{{#Wiki_filter:March 4, 2019
{{#Wiki_filter:rch 4, 2019


==SUBJECT:==
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000 445/2018 00 6 AND 05000 446/2018 00 6)
ANNUAL ASSESSMENT LETTER FOR COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000445/2018006 AND 05000446/2018006)


==Dear Mr. Peters:==
==Dear Mr. Peters:==
T he U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Comanche Peak Nuclear Power Plant, Units 1 and 2
The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Comanche Peak Nuclear Power Plant, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2018, through December 31, 2018. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
, reviewing performance indicators (PIs)
, inspection results
, and enforcement actions from January 1, 20 18 , through December 31, 20 18. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.


The NRC determined the performance at Comanche Peak Nuclear Power Plant, Units 1 and 2 , during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC
The NRC determined the performance at Comanche Peak Nuclear Power Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
's Reactor Oversight Process (ROP) Action Matrix
, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.


The enclosed inspection plan lists the inspections scheduled through December 31
The enclosed inspection plan lists the inspections scheduled through December 31, 2020.
, 20 20. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency has proposed changes regarding engineering inspections (SECY-18-0113, "Recommendations for Modifying the Reactor Oversight Process Engineering Inspections") and is drafting proposed changes to the ROP for Commission consideration. Should the Commission approve changes to the ROP, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC
 
's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency has proposed changes regarding engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections) and is drafting proposed changes to the ROP for Commission consideration. Should the Commission approve changes to the ROP, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Please contact me at (817) 200-1148 with any questions you have regarding this letter.
Please contact me at (817) 200-1148 with any questions you have regarding this letter.


Sincerely,
Sincerely,
/RA/ Mark S. Haire, Chief Project Branch A Division of Reactor Projects Dockets: 50-445 and 50-446 Licenses:
/RA/
NPF-87 and NPF-89 Enclosure:
Mark S. Haire, Chief Project Branch A Division of Reactor Projects Dockets: 50-445 and 50-446 Licenses: NPF-87 and NPF-89 Enclosure:
Inspection Plan
Inspection Plan


Comanche Peak
IP 22 Inspection Activity Plan Report Comanche Peak 01/01/2019 - 12/31/2020 Unit Start End Activity CAC   Title Staff Count COMANCHE PEAK 10CFR50.59 INSPECTION         3 1, 2 02/04/2019 02/08/2019 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments CPSES 2019 BRQ           2 1, 2 03/17/2019 03/23/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)
 
INSERVICE INSPECTION 1R20         1 1, 2 04/29/2019 05/10/2019 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
01/01/2019 - 12/31/2020
RP INSPECTION (1,3)         2 1, 2 04/29/2019 05/03/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/29/2019 05/03/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation CPSES 2019 INITIAL EXAM         7 1, 2 05/05/2019 05/11/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
 
1, 2 06/09/2019 06/15/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
Unit Start End Activity CAC Title Staff Count
Security Access Control .02         1 1, 2 06/17/2019 06/21/2019 IP 71130.02 000734 Access Control 1, 2 06/17/2019 06/21/2019 IP 71151 001338 Performance Indicator Verification RP INSPECTION (2,4)         2 1, 2 08/05/2019 08/09/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 08/05/2019 08/09/2019 IP 71124.04 000728 Occupational Dose Assessment IN OFFICE SCENARIO REVIEW         5 1, 2 09/02/2019 10/08/2019 IP 71114.08 000723 Exercise Evaluation  Scenario Review BIENNIAL PI&R           4 1, 2 09/16/2019 10/04/2019 IP 71152B 000747 Problem Identification and Resolution 1, 2 09/30/2019 10/04/2019 IP 71152B 000747 Problem Identification and Resolution EP EXERCISE INSPECTION         4 1, 2 11/04/2019 11/08/2019 IP 71114.01 000716 Exercise Evaluation 1, 2 11/04/2019 11/08/2019 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 11/04/2019 11/08/2019 IP 71151 001397 Performance Indicator Verification This report does not include INPO and OUTAGE activities.      Page 1 of 3 This report shows only on-site and announced inspection procedures.
 
COMANCHE PEAK 10CFR50.59 INSPECTION
 
1, 2 02/04/2019
 
02/08/2019
 
IP 71111.17T
 
000709 Evaluations of Changes, Tests, and Experiments
 
CPSES 2019 BRQ
 
1, 2 03/17/2019
 
03/23/2019
 
IP 71111.11B
 
000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)
 
INSERVICE INSPECTION 1R20
 
1, 2 04/29/2019
 
05/10/2019
 
IP 71111.08P
 
000702 Inservice Inspection Activities (PWR)
 
RP INSPECTION (1,3)
 
1, 2 04/29/2019
 
05/03/2019
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 04/29/2019
 
05/03/2019
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
CPSES 2019 INITIAL EXAM
 
1, 2 05/05/2019
 
05/11/2019
 
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
 
1, 2 06/09/2019
 
06/15/2019
 
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
 
Security Access Control .02
 
1, 2 06/17/2019
 
06/21/2019
 
IP 71130.02
 
000734 Access Control
 
1, 2 06/17/2019
 
06/21/2019
 
IP 71151 001338 Performance Indicator Verification
 
RP INSPECTION (2,4)
 
1, 2 08/05/2019
 
08/09/2019
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 08/05/2019
 
08/09/2019
 
IP 71124.04
 
000728 Occupational Dose Assessment
 
IN OFFICE SCENARIO REVIEW
 
1, 2 09/02/2019
 
10/08/2019
 
IP 71114.08
 
000723 Exercise Evaluation  
 
Scenario Review
 
BIENNIAL PI&R
 
1, 2 09/16/2019
 
10/04/2019
 
IP 71152B 000747 Problem Identification and Resolution
 
1, 2 09/30/2019
 
10/04/2019
 
IP 71152B 000747 Problem Identification and Resolution
 
EP EXERCISE INSPECTION
 
1, 2 11/04/2019
 
11/08/2019
 
IP 71114.01
 
000716 Exercise Evaluation
 
1, 2 11/04/2019
 
11/08/2019
 
IP 71114.04
 
000719 Emergency Action Level and Emergency Plan Changes
 
1, 2 11/04/2019
 
11/08/2019
 
IP 71151 001397 Performance Indicator Verification


2/22/2019 8:26:22 AM
2/22/2019 8:26:22 AM


Page
IP 22 Inspection Activity Plan Report Comanche Peak 01/01/2019 - 12/31/2020 Unit Start End Activity CAC   Title   Staff Count FORCE-ON-FORCE PLANNING AND EXERCISES         6 1, 2 11/18/2019 11/22/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 12/09/2019 12/13/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing RS5678 Radiation Safety PS Team         4 1, 2 01/27/2020 01/31/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation 1, 2 01/27/2020 01/31/2020 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 01/27/2020 01/31/2020 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 01/27/2020 01/31/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Cyber Security Inspection         2 1, 2 02/10/2020 02/14/2020 IP 71130.10P 000741 Cyber Security 1, 2 02/24/2020 02/28/2020 IP 71130.10P 000741 Cyber Security Inservice Inspection 2RD18         1 2 04/27/2020 05/08/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
 
RS13PI Radiation Safety         2 1, 2 04/27/2020 05/01/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/27/2020 05/01/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Triennial Fire Protection Inspection         4 1, 2 06/07/2020 06/13/2020 IP 71111.05T 000696 Fire Protection (Triennial)
of
1, 2 06/21/2020 06/27/2020 IP 71111.05T 000696 Fire Protection (Triennial)
 
Comanche Peak 1, 2 - Design Bases Assurance Inspection (Programs)       3 1, 2 08/10/2020 08/14/2020 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)
This report does not include INPO and OUTAGE activities.
1, 2 08/24/2020 08/28/2020 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)
 
EP Program Inspection         1 1, 2 10/05/2020 10/09/2020 IP 71114.02 000717 Alert and Notification System Testing 1, 2 10/05/2020 10/09/2020 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 10/05/2020 10/09/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 10/05/2020 10/09/2020 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 10/05/2020 10/09/2020 IP 71151 001397 Performance Indicator Verification This report does not include INPO and OUTAGE activities.      Page 2 of 3 This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
 
IP 22 Inspection Activity Plan Report
 
Comanche Peak
 
01/01/2019 - 12/31/2020
 
Unit Start End Activity CAC Title Staff Count
 
FORCE-ON-FORCE PLANNING AND EXERCISES
 
1, 2 11/18/2019
 
11/22/2019
 
IP 71130.03
 
000735 Contingency Response - Force-On-Force Testing
 
1, 2 12/09/2019
 
12/13/2019
 
IP 71130.03
 
000735 Contingency Response - Force-On-Force Testing
 
RS5678 Radiation Safety PS Team
 
1, 2 01/27/2020
 
01/31/2020
 
IP 71124.05
 
000729 Radiation Monitoring Instrumentation
 
1, 2 01/27/2020
 
01/31/2020
 
IP 71124.06
 
000730 Radioactive Gaseous and Liquid Effluent Treatment
 
1, 2 01/27/2020
 
01/31/2020
 
IP 71124.07
 
000731 Radiological Environmental Monitoring Program
 
1, 2 01/27/2020
 
01/31/2020
 
IP 71124.08
 
000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and  
 
Transportation
 
Cyber Security Inspection
 
1, 2 02/10/2020
 
02/14/2020
 
IP 71130.10P
 
000741 Cyber Security
 
1, 2 02/24/2020
 
02/28/2020
 
IP 71130.10P
 
000741 Cyber Security
 
Inservice Inspection 2RD18
 
2 04/27/2020
 
05/08/2020
 
IP 71111.08P
 
000702 Inservice Inspection Activities (PWR)
 
RS13PI Radiation Safety
 
1, 2 04/27/2020
 
05/01/2020
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 04/27/2020
 
05/01/2020
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
Triennial Fire Protection Inspection
 
1, 2 06/07/2020
 
06/13/2020
 
IP 71111.05T
 
000696 Fire Protection (Triennial)
 
1, 2 06/21/2020
 
06/27/2020
 
IP 71111.05T
 
000696 Fire Protection (Triennial)
 
Comanche Peak 1, 2 - Design Bases Assurance Inspection (Programs)
 
1, 2 08/10/2020
 
08/14/2020
 
IP 71111.21N
 
000714 Design Bases Assurance Inspection (Programs)
 
1, 2 08/24/2020
 
08/28/2020
 
IP 71111.21N
 
000714 Design Bases Assurance Inspection (Programs)
 
EP Program Inspection
 
1, 2 10/05/2020
 
10/09/2020
 
IP 71114.02
 
000717 Alert and Notification System Testing
 
1, 2 10/05/2020
 
10/09/2020
 
IP 71114.03
 
000718 Emergency Response Organization Staffing and Augmentation System
 
1, 2 10/05/2020
 
10/09/2020
 
IP 71114.04
 
000719 Emergency Action Level and Emergency Plan Changes
 
1, 2 10/05/2020
 
10/09/2020
 
IP 71114.05
 
000720 Maintenance of Emergency Preparedness
 
1, 2 10/05/2020
 
10/09/2020
 
IP 71151 001397 Performance Indicator Verification


2/22/2019 8:26:22 AM
2/22/2019 8:26:22 AM


Page
IP 22 Inspection Activity Plan Report Comanche Peak 01/01/2019 - 12/31/2020 Unit Start End Activity CAC   Title Staff Count Inservice Inspection 1RF21       1 1 10/12/2020 10/23/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
 
This report does not include INPO and OUTAGE activities.      Page 3 of 3 This report shows only on-site and announced inspection procedures.
of
 
This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
IP 22 Inspection Activity Plan Report
 
Comanche Peak
 
01/01/2019 - 12/31/2020
 
Unit Start End Activity CAC Title Staff Count
 
Inservice Inspection 1RF21
 
1 10/12/2020
 
10/23/2020
 
IP 71111.08P
 
000702 Inservice Inspection Activities (PWR)


2/22/2019 8:26:22 AM
2/22/2019 8:26:22 AM


Page
ML19057A547 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:
 
By: MSH/rdr Yes No Publicly Available Sensitive NRC-002 OFFICE DRP/SPE:A DRP/C:A NAME RAlexander MHaire SIGNATURE /RA/ /RA/
of
DATE 2/19/19 3/4/19
 
This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
IP 22 Inspection Activity Plan Report
 
ML19057A547 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: MSH/rdr Yes No Publicly Available Sensitive NRC-002 OFFICE DRP/SPE:A DRP/C:A NAME RAlexander MHaire SIGNATURE /RA/ /RA/ DATE 2/19/19 3/4/19
}}
}}

Latest revision as of 01:05, 20 October 2019

Annual Assessment Letter for Comanche Peak, Units 1 and 2 (Report 05000445/2018006 and 05000446/2018006)
ML19057A547
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/04/2019
From: Mark Haire
NRC/RGN-IV/DRP
To: Peters K
Vistra Operations Company
References
IR 2018006
Download: ML19057A547 (6)


Text

rch 4, 2019

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000445/2018006 AND 05000446/2018006)

Dear Mr. Peters:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Comanche Peak Nuclear Power Plant, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2018, through December 31, 2018. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Comanche Peak Nuclear Power Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2020.

This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency has proposed changes regarding engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections) and is drafting proposed changes to the ROP for Commission consideration. Should the Commission approve changes to the ROP, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (817) 200-1148 with any questions you have regarding this letter.

Sincerely,

/RA/

Mark S. Haire, Chief Project Branch A Division of Reactor Projects Dockets: 50-445 and 50-446 Licenses: NPF-87 and NPF-89 Enclosure:

Inspection Plan

IP 22 Inspection Activity Plan Report Comanche Peak 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count COMANCHE PEAK 10CFR50.59 INSPECTION 3 1, 2 02/04/2019 02/08/2019 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments CPSES 2019 BRQ 2 1, 2 03/17/2019 03/23/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

INSERVICE INSPECTION 1R20 1 1, 2 04/29/2019 05/10/2019 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP INSPECTION (1,3) 2 1, 2 04/29/2019 05/03/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/29/2019 05/03/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation CPSES 2019 INITIAL EXAM 7 1, 2 05/05/2019 05/11/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 06/09/2019 06/15/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

Security Access Control .02 1 1, 2 06/17/2019 06/21/2019 IP 71130.02 000734 Access Control 1, 2 06/17/2019 06/21/2019 IP 71151 001338 Performance Indicator Verification RP INSPECTION (2,4) 2 1, 2 08/05/2019 08/09/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 08/05/2019 08/09/2019 IP 71124.04 000728 Occupational Dose Assessment IN OFFICE SCENARIO REVIEW 5 1, 2 09/02/2019 10/08/2019 IP 71114.08 000723 Exercise Evaluation  Scenario Review BIENNIAL PI&R 4 1, 2 09/16/2019 10/04/2019 IP 71152B 000747 Problem Identification and Resolution 1, 2 09/30/2019 10/04/2019 IP 71152B 000747 Problem Identification and Resolution EP EXERCISE INSPECTION 4 1, 2 11/04/2019 11/08/2019 IP 71114.01 000716 Exercise Evaluation 1, 2 11/04/2019 11/08/2019 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 11/04/2019 11/08/2019 IP 71151 001397 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.

2/22/2019 8:26:22 AM

IP 22 Inspection Activity Plan Report Comanche Peak 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count FORCE-ON-FORCE PLANNING AND EXERCISES 6 1, 2 11/18/2019 11/22/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 12/09/2019 12/13/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing RS5678 Radiation Safety PS Team 4 1, 2 01/27/2020 01/31/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation 1, 2 01/27/2020 01/31/2020 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 01/27/2020 01/31/2020 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 01/27/2020 01/31/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Cyber Security Inspection 2 1, 2 02/10/2020 02/14/2020 IP 71130.10P 000741 Cyber Security 1, 2 02/24/2020 02/28/2020 IP 71130.10P 000741 Cyber Security Inservice Inspection 2RD18 1 2 04/27/2020 05/08/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RS13PI Radiation Safety 2 1, 2 04/27/2020 05/01/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/27/2020 05/01/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Triennial Fire Protection Inspection 4 1, 2 06/07/2020 06/13/2020 IP 71111.05T 000696 Fire Protection (Triennial)

1, 2 06/21/2020 06/27/2020 IP 71111.05T 000696 Fire Protection (Triennial)

Comanche Peak 1, 2 - Design Bases Assurance Inspection (Programs) 3 1, 2 08/10/2020 08/14/2020 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

1, 2 08/24/2020 08/28/2020 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

EP Program Inspection 1 1, 2 10/05/2020 10/09/2020 IP 71114.02 000717 Alert and Notification System Testing 1, 2 10/05/2020 10/09/2020 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 10/05/2020 10/09/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 10/05/2020 10/09/2020 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 10/05/2020 10/09/2020 IP 71151 001397 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.

2/22/2019 8:26:22 AM

IP 22 Inspection Activity Plan Report Comanche Peak 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count Inservice Inspection 1RF21 1 1 10/12/2020 10/23/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.

2/22/2019 8:26:22 AM

ML19057A547 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: MSH/rdr Yes No Publicly Available Sensitive NRC-002 OFFICE DRP/SPE:A DRP/C:A NAME RAlexander MHaire SIGNATURE /RA/ /RA/

DATE 2/19/19 3/4/19