Email - Subject: Revised Engineering/Repair Work Flow Chart
ML102910574
Person / Time
Site: Crystal River 
Issue date: 12/29/2009
From: George Thomas
Office of New Reactors
To: Lake L
NRC/RGN-II
References
FOIA/PA-2010-0116
Download: ML102910574 (2)


Text

I 94 j 7

Masters, Anthony From:

Sent:

To:

Cc:

Subject:

Attachments:

Categories:

Thomas, George Tuesday, December 29, 2009 9:04 AM Lake, Louis Khanna, Meena; Franke, Mark; Farzam, Farhad; Carrion, Robert; nausdj@ornl.gov; Masters, Anthony CR-3 Revised Engineering and Repair Work Flow Chart as of 12-28-09 Engg & Repair Work Flow'12-28-09.pdf Perform Review Attached is the revised (as of 12-28-09) Engineering and Repair Work Flow chart for CR-3.

Thanks.

George

V" Indicates Completed Task A S&L Calc: Loss of Load fuel (date TBD)

Decay Heat Removal LoAd EC 75218 Rev (for fuel load)

SGT Engineering &

Construction Input (Repair Preparations)

SGT Engineering &

Construction Input (Permanent Repair)

MPR Calc A S&L Calc: Polar I'

on Tendon Crane Loads Fini

  1. &Sequence r]

Pli Abaqus EC Mod EC Mod, Analysis of Phase 2 Phase 3 MPR Tendon De Removal

  1. &Sequence EC 7521B EC 75219 IPR 3D te Element

,nalysis MPR Tendon Analysis Sequence

~EC Mod

>* Phase 5 Re-Tensioning

~ EC 75221 Reinforcement Re-tensioning

~&Concrete

& Post-Repai1r iPlacem'ent Testing Permanent Repair L ---