ML17290B016: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 02/28/1994
| issue date = 02/28/1994
| title = Monthly Operating Rept for Feb 1994 for WNP-2.W/940310 Ltr
| title = Monthly Operating Rept for Feb 1994 for WNP-2.W/940310 Ltr
| author name = EMBREE D G, SMITH G O
| author name = Embree D, Smith G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  

Revision as of 23:31, 18 June 2019

Monthly Operating Rept for Feb 1994 for WNP-2.W/940310 Ltr
ML17290B016
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/28/1994
From: Embree D, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-94-057, GO2-94-57, NUDOCS 9403150508
Download: ML17290B016 (6)


Text

ACCELERATED DIS REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)""":*" FACIL:50-397 WPPSS Nuclear Project, Unit AUTH.NAME AUTHOR AFFILIATION EMBREE,D.G.

Washington Public Power SMITH,G.O.

Washington Public Power RECIP.NAME RECIPIENT AFFILIATION NOTARIZED:

NO DOCKET 2, Washington Public Powe 05000397 Supply System Supply System

SUBJECT:

Month operating rept for Feb 1994 for WPPS 2.40310 ltr.DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL TITLE: Monthly Operating Report (per Tech Specs)NOTES: SIZE: D RECIPIENT ID CODE/NAME PDV PD INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN5 EXTERNAL EGS(G BRYCE i J H NSIC COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CLIFFORD,J AEOD/DOA NRR~O+~SOEAB G FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D D R D NOTE TO ALL"RIDS" RECIPIENTS:

D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Bax968~3000George 1Pasbtngton Way~Richland, Wasbtngton 99352-0968

~(509)372-5000 March 10, 1994 G02-94-057 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555

Dear Sirs:

Subject:

NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT FEBRUARY 1994 Transmitted herewith is the Monthly Operating Report for the month of February, 1994 as required by our Technical Specifications 6.9.1.6.G.O.Smith Operations Division Manager (MD 9270)GOS:DGE CC: Mr.W.H.Lovelace, NRC, Washington, DC Mr.K.E.Perkins, NRC Region V Mr.R.C.Barr, NRC Resident Inspector (927N)Mr.J.T.Wheelock, INPO Mr.C.Bergesen, Utility Data Institute Mr.J.T.Irish, BPA (399)9405 j.50508'~05000~97

"'.', PDR ADOC PDR.R..'

I)'.4'<)j)q' OPERATING STATUS REPORT for WNP-2 Date: March 1, 1994 2.3.4 5.6.7.8.9.3323 1200.9 1120 1132 1086 n/a Docket: 50-397 Reporting Period: FEBRUARY 1994 Outage+On-Line Hours: 672.0 Utility Contact: David G.Embree (509)377-8448 Licensed Thermal Power (MW,): Nameplate Rating (Gross MW,): Design Electrical Rating (Net MW,): Maximum Dependable Capacity (Gross MW,): Maximum Dependable Capacity (Net MW,): If changes occur above since last report, give reasons;10.Power to which restricted, if any (Net MW,): 11.Reasons for restrictions, if any;about 1083 end-of-cycle coastdown 12.13.14.15.16.17.18.19.20.21.22.23.24.25.Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MVM)Gross Electrical Energy (MWH)Net Electrical Energy (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)Unit Capacity Factor (DER Net)Unit Forced Outage Rate Forced Outage Hours MONTH 672.0 672.0 0.0 672.0 0.0 2,222,531 771,920 742,643 100.0%100.0%101.8%98.7%0.0%0.0 YEAR 1,416.0 1,416.0 0.0 1,416.0 0.0 4,628,151 1,609,600 1,548,725 100.0%100.0%100.7%97.7%0.0%0.0 CUMULATIVE 80,744.2 57,526.2 340.4 55,483.0 381.7 163,389,457 54,921,810 52,634,110 68.7%69.2%S9.7%S9.2%12.4%7,885,3 26.Shutdowns scheduled over the next 6 months (type, date, duration):

Refueling Outage, about April 30, 1994, 60 Days.27.If currently shutdown estimated startup date: n/a Note: Cumualtive Unit Capacity Factors (MDC&DER)are calculated with weighted averages.

AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD: FEBRUARY 1994 DOCKET NO.: 50-397 UNIT: WNP-2 DATE: March 1, 1994 COMPLETED BY: D.G.Embree TELEPHONE:

(509)377-8448 DAY AVERAGE DAILY POWER LEVEL (Net MWe)AVERAGE DAILY POWER LEVEL DAY (Net MWe)10 12 13 14 15 1119 1118 1121 1117 1120 1101 1117 1116 1114 1110 1105 1110 1105.1106 1103 16 17 18 19 20 21 22 23 24 25 26 27 28 1105 1103 1098 1105 1108 1106 1102 1096 1104 1073 1083 1099 1083 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net)for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD: FEBRUARY 1994 DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: March 1, 1994 COMPLETED BY: D.G.Embree.TELEPHONE:

(509)3774448'o.

Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence

SUMMARY

WNP-2 operated near full power during the month with no significant power reductions

()20%), however, the reactor was in end-of-cycle coastdown with final feedwater temperature reduction in progress.TYPE F-Forced S-Scheduled REASON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other METHOD 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT NUREGA161 Exhibits F&H