I 94 j 7 Masters, Anthony From: Thomas, George Sent: Tuesday, December 29, 2009 9:04 AM To: Lake, Louis Cc: Khanna, Meena; Franke, Mark; Farzam, Farhad; Carrion, Robert; nausdj@ornl.gov; Masters, Anthony

Subject:

CR-3 Revised Engineering and Repair Work Flow Chart as of 12-28-09 Attachments: Engg & Repair Work Flow'12-28-09.pdf Categories: Perform Review Attached is the revised (as of 12-28-09) Engineering and Repair Work Flow chart for CR-3.

Thanks.

George

V" Indicates Completed Task A S&L Calc: Loss of Load fuel (date TBD)

Decay Heat Removal LoAd EC 75218 Rev (for fuel load)

SGT Engineering & SGT Engineering &

Construction Input Construction Input (Repair Preparations) (Permanent Repair)

MPR Calc A S&L Calc: Polar I' IPR 3D MPR Tendon on Tendon

  • Crane Loads Fini te Element Analysis
  1. &Sequence r] ,nalysis Sequence Pli Abaqus EC Mod EC Mod, ~EC Mod Analysis of Phase 2 Phase 3 >* Phase 5 MPR Tendon De Removal Re-Tensioning
  1. &Sequence EC 7521B EC 75219 ~EC 75221 Reinforcement Re-tensioning

~&Concrete & Post-Repai1r iPlacem'ent Testing PermanentRepair L ---