ML17279A476: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 04/30/1987
| issue date = 04/30/1987
| title = Monthly Operating Rept for Apr 1987.W/870508 Ltr
| title = Monthly Operating Rept for Apr 1987.W/870508 Ltr
| author name = HUTCHISON L B, POWERS C M
| author name = Hutchison L, Powers C
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  

Revision as of 00:58, 19 June 2019

Monthly Operating Rept for Apr 1987.W/870508 Ltr
ML17279A476
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/30/1987
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC
References
NUDOCS 8708190338
Download: ML17279A476 (6)


Text

OPERATING DATA REPORT WNP-2 01-May-87 1.DOCKET)50-397 2.REPORTING PERIODR 3 UTILITY CONTACT'pr-87 OUTAGE+ON-LINE HOURS LEONARD HUTCHISON (509>377-2486 719 4 LICENSED THERMAL POWER (MNt)e 5 NAMEPLATE RATING (GROSS MWe)z 6.DESIGN ELECTRICAL RATING (NET MWe)x 7.MAXIMUM DEPENDABLE CAPACITY (GROSS MWe>: B.MAXIMUM DEPENDABLE CAPACITY (NET MWe>a 9 IF CHANGES OCCUR ABOVE SINCE LAST REPORTS GIVE REASONS'323 1200.9 1100 1140 1095 10.POWER TO WHICH RESTRICTED, IF ANY (NET MWe)x f f REASONS FOR RESTRICTIONS IF ANY lA RRC PumP InoPerable 788.12 REPORT PERIOD HOURS 13.HOURS REACTOR CRITICAL 14.RX RESERVE SHTDWN HRS 15 HRS GENERATOR ON LINE ib.UNIT RESERVE SHUTDOWN HOURS 17 GROSS THERMAL ENERGY (MWH)18.GROSS ELECTRICAL ENERGY (MWH)19.NET ELECTRICAL ENERGY (MNH)20.UNIT SERVICE FACTOR 21.UNIT AVAILABILITY FACTOR 22.UNIT CAPACITY FACTOR (MDC NET)23.UNIT CAPACITY FACTOR (DER NET)24.UNIT FORCED OUTAGE RATE 25.FORCED OUTAGE HOURS MONTH 719 230 6 0 0 223 7 0.0 508800 169930 164018 31.1/31~1%20 BX 20.7X O.OX 0 0 YEAR CUMULATIVE 2879 20839.2 2248.1 15955.5 0.0 340.4 2198.5 15359.4 0.0 381.7 5104872 38786052 1710530 12929800 1651917 12421888 76.4X 73.7/76.4%75.5X 52.4/54.4X 52 2%54.2%7.8%7.6X 185.2 1260.5 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE~DATE INDURATION)s NONE 27.IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE!June 4, 1987 8708190339 870430 PDR ADOCK 05000~7 R PDR' e)v'rt r~~AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.WNP-2 5/1 F87 L.B.Hutehison TELEPHONE (509)377-2486 APRIL 1987 DAY AVH&GE DAILY POWER LEVEL (Meet)1 759 762 722 761 729 758 752?52 756 83 DAY AVERAGE DAILY POWER:(.EVEL (MWe-Net)0 18 13 14 15 PiSTRUCTIONS On this form, Bst the amma daily unit power level in MN'e~Xet for each day in the reporthg month.Compute to the nearest whole megawatt.These Ggures will be used to plot a graph for each reporting month.Note that when maximum dependable mpacity h used for the net electrical tathg of the unit, them may be occasions when.the daily avenge power!evel exceeds the.l00%Hne (or the restricted power level Hne).In such cases, the average daily unit power output sheet should be ,.'..footnoted to eq8ah the apparent anomaly.

P~i AEHAT PEAICO April 19 87 m~mm, year H5.DAAE Wii'GIE 1EltKH g~lgJ 86-14P 11/10/86 F NIT SIUTKNNS/AEOUCTIONS DOCKET NO.mlT Nex WNP-2 DATE 5/1/87 COMPLETED 8Y L.B.Hutchison TELEP)QNE (509)377-2486 BICKMll TIEIBI i'd%'llZlft CB PUMP XX~limited to 72K due to incurability of lA RRC Pup 87-04 4/10/87 S 495.3 C NA Plant shut down as scheduled for refueling outage SQffAAY WNP-2 operated at reduced power level unti 1 shutdown for refueling outage.lF-Forced QScl'IQd A-Equi p Failure 0-Haint or Test~C-Aef ue ling 0-Aegulatory Restriction E-Operator Trafning h License Examination F-Admfn G-Oper Error H-Other 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Aeduced Load 9-Other SYSTEM k COMPOM.:NT Exhibit F h H Instructions for Preparation of'ata Entry Sheet Licensee Event Aepnrt (LEA)File (NUAEG-0161)

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 Docket No.50-397 June 5, 1987 Director Office of Resource Management U.S.Nuclear Regulatory Commission Washington, D.C.20555

Dear Sir:

Subject:

NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for May 1987 as required by our Technical Specifications 6.9.1.6.Very truly yours, c"ri f C.M.Powers (M/D 927M)WNP-2 Plant Manager CMP/lc Enclosure cc: Mr.John B.Martin-Mr.Robert T.Dodds-Ms.Dottie Sherman-Mr.J.T.Wheelock-Mr.Phil Ross NRC, Region V NRC Site Representative ANI, Farmington CT INPO NRC, Washington D.C.

1 t'(I