ML102910574
| ML102910574 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 12/29/2009 |
| From: | George Thomas Office of New Reactors |
| To: | Lake L NRC/RGN-II |
| References | |
| FOIA/PA-2010-0116 | |
| Download: ML102910574 (2) | |
Text
I 94 j 7
Masters, Anthony From:
Sent:
To:
Cc:
Subject:
Attachments:
Categories:
Thomas, George Tuesday, December 29, 2009 9:04 AM Lake, Louis Khanna, Meena; Franke, Mark; Farzam, Farhad; Carrion, Robert; nausdj@ornl.gov; Masters, Anthony CR-3 Revised Engineering and Repair Work Flow Chart as of 12-28-09 Engg & Repair Work Flow'12-28-09.pdf Perform Review Attached is the revised (as of 12-28-09) Engineering and Repair Work Flow chart for CR-3.
Thanks.
George
V" Indicates Completed Task A S&L Calc: Loss of Load fuel (date TBD)
Decay Heat Removal LoAd EC 75218 Rev (for fuel load)
SGT Engineering &
Construction Input (Repair Preparations)
SGT Engineering &
Construction Input (Permanent Repair)
MPR Calc A S&L Calc: Polar I'
on Tendon Crane Loads Fini
- &Sequence r]
Pli Abaqus EC Mod EC Mod, Analysis of Phase 2 Phase 3 MPR Tendon De Removal
- &Sequence EC 7521B EC 75219 IPR 3D te Element
,nalysis MPR Tendon Analysis Sequence
~EC Mod
>* Phase 5 Re-Tensioning
~ EC 75221 Reinforcement Re-tensioning
~&Concrete
& Post-Repai1r iPlacem'ent Testing Permanent Repair L ---
1