| author name = Thomas G
| author name = Thomas G
| author affiliation = NRC/NRO
| author affiliation = NRC/NRO
| addressee name = Lake L F
| addressee name = Lake L
| addressee affiliation = NRC/RGN-II
| addressee affiliation = NRC/RGN-II
| docket = 05000302
| docket = 05000302

Revision as of 03:51, 11 July 2019

Email - Subject: Revised Engineering/Repair Work Flow Chart
ML102910574
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/29/2009
From: George Thomas
Office of New Reactors
To: Lake L
NRC/RGN-II
References
FOIA/PA-2010-0116
Download: ML102910574 (2)


Text

I 94 j 7 Masters, Anthony From: Sent: To: Cc:

Subject:

Attachments:

Categories:

Thomas, George Tuesday, December 29, 2009 9:04 AM Lake, Louis Khanna, Meena; Franke, Mark; Farzam, Farhad; Carrion, Robert; nausdj@ornl.gov; Masters, Anthony CR-3 Revised Engineering and Repair Work Flow Chart as of 12-28-09 Engg & Repair Work Flow'12-28-09.pdf Perform Review Attached is the revised (as of 12-28-09)

Engineering and Repair Work Flow chart for CR-3.Thanks.George V" Indicates Completed Task A S&L Calc: Loss of Load fuel (date TBD)Decay Heat Removal LoAd EC 75218 Rev (for fuel load)SGT Engineering

&Construction Input (Repair Preparations)

SGT Engineering

&Construction Input (Permanent Repair)MPR Calc A S&L Calc: Polar I'on Tendon Crane Loads Fini#&Sequence r]Pli Abaqus EC Mod EC Mod, Analysis of Phase 2 Phase 3 MPR Tendon De Removal# &Sequence EC 7521B EC 75219 IPR 3D te Element ,nalysis MPR Tendon Analysis Sequence~EC ModPhase 5 Re-Tensioning

~ EC 75221 Reinforcement Re-tensioning

~&Concrete

& Post-Repai1r iPlacem'ent Testing Permanent Repair L ---1