IR 05000237/2009001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 03/04/2009
| issue date = 03/04/2009
| title = Annual Assessment Letter - Dresden (05000237-09-001; 05000249-09-001)
| title = Annual Assessment Letter - Dresden (05000237-09-001; 05000249-09-001)
| author name = Ring M A
| author name = Ring M
| author affiliation = NRC/RGN-III/DRP/B1
| author affiliation = NRC/RGN-III/DRP/B1
| addressee name = Pardee C G
| addressee name = Pardee C
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000237, 05000249, 07200037
| docket = 05000237, 05000249, 07200037
Line 24: Line 24:
4300 Winfield Road  
4300 Winfield Road  


Warrenville IL 60555
Warrenville IL 60555  


SUBJECT: ANNUAL ASSESSMENT LETTER - DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 (05000237/2009001; 05000249/2009001) Dear Mr. Pardee
SUBJECT: ANNUAL ASSESSMENT LETTER - DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 (05000237/2009001; 05000249/2009001) Dear Mr. Pardee
Line 35: Line 35:
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possibl Please contact me at 630-829-9703 with any questions you may have regarding this letter or the inspection pla  
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possibl Please contact me at 630-829-9703 with any questions you may have regarding this letter or the inspection pla  


Sincerely,/RA/ Mark A. Ring, Chief Branch 1 Division of Reactor Projects  
Sincerely,
/RA/ Mark A. Ring, Chief Branch 1 Division of Reactor Projects  


Docket Nos. 50-237; 50-249; 72-037  
Docket Nos. 50-237; 50-249; 72-037  


License Nos. DPR-19; DPR-25  
License Nos. DPR-19; DPR-25 Enclosure: Dresden Inspection/Activity Plan  
 
===Enclosure:===
Dresden Inspection/Activity Plan  


DISTRIBUTION See next page  
DISTRIBUTION See next page  

Revision as of 02:56, 12 July 2019

Annual Assessment Letter - Dresden (05000237-09-001; 05000249-09-001)
ML090630159
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 03/04/2009
From: Ring M
NRC/RGN-III/DRP/B1
To: Pardee C
Exelon Generation Co, Exelon Nuclear
References
IR-09-001
Download: ML090630159 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 4, 2009

Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear

4300 Winfield Road

Warrenville IL 60555

SUBJECT: ANNUAL ASSESSMENT LETTER - DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 (05000237/2009001; 05000249/2009001) Dear Mr. Pardee

On February 11, 2009, the NRC staff completed its performance review of Dresden Nuclear Power Station, Units 2 and Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 200 The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security informatio A separate letter designated and marked as "Official Use Only - Security Related Information" will include the security cornerstone review and resultant inspection plan. Overall, Dresden Nuclear Power Station, Units 2 and 3, operated in a manner that preserved public health and safety and fully met all cornerstone objective Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within

the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facilit The enclosed inspection plan details the inspections, less those related to security, scheduled through June 30, 201 The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsit Routine resident inspections are not listed due to their ongoing and continuous natur The inspections scheduled include: engineering modifications/50.59, biennial PI&R, component design basis, and license renewal inspection The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle revie C. Pardee -2-

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possibl Please contact me at 630-829-9703 with any questions you may have regarding this letter or the inspection pla

Sincerely,

/RA/ Mark A. Ring, Chief Branch 1 Division of Reactor Projects

Docket Nos. 50-237; 50-249;72-037

License Nos. DPR-19; DPR-25 Enclosure: Dresden Inspection/Activity Plan

DISTRIBUTION See next page

Letter to