ML17279A474: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 02/28/1987
| issue date = 02/28/1987
| title = Monthly Operating Rept for Feb 1987.W/870310 Ltr
| title = Monthly Operating Rept for Feb 1987.W/870310 Ltr
| author name = HUTCHISON L B, POWERS C M
| author name = Hutchison L, Powers C
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:E?AVERAGE DAILY UNH'OWER LEVEL~DCKET ND.~WNP-2 DATE I 1 LE I COMPLETED BY TELEPHONE 509 377-2486 MONTH"EBRUARY 1 87 DAY AVERAGE DAILY POWER LEVEL (Meet)1 765'771 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)17 773 771 773 772 768 735 772 19?72 554 8 12 772 772 774 768 762 750 322 741 649 1B 771 769 INSTRUCTIONS On this form, list the a~daily unit power heel in KVe~fet for each day in the reporting month.Compute to the nearest whole megawatt.'Ihese Ggures wiH be used to plot a graph for each reporting month.Note that when maximum dependable capacity h used for the net electlcal rating of the.unit, them may be occasions when~daily average power hvei exceeds the l00%Bne (or the restricted power level line).In such cases, the aveage daily unit power output sheet should be footnoted to explain the apparent anomaly.870aX9OSaO e7a228 0~PDR ADOCK 05000>97 "AEPCAT PEAICO FEBRUARY 1987~mmt>, year..Ki.i'Pif Rm I'.EUH PEYlliV',86-14P 11/10/86 F 0 A 5 87-01 2/20/87 F 122.0 A 87-02 2/25/87 F 5.9 G LAIT SIUTDONNS/AEDUCTIONS e&#xc3;a&#xc3;DI ve a m p5tEwp CB PUMPXX HA TURBIN HA GENERAX a DOCKET NO.lNIT NAf 1E WNP-2 DATE 3 2 87 CQ1PLETED DY LB Hutchi son TELEPIQNE (509)377-2486 5 ON<C C IO Rl L A C 0.E.POWER OUTPUT LIMITED TO 72K DUE TO INOPERABILITY OF 1A RRC PUMP PLANT WAS SHUTDOWN BECAUSE OF LOW TURBINE BEARING OIL PRESSURE.INSPECTION REVEALED A BROKEN CHECK VALVE IN BEARING OIL SUPPLY HEADER WHICH WAS REPAIRED AND PLANT RETURNED TO SERVICE.TUPBIikE iiEHEPRTOR WAS REMOVED FROM SERVICE DUE TO HIGH EXCITER TEMPERATURE WHICH INITIATED A FIRE PROTECTION SYSTEM AND ADMITTED C02 INSIDE THE EXCITER HOUSING.CAUSE OF THE PERTURBATION WAS MISALIGNMENT OF COOLING WATER VALVING.AN INSPECTION OF EXCITER WAS HADE, VALVE ALIGNMENT CORRECTED AND UNIT RETURNED TO SERVICE.t S~PAAY)WNP-2 OPERATED AT A REDUCED POWER I,EVEL DURING FEBRUARY AND INCURRED TWO SHUTDOWNS.
{{#Wiki_filter:E?
.F-Admin 0-Oper Error H-Other F-Forced A-Equip Failure S-Schcd 0-Maint or Test~C-Ae f ue ling 0-Aegula tory Aes triction E-Df)era tor Trafning A License Examination 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Aeduced Load 9-Other SYSTEM k COMPOM.:NT Exhibit F h H Instructions for Preparation of'ata Entry Sheet Licensee Event Aeport (LEA)File (NUAEG-0161)
AVERAGE DAILYUNH'OWER LEVEL
OPER4TINB DATA REPORT WNP-2 Oi-Mar-87 1.DOCKET: 50-397 2.REPORTING PERIODs 3.UTILITY CONTRCT Feb-87 OUTAGE+ON-LINE HOURS LEONARD HUTCHI SON<509)377-2486 672 LICENSED THERMAL POWER (MWt)!5 NRMEPLRTE RATING (GROSS MWe)s 6.DESIGN ELECTRICAL RATING (NET MWe>: 7-MAXIMUM DEPENDABLE CRPACITY (GROSS MWe)c 8.MAXIMUM DEPENDABLE CAPACITY (NET MWe)!9~IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE RERSONS: 3323 1200.9 1100 1140 1095 10.POWER TO WHICH RESTRICTED, IF 4NY<NET MWe): 1 1~REASONS FOR RESTRICTIONS
                                                                                        ~ DCKET ND.
~IF ANY!~~Cg~~E~12 13.14.15.16 17 18 19 20 21.22 23 24.25.26.REPORT PERIOD HOURS HOURS REACTOR CRITICAL RX RESERVE SHTDWN HRS HRS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY (MWH)GROSS ELECTRICAL ENERGY (MWH)NET ELECTRICAL ENERGY (MWH)UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR UNIT CRP4CITY FACTOR (MDC NET)UNIT CAPRCITY FACTOR (DER NET>UNIT FORCED OUTAGE R4TE FORCED OUTAGE HOURS MONTH YEAR CUMULATIVE 672 1416 19376.2 570.9 1314.9 15022.4 0.0 0 0 340.4 544.1 1288.1 14449.0 0.0 0 0 381.7 1255200'988000 36669'180 418870 1006420 12225b90 404350 971693 11741664 81.0/91 0%74.6%81.0/91 0%76.5%55.0/62.7/55 3%54 7%62 4%55.1/19.0%9 0/7 7/127 9 127 9 1203 1 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE DATE DURATION)a REFUELING AND MAINTENANCE OUTAGE SCHEDULED FOR 60 i)AIS STARTING 4/ll/87 27.IF CURRENTLY SHUTDOWN EBTIM4TED STARTUP DATEa WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George N'ashington Way~Richland, N'ashinglon 99352 Docket No.50-397 April 8, 1987 Director Office of Resource Management U.S.Nuclear Regulatory Commission Washington, D.C.20555
COMPLETED BY DATE
                                                                                                        ~ WNP-2 I1 LE I TELEPHONE           509 377-2486 MONTH           "EBRUARY     1 87 DAY AVERAGE DAILYPOWER LEVEL                                DAY AVERAGE DAILYPOWER LEVEL (Meet)                                                   (MWe-Net) 1 765                                  17                 773
                              '771                                                    771 773                                                     ?72 19 772                                                     554 768 735 772 8                   772 772 774                                                     322 768                                                     741 12                    762                                                     649 750 771 769 1B INSTRUCTIONS On this form, list the nearest whole megawatt.
a~     daily unit power heel in KVe~fet for each day in the reporting month. Compute to the
      'Ihese Ggures wiH be used to plot a graph for each reporting month. Note that when maximum dependable capacity h used for the net electlcal rating of the. unit, them may be occasions when ~   daily average power hvei exceeds the l00% Bne (or the restricted power level line). In such cases, the aveage daily unit power output sheet should be footnoted to explain the apparent anomaly.
870aX9OSaO e7a228                                                                                                     0~
PDR     ADOCK     05000>97


==Dear Sir:==
a DOCKET NO.
lNIT NAf 1E      WNP-2 DATE      3 2 87 LAIT SIUTDONNS  / AEDUCTIONS                        CQ1PLETED DY      LB Hutchi son "AEPCAT PEAICO FEBRUARY 1987                                                                            TELEPIQNE    (509)377-2486
                    ~mmt  >,    year
..Ki.      i'Pif Rm                I'.EUH PEYlliV  e&#xc3;a&#xc3;DI ve        a  m p5tEwp        5            ON< C        C IO      Rl  L    A C  0 .E.
',86-14P 11/10/86    F    0        A    5                    CB      PUMPXX        POWER OUTPUT        LIMITED TO 72K  DUE TO INOPERABILITY OF 1A RRC PUMP 87-01  2/20/87    F    122.0      A                          HA      TURBIN PLANT WAS SHUTDOWN BECAUSE OF LOW TURBINE BEARING OIL PRESSURE.          INSPECTION REVEALED A BROKEN CHECK VALVE IN BEARING OIL SUPPLY HEADER WHICH WAS REPAIRED AND PLANT RETURNED TO  SERVICE.
87-02  2/25/87    F      5.9    G                          HA      GENERAX      TUPBIikE iiEHEPRTOR WAS REMOVED FROM SERVICE DUE TO          HIGH EXCITER TEMPERATURE WHICH INITIATED A FIRE PROTECTION SYSTEM AND ADMITTED C02 INSIDE THE EXCITER HOUSING.
CAUSE OF THE PERTURBATION WAS MISALIGNMENT OF COOLING WATER VALVING. AN INSPECTION OF EXCITER WAS HADE, VALVE ALIGNMENT CORRECTED AND UNIT RETURNED TO SERVICE.
t S~PAAY    WNP-2        OPERATED AT A REDUCED POWER I,EVEL DURING FEBRUARY AND INCURRED TWO SHUTDOWNS.
              )
SYSTEM  k  COMPOM.:NT F-Forced      A-Equip Failure            . F-Admin        1-Manual            Exhibit F h H S-Schcd        0-Maint or Test      ~      0-Oper Error    2-Manual Scram      Instructions for f
C-Ae ue ling                H-Other        3-Auto Scram        Preparation 0-Aegula tory Aes triction                    4-Continued              Entry Sheet of'ata E-Df)era tor Trafning                        5-Aeduced Load      Licensee Event Aeport A  License Examination                  9-Other            (LEA)  File  (NUAEG-0161)
 
OPER4TINB DATA REPORT WNP-2 Oi-Mar-87
: 1. DOCKET:  50-397
: 2. REPORTING PERIODs          Feb-87            OUTAGE +  ON-LINE HOURS              672
: 3. UTILITY CONTRCT                      LEONARD HUTCHISON      <509) 377-2486 LICENSED THERMAL POWER (MWt)!                                                    3323 5      NRMEPLRTE RATING (GROSS MWe)s                                                  1200.9
: 6. DESIGN ELECTRICAL RATING (NET MWe>:                                                1100 7-    MAXIMUM DEPENDABLE CRPACITY (GROSS MWe)        c                                  1140
: 8.      MAXIMUM DEPENDABLE CAPACITY (NET MWe)!                                            1095 9~    IF  CHANGES OCCUR ABOVE SINCE LAST REPORT,        GIVE RERSONS:
: 10. POWER TO WHICH  RESTRICTED,    IF  4NY <NET MWe):
11  ~  REASONS FOR RESTRICTIONS    ~  IF ANY!    ~~Cg~~E~
MONTH          YEAR    CUMULATIVE 12      REPORT PERIOD HOURS                                    672        1416    19376.2
: 13. HOURS REACTOR CRITICAL                                570.9        1314.9    15022.4
: 14. RX RESERVE SHTDWN HRS                                    0.0          0 0        340.4
: 15. HRS GENERATOR ON LINE                                544.1        1288.1    14449.0 16    UNIT RESERVE SHUTDOWN HOURS                              0.0          0 0        381.7 17    GROSS THERMAL ENERGY (MWH)                          1255200    '988000      36669'180 18      GROSS ELECTRICAL ENERGY (MWH)                        418870      1006420    12225b90 19      NET ELECTRICAL ENERGY (MWH)                          404350        971693    11741664 20      UNIT SERVICE FACTOR                                    81.0/        91 0%        74.6%
: 21. UNIT AVAILABILITYFACTOR                                81.0/        91 0%        76.5%
22      UNIT CRP4CITY FACTOR (MDC NET)                        55.0/        62.7/        55 3%
23      UNIT CAPRCITY FACTOR (DER NET>                        54 7%        62  4%        55.1/
: 24. UNIT FORCED OUTAGE R4TE                                19.0%        9 0/          7 7/
: 25. FORCED OUTAGE HOURS                                  127 9        127 9      1203    1
: 26. SHUTDOWNS SCHEDULED OVER THE NEXT        6 MONTHS (TYPE DATE DURATION)a REFUELING AND MAINTENANCE OUTAGE SCHEDULED FOR 60 i)AIS STARTING  4/ll/87
: 27. IF      CURRENTLY SHUTDOWN EBTIM4TED STARTUP DATEa
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968  ~  3000 George N'ashington Way  ~ Richland, N'ashinglon 99352 Docket No.      50-397 April 8,  1987 Director Office of Resource      Management U.S. Nuclear Regulatory Commission Washington, D. C.        20555
 
==Dear Sir:==


==Subject:==
==Subject:==
NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for March 1987 as required by our Technical Specifications 6.9.1.6.Very truly yours, C.'Powers (M/D 927M)WNP-2 Plant Manager CMP/lc Enclosure cc: Mr.John B.Martin-Mr.Robert T.Dodds-Ms.Dottie Sherman-Mr.J.T.Wheelock-Mr.Phil Ross NRC, Region V NRC Site Representative ANI, Farmington CT INPO NRC, Washington D.C.J g&}}
NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for March 1987 as     required by our Technical Specifications 6.9.1.6.
Very truly yours, C.'   Powers   (M/D 927M)
WNP-2 Plant Manager CMP/lc Enclosure cc:   Mr. John B. Martin-         NRC,  Region  V Mr. Robert T. Dodds-         NRC  Site Representative Ms. Dottie Sherman-         ANI, Farmington    CT Mr. J. T. Wheelock-         INPO Mr. Phil Ross               NRC, Washington D.C.
J g&}}

Latest revision as of 15:09, 29 October 2019

Monthly Operating Rept for Feb 1987.W/870310 Ltr
ML17279A474
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/28/1987
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8708190320
Download: ML17279A474 (4)


Text

E?

AVERAGE DAILYUNH'OWER LEVEL

~ DCKET ND.

COMPLETED BY DATE

~ WNP-2 I1 LE I TELEPHONE 509 377-2486 MONTH "EBRUARY 1 87 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (Meet) (MWe-Net) 1 765 17 773

'771 771 773 ?72 19 772 554 768 735 772 8 772 772 774 322 768 741 12 762 649 750 771 769 1B INSTRUCTIONS On this form, list the nearest whole megawatt.

a~ daily unit power heel in KVe~fet for each day in the reporting month. Compute to the

'Ihese Ggures wiH be used to plot a graph for each reporting month. Note that when maximum dependable capacity h used for the net electlcal rating of the. unit, them may be occasions when ~ daily average power hvei exceeds the l00% Bne (or the restricted power level line). In such cases, the aveage daily unit power output sheet should be footnoted to explain the apparent anomaly.

870aX9OSaO e7a228 0~

PDR ADOCK 05000>97

a DOCKET NO.

lNIT NAf 1E WNP-2 DATE 3 2 87 LAIT SIUTDONNS / AEDUCTIONS CQ1PLETED DY LB Hutchi son "AEPCAT PEAICO FEBRUARY 1987 TELEPIQNE (509)377-2486

~mmt >, year

..Ki. i'Pif Rm I'.EUH PEYlliV eÃaÃDI ve a m p5tEwp 5 ON< C C IO Rl L A C 0 .E.

',86-14P 11/10/86 F 0 A 5 CB PUMPXX POWER OUTPUT LIMITED TO 72K DUE TO INOPERABILITY OF 1A RRC PUMP 87-01 2/20/87 F 122.0 A HA TURBIN PLANT WAS SHUTDOWN BECAUSE OF LOW TURBINE BEARING OIL PRESSURE. INSPECTION REVEALED A BROKEN CHECK VALVE IN BEARING OIL SUPPLY HEADER WHICH WAS REPAIRED AND PLANT RETURNED TO SERVICE.

87-02 2/25/87 F 5.9 G HA GENERAX TUPBIikE iiEHEPRTOR WAS REMOVED FROM SERVICE DUE TO HIGH EXCITER TEMPERATURE WHICH INITIATED A FIRE PROTECTION SYSTEM AND ADMITTED C02 INSIDE THE EXCITER HOUSING.

CAUSE OF THE PERTURBATION WAS MISALIGNMENT OF COOLING WATER VALVING. AN INSPECTION OF EXCITER WAS HADE, VALVE ALIGNMENT CORRECTED AND UNIT RETURNED TO SERVICE.

t S~PAAY WNP-2 OPERATED AT A REDUCED POWER I,EVEL DURING FEBRUARY AND INCURRED TWO SHUTDOWNS.

)

SYSTEM k COMPOM.:NT F-Forced A-Equip Failure . F-Admin 1-Manual Exhibit F h H S-Schcd 0-Maint or Test ~ 0-Oper Error 2-Manual Scram Instructions for f

C-Ae ue ling H-Other 3-Auto Scram Preparation 0-Aegula tory Aes triction 4-Continued Entry Sheet of'ata E-Df)era tor Trafning 5-Aeduced Load Licensee Event Aeport A License Examination 9-Other (LEA) File (NUAEG-0161)

OPER4TINB DATA REPORT WNP-2 Oi-Mar-87

1. DOCKET: 50-397
2. REPORTING PERIODs Feb-87 OUTAGE + ON-LINE HOURS 672
3. UTILITY CONTRCT LEONARD HUTCHISON <509) 377-2486 LICENSED THERMAL POWER (MWt)! 3323 5 NRMEPLRTE RATING (GROSS MWe)s 1200.9
6. DESIGN ELECTRICAL RATING (NET MWe>: 1100 7- MAXIMUM DEPENDABLE CRPACITY (GROSS MWe) c 1140
8. MAXIMUM DEPENDABLE CAPACITY (NET MWe)! 1095 9~ IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE RERSONS:
10. POWER TO WHICH RESTRICTED, IF 4NY <NET MWe):

11 ~ REASONS FOR RESTRICTIONS ~ IF ANY! ~~Cg~~E~

MONTH YEAR CUMULATIVE 12 REPORT PERIOD HOURS 672 1416 19376.2

13. HOURS REACTOR CRITICAL 570.9 1314.9 15022.4
14. RX RESERVE SHTDWN HRS 0.0 0 0 340.4
15. HRS GENERATOR ON LINE 544.1 1288.1 14449.0 16 UNIT RESERVE SHUTDOWN HOURS 0.0 0 0 381.7 17 GROSS THERMAL ENERGY (MWH) 1255200 '988000 36669'180 18 GROSS ELECTRICAL ENERGY (MWH) 418870 1006420 12225b90 19 NET ELECTRICAL ENERGY (MWH) 404350 971693 11741664 20 UNIT SERVICE FACTOR 81.0/ 91 0% 74.6%
21. UNIT AVAILABILITYFACTOR 81.0/ 91 0% 76.5%

22 UNIT CRP4CITY FACTOR (MDC NET) 55.0/ 62.7/ 55 3%

23 UNIT CAPRCITY FACTOR (DER NET> 54 7% 62 4% 55.1/

24. UNIT FORCED OUTAGE R4TE 19.0% 9 0/ 7 7/
25. FORCED OUTAGE HOURS 127 9 127 9 1203 1
26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE DATE DURATION)a REFUELING AND MAINTENANCE OUTAGE SCHEDULED FOR 60 i)AIS STARTING 4/ll/87
27. IF CURRENTLY SHUTDOWN EBTIM4TED STARTUP DATEa

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George N'ashington Way ~ Richland, N'ashinglon 99352 Docket No. 50-397 April 8, 1987 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for March 1987 as required by our Technical Specifications 6.9.1.6.

Very truly yours, C.' Powers (M/D 927M)

WNP-2 Plant Manager CMP/lc Enclosure cc: Mr. John B. Martin- NRC, Region V Mr. Robert T. Dodds- NRC Site Representative Ms. Dottie Sherman- ANI, Farmington CT Mr. J. T. Wheelock- INPO Mr. Phil Ross NRC, Washington D.C.

J g&