{{#Wiki_filter:ust 28, 2018
[[Issue date::August 28, 2018]]


Mr. Scott Sharp Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089
==SUBJECT:==
-9642
UPDATED INSPECTION PLAN FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 (REPORT 05000282/2018005 and 05000286/2018005)


SUBJECT: UPDATED INSPECTION PLAN FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 (REPORT 05000 282/2018005 and 05000286/2018005)
==Dear Mr. Sharp:==
Dear Mr. Sharp
The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for the Prairie Island Nuclear Generating Plant, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
: The enclosed inspection plan lists the inspections scheduled through June 30 , 20 20 , for the Prairie Island Nuclear Generating Plant, Units 1 and The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the last twelve months of the inspection plan are tentative and may be revise The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change As we had previously notified you, the biennial Problem Identification and Resolution inspection originally scheduled to begin on June 25, 2018, was going to be reschedule Although the exact dates of the inspection have not yet been selected, this inspection will be completed by December 31, 201 We will notify your staff once the dates for this inspection have been finalize S. Sharp - 2 - This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading
-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."


Please contact me at 630-829-9628 with any questions you have regarding this lette
As we had previously notified you, the biennial Problem Identification and Resolution inspection originally scheduled to begin on June 25, 2018, was going to be rescheduled. Although the exact dates of the inspection have not yet been selected, this inspection will be completed by December 31, 2019. We will notify your staff once the dates for this inspection have been finalized. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely,/RA/ Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket No ; 50-306 License No DPR-42; DPR-60
Please contact me at 630-829-9628 with any questions you have regarding this letter.


===Enclosure:===
Sincerely,
/RA/
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60 Enclosure:
Inspection Plan cc: Distribution via LISTSERV
Inspection Plan cc: Distribution via LISTSERV
}}
}}

Latest revision as of 15:50, 20 October 2019

Updated Inspection Plan for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2018005 and 05000286/2018005)
ML18240A381
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/28/2018
From: Kenneth Riemer
NRC/RGN-III
To: Sharp S
Nuclear Management Co
References
IR 2018005
Download: ML18240A381 (6)


Text

ust 28, 2018

SUBJECT:

UPDATED INSPECTION PLAN FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 (REPORT 05000282/2018005 and 05000286/2018005)

Dear Mr. Sharp:

The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for the Prairie Island Nuclear Generating Plant, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

As we had previously notified you, the biennial Problem Identification and Resolution inspection originally scheduled to begin on June 25, 2018, was going to be rescheduled. Although the exact dates of the inspection have not yet been selected, this inspection will be completed by December 31, 2019. We will notify your staff once the dates for this inspection have been finalized. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at 630-829-9628 with any questions you have regarding this letter.

Sincerely,

/RA/

Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60 Enclosure:

Inspection Plan cc: Distribution via LISTSERV