IR 05000016/2008011: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 05/19/2009
| issue date = 05/19/2009
| title = IR 05000016-08-011(DNMS), on 04/21/2009 & 04/22/2009, Enrico Fermi Unit 1
| title = IR 05000016-08-011(DNMS), on 04/21/2009 & 04/22/2009, Enrico Fermi Unit 1
| author name = Lipa C A
| author name = Lipa C
| author affiliation = NRC/RGN-III/DNMS
| author affiliation = NRC/RGN-III/DNMS
| addressee name = Plona J H
| addressee name = Plona J
| addressee affiliation = Detroit Edison
| addressee affiliation = Detroit Edison
| docket = 05000016
| docket = 05000016
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:May 19, 2009 Mr. Joseph Plona Site Vice President Nuclear Generation The Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166  
[[Issue date::May 19, 2009]]
 
Mr. Joseph Plona Site Vice President Nuclear Generation The Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166


SUBJECT: NRC INSPECTION REPORT 050-00016/08-011(DNMS) - ENRICO FERMI UNIT 1
SUBJECT: NRC INSPECTION REPORT 050-00016/08-011(DNMS) - ENRICO FERMI UNIT 1
Line 34: Line 31:
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRC's document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you have concerning this inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRC's document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you have concerning this inspection.


Sincerely,/RA/ Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 050-00016 License No. DPR-9  
Sincerely,
 
/RA/ Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 050-00016 License No. DPR-9 Enclosure:
===Enclosure:===
Inspection Report 050-00016/08-011(DNMS)
Inspection Report 050-00016/08-011(DNMS)
cc w/encl:
cc w/encl:
}}
}}

Revision as of 23:33, 11 July 2019

IR 05000016-08-011(DNMS), on 04/21/2009 & 04/22/2009, Enrico Fermi Unit 1
ML091390697
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/19/2009
From: Christine Lipa
Division of Nuclear Materials Safety III
To: Plona J
Detroit Edison
References
IR-08-011
Download: ML091390697 (10)


Text

May 19, 2009 Mr. Joseph Plona Site Vice President Nuclear Generation The Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166

SUBJECT: NRC INSPECTION REPORT 050-00016/08-011(DNMS) - ENRICO FERMI UNIT 1

Dear Mr. Plona:

On April 22, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Enrico Fermi Unit 1 facility. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. At the conclusion of the inspection on April 22, 2009, the NRC inspector discussed the findings with members of your staff.

The inspection consisted of an examination of activities at the facility as they relate to safety and compliance with the Commission's rules and regulations. Areas examined during the inspection included facility management and control, and radiological safety. Within these areas, the inspection consisted of a selective examination of procedures and representative records, field observations of activities in progress, and interviews with personnel.

Based on the results of this inspection, the NRC did not identify any violations.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRC's document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you have concerning this inspection.

Sincerely,

/RA/ Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 050-00016 License No. DPR-9 Enclosure:

Inspection Report 050-00016/08-011(DNMS)

cc w/encl: