ML17279B099: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCRLERATED DIS1'SRUTI ON DEMONSTRAOON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8806160370 DOC.DATE: 88/05/31 NOTARIZED:
{{#Wiki_filter:ACCRLERATED           DIS1'SRUTI         ON   DEMONSTRAOON                   SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.
ACCESSION NBR:8806160370             DOC.DATE: 88/05/31   NOTARIZED: NO               DOCKET FACIL:50-397   WPPSS Nuclear Project, Unit 2, Washington Public               Powe   05000397 AUTH. NAME           AUTHOR AFFILIATION HUTCHISON,L.B.     Washington Public Power Supply System POWERS,C.M.         Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION
Washington Public Power Supply System POWERS,C.M.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for May 1988 for WNP-2.W/880610 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: 'RECIPIENT',ID'ODE/NAME PD5 LA SAMWORTH, R INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRR REP/RPB 10 EG F 01 l;I",COPIES''LTTR ENCL 1 0 1 0 10 10 1 1 1'1 1 1 1 AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 1 1 2 2 1 1 1 1 1 l.*'RECIPIENT i'"t]'"~'.COPIES>''I<ID CODE/NAME-LTTR ENCL PD5 PD 5 5 A EXTERNAL: EG&G WILLIAMS, S NRC PDR 1 1 1 1 LPDR NSIC 1 1 1 1 4 TOTAL NUMBER OF COPIES REQUIRED: LTTR 31 ENCL 29 0~~I H f~
Monthly operating rept         for May 1988   for WNP-2.W/880610       ltr.
~~r.OPERATING DATA REPORT WNP-2 01-Jun-88 il.DOCKET: 50-397 REPORTING PERIOD: UTILITY CONTACT: May-88 OUTAGE+QN-LINE HOURS LEONARD HUTCHISON (509)377-2486 744 5~0~7.3.LICENSED THERMAL POWER<MWt.): NAMEPLATE RATING<GROSS MWe): DESIGN ELECTRICAL RATING<NET MWe): MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): MAXIMUM DEPENDABLE CAPACITY<NET MWe): IF CHANGES OCCUR ABOVE SINCE LAST REPORT v GIVE REASONS 3323 1200.9 1100 1140 1095 10.POWER TO WHICH RESTRICTED, IF ANY<NET MWe): 11 REASONS FOR RESTRICTIONS'F ANY 12.REPORT PERIOD HOURS 13.HOURS REACTOR CRITICAL 14.RX RESERVE SHTDWN HRS 15.HRS GENERATOR ON LINE 16.UNIT RESERVE SHUTDOWN HOURS 17.GROSS THERMAL ENERGY<MWH)18.GROSS ELECTRICAL ENERGY (MWH)19.NET ELECTRICAL ENERGY (MWH)20.UNIT SERVICE FACTOR 21.UNIT AVAILABILITY FACTOR 22.UNIT CAPACITY FACTOR (MDC NET)23 UNIT CAPACITY FACTOR (DER NET)24.UNIT FORCED OUTAGE RATE 25.FORCED OUTAGE HOURS MONTH~744 0.0 0.0 0.0 0.0 0 0 0 0.0/0.0/0.0/0.0/0.0/0.0 YEAR CUMULATIVE 3647 30367.2 ,2223.2 22130.0 0'340.4 2176.1 21318 0 0.0 381 7 6719698 57102465 2244320 19061460 2166352 18334304 59.7/70.2%59.7%71.5/54.2/'5 1%54.0/54.9%24.6%9.9/709.3 2354.3 26.SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION):
DISTRIBUTION CODE: IE24D         COPIES RECEIVED LTR       ENCL           SIZE:
27.IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: 8806160370 880531 PDR ADOCK 05000307 R DCD gag+((,
TITLE: Monthly Operating Report (per Tech Specs)
BEKAT.PERIOD MAY 19 88 mcnth, year LNIT Sl IUTDONNS/BE'DUCTIONS DOCKET NO.50 397 UNIT t'lAl lf WNP-2 DATE 06/07/88 COMPLETED BY LB HUTCHISON TELEPllONE (509)377-2486 HQ.D~K TTTP Fi~n~~~7iSSH=~hf Tm 88-07 4/30/88 S 744 C=4&&I&&&&.&&&Y 1EII&&II%I&&&&
NOTES:
&&&&&&&&&&&&-V&""&'&&&&&:.RC FUELXX REFUEL OUTAGE CONTINUING SUl t lABY WNP-2 REMAINED SHUTDOWN IN MAY FOR SCHEDULED REFUELING OUTAGE TYPE F-Forced S-Scllcd A-Equip Failure 0-Maint or Test~C-Be f ue ling D-Begulatory Bestriction f-Operator Training h License Examination F-Admin 0-Oper Error l3-Other hlfTHOD 1-Manual 2-manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM k COhlPOM.:NT Exhibit F h H Instructions for Preparation of'ata Entry Sheet Licensee Event Bepnrt (LER)File (NUBEG-0161) 4 o" AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT MHP-2 06/07/88 COMPLETED BY~0 TELEPHONE (509)377"2486 MONTH MAY 1988 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)1 0 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)17 0 18 20 21 0 0 24 12 13 0 INSTRUCTIONS Qn this form, list the average daily unit power level in MVe~Net for each day in the reporting month.Compute to the nearest whole megawatt.1hese Qgures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity~s used for the net electrical rating of the-unit, there may be occasions when the daily average power!eve!exceeds the 100%line (or the respected power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the ap parent anomaly.
            'RECIPIENT'                              'RECIPIENT '" t ]'"~'. COPIES ''I
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968'000 George 1Vashington 1Vay~Richland, 1Vashington 99352 June 10, 1988 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555
* l;I ",COPIES
                                            '
i                    >  <
            ,ID 'ODE/NAME           'LTTR ENCL    ID  CODE/NAME        -
LTTR ENCL PD5 LA                     1    0    PD5 PD                      5    5 SAMWORTH, R                 1    0 A
INTERNAL: ACRS                       10  10    AEOD/DOA                    1    1 AEOD/DSP/TPAB               1    1    ARM TECH ADV                2    2 NRR/DLPQ/PEB 11             1 '       NRR/DOEA/EAB 11             1    1 NRR REP/RPB 10              1    1    NUDOCS-ABSTRACT             1   1 EG F          01          1   1     RGN5                        1   l.
EXTERNAL: EG&G WILLIAMS,S             1   1     LPDR                        1   1 NRC PDR                    1   1     NSIC                        1   1 4
TOTAL NUMBER OF COPIES REQUIRED: LTTR           31   ENCL   29


==Dear Sir:==
0 ~ ~ I H
f ~
 
            ~ ~
r  .
OPERATING DATA REPORT WNP-2 01-Jun-88 il. DOCKET:  50-397 REPORTING PERIOD:        May-88          OUTAGE +  QN-LINE HOURS            744 UTILITY CONTACT:                  LEONARD HUTCHISON    (509) 377-2486 LICENSED THERMAL POWER <MWt.):                                              3323 5 ~  NAMEPLATE RATING <GROSS MWe):                                            1200.9 0 ~  DESIGN ELECTRICAL RATING <NET MWe):                                          1100
: 7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):                                    1140
: 3. MAXIMUM DEPENDABLE CAPACITY <NET MWe):                                      1095 IF  CHANGES OCCUR ABOVE SINCE LAST REPORT  v GIVE REASONS
: 10. POWER TO WHICH  RESTRICTED, IF  ANY <NET MWe):
11    REASONS FOR  RESTRICTIONS'F  ANY MONTH          YEAR    CUMULATIVE
: 12. REPORT PERIOD HOURS                                ~  744        3647    30367. 2
: 13. HOURS REACTOR CRITICAL                                0.0      ,2223.2    22130.0
: 14. RX RESERVE SHTDWN HRS                                0.0          0'        340.4
: 15. HRS GENERATOR ON LINE                                0.0      2176.1    21318 0
: 16. UNIT RESERVE SHUTDOWN HOURS                          0.0          0.0      381 7
: 17. GROSS THERMAL ENERGY <MWH)                              0    6719698    57102465
: 18. GROSS ELECTRICAL ENERGY (MWH)                            0    2244320    19061460
: 19. NET ELECTRICAL ENERGY (MWH)                              0    2166352    18334304
: 20. UNIT SERVICE FACTOR                                  0. 0/      59.7/        70.2%
: 21. UNIT AVAILABILITYFACTOR
: 22. UNIT CAPACITY FACTOR (MDC NET) 23 UNIT CAPACITY FACTOR (DER NET)
: 0. 0/
: 0. 0/
: 0. 0/
: 59. 7%
54.2/
: 54. 0/
                                                                                  '554.
: 71. 5/
1%
9%
: 24. UNIT FORCED OUTAGE RATE                              0. 0/      24. 6%        9. 9/
: 25. FORCED OUTAGE HOURS                                0.0        709. 3    2354. 3
: 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS    (TYPE, DATE, DURATION):
: 27. IF CURRENTLY    SHUTDOWN ESTIMATED STARTUP DATE:
8806160370 880531                                                    gag +
PDR  ADOCK 05000307 R              DCD                                                      ((,
 
DOCKET NO. 50 397 UNIT t'lAllf  WNP-2 DATE    06/07/88 LNIT  Sl IUTDONNS  / BE'DUCTIONS                      COMPLETED BY      LB HUTCHISON BEKAT. PERIOD          MAY    19 88                                                                            TELEPllONE    (509) 377-2486 mcnth,    year HQ.      D~K    TTTP    Fi~n~    ~~7iSSH =
                                              ~hf Tm  &&I&&&&. &&    &Y 1EII    &&II%I&&&& &  &  &        &&&& &      & &        &&-V&" "&  '&&&&&
88-07      4/30/88    S      744      C  =
4                    :. RC    FUELXX      REFUEL OUTAGE CONTINUING SUl t lABY WNP-2 REMAINED SHUTDOWN IN MAY FOR SCHEDULED REFUELING OUTAGE TYPE                                                                hlfTHOD          SYSTEM  k COhlPOM.:NT F-Forced      A-Equip Failure                F-Admin          1-Manual              Exhibit F h H S-Scllcd      0-Maint or Test      ~          0-Oper Error    2-manual Scram        Instructions for C-Be fue ling                  l3-Other        3-Auto Scram          Preparation D-Begulatory Bestriction                        4-Continued                  Entry Sheet of'ata f-Operator Training                              5-Reduced Load        Licensee Event Bepnrt h  License Examination                      9-Other                (LER)  File  (NUBEG-0161)
 
4 o"
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
UNIT    MHP-2 COMPLETED BY        ~0 06/07/88 TELEPHONE (509) 377"2486 MAY  1988 MONTH DAY AVERAGE DAILYPOWER LEVEL                                  DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)                                                    (MWe-Net) 0                                                              0 1                                                          17 18 20 21 0
24 0
12 13 0
INSTRUCTIONS Qn this form, list the average daily unit power level in MVe~Net for each day in the reporting month. Compute to the nearest whole megawatt.
1hese Qgures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity ~s used for the net electrical rating of the- unit, there may be occasions when the daily average power !eve! exceeds the 100% line (or the respected power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the ap parent anomaly.
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 '000 George 1Vashington 1Vay ~  Richland, 1Vashington 99352 June    10, 1988 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
 
==Dear   Sir:==


==SUBJECT:==
==SUBJECT:==
NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for May l988 as required by our Technical Specifications 6.9.1.6.Very Truly Yours, C.M.Powers (M/D 927M)MNP-2 Plant Manager CMP/sl Enclosure cc: Mr.Mr.Ms.Mr.Mr,.J.B.Martin C.J.Bosted Dottie Sherman J.T.Wheelock M.H.Lovelace NRC Region V NRC Site Representative (901A)ANI, Farmington CT INPO NRC, Washington D.C.}}
NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for May l988 as required by our Technical Specifications 6.9.1.6.
Very Truly Yours, C. M. Powers     (M/D 927M)
MNP-2   Plant Manager CMP/sl Enclosure cc: Mr. J. B. Martin           NRC Region      V Mr. C. J. Bosted             NRC  Site Representative            (901A)
Ms. Dottie   Sherman       ANI, Farmington          CT Mr. J. T. Wheelock           INPO Mr,. M. H. Lovelace         NRC,   Washington D.C.}}

Revision as of 15:02, 29 October 2019

Monthly Operating Rept for May 1988 for Wppss Unit 2. W/880610 Ltr
ML17279B099
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/31/1988
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8806160370
Download: ML17279B099 (6)


Text

ACCRLERATED DIS1'SRUTI ON DEMONSTRAOON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8806160370 DOC.DATE: 88/05/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L.B. Washington Public Power Supply System POWERS,C.M. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for May 1988 for WNP-2.W/880610 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

'RECIPIENT' 'RECIPIENT '" t ]'"~'. COPIES I

  • l;I ",COPIES

'

i > <

,ID 'ODE/NAME 'LTTR ENCL ID CODE/NAME -

LTTR ENCL PD5 LA 1 0 PD5 PD 5 5 SAMWORTH, R 1 0 A

INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 ARM TECH ADV 2 2 NRR/DLPQ/PEB 11 1 ' NRR/DOEA/EAB 11 1 1 NRR REP/RPB 10 1 1 NUDOCS-ABSTRACT 1 1 EG F 01 1 1 RGN5 1 l.

EXTERNAL: EG&G WILLIAMS,S 1 1 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 4

TOTAL NUMBER OF COPIES REQUIRED: LTTR 31 ENCL 29

0 ~ ~ I H

f ~

~ ~

r .

OPERATING DATA REPORT WNP-2 01-Jun-88 il. DOCKET: 50-397 REPORTING PERIOD: May-88 OUTAGE + QN-LINE HOURS 744 UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486 LICENSED THERMAL POWER <MWt.): 3323 5 ~ NAMEPLATE RATING <GROSS MWe): 1200.9 0 ~ DESIGN ELECTRICAL RATING <NET MWe): 1100

7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140
3. MAXIMUM DEPENDABLE CAPACITY <NET MWe): 1095 IF CHANGES OCCUR ABOVE SINCE LAST REPORT v GIVE REASONS
10. POWER TO WHICH RESTRICTED, IF ANY <NET MWe):

11 REASONS FOR RESTRICTIONS'F ANY MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS ~ 744 3647 30367. 2
13. HOURS REACTOR CRITICAL 0.0 ,2223.2 22130.0
14. RX RESERVE SHTDWN HRS 0.0 0' 340.4
15. HRS GENERATOR ON LINE 0.0 2176.1 21318 0
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381 7
17. GROSS THERMAL ENERGY <MWH) 0 6719698 57102465
18. GROSS ELECTRICAL ENERGY (MWH) 0 2244320 19061460
19. NET ELECTRICAL ENERGY (MWH) 0 2166352 18334304
20. UNIT SERVICE FACTOR 0. 0/ 59.7/ 70.2%
21. UNIT AVAILABILITYFACTOR
22. UNIT CAPACITY FACTOR (MDC NET) 23 UNIT CAPACITY FACTOR (DER NET)
0. 0/
0. 0/
0. 0/
59. 7%

54.2/

54. 0/

'554.

71. 5/

1%

9%

24. UNIT FORCED OUTAGE RATE 0. 0/ 24. 6% 9. 9/
25. FORCED OUTAGE HOURS 0.0 709. 3 2354. 3
26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION):
27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

8806160370 880531 gag +

PDR ADOCK 05000307 R DCD ((,

DOCKET NO. 50 397 UNIT t'lAllf WNP-2 DATE 06/07/88 LNIT Sl IUTDONNS / BE'DUCTIONS COMPLETED BY LB HUTCHISON BEKAT. PERIOD MAY 19 88 TELEPllONE (509) 377-2486 mcnth, year HQ. D~K TTTP Fi~n~ ~~7iSSH =

~hf Tm &&I&&&&. && &Y 1EII &&II%I&&&& & & & &&&& & & & &&-V&" "& '&&&&&

88-07 4/30/88 S 744 C =

4  :. RC FUELXX REFUEL OUTAGE CONTINUING SUl t lABY WNP-2 REMAINED SHUTDOWN IN MAY FOR SCHEDULED REFUELING OUTAGE TYPE hlfTHOD SYSTEM k COhlPOM.:NT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F h H S-Scllcd 0-Maint or Test ~ 0-Oper Error 2-manual Scram Instructions for C-Be fue ling l3-Other 3-Auto Scram Preparation D-Begulatory Bestriction 4-Continued Entry Sheet of'ata f-Operator Training 5-Reduced Load Licensee Event Bepnrt h License Examination 9-Other (LER) File (NUBEG-0161)

4 o"

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

UNIT MHP-2 COMPLETED BY ~0 06/07/88 TELEPHONE (509) 377"2486 MAY 1988 MONTH DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe-Net) 0 0 1 17 18 20 21 0

24 0

12 13 0

INSTRUCTIONS Qn this form, list the average daily unit power level in MVe~Net for each day in the reporting month. Compute to the nearest whole megawatt.

1hese Qgures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity ~s used for the net electrical rating of the- unit, there may be occasions when the daily average power !eve! exceeds the 100% line (or the respected power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the ap parent anomaly.

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 '000 George 1Vashington 1Vay ~ Richland, 1Vashington 99352 June 10, 1988 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Dear Sir:

SUBJECT:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for May l988 as required by our Technical Specifications 6.9.1.6.

Very Truly Yours, C. M. Powers (M/D 927M)

MNP-2 Plant Manager CMP/sl Enclosure cc: Mr. J. B. Martin NRC Region V Mr. C. J. Bosted NRC Site Representative (901A)

Ms. Dottie Sherman ANI, Farmington CT Mr. J. T. Wheelock INPO Mr,. M. H. Lovelace NRC, Washington D.C.