{{#Wiki_filter:OPERATING STATUS REPORT for WNP-2 Date: April 1, 1997 2.3.4.5.6.7.8.9.10.11.Outage+On-line Hours: 633.2 3486 1199 1153 1153 1107 none none Docket: 50-397 Reporting Period: MARCH 1997 Utility Contact: Bernice Kasko (509)377-4473 Licensed Thermal Power (MW,): Nameplate Rating (Gross MW,): Design Electrical Rating (Net MW,): Maximum Dependable Capacity-summer (Gross MW,): Maximum Dependable Capacity-summer (Net MW,): If changes occur above since last report, give reasons: Power to which restricted, if any (Net MW,): Reasons for restrictions, if any: MONTH YEAR CUMULATIVE OO: O'HA, OOO'O~IA'O'A<O'M Cl Ol IrI QO:+@I O'O O'2.13.14.15.16, 17.18.19.20.21.22.23.24.25.26.27.28.Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)Gross Electrical Energy (MWH)Net Electrical Energy (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)Unit Capacity Factor (DER Net)Unit Forced Outage Rate Forced Outage Hours 744.0 633.2 0.0 633.2 110.8 1,813,573 602,390 578,015 85.1%100.0%70.2%67.4%1.9%14.8 2,160.0 2,049.2 0.0 2,049.2 110.8 5,421,553 1,793,744 1,723,807 94.9%100.0%72.1%.69.2%0.6%14.8 107,792.2 77,921.8 1,730.8 75,299.3 2,067.0 223,267,583 75,178,534 72,032,082 69.9%71.8%61.1%60.1%9.8%8,457.8 If currently shutdown, estimated startup date: 6/19/97 Challenges to safety/relief valves: See Table Shutdowns scheduled over the next 6 months (type, date, duration):
{{#Wiki_filter:OPERATING STATUS REPORT for WNP-2 Date: April 1, 1997 Docket: 50-397
Refueling outage begins 4/18/97, duration is 60 days Note: Cumulative Unit Capacity Factors (MDC&DER)are calculated with weighted averages.  
: 2. Reporting Period: MARCH 1997                                Outage   + On-line Hours: 633.2
~~f~~P s}}
: 3. UtilityContact: Bernice Kasko (509) 377-4473
: 4. Licensed Thermal Power (MW, ):                                                             3486
: 5. Nameplate Rating (Gross MW, ):                                                             1199
: 6. Design Electrical Rating (Net MW, ):                                                       1153
: 7. Maximum Dependable Capacity - summer (Gross MW,):                                           1153
: 8. Maximum Dependable Capacity - summer (Net MW, ):                                           1107
: 9. Ifchanges occur above since last report, give reasons:                                     none
: 10. Power to which restricted, if any (Net MW,):                                               none
: 11. Reasons for restrictions, ifany:
MONTH               YEAR           CUMULATIVE Report Period Hours                              744.0              2,160.0          107,792.2
: 13. Hours Reactor Critical                            633.2              2,049.2          77,921.8
: 14. Rx Reserve Shutdown Hours                          0.0                  0.0            1,730.8
: 15. Hours Generator On-Line                           633.2              2,049.2          75,299.3 16,  Unit Reserve Shutdown Hours                       110.8                110.8            2,067.0
: 17. Gross Thermal Energy (MWH)                   1,813,573            5,421,553        223,267,583
: 18. Gross Electrical Energy (MWH)                 602,390            1,793,744          75,178,534
: 19. Net Electrical Energy (MWH)                   578,015            1,723,807          72,032,082
: 20. Unit Service Factor                              85.1%               94.9%               69.9%
: 21. Unit Availability Factor                        100.0%               100.0%               71.8%
O'2.22. Unit Capacity Factor (MDC Net)                  70.2%                72.1%              61.1%
: 23. Unit Capacity Factor (DER Net)                  67.4%               .69.2%               60. 1%
: 24. Unit Forced Outage Rate                          1.9%                0.6%                9.8%
OO:    25. Forced Outage Hours                                14.8                  14.8           8,457.8 O'HA, OOO    'O
~IA      26. Shutdowns scheduled over the next 6 months (type, date, duration): Refueling outage
'O' A<            begins 4/18/97, duration is 60 days O'M Cl Ol      27. Ifcurrently shutdown,    estimated startup date:                                        6/19/97 IrI QO:
  +@I O'O    28. Challenges to safety/relief valves:                                                  See Table Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.
 
f~ ~ P s
~ ~}}

Latest revision as of 13:07, 29 October 2019

Corrected MOR for Mar 1997 for WNP-2
ML17292A856
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/31/1997
From: Kasko B
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17292A854 List:
References
NUDOCS 9705200193
Download: ML17292A856 (2)


Text

OPERATING STATUS REPORT for WNP-2 Date: April 1, 1997 Docket: 50-397

2. Reporting Period: MARCH 1997 Outage + On-line Hours: 633.2
3. UtilityContact: Bernice Kasko (509) 377-4473
4. Licensed Thermal Power (MW, ): 3486
5. Nameplate Rating (Gross MW, ): 1199
6. Design Electrical Rating (Net MW, ): 1153
7. Maximum Dependable Capacity - summer (Gross MW,): 1153
8. Maximum Dependable Capacity - summer (Net MW, ): 1107
9. Ifchanges occur above since last report, give reasons: none
10. Power to which restricted, if any (Net MW,): none
11. Reasons for restrictions, ifany:

MONTH YEAR CUMULATIVE Report Period Hours 744.0 2,160.0 107,792.2

13. Hours Reactor Critical 633.2 2,049.2 77,921.8
14. Rx Reserve Shutdown Hours 0.0 0.0 1,730.8
15. Hours Generator On-Line 633.2 2,049.2 75,299.3 16, Unit Reserve Shutdown Hours 110.8 110.8 2,067.0
17. Gross Thermal Energy (MWH) 1,813,573 5,421,553 223,267,583
18. Gross Electrical Energy (MWH) 602,390 1,793,744 75,178,534
19. Net Electrical Energy (MWH) 578,015 1,723,807 72,032,082
20. Unit Service Factor 85.1% 94.9% 69.9%
21. Unit Availability Factor 100.0% 100.0% 71.8%

O'2.22. Unit Capacity Factor (MDC Net) 70.2% 72.1% 61.1%

23. Unit Capacity Factor (DER Net) 67.4% .69.2% 60. 1%
24. Unit Forced Outage Rate 1.9% 0.6% 9.8%

OO: 25. Forced Outage Hours 14.8 14.8 8,457.8 O'HA, OOO 'O

~IA 26. Shutdowns scheduled over the next 6 months (type, date, duration): Refueling outage

'O' A< begins 4/18/97, duration is 60 days O'M Cl Ol 27. Ifcurrently shutdown, estimated startup date: 6/19/97 IrI QO:

+@I O'O 28. Challenges to safety/relief valves: See Table Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.