{{#Wiki_filter:PR.XC38.1 EY'CCELERATED RIDS PROCESSING)
{{#Wiki_filter:PR.XC38.1             EY' CCELERATED   RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9504120340 DOC.DATE: 95/03/31 NOTARIZED:
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION EMBREE,D.G.
ACCESSION NBR:9504120340                 DOC.DATE: 95/03/31 NOTARIZED: NO             DOCKET FACIL:50-397   WPPSS     Nuclear Project, Unit 2, Washington Public             Powe 05000397 AUTH. NAME             AUTHOR     AFFILIATION EMBREE,D.G.           Washington Public Power Supply System SCHWARZ,C.J.           Washington Public Power Supply System RECIP.NAME             RECIPIENT AFFILIATION
Washington Public Power Supply System SCHWARZ,C.J.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Mar 1995 for WA Nuclear Project.2.W/950407 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR
Monthly operating rept             for Mar 1995   for WA Nuclear Project
!ENCL J SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS C NXER DOPS7OECB EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CLIFFORD,J AEOD/SPD/RRAB NRR/DIS P/PI PB RGN4 NOAC COPIES LTTR ENCL 1 1 1 1 1.1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
          . 2.W/950407     ltr.
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.504-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20  
DISTRIBUTION CODE: IE24D               COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)
                                                                  ! ENCL  J  SIZE:
NOTES RECIPIENT                 COPIES            RECIPIENT        COPIES ID CODE/NAME                LTTR ENCL        ID CODE/NAME     LTTR ENCL PD4-2 PD                       1    1    CLIFFORD,J             1     1 INTERNAL: ACRS                            10     10     AEOD/SPD/RRAB         1    1 C NXER                    1    1    NRR/DIS P/PI PB       1 . 1 DOPS7OECB                  1     1     RGN4                  1     1 EXTERNAL: LITCO BRYCE,J H                    1     1     NOAC                  1     1 NRC PDR                        1    1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                   20   ENCL   20


WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Bax'968~3000 George%'ashtngton Way~Rtchland, 1Pashtngton 993524968~(509)372-5000 April 7, 1995 G02-95-067 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555  
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Bax'968   ~ 3000 George %'ashtngton Way ~ Rtchland, 1Pashtngton 993524968 ~ (509) 372-5000 April 7, 1995 G02-95-067 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555


==Dear Sirs:==
==Dear Sirs:==


==Subject:==
==Subject:==
WASHINGTON NUCLEAR PROJECT NO.2 MONTHLY OPERATING REPORT MARCH 1995 Transmitted herewith is the Monthly Operating Report for the month of March, 1995 as required by our Technical Specifications 6.9.1.6.Sincerely,.J.Schwarz Operations Manager (MD 9270)CJS:DGE CC: NRC, Administrator, Region IV NRC, Resident Inspector (927N)INPO ANI Library Utility Data Institute BPA (399)."'.'-..'C G t.'.6 9S04120MO 950331 PDR ADOCK 05000397 R , PDR  
WASHINGTONNUCLEAR PROJECT NO. 2 MONTHLYOPERATING REPORT MARCH 1995 Transmitted herewith is the Monthly Operating Report for the month                 of March,   1995 as required by our Technical Specifications 6.9.1.6.
Sincerely,
  . J. Schwarz Operations Manager           (MD 9270)
CJS:DGE CC:     NRC, Administrator, Region IV NRC, Resident Inspector (927N)
INPO ANI Library Utility Data Institute BPA (399)
              ."'.'-..'C G t.'. 6 9S04120MO 950331 PDR     ADOCK 05000397 R                           , PDR


t t AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD: MARCH 1995 DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
t AVERAGE DAILY UNIT POWER LEVEL t
50-397 WNP-2 April 1, 1995 D.G.Embree (509)377-S44S DAY AVERAGE DAILY POWER LEVEL (Net MWe)AVERAGE DAILY POWER LEVEL DAY (Net MWe)6 10 12 13 14 15 487 1100 1068 1116 1117 1117 1103 1099 1042 1108 1107 1103 1108 16 17 18 19 20 21 22 23 25 26 27 28 29 30 31 1112 1108 1103 1109 1097 1110 1113 1061 1116 1112 1109 1112 1106 INSTRUCTIONS On this form, list the average daily unit power level'in MWe (net)for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
DOCKET NO.:       50-397 UNIT:    WNP-2 DATE:    April 1, 1995 COMPLETED BY:          D. G. Embree TELEPHONE:        (509) 377-S44S REPORT PERIOD:            MARCH 1995 AVERAGE DAILYPOWER LEVEL                                        AVERAGE DAILYPOWER LEVEL DAY                    (Net MWe)                                 DAY                 (Net MWe) 16                    1112 487                                   17                    1108 1100                                   18                    1103 1068                                   19                    1109 1116                                   20                    1097 6                        1117                                   21                    1110 1117                                   22                    1113 23 1103 10                        1099                                   25                    1061 1042                                   26                    1116 12                        1108                                   27                    1112 13                        1107                                   28                    1109 14                        1103                                   29                    1112 15                        1108                                   30 31                     1106 INSTRUCTIONS On this form, list the average daily unit power level'in MWe (net) for each day in the reporting month.
I ll li J J OPERATING STATUS REPORT for WNP-2 Date: April 1, 1995 2.3.4, 5.6.7.8.9.3323 1200.9 1120 1132 1086 N/A Docket: 50-397 Reporting Period: MARCH 1995 Outage+On-Line Hours: 744.0 Utility Contact: David G.Embree (509)377-8448 Licensed Thermal Power (MW,): Nameplate Rating (Gross MW,): Design Electrical Rating (Net MW,): Maximum Dependable Capacity (Gross MW,): Maximum Dependable Capacity (Net MW,): If changes occur above since last report, give reasons: 10.Power to which restricted, if any (Net MW,): 11.Reasons for restrictions, if any: None 12., Report Period Hours 13.Hours Reactor Critical 14.Rx Reserve Shutdown Hours 15.Hours Generator On-Line 16.Unit Reserve Shutdown Hours 17.Gross Thermal Energy (MWH)18.Gross Electrical Energy (MwH)19.Net Electrical Energy (MWH)20.Unit Service Factor 21.Unit Availability Factor'2.Unit Capacity Factor (MDC Net)23.Unit Capacity Factor (DER Net)24.Unit Forced Outage Rate 25.Forced Outage Hours MONTH 744.0 739.6 0.0 722.2 0.0 2,342,830 809,850 779,555"97.1%97.1%96.5%93.6%2.9%21.8 YEAR 2,160.0 2,011.4 0.0 1,963.8 0.0 6,317,832 2,185,780 2,101,632 90.9%90.9%89.6%86.9%9.1%196.2 CUMULATIVE 90,248.2 64,712.0 340.4 62,531.4 381.7 185,580,672 62,539,280 59,926,766 69.3%69.7%60.8%60.2%11.6%8,167.3 26.Shutdowns scheduled over the next 6 months (type, date, duration):
Compute to the nearest whole megawatt.
Refueling, April 15, 1995, 42 days.27.If currently shutdown, estimated startup date: Note: Cumulative Unit Capacity Factors (MDC 8r, DER)are calculated with weighted averages.
These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD: MARCH 1995 DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: April 1, 1995 COMPLETED BY: D.G.Embree TELEPHONE:
 
(509)3774448 No.Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 95-03 2/26/95 F 21.8 95404 INSTRU gttutpment malfunction causing turbine governor'valves to ramp closed-DEH electronic control card was replaced.
I ll li J J
 
OPERATING STATUS REPORT for WNP-2 Date:   April 1, 1995 Docket: 50-397
: 2. Reporting Period: MARCH 1995                                 Outage   + On-Line Hours:     744.0
: 3. Utility Contact:       David G. Embree (509) 377-8448 4,    Licensed Thermal Power (MW, ):                                                             3323
: 5. Nameplate Rating (Gross MW, ):                                                           1200.9
: 6. Design Electrical Rating (Net MW,):                                                         1120
: 7. Maximum Dependable Capacity (Gross MW,):                                                   1132
: 8. Maximum Dependable Capacity (Net MW, ):                                                     1086
: 9. If changes occur above since last report, give reasons:                                      N/A
: 10. Power to which restricted, if any (Net MW,):                                              None
: 11. Reasons for restrictions, if any:
MONTH                YEAR          CUMULATIVE 12., Report Period Hours                                 744.0              2,160.0          90,248.2
: 13. Hours Reactor Critical                             739.6              2,011.4          64,712.0
: 14. Rx Reserve Shutdown Hours                             0.0                  0.0              340.4
: 15. Hours Generator On-Line                             722.2              1,963.8          62,531.4
: 16. Unit Reserve Shutdown Hours                           0.0                  0.0              381.7
: 17. Gross Thermal Energy (MWH)                   2,342,830            6,317,832        185,580,672
: 18. Gross Electrical Energy (MwH)                   809,850            2,185,780          62,539,280
: 19. Net Electrical Energy (MWH)                     779,555            2,101,632          59,926,766
: 20. Unit Service Factor                               "97.1%                90.9%              69.3%
: 21. Unit Availability Factor                           97.1%                90.9%              69.7%
Unit Capacity Factor (MDC Net)
                                  '2.
96.5%                89.6%              60.8%
: 23. Unit Capacity Factor (DER Net)                     93.6%               86.9%               60.2%
: 24. Unit Forced Outage Rate                            2.9%                 9.1%               11.6%
: 25. Forced Outage Hours                                  21.8               196.2             8,167.3
: 26. Shutdowns scheduled over the next 6 months (type, date, duration):                   Refueling, April 15, 1995, 42 days.
: 27. Ifcurrently  shutdown, estimated startup date:
Note: Cumulative Unit Capacity Factors (MDC 8r, DER) are calculated with weighted averages.
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:       50-397 UNIT NAME:       WNP-2 DATE:     April 1, 1995 COMPLETED BY:         D.G. Embree TELEPHONE:       (509) 3774448 REPORT PERIOD:      MARCH 1995 No.         Date   Type     Hours     Reason     Method     LER Number       System Component     Cause and Corrective Action To Prevent Recurrence 95-03     2/26/95   F       21.8                             95404                 INSTRU       gttutpment malfunction causing turbine governor     '
valves to ramp closed - DEH electronic control card was replaced.


==SUMMARY==
==SUMMARY==
: At the beginning of the month the plant was in the process of starting up following an automatic scram as the result of a DEB control panel problem.The plant completed the month with normal operation.
:             At the beginning of the month the plant was in the process of starting up following an automatic scram         as the result   of a DEB control panel problem. The plant completed the month with normal operation.
TYPE F-Forced S-Scheduled REASON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-ŽOther METHOD 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT NUREG4161 Exhibits F&H t>}}
TYPE                     REASON                                                          METHOD                    SYSTEM & COMPONENT F - Forced               A - Equipment Failure             E - Operator Training &       1 - Manual                NUREG4161 Exhibits F & H S - Scheduled            B - Maintenance or Test                  License Examination    2 - Manual Scram C - Refueling                    F - Administration            3 - Auto Scram D - Regulatory Restriction          -
G Operational Error            4 - Continued H - 'Other                    5 - Reduced Load 9 - Other
 
t>}}

Revision as of 13:26, 29 October 2019

Monthly Operating Rept for Mar 1995 for Wa Nuclear Project 2.W/950407 Ltr
ML17291A720
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/31/1995
From: Embree D, Schwarz C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-95-067, GO2-95-67, NUDOCS 9504120340
Download: ML17291A720 (9)


Text

PR.XC38.1 EY' CCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9504120340 DOC.DATE: 95/03/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION EMBREE,D.G. Washington Public Power Supply System SCHWARZ,C.J. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Mar 1995 for WA Nuclear Project

. 2.W/950407 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)

! ENCL J SIZE:

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 CLIFFORD,J 1 1 INTERNAL: ACRS 10 10 AEOD/SPD/RRAB 1 1 C NXER 1 1 NRR/DIS P/PI PB 1 . 1 DOPS7OECB 1 1 RGN4 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Bax'968 ~ 3000 George %'ashtngton Way ~ Rtchland, 1Pashtngton 993524968 ~ (509) 372-5000 April 7, 1995 G02-95-067 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sirs:

Subject:

WASHINGTONNUCLEAR PROJECT NO. 2 MONTHLYOPERATING REPORT MARCH 1995 Transmitted herewith is the Monthly Operating Report for the month of March, 1995 as required by our Technical Specifications 6.9.1.6.

Sincerely,

. J. Schwarz Operations Manager (MD 9270)

CJS:DGE CC: NRC, Administrator, Region IV NRC, Resident Inspector (927N)

INPO ANI Library Utility Data Institute BPA (399)

."'.'-..'C G t.'. 6 9S04120MO 950331 PDR ADOCK 05000397 R , PDR

t AVERAGE DAILY UNIT POWER LEVEL t

DOCKET NO.: 50-397 UNIT: WNP-2 DATE: April 1, 1995 COMPLETED BY: D. G. Embree TELEPHONE: (509) 377-S44S REPORT PERIOD: MARCH 1995 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe) 16 1112 487 17 1108 1100 18 1103 1068 19 1109 1116 20 1097 6 1117 21 1110 1117 22 1113 23 1103 10 1099 25 1061 1042 26 1116 12 1108 27 1112 13 1107 28 1109 14 1103 29 1112 15 1108 30 31 1106 INSTRUCTIONS On this form, list the average daily unit power level'in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

I ll li J J

OPERATING STATUS REPORT for WNP-2 Date: April 1, 1995 Docket: 50-397

2. Reporting Period: MARCH 1995 Outage + On-Line Hours: 744.0
3. Utility Contact: David G. Embree (509) 377-8448 4, Licensed Thermal Power (MW, ): 3323
5. Nameplate Rating (Gross MW, ): 1200.9
6. Design Electrical Rating (Net MW,): 1120
7. Maximum Dependable Capacity (Gross MW,): 1132
8. Maximum Dependable Capacity (Net MW, ): 1086
9. If changes occur above since last report, give reasons: N/A
10. Power to which restricted, if any (Net MW,): None
11. Reasons for restrictions, if any:

MONTH YEAR CUMULATIVE 12., Report Period Hours 744.0 2,160.0 90,248.2

13. Hours Reactor Critical 739.6 2,011.4 64,712.0
14. Rx Reserve Shutdown Hours 0.0 0.0 340.4
15. Hours Generator On-Line 722.2 1,963.8 62,531.4
16. Unit Reserve Shutdown Hours 0.0 0.0 381.7
17. Gross Thermal Energy (MWH) 2,342,830 6,317,832 185,580,672
18. Gross Electrical Energy (MwH) 809,850 2,185,780 62,539,280
19. Net Electrical Energy (MWH) 779,555 2,101,632 59,926,766
20. Unit Service Factor "97.1% 90.9% 69.3%
21. Unit Availability Factor 97.1% 90.9% 69.7%

Unit Capacity Factor (MDC Net)

'2.

96.5% 89.6% 60.8%

23. Unit Capacity Factor (DER Net) 93.6% 86.9% 60.2%
24. Unit Forced Outage Rate 2.9% 9.1% 11.6%
25. Forced Outage Hours 21.8 196.2 8,167.3
26. Shutdowns scheduled over the next 6 months (type, date, duration): Refueling, April 15, 1995, 42 days.
27. Ifcurrently shutdown, estimated startup date:

Note: Cumulative Unit Capacity Factors (MDC 8r, DER) are calculated with weighted averages.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: April 1, 1995 COMPLETED BY: D.G. Embree TELEPHONE: (509) 3774448 REPORT PERIOD: MARCH 1995 No. Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 95-03 2/26/95 F 21.8 95404 INSTRU gttutpment malfunction causing turbine governor '

valves to ramp closed - DEH electronic control card was replaced.

SUMMARY

At the beginning of the month the plant was in the process of starting up following an automatic scram as the result of a DEB control panel problem. The plant completed the month with normal operation.

TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure E - Operator Training & 1 - Manual NUREG4161 Exhibits F & H S - Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction -

G Operational Error 4 - Continued H - 'Other 5 - Reduced Load 9 - Other