ML18051B048

From kanterella
Jump to navigation Jump to search
Inservice Insp Rept for 831216-840504.All Reportable Indications Re Primary Coolant Pumps Evaluated & Dispositioned to Accept as Is
ML18051B048
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/02/1984
From: Beach D, Esch H, Van Wagner B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18051B047 List:
References
NUDOCS 8408310165
Download: ML18051B048 (29)


Text

{{#Wiki_filter:.,,. Consumers Power Company Palisades Plant - Docket 50-255 INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS August 2, 1984

    ,- 940831ofbs     840002=---~,
    '
  • PDR ADOCK 0500025~

G PDR 8 Pages OC0884-0002B-NL02

INSERVICE lNSPECTION-0~ PC?-PSO-C PAI.ISADES NUCLE.\R POWER PLANT ISI RECORD OF EXi'\HINATION PERIOD 12/16/83 - 05/04/84 REVIEWS AND APPROVALS General Office Palisades Nuclear Power Plant Reviews Reviews z1r6 lf" 1.,fr"*:r 1,. l~cou/t

  • Prepared by (NPS Date 0roj Eng)

Date 1fa<'.LJL'! Date rfN/ll'v~ Pl~nt General Manager

                                                                                  -th.t?l~1 Date Approval                                             Approval

.Ml0484-0030B-NS03

PALISADES NUCLEAR PLANT INSERVICE INSPECTION OF PCP-P50-C Submitted in accordance with ASME Boiler and Pressure Vessel Code, Section XI, Article IWA-6000, 1977 Edition with Addenda through Summer, 1978 for components. 1977 Edition, Winter 1978 Addenda for component supports.

1) Date: July 19, 1984
2) Corporate Headquarters: Consumers Power Company 212 W Michigan Ave Jackson, MI 49201
3) Plant: Palisades Nuclear Power Plant Route 2, Box 154 Covert, MI 49043
4) Unit No: 1
5) Commercial Service Date: December 31, 1971
6) Gross Generating Capacity: 830 Mw electric 2400 Mw thermal 7,8,9,10) See attached table and the remainder of the ISI Report
11) Completion Date for Inspections: May 4, 1984
12) Code Inspector(s): Derald C Young Ed Resell Ian Wright
13) Authorized Inspection Agency: Protection Mutual, Norwood, MA
14) Abstract: See ISI Report MI0384-0028B-NS03
                                                                            ~-**

Item 7, 8, 9, 10 MAJOR COMPONENTS INSPECTED TABLE Manufacturer State Assigned National Board

  • Components or Appurtenance Manufacturer Serial No No No PCP-P50-C Byron-Jackson 0766 N/A N/A r
-U0484-0030B-NS03 i;

PALISADES NUCLEAR POWER PLANT Inservice Inspection of PCP-PSOC The Inservice Inspection of PCP-PSOC was conducted during the period of December 16, 1983 through May 4, 1984. Inspections were conducted in accordance with the Palisades Plant Technical Specification, Section 4.3. The ASME Specification is as follows: Section XI 1977 Edition Summer 1978 Addenda for Components, 1977 Edition Winter 1978 Addenda for Components Supports. The NDT examinations were performed using magnetic particle (MP), manual ultrasonic (UT), and visual (VT), and liquid penetrant (PT) techniques. Indications were recorded in compliance with applicable procedures; reportable indications which were judged by the examination agencies to be relevant wen:! documented and transmitted to CPCo, Nuclear Plant Support personnel for evaluation. NPS evaluated all reportabie indications and dispositioncd these by "accepting as is". The examination agency which was utilized in on-site NDT-ISI activities was CPCo System Protection and Laboratory Services (SP&LS). Inspection personnel were qualified in accordance with the requirements set forth by IWA-2300, Section XI of ASME B&PV code. All records of procedures, personnel and equipment certifications, examination data and dispositions of all reportable indications are on file at the Palisades Nuclear Plant and also in the General Office, 1945 W Parnall Rd, Jackson, Michigan. MI0684-0001A-NS03

Page 1 of 1 TABLE 1 Resolution of Reportable Indications Examination Condition Reporting Component Methods Reported Mechanism Disposition Re-inspection Primary Coolant Pump P50-C '(Pump Casing) PT,VT Linear DN//DMZ 122383-1 Accept as N/A Indications DR{/D-PAL-83-398 is.*

  • All indicati~ns noted are in.the diffuser vanes, far removed from the pressure boundary surface of the casing and therefore do not challenge the integrity of *the pressure boundary. The increasing section thickness of the vanes greatly reduces the likelihood of these indications propagating to the pressure retaining surface.

For further information on this refer to DR#D-PAL-83-398. MI0684-0001A-NS03

Page 1 of 1 TABLE 2 Summary of Areas Examined and Results Final ASME Section XI ASME Section XI Exam Component Examination Item No. Category No. Methods Identification Results B6 *. 190 B-G-1 MT,UT 2A-1BT-S-l 1 thru 16, Pump Closure Studs Acceptable B6.190 B-G-1 MT 2A-1BT-N-l 1 thru 16, Pump Closure Nuts Acceptable B6.200 B-G..:.l VT-1 2A-1BT-S-l 1 thru 16, Pump Closure Studs Acceptable B6.200 B-G-1 VT-1 2A-1BT-N-l 1 thru 16, Pump Closure Nuts Acceptable B6~200 B-G-1 VT-1 Ligaments Acceptable Bl2.20 B-1-2* VT-1,PT 2A-C, Pump Casing Acceptable ~I0684-0001A-NS03

FOAS-1 OWNER'S REPORT FOR INSERVICE.PECTIONS As required by the Provisions of the ASME Code Rules I Consume.rs Power Company, 212 W Michican Ave, J.ackson, MI !19201

1. Owner _ _ __

(Name and Addrcs~ of Owner) Palisades Nuclear Plant, Route 2, _Box 154,

2. Plant ____________________________ Covert, MI 49043 (Nam*: and Address of Plant)
3. Plant Unit _ _ _ _ 1 _ _ _ _ _ _ 4. Owner Certificate of Authorization (if required) _ _ N/A
5. Commercial Service Date 12 /3l/7l 6. N.itior.al Board Number for Unit _N_B_2_0_8_2_7_________
7. Components Inspected Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No.

PCP-P50-C Byron-Jackson 0766 N/A N/A Note: Supplcmrnt:il sheets in form of lists, sketches, or drawings may be used, provided (I) size is 8\li in. x 11 in., {2) informalillll in .it.::111s I through 6 011 this.report is included on each sheet, and (3) each sheet is numbned and the number of sheets is recorded at the top of this form. (12/82) This Form (E00029) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, N.Y. 10017

  • FORM NIS-1 (Back) 12/16/83
8. Examination o'ates _ _ _ _ _ _ c o _ _ _ _

05/04/84 _ 9. . lnspecnon Interval from 11/10/83 co _____ 11/10/93 _

10. Abstract of Examinations. Include a list of examinaciom. and a statement concerning status of work requircJ for current interval.

See ISI Report, Table 2

11. Abstract of Conditions Noted See ISI Heport, 'rn.ble 1
12. Absrr:1cr of Corrective Measures Recommended and Tak1:n See ISI Hepor t, Table 1 We certify th:tt the statements made in this fl'{lort arc correct and the examinations and corrective 111c;,i-surcs takc*r. conforn: tu the 1-,u~s of the AS1'.1E Code, Scctic*n :\I. 1977 Edi ti on, Summer 78. Addenda .!:'er Compon: :nt3, lhr1tt~1* (o Addenda for CompoW~Rt Supports 0

Certificate of Autliori1.ation No. (if applicable) l I____ Expiration Date N/ A Date_ -*--J:.d.~;-L<;f_ ____ 19 _&"'L_s;gncd Consumers Power Co By z1W //. L(vn ifl<<L_ 0 (f 1 Owner CERTIFICATE OF INS:ERVICE INSPECTION I, the t111L!ersi~;ncd, holding a valid con!mis~ion issued by the N .* tional Board of ~oile{ antPresst}nc Yes~~! Insp~ctor:: and the State or l'ro\incc of Micln3an :rnd employell bylro e~ .LOn _ -~'tuu.._

  • of

_t_'~-..,.--~-'----------havc inspected the components described in this Owner's Reporturir."g the oerind N)r*oo'l. Ml\ nsw ""nee DJJ.dtanv  ! _J_?./J.C>/J) ___ to __Q_'i.LOli.J_ll) , and sta*te that to the best of my knowledge and belief, the Owner  ! has performed examinations and taken corrective measurt"s described in this Owner's Report in accordance with the rcquirc*ments of the i\S~lE Code, Section XI. Ily signing this cntit'ieatc neither the Inspector nor his employer makes any warranty, expressed or implied. concerning the cxarnin:itions and corrective measures dc:;cribcd in this Owner's Report. Furthermore, neither the Inspcctor nor his employ..:r shall be liable in any manner for any personal injury or property damage or a loss of any

*kind arising from or connected with this inspection.                                                           .
. J,\           ! t        ) I                    .                                                      ft_
 -~J.~'iJ~,(__(:__ __ ~//i-<_:1_~fL__commissions J)_,8
  • 7 S-{ o 1111 *c.. '-{It __

lnspcctor'!-/Signat1J~-- National Board, State, Province, and Endorsem<::nts Date -~L~1J_~----- 19 VL(_ (12/82)

consumers Power company [TC OI DRMA FILE General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-0550 August 2, 1984 James G Keppler, Administrator Region Ill US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS In accordance with the Palisades Plant Technical Specifications, ASME Code and 10 CFR 50.55, a summary, that includes Approval Sheet, Title Page, NIS-1 Form and Tables that give a summary of the results ot the Inservice Inspection of PCP-P50C is transmitted for your use. This report covers the examination period of December 16, 1983 to May 4, 1984. These examinations were performed after the beginning of the second inspection interval (November 10, 1983) and Consumers Power Company is therefore taking credit tor them in the second interval. Copies of the attached report are being transmitted to S J Miergwa Chief - Boiler Division, State of Michigan Department of Labor per require-ments of the ASME Code. Brian D Johnson (Signed) Brian D Johnson Staff Licensing Engineer CC Director, Office ot Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palisades Attachment OC0884-0002-NL02

Consumers Power Company Palisades Plant - Docket 50-255 INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS August 2, 1984 8 Pages OC0884-0002B-NL02

INSERVICE INSPECTION-OF PC?-PSO-C PAJ.ISADES NUCLE.\::l POWER PI.ANT ISI RECORD OF EXl\HINATION PERIOD 12/16/83 - 05/04/84 REVIEWS AND APPROVALS Palisades Nuclear Power *Plant General Off ice Reviews Reviews

zJ,,._(A l( I .fr::** ( 1.~r/!t11\ 7/1q/-;~1 7 ,?<i.~l1*
                                                                                                           ----- .;..;l-  ...

Prepared by (NPS Vroj Eng) ~ Late a/1~)

  • __,4:~*;,-~ ~; ~;
                                                                                                            .., / , ' /" ._r f   Ii\-: ... *~. /~-- - * - * - * - .)     ,/    '~ "- '*.' .
  • Da r.e Prant3c-,.:1mical Supt Date
                                                           . C~------        ..

7/~o/Ji.( rf!Nlr_i'\~.

                                                 'Dat'e             Plant Cericral Manager
                                                                                                          *1
                                                                                                          . Date h.i:,/~1 Approval                                                       Approval U~""':_' !L, L Director. NPS

.Ml0484-0030B-NS03

PALISADF.S NUCLEAR PLANT INSERVICE INSPECTION OF PCP-P50-C Submitted in accordance with ASME Boiler and Pressure Vessel Code, Section XI, Article IWA-6000, 1977 Edition with Addenda through_ Summer, 1978 for components. 1977 Edition, Winter 1978 Addenda for component supports.

1) Date: July 19, 1984
2) Corporate Headquarters: Consumers Power Company 212 W Michigan Ave Jackson, MI 49201 . I
3) Plant: Palisades Nuclear Power Plant Route 2, Box 154 Covert, MI 49043
4) Unit No: 1
5) Conunercial Service Date: December 31, 1971
6) Gross Generating Capacity: 830 Mw electric 2400 Mw thermal 7,8,9,10) See attached table and the remainder of the ISI Report
11) Completion Date for Inspections: May 4, 1984
12) Code Inspector(s): Derald C Young Ed Resell Ian Wright
13) Authorized Inspection Agency: Protection Mutual, Norwood, MA
14) Abstract: See ISI Report Ml0384-0028B-NS03

Item 7, 8, 9, 10 MAJOR COMPONENTS INSPECTED TABLE Manufacturer State Assigned National Board

  • Components or Appurtenance Manufacturer Serial No No No PCP-P50-C Byron-Jackson 0766 N/A N/A

~I0484-0030B-NS03

PALISADES NUCLEAR POWER PLANT Inservicc Inspection of PCP-P50C The Inservicc Inspection of PCP-PSOC was conducted during the period of December 16, 1983 through May 4, 1984. Inspections were conducted in accordance with the Palisades Plant Technical Specification, Section 4.3. The ASME Specification is as follows: Section XI 1977 Edition Summer 1978 Addenda for Components, 1977 Edition Winter 1978 Addenda for Components Supports. The NDT exaQinations were performed using magnetic particle (MP), manual ultrasonic (UT), and visual (VT), and liquid penetrant (PT) techniques. Indications were recorded in coQpliance with applicable procedures; reportable indications which were judged by the examination agencies to be relevant were documented and transmitted to CPCo, Nuclear Plant Support personnel for evaluation. NPS evaluated all reportable indications and dispositioncd these by "accepting as is". The examination agency which was utilized in on-site NDT-ISI activities was CPCo Syst~m Protection and Laboratory Services (SP&LS). Inspection personnel were qualified in accordance with the requirements set forth by IWA-2300, Section XI of ASME B&PV code. All records of procedvres, personnel and equipment certifications, examination data and dispositions of all reportable indications are on file at the Palisades Nuclear Plant and also in the General Office, 1945 W Parnall Rd, Jackson, Michigan. MI0684-0001A-NS03

Page 1 of 1 TABLE 1 Resolution of Reportable Indications Examination Condition Reporting Component Methods Reported Mechanism* Disposition Re-inspection Primary Coolant Pump P50-C *(Pump Casing) . PT, VT Linear DN/IDMZ 122383-1 Accept as N/A Indications DR{ID-PAL-83-398 is~*

  • All indicati<?ns noted.are in.the diffuser vanes, far removed from the pressure* boundary surfa~e of the casing and therefore do not challenge the integrity of the pressure boundary. The increasing section thickness of the vanes greatly reduces the likelihood of these indications propagating to the pressure retaining surface.

For further information on this refer to DR#D-PAL-83-398. MI0684-0001A-NS03

Page 1 of 1 TABLE 2 Summary of Areas Examined and Results ASME Section XI Item No. Il6." 190 ASME Section XI Category No. B-G-1 Exam Methods MT,UT Component Identification 2A-1BT-S-l Final Examination Results 1 thru 16, Pump Closure Studs Acceptable B6.190 B-G-1 MT 2A-1BT-N.:..l 1 thru 16, Pump Closure Nuts Acceptable B6.200 B-G,;.l VT-1 2A-1BT-'S-l 1 thru 16, Pump Closure Studs Acceptable B6.200 B-G-1 VT-1 2A-1BT-N-l 1 thru 16, Pump Closure Nuts Acceptable B6~200 B-G-1 VT-1 Ligaments Acceptable B12.20 B-L-2 VT-1,PT 2A-C, Pump Casing Acceptable

:1:j684-ooo lA-;;soJ

I 9* A FORM NIS-1 OWNER'!i REPORT FOR INSERVIC~SPECTIONS As required by the l'n>visions of the ASME Code Rules Consumers Power Comrany, 212 W Michican Ave, Jackson, MI 4~201

1. Owner _ _ __

(!',jame anJ AJJres.~ of Owner)

2. Plant Palisades Nuclear Plruit, Route 2, Box 154, Covert, MI 49043 (Nam*: and Address of Plant)
3. Plant Unit 1 N/A
                          - - - - - - 4. Owner Certificate of Authorization (if required)_.- - - - - - - - -

S. Commercial Service Date 12 /3l/7l 6. Nitior.al Board Number for Unit __N_B_2_0_8_2_7________

7. Components Inspected Manufacturer Component or Manufacturer* or Installer State or National Appurtenance or Installer Serial No. Province No. Board No.

PCP-P50-C Byron-Jackson

                                                      -             0766                    N/A                 N/A Note: Suppkllll'nlJI shccts in form of lists, sketches, or drawings may be used, provided (I) size is Sliz in. x 11 in.,

(2) i11formatllln in .itcms I through 6 on this.rl*port is indudl'U on each sht:cl, and (3) ead1 sheet is numbl*red and thl' number of shl'l'ts is recorded at the top of this form. (12/t12l This Form (E00029) may be ol>tain<?d from the Order Dept,. ASME, 345 E. 47th St., New*York, N.Y. 10017

FORM NIS-1 (B:ick) 12/16/83 05/04/84 11/10/83 11/10/93

8. Examination o':itcs - - - - - - t o _ _ _ _ _ 9. Inspection Interval from to
10. A!Jsr-racc of Examinations. Include a list of examinatiom and a statement concerning status of work requircJ for l"urrcnt intcrv:il.

See ISI Report, Table 2

11. Abstract of Con.litions Noted See ISI Peport, 'rable 1
12. Absrr:ict of Corrective Measures Recommended anJ 1'ak.~n See ISI I\cport, Table 1 We certify t!::1t the statements made in this rL'Jlc>rl arc correct and the examinations and corrective ni.:J-surcs tJ!:,*r. confor;:: t-i tlil' ru1.l;*s of th.: :\S~!E Code. Scctir.n XI. 1977 Edition, Sum.TJler 78 Addenda .:~c:*

Cornp.'.)r!":n-::.s, Hi!1t,0>:* *10 Adden(ta for ComJJo~e~t Supports Certifi,:atc of Authorization No. (if applicable) *I.!....___ Expiration Date N/ A Date.-*-- ~!.:.l~f-L~f--- l9 .d'L s;gned Consumers Power Co By z3;tl V'. IA'in /,,7""-'\_ (/ (f Owner CERTIFICATE OF IN SERVICE INSPECTION I, the tinckrsi~:nl'd. lwlding a valid co!1!mis~ion issued by be N 1tional Board of Boile,r and J'resst)~<; V,e,~~l Insp-:!.:tor~

             ' s._t 2tc ~~t-I!'()\
                                '*             f      1'*J1cl11cr"n                     d         db.Protec-c.J..on ... 1.rc~~-                  .

a1~ d _t:i;_ 111.::i.: o ~c.. *in emp 1oye YIlr::, Ul 2.llc e C:'J,:, ~'C.!l , o! No.i '~~~'..:.'....~ -' 1 h~vc impcctcd the components described Ill this Owner's H.eport durir{g the t:'er;;,,i _J.? / J0_i.).l______ to_05.lQlVJ.l),_____ , and sta:L' that to the best of my knowledge and belief. the o . . nc; has performed exa:11in:;i inns :ind taken com:ctive me::isuft's d,:scribed in this Owner's Report in accordance with i:*,c requir,*1ncl!ts of !ht: ;\:~:in: Code, Section XI. Ily si'.:ning this l*ntifiL':.:k neither the Inspector nor t..is employer makes any warranty, expressed or imp!kcl. conc<*rnini; the: cxai11i11:1lions and corrective measures dc:;cribcd in this Owner's Report. Furthermore, neither 1)1..: Insprct"r nor his cmployi.:r shall be li:ihle in any manner for any personal injury or property damage or a loss of any kind ari~ing from or co:im*ctcd with this inspection. _§JJ:-:. dLC:__ L// *'1-~V_ _ Insprc!or\ 1 Sig11:1t1J~-- commissions ).)_.[]

  • 7r { o 1111.c.lt. '-{I c _

National Board, State, Province, and Endorsemo::nts

   . Date     _'J._::__'J._J_-:_ ____ 19 _t!:{_

(12/82)

~- e ett0-t~ consumers Power PAO company SGA EIC DRMJ.\ General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-0550 August 2, 1984 . James G Keppler, Administrator Region Ill US Nuclear Regulatory Connnission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS In accordance with the Palisades Plant Technical Specifications, ASME Code and 10 CFR 50.55, a summary, that includes Approval Sheet, Title Page, NIS-1 Form and Tables that give a summary of the results ot the Inservice Inspection of PCP-J:>50C is transmitted for your use. This report covers the examination period of December 16, 1983 to May 4, 1984. ~hese examinations were performed after the beginning of the second inspection interval (November 10, 1983) and Consumers Power Company is therefore taking credit tor them in the second interval. Copies of the attached report are being transmitted to S J Miergwa Chief - Boiler Division, State of Michigan Department of Labor per require-ments of the ASME Code. Brian D Johnson (Signed) Brian D Johnson Staff Licensing Engineer CC Director, Office ot Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palisades Attachment

                                                                                       . l OC0884-0002-NL02

Consumers Power Company Palisades Plant - Docket 50-255 INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS August 2, 1984 8 Pages OC0884-0002B-NL02

INSERVICE INSPECTION-OF PC?-P50-C PAI.lSADES NUCLL\:Z POWER PLANT ISI RECORD OF EXAMINATION PERIOD 12/16/83 - 05/04/84 REVIEWS AND APPROVALS Palisades Nuclear Pcwer Plant General Off ice Reviews Reviews Late

                                                       ,,_.;.r-:::,-...
                                               ~///'.,o'j )                           .--/,.
                                              !' I'~*-* , .I            -*-*- -          I        , /**-r I  J ..

I . . --

"'<~----- ~--* *;, I , .,. - *.

Prant '1cdmical Supt Date c~;> -- 1/o":/N 1

                                   'Dat e rf!N./r_~'vs-~

Plant General Manager 1 l1..i:1l ~1 Date Approval Approval ew\V\,0,.~ /'l--i. I &_J~'1 c j . ~0-l( *H t,.1- i Director, NPS r1<.L Plant General Manager 7 Date

.Ml0484-0030B-NS03

PALISADF.S NUCLEAR PLANT. INSERVICE INSPECTION OF PCP-PSO-C Submitted in accordance with ASM~ Boiler and Pressure Vessel Code, Section XI, Article IWA-6000, 1977 Edition with Addenda through Summer, 1978 for components. 1977 Edition, Winter 1978 Addenda for component supports.

1) Date: July 19, 1984
2) torporate Headquarters: Consumers Power Company 212 W Michigan Ave Jackson, MI 49201
3) Plant: Palisades Nuclear Power Plant Route 2, Box 154 Covert, MI 49043
4) Unit No: 1
5) Conunercial Service Date: December 31, 1971
6) Gross Generating Capacity: 830 Mw electric 2400 Mw thermal 7,8,9,10) See attached table and the remainder of the IS! Report
11) Completion Date for Inspections: May 4, 1984
12) Code Inspector(s): Derald C Young Ed Resell Ian Wright
13) Authorized Inspection Agency: Protection Mutual, Norwood, MA
14) Abstract: See !SI Report MI0384-0028B-NS03
                                                                                               ... ~

Item 7, 8, 9, 10 MAJOR COMPONENTS INSPECTED TABLE Manufacturer State Assigned National Board

  • Components or Appurtenance Manufacturer Serial No No No PCP-P50-C Byron-Jackson 0766 N/A N/A

~I0484-00JOB-NS03

PALISADES NUCLEAR POWER PLANT Inservicc Inspection of PCP-PSOC The Inservicc Inspection of PCP-PSOC was conducted during the period of December 16, 1983 through May 4, 1984. Inspections were conducted in

  • accordance with the Palisades Plani Technical Specification, Section 4.3. The ASME Specification is as follows: Section XI 1977 Edition Summer 1978 Addenda for Components, 1977 Edition Winter 1978 Addenda for Components Supports.

The NDT exDninations were performed using magnetic particle (MP), manual ultrasonic (UT), and visual (VT), and liquid penetrant (PT) techniques. Indications were recorded. in compliance with applicable procedures; reportable indications which were judged by the examination agencies to be relevant were documented and transmitted to CPCo. Nuclear Plant Support personnel for evaluation. NPS evaluated all reportable indications and dispositioncd thes~ by "accepting as is". The examination agency which was utilized in on-site NDT-ISI activities was CPCo System Protection and Laboratory Services (SP&LS). Inspection personnel were qualified in accordance with the requirements set forth by IWA-2300, Section XI of ASME B&PV code. All records of procedures, personnel and equipment certifications, examination data and dispositions 6£ all reportable indications are on file at the Palisades Nuclear Plant and also in the General Office, 1945 W Parnall.Rd, Jackson, Michigan. MI0684-0001A-NS03

Page 1 of 1 TABLE 1 Resolution of Reportable Indications Examination Condition Reporting Component Methods Reported Mechanism Disposition Re-inspection Primary Coolant Pump P50-C '(Pump Casing) PT,VT Linear DN//DMZ 122383-1 Accept as N/A Indications DR/ID-PAL-83-398 is.*

  • All indicati~ns noted are in.the diffuser vanes; far removed from the pressure boundary surface of the casing and therefore do not challenge the integrity of the pressure boundary. The increasing section thickness of the vanes greatly reduces the likelihood of these indications propagating to the pressure retaining surface.

For further information on this refer to DR#D-PAL-83-398. MI0684-0001A-NS03

Page 1 of 1 TABLE 2 Summary of Areas Examined and Results ASME Section XI Item No. ASME Section XI Category No. Exam Methods Component Identification Final Examination Results Il6.190 B-G-1 MT,UT 2A-1BT-S-l 1 thru 16, Pump Closure Stud~ Acceptable B6.190 B-G-1 MT 2A-1BT-N;_l 1 thru 16, Pump Closure Nuts Acceptable B6.200 B-G..:..1 VT-1 2A-1BT-S-l 1 thru 16, Pump Closure Studs Acceptable B6.200 B-G-1 VT-1 2A-1BT-N-1 1 thru . 16. Pump Closure Nuts Acceptable B6~200 B-G-1 VT-1 Ligaments Acceptable Bl2.20 B-L-2 VT-I ,PT 2A-C, Pump Casing Acceptable

:1:jG84-ooo 11i-;;soJ

FOR!llS-1 OWNER'!) REPORT FOR INSERVICISPECTIONS As required by the Provisions of the ASME Code Rules Consumers Power Company, 212 W Michican Ave, Jackson, MI 4~201

1. Owner _ _ __

(!'Jame and AJJress of Owner)

2. Plant Palisades Nuclear Plant, Route 2, Box 154, Covert, MI 49043 (Nam*: and Address of Plane)
3. Plant Unit 1 _ _ _ _ _ _ 4. Owner Certificate of Authorization (if required) _________

_ N/A _ S. Commercial Service Date 12 /3l/7l 6. Nuior.al Board Number for Unit _N_B_2_0_8_2_7________

7. Components Inspected Manufacturer Component or Manufacturer or Installer State or National Appurtenance o*r Inst all er Serial No. Province No. Board No.

PCP-P50-C Byron-Jackson

                                                               -                0766                     N/A                 N/A Noll*: Suppkml*ntal sheets in form of lists, sketches, or drawings may bi: used, provided (I) size is 8!/z in. x 11 in.,

(.:?) i11for111a11,111 i11.itc111s I throul~h 6 011 this.rl*port is i11d11di:c..I on each shl*ct, and (3) cad1 shi:i:t is numbl*rcd and thl' numha of shl'l'ls is rci.:onlcd at thl' top of this form. ( 12/tl2) This Form (E00029) mav be obtainC?d from the Order OC?r>t., ASME, 345 E, 47th St., New York, N.Y. 10017

.~ ' '

  • FORM NIS* I (l!Jck) l 12/16/83
8. Examin:Hion o'ates - - - - - - t o _ _ _ _

0'-J/04/81.i _ 9. . Inspection Interval from 11/10/83 to 11/10/:13

10. Absr-ract of Examinations. Include a list of examinatiom and a statement concerning status of work requircJ for current intcrv:i.I.

See lSI Report, Table 2

11. Abstract of Conditions Noted See ISI Heport, Table 1
12. Absrr:1cr of Corrective Measures Recommended and Tak1:n See ISI Hcpor t, Table 1 We certify t!::it till' statements m:ide in this f*'P<Hl are correct and the examinations and corrective lllc'J-surcs t~kt*r. confor;1: t.i th*' r.u~*s of. tJ1c :\S:\lli Code. Scctic n \I. 1977 Edi ti on, Sum_rner 78 Addenda ;,c~*

Cornp:)n,:n"~::>, 'd1~1t<~~* 10 Anaencm !or Com}Jo~~~t Supports Ccrtifi,*atc: of Authori1.ation No. (if applicable) *I 1 Expiration Date N/ A Date . *-*-->'-dr--L~f--- 19 _<f'L s;gn<d Consumers Power Co By z"W v. j,,(t17 /,,/?!L'(_ J ~ Owncr CERTIFICATE OF INS:ERVICE INSPECTION I, the unckrsi~:nl'd. lwlding :i valid co!1!111is~ion issued by t:1e N itional Board of B~ile.r and J'resst~~i; V,i.:'.).2d Insp~.:tor>

                ' ..c: tat*~ or I' r<n111.::c anu.* t11c*                    .      of          I*Jlc*l1io-"n i..;o"'

d I

                                                                                          '!O emp oye db y P, otec"G.1..on _._J:t~"'-           o!.

Ny**---'< 1..... hI::;U12..aCe CD .. ,~c..l'

        ~'~::'.._'='.:.'.._? '"'                        h~vc inspected the components described m this Owner's H.eport durir.'g th~ t:'er;,,_i J?/Jf-,/*'?                            n::!r.J./Ol
        -:~ _l'.J~.LL.____ _____ to _ _;-2..L.J..l.:i..--il'
                                                                            , and sta:c that to the best of my knowledge and belief, the o . " n::.-~

has pcrfo;*med ex~:11in;iiions :ind taken corn:ctive measurl's d.:scribed in this Owner's Report in accordance with i;-,.: requir,*111.:l!ts of the ;\,.;\!E Code, Section XI. Ily si~:nin!; this vntific*;;r,* neitlwr the Inspector nor !:.is employer makes any warranty, expressed or implied. conc,*rnini; the cxarni11:1tions anJ corr.:i.:tin: measures dc:;cribcd in this Owner's Report. Furthermore, neither th.: lnspl'.:t1*r nor his employc:r shall be liahle in any manner for any personal injury or property damage or a Joss of any kind ari>ing from or cu:im*rtcd with this inspection. fJJ:*.~dLC:__ LJ~~ **.!~V_ _ lnsper!or'!-/Sign:itiJ~-- commissions

                                                                                       )J__B
  • 7r { o 1n, *c.tt. 41 c National Board, St:ite, Province, and Endorsements
       -Date    _'J._:_JJ_-:___ .__ 19 bJ_

(12/82)}}