{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)FACIL:STN-50-528 Palo Verde Nuclear Station, STN-50-529 Palo Verde.Nuclear Station, STN-50-530 Palo Verde Nuclear Station, AUTH.NAME AUTHOR AFFILIATION PORTER,K.F.
{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Arizona Public Service Co.LEVINE,J.M.
NOTARIZED: NO          DOCKET g FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi                05000528 STN-50-529 Palo Verde .Nuclear Station, Unit, 2, Arizona Publi            05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi              05000530 AUTH. NAME           AUTHOR AFFILIATION PORTER,K.F.         Arizona Public Service Co. (formerly Arizona Nuclear Power            R LEVINE,J.M.         Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME           RECIPIENT AFFILIATION                                               [
Arizona Public Service Co.RECIP.NAME RECIPIENT AFFILIATION NOTARIZED:
D
NO DOCKET g Unit 1, Arizona Publi 05000528 Unit, 2, Arizona Publi 05000529 Unit 3, Arizona Publi 05000530 (formerly Arizona Nuclear Power R (formerly Arizona Nuclear Power[


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for June 1990 Palo Verde Generating Station Units 1,2&3.W 00713 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: Standardized plant.Standardized plant.D S 05000528 05000529 p5ppp53p D D RECIPIENT ID CODE/NAME PD5 LA PETERSONgS
Monthly operating repts for June 1990               Palo Verde Generating Station Units 1,2 & 3.W 00713             ltr.                       S DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR       ENCL       SIZE:
~INTERNAL: ACRS AEOD/DS P/TPAB NRR/DLPQ/LPEB10 EXTERNAL: EG&G BRYCE,J.H NRC PDR NOTES COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 3 3 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD CHAN,T AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 RGN5 LPDR NSIC COPIES LTTR ENCL 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 D NOTE TO ALL"RIDS" RECIPIENTS:
TITLE: Monthly Operating Report (per Tech Specs)
A D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 31 ENCL 31 ill P ll Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O.BOX 52034~PHOENIX, ARIZONA 85072-2034 254-01024-JML/KPP July 13, 1990 Docket;Nos.STN 50-528/529/530 Document Control Desk U.S.Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C.20555  
NOTES:                                                                           05000528 Standardized plant.                                                       05000529 Standardized plant.                                                       p5ppp53p D D
RECIPIENT              COPIES          RECIPIENT           COPIES ID CODE/NAME            LTTR ENCL      ID CODE/NAME         LTTR ENCL PD5 LA                     3    3    PD5 PD                  1    1 PETERSONgS ~               1    1    CHAN,T                  1    1 INTERNAL: ACRS                       10    10    AEOD/DOA                1    1 AEOD/DS P/TPAB             1    1    IRM TECH ADV            2    2 NRR/DLPQ/LPEB10             1    1    NRR/DOEA/OEAB11        1    1 1    1    RGN5                    1    1 EXTERNAL: EG&G BRYCE,J.H               3     3     LPDR                    1   1 NRC PDR                    1     1     NSIC                   1   1 NOTES                                  1     1 D
A D
D NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR             31   ENCL   31 ill
 
P ll
 
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PHOENIX, ARIZONA85072-2034 254-01024-JML/KPP July 13,     1990 Docket; Nos. STN 50-528/529/530 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C.       20555


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Monthly Operating Reports for June 1990 File: 90-024-404 Attached are the Monthly Operating Reports for June 1990 prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Operating Licenses.By copy of this letter, we are also forwarding the Monthly Operating Reports to the Regional Administrator of the Region V Office.If you have any questions, please contact Mr.K.F.Porter, at (602)340-4187.Very truly yours, J.M.Levine ice President Nuclear Production JML/KFP Attachments cco S.Peterson (all w/attachments)
Palo Verde Nuclear Generating Station                     (PVNGS)
J.B.'artin D.H.Coe INPO Records Center 9007180323 900630 PDR ADOCK 05000528 R PDC II-4 I V'l ll NRC MONTHLY OPERATING REPORT DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter OPERATING STATUS l.2.3.4.5.6.7.8.9.10.Unit Name: Palo Verde Nuclear Generatin Station Unit 1 Reporting Period: June 1990 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe): 1270 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)Since Last Report, Give Reasons: N A Power Level to Which Restricted, If Any (Net MWe): None Reasons For Restrictions, If Any: N A 11.12.13.14.15.16.17.18.19.20.21.22.23.24.Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)Gross Electrical Energy Generated (MWH)Net Electrical Energy Generated (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate Shutdowns Scheduled Over Next 6 N A This Month 720 Yr.-to-Date 4 344 13 6 0 0 0 0 0 0 13 6 0 0 0 0 0 0 10 825 10 825 0 0%0 Oa 0 0 0 0 0.0 0 0 Months (Type, Date and Duration of Each): Cumulative 38 60 1 399 0 0 16 826 9 0 0 60 942 046 21 163 100 19 793 190 43 4%43 4 41 8a 40 2 28 1 25'f Shutdown At End of Report Period, Estimated Date of Start-up: Jul 5 1990 Actual Start-u Date INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast~05 85~06 85 11 85 Achieved 05/525 85~06 10 85 01 28 86 1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter MONTH: JUNE 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL" 17 18 19 20 21 22 23 24 0 25 10 26 27 12 28 13 29 30 15 16 2 l
Units 1, 2, and         3 Monthly Operating Reports               for     June 1990 File: 90-024-404 Attached are the Monthly Operating Reports for June 1990 prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Operating Licenses. By copy of this letter, we are also forwarding the Monthly Operating Reports to the Regional Administrator of the Region V Office.
REFUELING INFORMATION DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter 1.Scheduled date for next refueling shutdown.02/01/92, 3rd refueling.
If you have any questions, at (602) 340-4187.
2.Scheduled date for restart following refueling.
please contact Mr. K. F. Porter, Very   truly       yours, J. M. Levine ice President Nuclear Production JML/KFP Attachments cco   S. Peterson                 (all   w/attachments)
04/11/92 3.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
J. B.'artin D. H. Coe INPO Records     Center 9007180323 900630 PDR ADOCK 05000528 R               PDC
To be determined.
 
4.Scheduled date for submitting proposed licensing action and supporting information.
II
          -4 I
V 'l ll
 
NRC MONTHLY OPERATING REPORT DOCKET NO.       50-528 UNIT NAME         PVNGS-1 DATE COMPLETED BY K F Porter OPERATING STATUS
: l. Unit Name:   Palo Verde Nuclear Generatin Station Unit 1
: 2. Reporting Period: June 1990
: 3. Licensed Thermal Power (MWt): 3800
: 4. Nameplate Rating (Gross MWe):       1403
: 5. Design Electrical Rating (Net MWe): 1270
: 6. Maximum Dependable Capacity (Gross MWe): 1303
: 7. Maximum Dependable Capacity (Net MWe):         1221
: 8. If Changes   Occur In Capacity Ratings (Item Numbers 3 Through 7)
Since Last Report, Give Reasons:     N A
: 9. Power Level   to Which Restricted, If Any (Net     MWe): None
: 10. Reasons For   Restrictions, If Any: N A This Month            Yr.-to-Date          Cumulative
: 11. Hours   in Reporting Period                     720                4 344                38  60
: 12. Number of Hours Reactor Was Critical                                 13  6                13  6              1  399
: 13. Reactor Reserve Shutdown Hours                 0 0                  0 0                  0 0
: 14. Hours Generator On-Line                         0 0                  0 0              16 826 9
: 15. Unit Reserve   Shutdown Hours                 0 0                  0 0                  0 0
: 16. Gross Thermal Energy Generated (MWH)                             10 825                10 825            60 942 046
: 17. Gross Electrical Energy Generated (MWH)                                                                       21 163 100
: 18. Net Electrical Energy Generated   (MWH)                                                                   19 793 190
: 19. Unit Service Factor                           0 0%                  0 0                  43 4%
: 20. Unit Availability Factor                     0 Oa                  0 0                  43 4
: 21. Unit Capacity Factor (Using   MDC Net)                           0.0                  0 0                  41 8a
: 22. Unit Capacity Factor (Using   DER Net)                                                                       40 2
: 23. Unit Forced   Outage Rate                                                               28 1 of Each):
  'f
: 24. Shutdowns Scheduled Over Next     6 Months (Type, Date and Duration N A 25       Shutdown At End of Report Period, Estimated Date       of Start-up:
Jul   5 1990     Actual Start-u Date Forecast              Achieved INITIAL CRITICALITY                           ~05 85               05/525 85 INITIAL ELECTRICITY                          ~06 85                ~06 10 85 COMMERCIAL OPERATION                            11 85              01 28 86 1
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-528 UNIT NAME   PVNGS-1 DATE COMPLETED BY K F Porter MONTH:     JUNE 1990
                                                                                    "
DAY AVERAGE DAILY POWER LEVEL                       DAY AVERAGE DAILY POWER LEVEL 17 18 19 20 21 22 23 24 0                                   25 10                                                   26 27 12                                                   28 13                                                   29 30 15 16 2
 
l REFUELING INFORMATION DOCKET NO. 50-528 UNIT NAME     PVNGS-1 DATE COMPLETED BY K F Porter
: 1. Scheduled date   for next refueling   shutdown.
02/01/92, 3rd refueling.
: 2. Scheduled date   for restart following refueling.
04/11/92
: 3. Will refueling or resumption of operation thereafter require       a Technical Specification change or   other license   amendment?
To be determined.
To be determined.
5.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
: 4. Scheduled date  for submitting  proposed licensing action and supporting information.
To be determined.
To be determined.
6.The number of fuel assemblies.
: 5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
a)In the core.241 b)In the spent fuel storage pool.188 7.Licensed spent fuel storage capacity.1329 Intended change in spent fuel storage capacity.None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2004 (18 Month reloads and full core discharge capability).
To be  determined.
3  
: 6. The number   of fuel assemblies.
a)   In the core.         241 b)   In the spent fuel storage pool.         188
: 7. Licensed spent   fuel storage capacity.         1329 Intended change in spent fuel storage capacity.         None Projected date of last refueling that can be discharged         to spent fuel storage pool assuming present capacity.
2004 (18 Month reloads and     full core discharge capability).
3


t i  
t                                   i


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter June 1990 06/01 06/13 06/14 06/24 06/25 06/25 06/30 06/30 00:00 18:41 14:10 19:55 08:53 19:21 02:26 24:00 Unit began the month in Mode 5, 2nd Refueling Outage.Unit entered Mode 4.Unit entered Mode 3.Unit entered Mode 2, low power physics testing.Unit entered Mode 3, planned RX trip during low power physics testing.Unit entered Mode 2, continuation of low power physics testing.Unit entered Mode 1.Unit ended the month in Mode 1, 2nd Refueling Outage.4 I I SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.F.Porter Method of Duration Shutting System No.Date Type'ours Reason Down Reactor~LER No.Code'omponent Code Cause and Corrective Action to Prevent Recurrence 89/03 04/08/89 S 720 N/A N/A N/A Continuation of 2nd refueling outage.'F-Forced S-Scheduled Reason: Method: A-Equipment Failure(Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from E-Operator Training&License Previous Month Examination 5-Reduction of 20%or F-Administrative Greater in the Past G-Operational Error 24 Hours H-Other (Explain)9-Other-(Explain)
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-528 UNIT NAME     PVNGS-1 DATE COMPLETED BY K F Porter June 1990 06/01     00:00 Unit began the month   in Mode 5, 2nd Refueling Outage.
'Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)Exhibit H-Same Source 5 NRC MONTHLY OPERATING REPORT DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.F.Porter OPERATING STATUS l.2.3.4.5.6.7.8.9.10.Unit Name: Palo Verde Nuclear Generatin Station Unit 2 Reporting Period: June 1990 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe):~12 0 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)Since Last Report, Give Reasons: N A Power Level to Which Restricted, If Any (Net MWe): None Reasons For Restrictions, If Any: N A ll 12 13.14.15.16.17 18 19 20 21 22 23 24 This Month 720 Yr.-to-Date 4 344 1 295 0 0 0 1 295.0 29 8 0 0 30 4 Hours in Reporting Period Number of Hours Reactor Was Critical 0 0 Reactor Reserve Shutdown Hours 0 0 Hours Generator On-Line 0 0 Unit Reserve Shutdown Hours 0 0 0 0 Gross Thermal Energy Generated (MWH)0 Gross Electrical Energy Generated (MWH)0 1 712 500 Net Electrical Energy Generated (MWH)0 1 614 008'nit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): N A Cumulative 33 144 20 546 1 0 0 20 042 2 0 0 3 499 053 25 682 370 23 996 820 60.5 60 5 59 3 57.0a 9 9 25.If Shutdown At End of Report Period, Estimated Date of Start-up: Jul 16 1990 INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast~03 86 06 86 11 86 Achieved 04/618 86~05 20 86 09/919 86 6 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K F Porter MONTH: JUNE 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 18 19 20 21 22 23 24 25 10 26 27 12 28 13 29 14 30 15 16 7
06/13    18:41 Unit entered Mode 4.
06/14    14:10 Unit entered Mode 3.
06/24    19:55 Unit entered Mode 2,   low power physics testing.
06/25    08:53 Unit entered Mode 3, planned RX trip during low power physics testing.
06/25    19:21 Unit entered Mode 2,   continuation of low power physics testing.
06/30    02:26 Unit entered Mode 1.
06/30    24:00 Unit ended the month   in Mode 1, 2nd Refueling Outage.
4
 
I I
 
SHUTDOWNS AND POWER REDUCTIONS DOCKET NO     50-528 UNIT NAME     PVNGS-1 DATE COMPLETED BY K.F. Porter Method of                                         Cause and  Corrective Duration                 Shutting                   Code'omponent System                       Action to No.     Date   Type'ours       Reason     Down Reactor~     LER No.                   Code     Prevent Recurrence 89/03   04/08/89 S       720                                   N/A       N/A             N/A   Continuation of 2nd refueling outage.
  'F-Forced       Reason:                         Method:                   'Exhibit F-Instructions S-Scheduled    A-Equipment Failure(Explain)   1-Manual                   for Preparation of the Data B-Maintenance or Test           2-Manual Scram             Entry Sheets for Licensee C-Refueling                     3-Automatic Scram           Event Report (LER) File D-Regulatory Restriction       4-Continuation from         (NUREG 0161)
E-Operator Training & License     Previous Month Examination                   5-Reduction of 20% or F-Administrative                   Greater in the Past     Exhibit H-Same Source G-Operational Error               24 Hours H-Other (Explain)               9-Other-(Explain) 5
 
NRC MONTHLY OPERATING REPORT DOCKET NO.             50-529 UNIT NAME             PVNGS-2 DATE COMPLETED BY K.F. Porter OPERATING STATUS
: l. Unit Name:   Palo Verde Nuclear Generatin   Station     Unit   2
: 2. Reporting Period: June 1990
: 3. Licensed Thermal Power (MWt): 3800
: 4. Nameplate Rating (Gross MWe):     1403
: 5. Design Electrical Rating (Net MWe): ~12 0
: 6. Maximum Dependable Capacity (Gross MWe): 1303
: 7. Maximum Dependable Capacity (Net MWe):       1221
: 8. If Changes Occur In Capacity Ratings (Item Numbers     3 Through 7)
Since Last Report, Give Reasons:     N A
: 9. Power Level   to Which Restricted, If Any (Net     MWe):     None
: 10. Reasons For   Restrictions, If Any: N A This Month               Yr.-to-Date                   Cumulative ll 12 Hours in Reporting Period Number of Hours Reactor 720                      4 344                        33 144 Was Critical                                 0 0                  1 295 0                     20 546 1
: 13. Reactor Reserve Shutdown Hours               0 0                       0 0                        0 0
: 14. Hours Generator On-Line                       0 0                 1  295.0                    20 042 2
: 15. Unit Reserve Shutdown Hours                   0 0                       0 0                         0 0
: 16. Gross Thermal Energy Generated (MWH)                                 0                                               3  499 053 17  Gross Electrical Energy Generated (MWH)                                 0                 1 712 500                   25 682 370 18  Net Electrical Energy Generated (MWH)                                 0                 1 614                     23 996 820 Service Factor                                                                                60.5 008'nit 19                                                                          29 8 20  Unit Availability Factor                     0 0                                                  60 5 21  Unit Capacity Factor (Using MDC Net)                                                         30 4                        59 3 22  Unit Capacity Factor (Using DER Net)                                                                                     57.0a 23  Unit Forced Outage Rate                                                                             9 9 24  Shutdowns Scheduled Over Next   6 Months (Type, Date and Duration                 of Each):
N A
: 25. If Shutdown   At End of Report Period, Estimated   Date     of Start-up:
Jul   16   1990 Forecast                        Achieved INITIAL CRITICALITY                         ~03 86                           04/618 86 INITIAL ELECTRICITY                            06 86                          ~05 20 86 COMMERCIAL OPERATION                            11 86                        09/919 86 6


REFUELING INFORMATION DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K F Porter 1.Scheduled date for next refueling shutdown.10/17/91, 3rd refueling.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-529 UNIT NAME    PVNGS-2 DATE COMPLETED BY K F Porter MONTH:      JUNE 1990 DAY  AVERAGE DAILY POWER LEVEL                        DAY  AVERAGE DAILY POWER LEVEL 17 18 19 20 21 22 23 24 25 10                                                  26 27 12                                                  28 13                                                  29 14                                                  30 15 16 7
2.Scheduled date for restart following refueling.
 
12/26/91 3.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendments To be determined.
REFUELING INFORMATION DOCKET NO. 50-529 UNIT   NAME   PVNGS-2 DATE COMPLETED BY K F Porter
4.Scheduled date for submitting proposed licensing action and supporting information.
: 1. Scheduled date   for next refueling   shutdown.
To be determined.
10/17/91, 3rd refueling.
5.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
: 2. Scheduled date   for restart following refueling.
To be determined.
12/26/91
6.The number of fuel assemblies.
: 3. Will refueling or resumption of operation thereafter require       a Technical Specification change or   other license amendments To be determined.
a)In the core.241 b)In the spent fuel storage pool.204 7.Licensed spent fuel storage capacity.1329 Intended change in spent fuel storage capacity.None 8.Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2004 (18 Month reloads and full core discharge capability).
: 4. Scheduled date   for submitting proposed licensing action and supporting information.
8  
To be determined.
: 5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
To be determined.
: 6. The number   of fuel assemblies.
a)   In the core.         241 b)   In the spent fuel storage pool.           204
: 7. Licensed spent   fuel storage capacity.         1329 Intended change   in spent fuel storage capacity. None
: 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2004 (18 Month   reloads and full core discharge capability).
8


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K F Porter June 1990 06/01 06/03 06/30 00'00 ll:24 24:00 Unit began the month in Mode 6, 2nd Refueling Outage.Unit entered Mode 5.Unit ended the month in Mode 5, 2nd Refueling Outage.9 V~
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-529 UNIT NAME     PVNGS-2 DATE COMPLETED BY K F Porter June 1990 06/01     00'00 Unit began the month in Mode 6, 2nd Refueling Outage.
SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.F.Porter No.Duration Date Type'ours Reason Method of Shutting Down Reactor System LER No.Code Component Code Cause and Corrective Action to Prevent Recurrence 90/01 02/23/90 S 720 N/A N/A N/A Continuation of 2nd Refueling Outage.'F-Forced S-Scheduled
06/03    ll:24 Unit entered Mode 5.
'Reason: Method: A-Equipment Failure(Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from E-Operator Training&License Previous Month Examination 5-Reduction of 20$or F-Administrative Greater in the Past G-Operational Error 24 Hours H-Other (Explain)9-Other-(Explain)
06/30    24:00 Unit ended the month in Mode 5, 2nd Refueling Outage.
'Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)'Exhibit H-Same Source 10-P NRC MONTHLY OPERATING REPORT DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F Porter OPERATING STATUS 1.2.3.4., 5.6.7.8.9.10.Unit Name: Palo Verde Nuclear Generatin Station Unit 3 Reporting Period: June 1990 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe):~12 0 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)Since Last Report, Give Reasons: N A Power Level to Which Restricted, If Any (Net MWe): one Reasons For Restrictions, If Any: N A 11'2.13.14.15.16.17.18.19.20.21.22.23.24.Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)Gross Electrical Energy Generated (MWH)Net Electrical Energy Generated (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate Shutdowns Scheduled Over Next 6 N A This Month 720 Yr.-to-Date 4 344 20 0 0 0 720 0 0 0 3 813 2 0 0 3 14 0 0 2 723 341 954 400 901 098 100 0 100 0 13 061 555 4 583 100 4 291 203 85 5 85 5 102 5 80 9 0 Oa Months (Type, Date and Duration of Each): Cumulative 21 720 13 224 4 0 0 12 988.7 0 0 4 4 1 946 16 650 900 15 654 668 59 8 59 8 59 0 56 8 10.9%25.If Shutdown At End of Report Period, Estimated Date of Start-up: N A INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast~07 87~08~09 8 Achi.eve d~10 25 8~11 28 8~01 08 88 e  
9
~,'AVERAGE DAILY UNIT POWER LEVEL DOCKET NO~50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F Porter MONTH: JUNE 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1261 1261 1259 17 19 1252 1252 1251 1254 20 1249 1252 21 1249 1255 22 1248 1255 23 1245 1248 24,.1241 1219 25 1240 10 1245 26 1241 1251 27 1243 12 1248 28 1243 13 1249 29 1240 14 1253 30 1245 15 1252 16 1256  
 
't REFUELING INFORMATION DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F.Porter Scheduled date for next refueling shutdown.03/16/91, 2nd refueling.
V ~
Scheduled date for restart following refueling.
SHUTDOWNS AND POWER REDUCTIONS DOCKET NO     50-529 UNIT NAME     PVNGS-2 DATE COMPLETED BY K.F. Porter Method  of                                          Cause and  Corrective Duration                Shutting                  System      Component        Action to No.     Date   Type'ours         Reason     Down Reactor       LER No. Code           Code       Prevent Recurrence 90/01   02/23/90   S       720                                     N/A       N/A             N/A     Continuation of 2nd Refueling Outage.
05/25/91 Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment2 To be determined.
  'F-Forced       'Reason:                         Method:                 'Exhibit F-Instructions S-Scheduled      A-Equipment Failure(Explain)   1-Manual                   for Preparation of the Data B-Maintenance or Test           2-Manual Scram             Entry Sheets for Licensee C-Refueling                     3-Automatic Scram           Event Report (LER)  File D-Regulatory Restriction       4-Continuation from         (NUREG 0161)
Scheduled date for submitting proposed licensing action and supporting information.
E-Operator Training & License     Previous Month Examination                   5-Reduction of 20$ or F-Administrative                   Greater in the Past   'Exhibit H-Same Source G-Operational Error               24 Hours H-Other (Explain)               9-Other-(Explain) 10-
To be determined.
 
P NRC MONTHLY OPERATING REPORT DOCKET NO.       50-530 UNIT   NAME     PVNGS-3 DATE COMPLETED BY K F Porter OPERATING STATUS
: 1.     Unit Name:   Palo Verde Nuclear Generatin Station Unit 3
: 2.      Reporting Period: June 1990
: 3.      Licensed Thermal Power (MWt): 3800 4.,    Nameplate Rating (Gross MWe):     1403
: 5.      Design Electrical Rating (Net MWe): ~12 0
: 6.      Maximum Dependable Capacity (Gross MWe): 1303
: 7.      Maximum Dependable Capacity (Net MWe):       1221
: 8.      If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)
Since Last Report, Give Reasons:     N A
: 9.      Power Level   to Which Restricted, If Any (Net     MWe):   one
: 10. Reasons For Restrictions, If Any: N A This Month            Yr.-to-Date          Cumulative 11     Hours in Reporting Period                     720                  4 344                21 720
    '2.
Number of Hours Reactor Was Critical                               20  0                3  813 2              13 224 4
: 13. Reactor Reserve Shutdown Hours                 0 0                  0 0                  0 0
: 14. Hours Generator On-Line                     720  0                3  14                12 988.7
: 15. Unit Reserve   Shutdown Hours                 0 0                  0 0                  0 0
: 16. Gross Thermal Energy Generated (MWH)                         2  723 341            13 061 555            4  4 1 946
: 17. Gross Electrical Energy Generated (MWH)                           954 400              4 583 100            16 650 900
: 18. Net Electrical Energy Generated (MWH)                           901 098              4 291 203            15 654 668
: 19. Unit Service Factor                       100 0                    85 5                  59 8
: 20. Unit Availability Factor                   100 0                    85 5                  59 8
: 21. Unit Capacity Factor (Using MDC Net)                           102 5                    80 9                  59 0
: 22. Unit Capacity Factor (Using DER Net)                                                                         56 8
: 23. Unit Forced Outage Rate                     0 Oa                                        10.9%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration           of Each):
N A
: 25. If Shutdown At End of Report Period, Estimated   Date of Start-up:
N A Forecast              Achi.eve d INITIAL CRITICALITY                           ~07 87                 ~10 25 8 INITIAL ELECTRICITY                          ~08                    ~11 28 8 COMMERCIAL OPERATION                          ~09  8                ~01 08 88
 
e
~,
    '
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ~ 50-530 UNIT NAME   PVNGS-3 DATE COMPLETED BY K F Porter MONTH:       JUNE 1990 DAY   AVERAGE DAILY POWER LEVEL                       DAY AVERAGE DAILY POWER LEVEL 1261                                 17            1252 1261                                               1252 1259                                 19             1251 1254                                 20             1249 1252                                 21             1249 1255                                 22             1248 1255                                 23             1245 1248                                 24,.           1241 1219                                 25             1240 10             1245                                 26             1241 1251                                 27             1243 12             1248                                 28             1243 13             1249                                 29             1240 14             1253                                 30             1245 15             1252 16             1256
 
't REFUELING INFORMATION DOCKET NO. 50-530 UNIT NAME     PVNGS-3 DATE COMPLETED BY K F. Porter Scheduled date   for next refueling   shutdown.
03/16/91, 2nd refueling.
Scheduled date   for restart following refueling.
05/25/91 Will refueling or resumption of operation thereafter require       a Technical Specification change or   other license amendment2 To be determined.
Scheduled date   for submitting proposed licensing action and supporting information.
To be determined.
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
To be determined.
To be determined.
The number of fuel assemblies.
The number   of fuel assemblies.
a)In the core.241 b)In the spent fuel storage pool.104 Licensed spent fuel storage capacity.1329 Intended change in spent fuel storage capacity.None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability).
a)   In the core.         241 b)   In the spent fuel storage pool.           104 Licensed spent   fuel storage capacity.         1329 Intended change   in spent fuel storage capacity. None Projected date   of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
13 g 4'k i I t l 3  
2005 (18 Month   reloads and full core discharge capability).
13
 
g 4
  '
k i
I t
l 3


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F Porter June 1990 06/01 06/09 06/09 06/30 00'00 05:00 13:27 24:00 Unit began the month in Mode 1, 100%RX power.Began RX power reduction to 95%for planned valve testing.Unit back at 100$RX power.Unit ended the month in Mode 1, 100%RX power.14-l'g t h SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.F.Porter No.Duration Date Type'ours Reason Method of Shutting Down Reactor System LER No.Code~Component Code Cause and Corrective Action to Prevent Recurrence No outages or power reductions of greater than 20$occurred during the month.'F-Forced S-Scheduled Reason: Method: A-Equipment Failure(Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from E-Operator Training&License Previous Month Examination 5-Reduction of 20%or F-Administrative Greater in the Past G-Operational Error 24 Hours H-Other (Explain)9-Other-(Explain)
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-530 UNIT NAME   PVNGS-3 DATE COMPLETED BY K F Porter June 1990 06/01     00'00 Unit began the month in Mode 1, 100% RX power.
'Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)'Exhibit H-Same Source 15 g~I'4 f i I}}
06/09    05:00 Began RX power reduction to 95% for planned valve testing.
06/09    13:27 Unit back at 100$ RX power.
06/30    24:00 Unit ended the month in Mode 1, 100% RX power.
14-
 
l'g t
h
 
SHUTDOWNS AND POWER REDUCTIONS DOCKET NO   50-530 UNIT NAME   PVNGS-3 DATE COMPLETED BY K.F. Porter Method  of                                              Cause and Corrective Duration              Shutting                    System        Component        Action to No.     Date Type'ours         Reason     Down Reactor       LER No. Code~           Code       Prevent Recurrence No outages or power reductions of greater than   20$ occurred during the month.
'F-Forced       Reason:                         Method:                   'Exhibit F-Instructions S-Scheduled    A-Equipment Failure(Explain)   1-Manual                     for Preparation of the Data B-Maintenance or Test           2-Manual Scram               Entry Sheets for Licensee C-Refueling                     3-Automatic Scram             Event Report (LER)  File D-Regulatory Restriction       4-Continuation from           (NUREG 0161)
E-Operator Training & License     Previous Month Examination                 5-Reduction of 20% or F-Administrative                   Greater in the Past       'Exhibit H-Same Source G-Operational Error               24 Hours H-Other (Explain)               9-Other-(Explain) 15
 
g ~
I
      '4 f
i   I}}

Revision as of 10:26, 29 October 2019

Monthly Operating Repts for June 1990 for Palo Verde Generating Station Units 1,2 & 3.W/900713 Ltr
ML17305A935
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/30/1990
From: James M. Levine, Porter K
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
254-01024-JML-K, 254-1024-JML-K, NUDOCS 9007180323
Download: ML17305A935 (31)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

NOTARIZED: NO DOCKET g FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde .Nuclear Station, Unit, 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION PORTER,K.F. Arizona Public Service Co. (formerly Arizona Nuclear Power R LEVINE,J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION [

D

SUBJECT:

Monthly operating repts for June 1990 Palo Verde Generating Station Units 1,2 & 3.W 00713 ltr. S DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES: 05000528 Standardized plant. 05000529 Standardized plant. p5ppp53p D D

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 PETERSONgS ~ 1 1 CHAN,T 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 IRM TECH ADV 2 2 NRR/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB11 1 1 1 1 RGN5 1 1 EXTERNAL: EG&G BRYCE,J.H 3 3 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTES 1 1 D

A D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 31 ENCL 31 ill

P ll

Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PHOENIX, ARIZONA85072-2034 254-01024-JML/KPP July 13, 1990 Docket; Nos. STN 50-528/529/530 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Monthly Operating Reports for June 1990 File: 90-024-404 Attached are the Monthly Operating Reports for June 1990 prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Operating Licenses. By copy of this letter, we are also forwarding the Monthly Operating Reports to the Regional Administrator of the Region V Office.

If you have any questions, at (602) 340-4187.

please contact Mr. K. F. Porter, Very truly yours, J. M. Levine ice President Nuclear Production JML/KFP Attachments cco S. Peterson (all w/attachments)

J. B.'artin D. H. Coe INPO Records Center 9007180323 900630 PDR ADOCK 05000528 R PDC

II

-4 I

V 'l ll

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter OPERATING STATUS

l. Unit Name: Palo Verde Nuclear Generatin Station Unit 1
2. Reporting Period: June 1990
3. Licensed Thermal Power (MWt): 3800
4. Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): 1270
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): None
10. Reasons For Restrictions, If Any: N A This Month Yr.-to-Date Cumulative
11. Hours in Reporting Period 720 4 344 38 60
12. Number of Hours Reactor Was Critical 13 6 13 6 1 399
13. Reactor Reserve Shutdown Hours 0 0 0 0 0 0
14. Hours Generator On-Line 0 0 0 0 16 826 9
15. Unit Reserve Shutdown Hours 0 0 0 0 0 0
16. Gross Thermal Energy Generated (MWH) 10 825 10 825 60 942 046
17. Gross Electrical Energy Generated (MWH) 21 163 100
18. Net Electrical Energy Generated (MWH) 19 793 190
19. Unit Service Factor 0 0% 0 0 43 4%
20. Unit Availability Factor 0 Oa 0 0 43 4
21. Unit Capacity Factor (Using MDC Net) 0.0 0 0 41 8a
22. Unit Capacity Factor (Using DER Net) 40 2
23. Unit Forced Outage Rate 28 1 of Each):

'f

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration N A 25 Shutdown At End of Report Period, Estimated Date of Start-up:

Jul 5 1990 Actual Start-u Date Forecast Achieved INITIAL CRITICALITY ~05 85 05/525 85 INITIAL ELECTRICITY ~06 85 ~06 10 85 COMMERCIAL OPERATION 11 85 01 28 86 1

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter MONTH: JUNE 1990

"

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 18 19 20 21 22 23 24 0 25 10 26 27 12 28 13 29 30 15 16 2

l REFUELING INFORMATION DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter

1. Scheduled date for next refueling shutdown.

02/01/92, 3rd refueling.

2. Scheduled date for restart following refueling.

04/11/92

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

To be determined.

4. Scheduled date for submitting proposed licensing action and supporting information.

To be determined.

5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

To be determined.

6. The number of fuel assemblies.

a) In the core. 241 b) In the spent fuel storage pool. 188

7. Licensed spent fuel storage capacity. 1329 Intended change in spent fuel storage capacity. None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2004 (18 Month reloads and full core discharge capability).

3

t i

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter June 1990 06/01 00:00 Unit began the month in Mode 5, 2nd Refueling Outage.

06/13 18:41 Unit entered Mode 4.

06/14 14:10 Unit entered Mode 3.

06/24 19:55 Unit entered Mode 2, low power physics testing.

06/25 08:53 Unit entered Mode 3, planned RX trip during low power physics testing.

06/25 19:21 Unit entered Mode 2, continuation of low power physics testing.

06/30 02:26 Unit entered Mode 1.

06/30 24:00 Unit ended the month in Mode 1, 2nd Refueling Outage.

4

I I

SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.F. Porter Method of Cause and Corrective Duration Shutting Code'omponent System Action to No. Date Type'ours Reason Down Reactor~ LER No. Code Prevent Recurrence 89/03 04/08/89 S 720 N/A N/A N/A Continuation of 2nd refueling outage.

'F-Forced Reason: Method: 'Exhibit F-Instructions S-Scheduled A-Equipment Failure(Explain) 1-Manual for Preparation of the Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training & License Previous Month Examination 5-Reduction of 20% or F-Administrative Greater in the Past Exhibit H-Same Source G-Operational Error 24 Hours H-Other (Explain) 9-Other-(Explain) 5

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.F. Porter OPERATING STATUS

l. Unit Name: Palo Verde Nuclear Generatin Station Unit 2
2. Reporting Period: June 1990
3. Licensed Thermal Power (MWt): 3800
4. Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): ~12 0
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): None
10. Reasons For Restrictions, If Any: N A This Month Yr.-to-Date Cumulative ll 12 Hours in Reporting Period Number of Hours Reactor 720 4 344 33 144 Was Critical 0 0 1 295 0 20 546 1
13. Reactor Reserve Shutdown Hours 0 0 0 0 0 0
14. Hours Generator On-Line 0 0 1 295.0 20 042 2
15. Unit Reserve Shutdown Hours 0 0 0 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 3 499 053 17 Gross Electrical Energy Generated (MWH) 0 1 712 500 25 682 370 18 Net Electrical Energy Generated (MWH) 0 1 614 23 996 820 Service Factor 60.5 008'nit 19 29 8 20 Unit Availability Factor 0 0 60 5 21 Unit Capacity Factor (Using MDC Net) 30 4 59 3 22 Unit Capacity Factor (Using DER Net) 57.0a 23 Unit Forced Outage Rate 9 9 24 Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

N A

25. If Shutdown At End of Report Period, Estimated Date of Start-up:

Jul 16 1990 Forecast Achieved INITIAL CRITICALITY ~03 86 04/618 86 INITIAL ELECTRICITY 06 86 ~05 20 86 COMMERCIAL OPERATION 11 86 09/919 86 6

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K F Porter MONTH: JUNE 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 18 19 20 21 22 23 24 25 10 26 27 12 28 13 29 14 30 15 16 7

REFUELING INFORMATION DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K F Porter

1. Scheduled date for next refueling shutdown.

10/17/91, 3rd refueling.

2. Scheduled date for restart following refueling.

12/26/91

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendments To be determined.
4. Scheduled date for submitting proposed licensing action and supporting information.

To be determined.

5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

To be determined.

6. The number of fuel assemblies.

a) In the core. 241 b) In the spent fuel storage pool. 204

7. Licensed spent fuel storage capacity. 1329 Intended change in spent fuel storage capacity. None
8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2004 (18 Month reloads and full core discharge capability).

8

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K F Porter June 1990 06/01 00'00 Unit began the month in Mode 6, 2nd Refueling Outage.

06/03 ll:24 Unit entered Mode 5.

06/30 24:00 Unit ended the month in Mode 5, 2nd Refueling Outage.

9

V ~

SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.F. Porter Method of Cause and Corrective Duration Shutting System Component Action to No. Date Type'ours Reason Down Reactor LER No. Code Code Prevent Recurrence 90/01 02/23/90 S 720 N/A N/A N/A Continuation of 2nd Refueling Outage.

'F-Forced 'Reason: Method: 'Exhibit F-Instructions S-Scheduled A-Equipment Failure(Explain) 1-Manual for Preparation of the Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training & License Previous Month Examination 5-Reduction of 20$ or F-Administrative Greater in the Past 'Exhibit H-Same Source G-Operational Error 24 Hours H-Other (Explain) 9-Other-(Explain) 10-

P NRC MONTHLY OPERATING REPORT DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F Porter OPERATING STATUS

1. Unit Name: Palo Verde Nuclear Generatin Station Unit 3
2. Reporting Period: June 1990
3. Licensed Thermal Power (MWt): 3800 4., Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): ~12 0
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): one
10. Reasons For Restrictions, If Any: N A This Month Yr.-to-Date Cumulative 11 Hours in Reporting Period 720 4 344 21 720

'2.

Number of Hours Reactor Was Critical 20 0 3 813 2 13 224 4

13. Reactor Reserve Shutdown Hours 0 0 0 0 0 0
14. Hours Generator On-Line 720 0 3 14 12 988.7
15. Unit Reserve Shutdown Hours 0 0 0 0 0 0
16. Gross Thermal Energy Generated (MWH) 2 723 341 13 061 555 4 4 1 946
17. Gross Electrical Energy Generated (MWH) 954 400 4 583 100 16 650 900
18. Net Electrical Energy Generated (MWH) 901 098 4 291 203 15 654 668
19. Unit Service Factor 100 0 85 5 59 8
20. Unit Availability Factor 100 0 85 5 59 8
21. Unit Capacity Factor (Using MDC Net) 102 5 80 9 59 0
22. Unit Capacity Factor (Using DER Net) 56 8
23. Unit Forced Outage Rate 0 Oa 10.9%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

N A

25. If Shutdown At End of Report Period, Estimated Date of Start-up:

N A Forecast Achi.eve d INITIAL CRITICALITY ~07 87 ~10 25 8 INITIAL ELECTRICITY ~08 ~11 28 8 COMMERCIAL OPERATION ~09 8 ~01 08 88

e

~,

'

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ~ 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F Porter MONTH: JUNE 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1261 17 1252 1261 1252 1259 19 1251 1254 20 1249 1252 21 1249 1255 22 1248 1255 23 1245 1248 24,. 1241 1219 25 1240 10 1245 26 1241 1251 27 1243 12 1248 28 1243 13 1249 29 1240 14 1253 30 1245 15 1252 16 1256

't REFUELING INFORMATION DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F. Porter Scheduled date for next refueling shutdown.

03/16/91, 2nd refueling.

Scheduled date for restart following refueling.

05/25/91 Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment2 To be determined.

Scheduled date for submitting proposed licensing action and supporting information.

To be determined.

Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

To be determined.

The number of fuel assemblies.

a) In the core. 241 b) In the spent fuel storage pool. 104 Licensed spent fuel storage capacity. 1329 Intended change in spent fuel storage capacity. None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

13

g 4

'

k i

I t

l 3

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F Porter June 1990 06/01 00'00 Unit began the month in Mode 1, 100% RX power.

06/09 05:00 Began RX power reduction to 95% for planned valve testing.

06/09 13:27 Unit back at 100$ RX power.

06/30 24:00 Unit ended the month in Mode 1, 100% RX power.

14-

l'g t

h

SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.F. Porter Method of Cause and Corrective Duration Shutting System Component Action to No. Date Type'ours Reason Down Reactor LER No. Code~ Code Prevent Recurrence No outages or power reductions of greater than 20$ occurred during the month.

'F-Forced Reason: Method: 'Exhibit F-Instructions S-Scheduled A-Equipment Failure(Explain) 1-Manual for Preparation of the Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)