g 6151'152@ 6155'175@ 7141@

7226 g 7443 g 7444 g 7445 g 7448 g 7452 g 7456/

8418, 8419, 8623, 9227 and 9229 are con-sidered passive valves which are not required to change position to acccomplish their specific function. Stroking these valves would serve no useful function and will therefore not be done as per IWV-3700-1.

TIT LE i DATE QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 34 DP 40 Note 12- Valve 866A cannot be stroke tested during normal plant operation on a quarterly basis because this test would result in a sub-stantial radiation exposure to test per-sonnel. Stroke testing at this location resulted in approximately 400- mrem whole body exposure to the test personnel. This valve 'will be stroked at cold shutdowns and refueling outages.

Note Valves 867A, 867B, 878G, and 878J cannot be stroked during normal operation on a quarterly basis or at cold shutdown condition when the primary system is full. This test may only be done when the plant. is in a refueling shutdown condition with a partially full primary system in order to prevent an over-pressurization. Leakage, testing of check valves 867A, 867B, 878G and 878J shall be accomplished prior to criticality, except for low power physics testing, following (1) refueling, (2) cold shutdown, and (3) maintenance, repair or replacement work on the valves. Leakage may be measured indirectly from the performance of pressure indicators, system volume measurements or by direct measurement.

Check valves 878G and 878J shall also be tested for leakage following each safety injection flow test. Minimum test differential shall be greater than 150 psid. Technical Specification 4.3.3.4 defines the allowable leakage rates.

Note 14- Valves 3516 and 3517 cannot be stroked during normal plant operation on a quar-terly basis because they are the main steam isolation valves. These valves, are stroked during each plant refueling.

Note 15- Category C Relief Valves shall be tested in accordance with the extent and fre-quency requirements of Paragraph IWV-3510 of Article IWV of Section XI of the Code.

~ T

'J

TITLE: DATE QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 35 Op 40 Note 16- Valves 430 and 431C are the power operated relief valves associated with the overpressurization system. These valves shall not be stroked quarterly as an unplanned pressure transient could result, from a leaky block valve.

Operability of these valves shall be verified as follows:

(1) Full stroke exercising during cool down prior to achieving water solid condition in the pressurizer and during cold shutdown prior to heat up.

(2) Stroke timing to be performed as a minimum once each refueling cycle as a part of the channel calibration specified by Technical Specifications 4.16.lb.

(3) Fail safe actuation testing is permitted by the code to be per-formed at each cold shutdown if valve cannot be tested during power operation.

(4) Technical specification 4.16.1a and 4.16.1c delineate additional re-quirements for operability verifi-cation of the PORV actuation channel and valve position.

Note 17- Additional stroking will be consistent with Technical Specifications.

Note 18- Valves 852A and 852B cannot be stroked during normal plant operation as these valves, when cycled, could subject the Residual Heat Removal System to a pressure in excess of its design pressure. These valves will be stroked at cold shutdowns and refueling outages.

Note 19- Stroking Valves 5392 and 5393 during operation and cold shutdown would inter-rupt instrument air to containment and

TITLE: DATE QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 36 DF 40 be disruptive to air operated valves inside.'hese valves will be stroked at refueling outages.

Not.e 20- Valve 959 is normally closed and in the containment isolating position during normal operation. These valves will be stroked at cold shutdown and refueling outages.

Note 21- Valves 1819A, B, C, D, E, F and G cannot be stroked during normal plant operation as this test would interrupt containment pressure monitoring transmitters from performing their intended function.

These valves will be stroked at cold and refueling outages.

Note 22- Category A valves 5869, 5870, 5878 and 5879 are normally closed and in the containment isolating position during normal operation. Leak tightness of these valves is reverified following .

reclosure after each use in accordance with Section 4.4.2.4 of Technical Speci-fications. The valves shall be stroked at. least each cold shutdown. In addition, if the valves are opened for purging,

- they shall be stroked at least once each quarter during which they have been opened.

Note 23- Valves 515 and 516 stroked quarterly except and if already closed or during cold refueling shutdowns'.

Note Not to be done during time that redundant valve is inoperable per Technical Speci-fication.

Note 25- As per Technical Specifications 3.3.1.2.f, no cycling shall be done if normally open valve in other flow path is inop'erable in the open position.

TITLEc DATE QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 37 OF 40 Note 26- As per Technical Speci failure of valves ficationsduring 624 and 625

3. 3.1.2. e, quarterly stroking in the closed position can degrade LPSI system function. How-ever, these valves shall be stroked at cold shutdown and refueling outages.

Note 27- As per Technical Specifications 3.3.1.2.e,

~

failure of valves 857A, 857B, 857C, 897 and 898 during quarterly stroking can degrade the injection phase of the SI pumps. However,- these valves shall be stroked at cold shutdown and refueling outages.

Note 28- Check valves 842A and 842B (accumulator check valves) cannot and should not be exercised during plant operation.

Exercising of these valves requires the reactor coolant system pressure to be reduced to below accumulator pressure.

Therefore testing of these valves performed after refueling and cold will'e and after maintenance, repair 'hutdowns, or replacement. Full stroke testing, which involves discharge of the accumu-lator through the valve to a partially-filled reactor coolant system will not be utilized since this test mode is considered impractical and unsafe.

Valve operability from the normal closed

.position will be verified by partial stroking prior to leak testing with flow through the safety injection test line.

Leak testing will be performed to assure primary system integrity following each cold and refueling shutdown after achieving normal reactor coolant system pressure and prior to reactor criticality. Testing will be performed by either (1) closing each accumulator motor operated discharge valve, pressuring the line downstream of the check valves and measuring the upstream leakage, or (2) by measuring

1I P+ '

QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 38 PP 40 accumulator in-leakage by pressurizing the line downstream of the 842 valves.

These valves are not event V-check valves'.

Therefore, the test acceptance criterion shall be that of Technical Specification 3.1.5.

Note 29- Valves 877A, 877B, 878F and 878H are currently not listed in our valve test program, however, a pair of these valves in each hot leg high head safety injec-tion line (877A nd 878F in loop B hot leg and 877B and 878H in loop A hot leg) together form one of the two pressure boundaries required to be tested by Technical Specification 4.3.3.3. Because these valves are normally closed and the piping contains motor operated valves (MOV's) which are also closed and deener-gized, the check valves will not. move with the possible exception of when the MOVs are required to be opened to test the check valves. Thus, once tested the check valves will remain closed. An NRC order dated April 20, 1981 established an appropriate test frequency for these valves to be once every 40 months or after each opening of the MOVs. These valves are listed as passive valves in our valve testing program with testing required to meet Technical Specification 4.3.3.3.

Note 30- Valves 851A and 851B are'ot qualified to operate in the post-accident containment environment and therefore not required to perform a post-accident function. Since the valves are normally open, and in their post-accident position, stroking of these valves will not be performed.

Note 31- Valves 4601, 4602, 4603 and 4604 shall be leak tested each refueling outage using a back flow test method to determine

TITI.Kc DATE QUAJ ITY 1/30/86 AS SURANCE APPENDIX C PAGE MANUAZ Pump and Valve GINNA STATION Testing Program 39 DF 40 if'ack flow to the corresponding idle pump is minimal (i.e. 2 psid as monitored by pressure change in the discharge header between pump discharge isolated and unisolated). Quarterly valve stroking shall be limited to verifying that a normally closed valve will open concurrent with the start of an idle pump. An open check valve for a pump already in service will be deemed operable without 'having to stop and restart the pump since the open valve is considered to be performing its normal safety function.

Note 32- Valves 590, 591, 592 and 593 shall not, be stroked quarterly as an unplanned pressure transient could result from a leaky alternate isolation valve. These valves will be stroked at refueling outages Note 33- Sampling valves 951 and .953 need not be stroked as part of this program as they are not required to perform a safety function.

Although considered to be part of the reactor coolant system boundary, 10CFR50.55a(c)(2) specifies that components which are connected to the reactor coolant system and are. part of the boundary as defined in 50.2(v) of this part need not meet the requirements of paragraph (c)(1) of this section, provided: In the event of postulated failure of the component, during normal reactor operation, the reactor can be shut down and cooled down in an orderly manner, assuming makeup is provided by the reactor coolant makeup system. The valves are exercised during routine. sampling operations.

PVT 5.0 Records 5.1 Records for the Inservice Pump Testing Program shall be developed and maintained in accordance with Article IWP-6000 of Section XI of the Code.

TITLEs DATE QUALITY 1/30/86 ASSURANCE APPENDIX C PAGE MANUAL Pump and Valve GINNA STATION Testing Program 40 DP 40 5.2 Records for the Inservice Valve Testing Program shall be developed and maintained in accordance with Article IWV-6000 of Section XI of the Code.

~~a gW l