{{#Wiki_filter:0 PMP EPP INDEX INDIANA a MICHIGAN POWER COMP~N'(DONALD C.COOK NUCLEAR PLANT PLANT MANAGER PROCEDURE Index Identification Number Ti tie Revi s'.on No.i And Date Comments PMP 2081 EPP.014 Off-Site Dose Assessments EPP.015 Sampling and Analysis of Waterborne Releases EPP.016 Collection and Analysis of Liquid and Gaseous Samples EPP.017 Interpretation of Liquid and Gaseous Samples EPP.018 Transpor tati on Accidents Involving Radioactive
{{#Wiki_filter:0                                                                 PMP EPP INDEX INDIANA a MICHIGAN         POWER COMP~N'(
'aterial EPP.019 AEP Emergency Response Organization Activation and Management Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-81 Revision 0 4-1-8)EPP.020 Activation and Operation of Revision 0 the Technical Support Center 4-1-81 (TSC)TP-1,11-16-81 Exp N/A EPP.021 EPP.022 EPP.023 Acti vati on and Operati on o f the Operations Staging Ar:ea (OSA)and Personnel Accountability Activation and Operation of the Recovery Center (RC)(An Emergency Operations Faci 1 i ty)Activation and Operation of the Emer gency Control Center (ECC)(An Emergency Operations Facility)Revision 0 4-1-81'evision 0 4-1-81 Revision 0 4-1-81 TP-1,11-16-81 Exp N/A P~4,~~(C, p@gay~~Activation and Operation of the Joint Public Information EPP.024 Revision 0 4-1-81 Center (JPIC)(An Emergency Operations Facility)I<8i i2040323 81 i20i i PDR ADOCK 05000315'ORE 3>><<C.Pl-p p"Q Q~Qg,t,~V'C'I,  
DONALD C. COOK NUCLEAR PLANT PLANT MANAGER PROCEDURE Index Identification                       Ti tie Revi s'.on No.i                 Comments Number                                                  And Date PMP 2081 EPP.014   Off-Site       Dose Assessments       Revision          0 4-1-81 EPP.015 Sampling and Analysis         of     Revision          0 Waterborne Releases                     4-1-81 EPP.016 Collection       and Analysis of       Revision          0 Liquid and     Gaseous Samples       4-1-81 EPP.017   Interpretation of Liquid             Revision          0 and Gaseous       Samples             4-1-81 EPP.018 Transpor     tati on Accidents       Revision 0 Involving Radioactive                 4-1-81
~,~/PJB'/APJA Br H//.8/GAi"J ECECTRIC COINPAIJY DONALD C.COOK NUCLEAR Pl Ai>)'T instruction or Procedure Temporary Sheet This temporary sheet applies to Acttvation and Operation Qf the TSC Instruction or Procedure No.PMP 2081 EPP.020 Revision No.0: EMPQRARY SHEET NO.The following change (X)instituted effective (Date)new requirement
                  'aterial EPP.019 AEP   Emergency Response             Revision          0 Organization Activation and           4-1-8)
()shall be-8 Add the following after 4.3.4: Note: The Technical Director shall perform this accotIntability only in the event the Security Computer is not used.Normally, the accountability is performed by the OSAM using the computer listing.Reason: Roll call is used for back-up only.Accountability is normally p'erformed by computer.~;s~w n ir>>~>>)tJ<i g g~>>j>>g I This change should be made a permanent revision to the Instruction or Procedure:
Management EPP.020 Activation       and Operation of     Revision           0 TP-1,11-16-81 Exp N/A the Technical Support Center           4-1-81 (TSC)
CIYES a NO 0 NOT KNOWN, addittonal review required Expir'ation Date Procedure Revision Originator:
EPP.021  Activati on      and Operati on o  f  Revision 0          TP-1,11-16-81 Exp N/A the Operations Staging Ar:ea           4-1-81 (OSA) and Personnel Accountability                                               P ~4,~~( C, p @gay EPP.022  Activation     and Operation     of           'evision 0
Management Staff: Senior I PNSRC Rant Manager Standard Dist.List No.: Distribution:
the Recovery Center (RC) (An           4-1-81 Emergency Operations                                                       ~ ~
Form No.4330 REVISED 7128 FORM NO.PMI 201&4 REV.2-ORIGI:IAL CANARY ORIGINATOR COPY PINK-iVORKING COPY U 0 ll V III II 1~g i'\J/PJ J'/A/VA 5 M//:8/GAPJ EIECTRIC COMPAIV Y DONALD C.COOK NUCLEAR PLANT Instruction or Procedure Temporary Sheet This temporary sheet applies to Activation and Operation of the OSA and Instruction or procedure No.Personnel Accountability PMP 2081 EPP.021 Revision No.TEMPORARY SHEET NO.The following change (X)instituted effective (Date)new requirement
Faci 1 i ty)
()shall be 11-16-81 Add the following after 3.1.3.3: Note: Roll call for accountability needgonly to be used in the event the computer is unavailable to perform accountability.
EPP.023  Activation     and Operation     of Revision          0 the   Emer gency Control Center       4-1-81 (ECC) (An Emergency Operations       Facility)
Reason: Roll call is used for back-up only.Accountability is normally performed by computer.~1 J r This change should be made a permanent revision to the Instruction or Procedure:
EPP.024  Activation and Operation of Revision                    0 Pl the Joint Public Information           4-1-81 Center (JPIC) (An Emergency Operations Facility)                                           >> <<C.
g YES aNO 0 NOT KNOWN, additional review required Procedure Revision Originator:
3 I< 8i i2040323 81 i20i       i PDR ADOCK 05000315'ORE
ibhnagement Staff: Senior Reac PNSRC Cate Rant Manager Standard Dist.List No.: Distribution:
 
Form No.4330 REVISED 717$FORM iNO.PMI 201~REV.2 WHITE-ORIGINAL CANARY-ORIGINATOR COPY PINK-WORKING COPY}}
p p "Q   Q~ Qg,t, ~V '
C'I,
 
                                      ~,
                              /PJB'/APJA Br                 H//.8/GAi
                                                                                    ~ "J ECECTRIC COINPAIJY DONALD C. COOK NUCLEAR Pl Ai>)'T instruction or Procedure Temporary Sheet                                               : EMPQRARY This temporary sheet applies to Acttvation and Operation Qf the TSC                                   SHEET NO.
Instruction or Procedure No. PMP 2081 EPP .020 Revision No. 0 The following change ( X )             new requirement (     )     shall be instituted effective (Date)                  -8 Add   the following after 4.3.4:
Note:     The Technical     Director shall perform this accotIntability only in the event the Security Computer is not used. Normally, the accountability is performed by the OSAM using the computer listing.
Reason:       Roll call is used       for back-up only.       Accountability is normally p'erformed by computer.
                                                                                      ~;s~   w ng ir>>~>>
                                                                                                    >>j>>g
                                                                                      )tJ <i g   ~
I This change should be made     a permanent revision to the Instruction or Procedure:
CIYES         a NO           0 NOT KNOWN, addittonal review required Expir'ation Date     Procedure Revision                           Standard Dist. List No.:
Originator:                                                      Distribution:
Management   Staff:
I Senior PNSRC Rant Manager Form No. 4330             REVISED 7128                                                           ORIGI:IAL CANARY            ORIGINATOR COPY PINK          iVORKING COPY FORM NO. PMI 201&4     REV. 2
 
U 0
ll V III II
 
1 i '
g 5
~
J
          \
                                            /PJ J'/A/VA                   M//:8/GAPJ EIECTRIC     COMPAIV       Y DONALD C. COOK NUCLEAR PLANT Instruction or Procedure Temporary Sheet                                       TEMPORARY This temporary sheet applies to         Activation and Operation       of the OSA and         SHEET NO.
Instruction or procedure No. Personnel Accountability PMP 2081   EPP   .021 Revision No.
The following change ( X )             new requirement (   )     shall be 11-16-81 instituted effective (Date)
Add   the following after 3.1.3.3:
Note:     Roll call for accountability needgonly to be used in the event the computer is unavailable to perform accountability.
Reason:       Roll call is used for back-up only.             Accountability is normally performed by computer.
                                                                                                ~1 J r
This change should be made     a permanent revision to the Instruction or Procedure:
g YES           aNO           0 NOT KNOWN, additional review required Procedure Revision                         Standard Dist. List No.:
Originator:                                                      Distribution:
ibhnagement Staff:
Senior Reac PNSRC                               Cate Rant Manager Form No. 4330             REVISED 717$                                               WHITE  ORIGINAL CANARY  ORIGINATOR COPY PINK    WORKING COPY FORM iNO. PMI 201~     REV. 2}}

Latest revision as of 07:40, 29 October 2019

Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures PMP 2081 EPP.020 Re Activation & Operation of Technical Support Ctr & PMP 2081 EPP.021 Re Personnel Accountability
ML17319B096
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/19/1981
From:
INDIANA MICHIGAN POWER CO.
To:
Shared Package
ML17319B094 List:
References
PROC-811119-01, NUDOCS 8112040323
Download: ML17319B096 (6)


Text

0 PMP EPP INDEX INDIANA a MICHIGAN POWER COMP~N'(

DONALD C. COOK NUCLEAR PLANT PLANT MANAGER PROCEDURE Index Identification Ti tie Revi s'.on No.i Comments Number And Date PMP 2081 EPP.014 Off-Site Dose Assessments Revision 0 4-1-81 EPP.015 Sampling and Analysis of Revision 0 Waterborne Releases 4-1-81 EPP.016 Collection and Analysis of Revision 0 Liquid and Gaseous Samples 4-1-81 EPP.017 Interpretation of Liquid Revision 0 and Gaseous Samples 4-1-81 EPP.018 Transpor tati on Accidents Revision 0 Involving Radioactive 4-1-81

'aterial EPP.019 AEP Emergency Response Revision 0 Organization Activation and 4-1-8)

Management EPP.020 Activation and Operation of Revision 0 TP-1,11-16-81 Exp N/A the Technical Support Center 4-1-81 (TSC)

EPP.021 Activati on and Operati on o f Revision 0 TP-1,11-16-81 Exp N/A the Operations Staging Ar:ea 4-1-81 (OSA) and Personnel Accountability P ~4,~~( C, p @gay EPP.022 Activation and Operation of 'evision 0

the Recovery Center (RC) (An 4-1-81 Emergency Operations ~ ~

Faci 1 i ty)

EPP.023 Activation and Operation of Revision 0 the Emer gency Control Center 4-1-81 (ECC) (An Emergency Operations Facility)

EPP.024 Activation and Operation of Revision 0 Pl the Joint Public Information 4-1-81 Center (JPIC) (An Emergency Operations Facility) >> <<C.

3 I< 8i i2040323 81 i20i i PDR ADOCK 05000315'ORE

p p "Q Q~ Qg,t, ~V '

C'I,

~,

/PJB'/APJA Br H//.8/GAi

~ "J ECECTRIC COINPAIJY DONALD C. COOK NUCLEAR Pl Ai>)'T instruction or Procedure Temporary Sheet  : EMPQRARY This temporary sheet applies to Acttvation and Operation Qf the TSC SHEET NO.

Instruction or Procedure No. PMP 2081 EPP .020 Revision No. 0 The following change ( X ) new requirement ( ) shall be instituted effective (Date) -8 Add the following after 4.3.4:

Note: The Technical Director shall perform this accotIntability only in the event the Security Computer is not used. Normally, the accountability is performed by the OSAM using the computer listing.

Reason: Roll call is used for back-up only. Accountability is normally p'erformed by computer.

~;s~ w ng ir>>~>>

>>j>>g

)tJ <i g ~

I This change should be made a permanent revision to the Instruction or Procedure:

CIYES a NO 0 NOT KNOWN, addittonal review required Expir'ation Date Procedure Revision Standard Dist. List No.:

Originator: Distribution:

Management Staff:

I Senior PNSRC Rant Manager Form No. 4330 REVISED 7128 ORIGI:IAL CANARY ORIGINATOR COPY PINK iVORKING COPY FORM NO. PMI 201&4 REV. 2

U 0

ll V III II

1 i '

g 5

~

J

\

/PJ J'/A/VA M//:8/GAPJ EIECTRIC COMPAIV Y DONALD C. COOK NUCLEAR PLANT Instruction or Procedure Temporary Sheet TEMPORARY This temporary sheet applies to Activation and Operation of the OSA and SHEET NO.

Instruction or procedure No. Personnel Accountability PMP 2081 EPP .021 Revision No.

The following change ( X ) new requirement ( ) shall be 11-16-81 instituted effective (Date)

Add the following after 3.1.3.3:

Note: Roll call for accountability needgonly to be used in the event the computer is unavailable to perform accountability.

Reason: Roll call is used for back-up only. Accountability is normally performed by computer.

~1 J r

This change should be made a permanent revision to the Instruction or Procedure:

g YES aNO 0 NOT KNOWN, additional review required Procedure Revision Standard Dist. List No.:

Originator: Distribution:

ibhnagement Staff:

Senior Reac PNSRC Cate Rant Manager Form No. 4330 REVISED 717$ WHITE ORIGINAL CANARY ORIGINATOR COPY PINK WORKING COPY FORM iNO. PMI 201~ REV. 2