ML18051B046: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.. 9 .... ---='> consumers Power company General Offices: 1945 West Parnall Road, Jackson, Ml 49201 * (517) 788-0550 August 2, 1984 James G Keppler, Administrator Region III (;r& lIQ, l!' ILE ,OOIPX: US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 -LICENSE DPR-20 -PALISADES PLANT -INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS In accordance with the Palisades Plant Technical Specifications, ASME Code and 10 CFR 50.55, a summary, that includes Approval Sheet, Title Page, NIS-1 Form and Tables that give a summary of the results of the Inservice Inspection of PCP-PSOC is transmitted for your use. This report covers the examination period of December 16, 1983 to May 4, 1984. These examinations were performed after the beginning of the second inspection interval (November 10, 1983) and Consumers Power Company is therefore taking credit for them in the second interval.
{{#Wiki_filter:---1 9        *--~
Copies of the attached report are being transmitted to S J Miergwa Chief -Boiler Division, State of Michigan Department of Labor per ments of the ASME Code. Brian D Johnson Staff Licensing Engineer CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector  
                ..
-Palisades Attachment OC0884-0002A-NL02 AUG 6 1984 ---1}}
                ~
  .... ---='>
consumers Power company General Offices: 1945 West Parnall Road, Jackson, Ml 49201 * (517) 788-0550 August 2, 1984 James G Keppler, Administrator
(;r& lIQ, l!' ILE ,OOIPX:
                                                                                                                          ~
Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR                     PALISADES PLANT - INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS In accordance with the Palisades Plant Technical Specifications, ASME Code and 10 CFR 50.55, a summary, that includes Approval Sheet, Title Page, NIS-1 Form and Tables that give a summary of the results of the Inservice Inspection of PCP-PSOC is transmitted for your use. This report covers the examination period of December 16, 1983 to May 4, 1984. These examinations were performed after the beginning of the second inspection interval (November 10, 1983) and Consumers Power Company is therefore taking credit for them in the second interval. Copies of the attached report are being transmitted to S J Miergwa Chief - Boiler Division, State of Michigan Department of Labor per require-ments of the ASME Code.
Brian D Johnson Staff Licensing Engineer CC   Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palisades Attachment AUG  6 1984 OC0884-0002A-NL02}}

Revision as of 19:53, 21 October 2019

Forwards Summary of Primary Coolant Pump Inservice Insp Results for 831216-840504
ML18051B046
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/02/1984
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML18051B047 List:
References
NUDOCS 8408310161
Download: ML18051B046 (1)


Text

---1 9 *--~

..

~

.... ~ ---='>

consumers Power company General Offices: 1945 West Parnall Road, Jackson, Ml 49201 * (517) 788-0550 August 2, 1984 James G Keppler, Administrator

(;r& lIQ, l!' ILE ,OOIPX:

~

Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS In accordance with the Palisades Plant Technical Specifications, ASME Code and 10 CFR 50.55, a summary, that includes Approval Sheet, Title Page, NIS-1 Form and Tables that give a summary of the results of the Inservice Inspection of PCP-PSOC is transmitted for your use. This report covers the examination period of December 16, 1983 to May 4, 1984. These examinations were performed after the beginning of the second inspection interval (November 10, 1983) and Consumers Power Company is therefore taking credit for them in the second interval. Copies of the attached report are being transmitted to S J Miergwa Chief - Boiler Division, State of Michigan Department of Labor per require-ments of the ASME Code.

Brian D Johnson Staff Licensing Engineer CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palisades Attachment AUG 6 1984 OC0884-0002A-NL02