ML17320A230: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:DONALDC.COOKNUCLEARPLANT-UNXTSNO1AND2.ASMEB&PVCODESECTXONXIPUMPINSERVXCETESTPROGRAMA.ThepumptestprogramshallbeconductedinaccordancewithSubsectionIMPofSectionXIofthe1974EditionoftheASMEBoilerandPressureVesselCodethroughSummer1975Addenda,exceptforspecificreliefrequestedinaccordancewith10CFR50.55a(g)(5)(iii)whichisidentifiedinTableB.B.Theperiodforwhichthepumpinservice-testprogramisapplic-ableistheperiodbeginningDecember23,1978forUnit1(secondthird,firstinspectioninterval)andtheperiodbegin-ningJuly1,1978forUnit2(firstthird,firstinspectioninterval).Therevisiontotheprogram,.proposedhereinbytheCodeReliefRequest,dated11/30/82,shallbeimplementedonlyuponapprovalbytheNRC.C.Thepumptest,programwasdevelopedemployingtheclassificationguidelinescontainedin10CRF50.2(v)forQualityGroupAandRegulatoryGuide1.26,Revision2forQualityGroupsBandC.(QualityGroupAisthesameasASMEClassl.GroupBis2,andGroupCis3).UsingtheseguidelinesandIWP-1100,thepumplistattachedasTableAwasdeveloped.TableAidenti-fiesthefollowing:Thepumpnumberandserviceitperformsalongwiththedrawingidentificationnumberonwhichitisfound.Theapplicabletestparameters:2.3.SpeedInletPressureDifferentialPressureDeterminedasthedifferencebetweenmeasureddischargeandsuctionpressures4.FlowRate5.VibrationAmplitude6.Bearing-Temperatureiii.Thetest,frequencyrequired.Revision111/39828212100300821206PDRADOCK05000315PPDR
{{#Wiki_filter:DONALD C. COOK NUCLEAR PLANT  UNXTS NO        1 AND 2.
ASME B  & PV CODE SECTXON  XI PUMP INSERVXCE TEST PROGRAM A. The  pump  test  program  shall be conducted in accordance with Subsection    IMP  of Section XI of the 1974 Edition of the ASME Boiler and Pressure Vessel Code through Summer 1975 Addenda, except for specific relief requested in accordance with 10 CFR 50.55a(g)       (5) (iii) which is identified in Table B.
B. The period for which the pump inservice- test program is applic-able is the period beginning December 23, 1978 for Unit 1 (second third, first inspection interval) and the period begin-ning July 1, 1978 for Unit 2 (first third, first inspection interval) .
The revision to the program,. proposed herein by the Code Relief Request, dated 11/30/82, shall be implemented only upon approval by the NRC.
C. The    pump  test, program    was developed  employing the  classification guidelines contained in 10 CRF 50.2 (v) for Quality Group A and Regulatory Guide 1.26, Revision 2 for Quality Groups B and C.   (Quality Group A is the same as ASME Class l. Group B is 2, and  Group C is 3) . Using these guidelines and IWP-1100, the pump list attached as Table A was developed. Table A identi-fies the following:
The pump number and service drawing it identification number on performs along with the which  it is  found.
The  applicable test parameters:
Speed
: 2. Inlet Pressure
: 3. Differential Pressure Determined as the difference between measured discharge and suction pressures
: 4. Flow Rate
: 5. Vibration Amplitude
: 6. Bearing- Temperature iii. The  test, frequency required.
Revision  1 11/ 39 82 8212100300 821206 PDR ADOCK 05000315 P                PDR
 
)
)
DONALDC.COOKNUCLEARPLANT-UNXTSNO.1AND2TABLEA-PUMPINSERVICETESTPROGRAM~PROGRAMSUMMARYTESTPARtQIETERSPUMPSERVICEDWG.NO.AUXILIARYFEEDWATER(5106A)ESSENTIALSERVICEHATER(5113)CENTRIFUGCHARGING(5129)BORICACIDTRANSFER(5131)COMPONENTCOOLINGWATER(5135A)PUMPNUMBERPP-3HPP-3EPP-4PP-7WPP-7EPP-50WPP-50EPP61u-/PP-46-2'PP-46-3)ggPP-46-4JPP-10WPP-10ESPEEDNNONOYESNONONONONONONONONONO.INLETPRESSUREP~aYESYESYESYES(3)YES(3)YESYESYES(3)YES(3)YES(3)YES(3)YESYESDIFFERENTIALPRESSUREWPYESYESYESYESYESYESYESYESYESYESYESYESYESFLOWRATEQYES*YES*YES*YESYESNO**NO**NO*NO*NO*NO*YESYESVXBRATXONAMPLITUDEVYESYESYESYESYESYESYESYESYESYESYESYESYESBEARINGTEMPERATURETb(1)YESYESYESYESYESYESYESYESYESYESYESYESYESTEST'REQUENCY(1)(2)QUARTERLYQUARTERLYQUARTERLYQUARTERLYQUARTERLYQUARTERLYQUARTERLYQUARTERLYQUARTERLYQUARTERLYQUARTERLYQUARTERLYQUARTERLYRESIDUALHEATRE-MOVAL(5143)PP-35WPP-35ECONTAINMENTPP-9WSPRAYPP-9E(5144)SAFETYPP-26NXNJECTIONPP-26S(5142)NONONONONONOYESYESYESYESYESYESYESYESYESYESYESYESNO*+NO**YES*~YES*YES~YES*YESYESYESYESYESYESYESYESYESYESYESYESQUARTERLYQUARTERLYQUARTERLYQUAR'l~YQUARTERLYQUARTERLY(1)BearingTemperaturewillbemeasuredannually-pertheCode.(2)RefertoTABLEB.(3)InletPressureMeasurementisHeadofLiquid.*Pumpsaretestedonby-pass(test)loopssinceitisimpracticaltotestinregularcircuits-pertheCode.**Pumpsaretestedonrecirculation(minimumflow)pathstopreventunsafeoperatingconditions(impract-icaltoalignsystemforfullflowtest)-pertheCode.Revision111/30/82 4DONALDC.COOKNUCLEARPLANT-UNITSNO.1AND2TABLEB-PUMPINSERVXCETESTPROGRAMCODERELXEFREQUESTTestFrequencya~Requestthatfrequencyoftestingbechangedfrommonthlytoquarterlyforthefollowingpumps:*AuxiliaryFeedwaterPumpsCentrifugalChargingPumpsContainmentSprayPumpsResidualHeatRemovalPumpsSafetyInjectionPumpsTherequirement.ofthetestingofthepumpsatmonthlyintervalscausesunnecessaryoperationofsafeguardsequipmentwhichcouldbedetrimentaltotheavailability,operabilityandusefulservicelifeoftheequipment.b.Requestthatfrequencyoftestingbechangedfrommonthlytoquarterlyforthefollowingpumps:*BoricAcidTransferPumpsComponentCoolingWaterPumpsEssentialServiceWaterPumpsOneormoreofeachofthesepumpsaregenerallyinoperation.Howevertoprovideauniformtestpro-gram,thefrequencyoftestingshouldbethesameforallpumpsinvolvedintheprogram.*Note:Thisquarterlytestfrequencyisinaccordwiththe1980EditionofSectionXX,SubarticleXWP-3400.Revision011/30/82 1}}
DONALD C. COOK NUCLEAR PLANT    - UNXTS NO. 1 AND 2 TABLE A  - PUMP INSERVICE TEST PROGRAM
                                              ~ PROGRAM
 
==SUMMARY==
 
TEST PARtQIETERS PUMP                                  INLET          DIFFERENTIAL    FLOW  VXBRATXON      BEARING TEST'REQUENCY SERVICE      PUMP          SPEED    PRESSURE          PRESSURE        RATE  AMPLITUDE    TEMPERATURE DWG. NO. NUMBER            N          P ~
WP              Q        V          Tb    (1) (1)       (2) a AUXILIARY    PP-3H          NO          YES              YES          YES*    YES            YES    QUARTERLY FEEDWATER    PP-3E          NO          YES              YES          YES*    YES            YES    QUARTERLY (5106A)       PP-4          YES        YES              YES          YES*    YES            YES    QUARTERLY ESSENTIAL    PP-7W          NO          YES (3)         YES          YES      YES            YES    QUARTERLY SERVICE      PP-7E          NO          YES (3)         YES          YES     YES             YES   QUARTERLY HATER (5113)
CENTRIFUG    PP-50W        NO          YES             YES           NO**     YES            YES    QUARTERLY CHARGING      PP-50E        NO          YES              YES          NO**     YES            YES    QUARTERLY (5129)
BORIC ACID TRANSFER PP  6 PP-46-2 1  u-/  NO         YES (3)          YES          NO*
NO*
YES            YES    QUARTERLY NO         YES (3)          YES                    YES            YES    QUARTERLY (5131)       'PP-46-3)g g    NO          YES (3)         YES          NO*      YES            YES    QUARTERLY PP-46-4J      NO          YES (3)         YES          NO*      YES            YES    QUARTERLY COMPONENT    PP-10W        NO          YES              YES          YES      YES            YES    QUARTERLY COOLING      PP-10E        NO.        YES              YES          YES      YES            YES    QUARTERLY WATER (5135A)
SAFETY        PP-26N                    YES                            NO*+                            QUARTERLY NO                          YES                    YES            YES    QUARTERLY XNJECTION    PP-26S         NO          YES              YES          NO**    YES            YES    QUARTERLY (5142)
RESIDUAL      PP-35W        NO          YES              YES          YES*     YES            YES HEAT RE-      PP-35E        NO         YES              YES         ~
YES*     YES             YES   QUAR'l~Y MOVAL (5143)
CONTAINMENT PP-9W            NO          YES              YES          YES~    YES            YES    QUARTERLY SPRAY        PP-9E          NO          YES              YES          YES*    YES            YES    QUARTERLY (5144)
(1) Bearing Temperature    will  be measured annually  per the Code.
(2) Refer to  TABLE  B.
(3) Inlet Pressure Measurement is Head of Liquid.
  *Pumps are tested on by-pass (test) loops since Code.
it is impractical to test  in regular circuits  per    the
**Pumps are tested on recirculation (minimum flow) paths to prevent unsafe        operating conditions (impract-ical to align system for    full flow test) per the Code.
Revision  1 11/30/82
 
4 DONALD C. COOK NUCLEAR PLANT-UNITS NO. 1 AND 2 TABLE B  PUMP INSERVXCE TEST PROGRAM CODE RELXEF REQUEST Test Frequency a~       Request  that frequency of testing be changed from monthly to quarterly for the following pumps:*
Auxiliary Feedwater Pumps Centrifugal Charging Pumps Containment Spray Pumps Residual Heat Removal Pumps Safety Injection  Pumps The requirement. of the testing of the  pumps  at monthly intervals causes unnecessary operation of safeguards equipment which could be detrimental to the availability, operability and useful service life of the equipment.
: b.       Request that frequency of testing be changed from monthly to quarterly for the following pumps:*
Boric Acid Transfer Pumps Component Cooling Water Pumps Essential Service Water Pumps One or more of each of these pumps are generally in operation. However to provide a uniform test pro-gram, the frequency of testing should be the same for all pumps involved in the program.
  *Note:   This quarterly test frequency is in accord with the      1980 Edition of Section XX, Subarticle XWP-3400.
Revision  0    11/30/82
 
1}}

Latest revision as of 07:33, 29 October 2019

to Pump Inservice Test Program
ML17320A230
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/30/1982
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17320A229 List:
References
PROC-821130, NUDOCS 8212100300
Download: ML17320A230 (5)


Text

DONALD C. COOK NUCLEAR PLANT UNXTS NO 1 AND 2.

ASME B & PV CODE SECTXON XI PUMP INSERVXCE TEST PROGRAM A. The pump test program shall be conducted in accordance with Subsection IMP of Section XI of the 1974 Edition of the ASME Boiler and Pressure Vessel Code through Summer 1975 Addenda, except for specific relief requested in accordance with 10 CFR 50.55a(g) (5) (iii) which is identified in Table B.

B. The period for which the pump inservice- test program is applic-able is the period beginning December 23, 1978 for Unit 1 (second third, first inspection interval) and the period begin-ning July 1, 1978 for Unit 2 (first third, first inspection interval) .

The revision to the program,. proposed herein by the Code Relief Request, dated 11/30/82, shall be implemented only upon approval by the NRC.

C. The pump test, program was developed employing the classification guidelines contained in 10 CRF 50.2 (v) for Quality Group A and Regulatory Guide 1.26, Revision 2 for Quality Groups B and C. (Quality Group A is the same as ASME Class l. Group B is 2, and Group C is 3) . Using these guidelines and IWP-1100, the pump list attached as Table A was developed. Table A identi-fies the following:

The pump number and service drawing it identification number on performs along with the which it is found.

The applicable test parameters:

Speed

2. Inlet Pressure
3. Differential Pressure Determined as the difference between measured discharge and suction pressures
4. Flow Rate
5. Vibration Amplitude
6. Bearing- Temperature iii. The test, frequency required.

Revision 1 11/ 39 82 8212100300 821206 PDR ADOCK 05000315 P PDR

)

DONALD C. COOK NUCLEAR PLANT - UNXTS NO. 1 AND 2 TABLE A - PUMP INSERVICE TEST PROGRAM

~ PROGRAM

SUMMARY

TEST PARtQIETERS PUMP INLET DIFFERENTIAL FLOW VXBRATXON BEARING TEST'REQUENCY SERVICE PUMP SPEED PRESSURE PRESSURE RATE AMPLITUDE TEMPERATURE DWG. NO. NUMBER N P ~

WP Q V Tb (1) (1) (2) a AUXILIARY PP-3H NO YES YES YES* YES YES QUARTERLY FEEDWATER PP-3E NO YES YES YES* YES YES QUARTERLY (5106A) PP-4 YES YES YES YES* YES YES QUARTERLY ESSENTIAL PP-7W NO YES (3) YES YES YES YES QUARTERLY SERVICE PP-7E NO YES (3) YES YES YES YES QUARTERLY HATER (5113)

CENTRIFUG PP-50W NO YES YES NO** YES YES QUARTERLY CHARGING PP-50E NO YES YES NO** YES YES QUARTERLY (5129)

BORIC ACID TRANSFER PP 6 PP-46-2 1 u-/ NO YES (3) YES NO*

NO*

YES YES QUARTERLY NO YES (3) YES YES YES QUARTERLY (5131) 'PP-46-3)g g NO YES (3) YES NO* YES YES QUARTERLY PP-46-4J NO YES (3) YES NO* YES YES QUARTERLY COMPONENT PP-10W NO YES YES YES YES YES QUARTERLY COOLING PP-10E NO. YES YES YES YES YES QUARTERLY WATER (5135A)

SAFETY PP-26N YES NO*+ QUARTERLY NO YES YES YES QUARTERLY XNJECTION PP-26S NO YES YES NO** YES YES QUARTERLY (5142)

RESIDUAL PP-35W NO YES YES YES* YES YES HEAT RE- PP-35E NO YES YES ~

YES* YES YES QUAR'l~Y MOVAL (5143)

CONTAINMENT PP-9W NO YES YES YES~ YES YES QUARTERLY SPRAY PP-9E NO YES YES YES* YES YES QUARTERLY (5144)

(1) Bearing Temperature will be measured annually per the Code.

(2) Refer to TABLE B.

(3) Inlet Pressure Measurement is Head of Liquid.

  • Pumps are tested on by-pass (test) loops since Code.

it is impractical to test in regular circuits per the

    • Pumps are tested on recirculation (minimum flow) paths to prevent unsafe operating conditions (impract-ical to align system for full flow test) per the Code.

Revision 1 11/30/82

4 DONALD C. COOK NUCLEAR PLANT-UNITS NO. 1 AND 2 TABLE B PUMP INSERVXCE TEST PROGRAM CODE RELXEF REQUEST Test Frequency a~ Request that frequency of testing be changed from monthly to quarterly for the following pumps:*

Auxiliary Feedwater Pumps Centrifugal Charging Pumps Containment Spray Pumps Residual Heat Removal Pumps Safety Injection Pumps The requirement. of the testing of the pumps at monthly intervals causes unnecessary operation of safeguards equipment which could be detrimental to the availability, operability and useful service life of the equipment.

b. Request that frequency of testing be changed from monthly to quarterly for the following pumps:*

Boric Acid Transfer Pumps Component Cooling Water Pumps Essential Service Water Pumps One or more of each of these pumps are generally in operation. However to provide a uniform test pro-gram, the frequency of testing should be the same for all pumps involved in the program.

  • Note: This quarterly test frequency is in accord with the 1980 Edition of Section XX, Subarticle XWP-3400.

Revision 0 11/30/82

1