| issue date = 04/30/1996
| issue date = 04/30/1996
| title = Monthly Operating Rept for Apr 1996 for WPPSS.W/960513 Ltr
| title = Monthly Operating Rept for Apr 1996 for WPPSS.W/960513 Ltr
| author name = EMBREE D G, SMITH G O
| author name = Embree D, Smith G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  

Revision as of 23:10, 18 June 2019

Monthly Operating Rept for Apr 1996 for WPPSS.W/960513 Ltr
ML17292A267
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/30/1996
From: Embree D, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-101, NUDOCS 9605200397
Download: ML17292A267 (8)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTIONSYSTEM (RIDE)ACCESSION NBR:9605200397 DOC.DATE: 96/04/30 NOTARIZED:

NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION EMBREE,D.G.

Washington Public Power Supply System SMITH,G.O.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Apr 1996 for WPPSS.W/960513 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS RGN4 COPIES LTTR ENCL 1 1 10 10 1 1 1 1 RECIPIENT ID CODE/NAME COLBURN,T AEOD/SPD/RRAB NRR/DRPM/PECB COPIES LTTR ENCL 1 1 1 1 1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!*TOTAL NUMBER OF COPIES'REQUIRED':

'LTTR"'19ENCL",;

'.,"1'9;

"'*'

'I h WASHINGTON PUBLIC POWER SUPPLY SYSTEM I'.O.Box 968~3000 George Washington Way~Richland, Washington 99352-0968

~(509)372-5000 May 13, 1996 G02-96-101 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT APRIL 1996 Transmitted herewith is the Monthly Operating Report for the month of April 1996 as required by Technical Specification 6.9.1,6.Respectfully, G.O.Smith Plant General Manager (Mail Drop 9270)GOS'DGE CC: LJ Callan-NRC RIV TG Colburn-NRR KE Perkins, Jr.-NRC RIV, WCFO NRC Sr.Resident Inspector-927N NS Reynolds-Winston&Strawn INPO ANI Library Utility Data Institute DL Williams-BPA/399 96052003'V7 960430 PDR,,ADQCK 05000397 R"'tDR OPERATING STATUS REPORT for WNP-2 Date: May 1, 1996 2.3.4 5.6.7.8.9.Outage+On-line Hours: 432.0 3486 1199 1153 1153 1107 none Docket: 50-397 Reporting Period: APRIL 1996 Utility Contact: David G.Embree (509)377-8448 Licensed Thermal Power (MW,): Nameplate Rating (Gross MW,): Design Electrical Rating (Net MW,): Maximum Dependable Capacity-summer (Gross MW,): Maximum Dependable Capacity-summer (Net MW,): If changes occur above since last report, give reasons: 10.11.Power to which restricted, if any (Net MW,): 0 Reasons for restrictions, if any: Reserve shutdown and annual refueling outage.12.13.14.15.16.17.18.19.20.21~22.23.24.25.Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)Gross Electrical Energy (MWH)Net Electrical Energy (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)Unit Capacity Factor (DER Net)Unit Forced Outage Rate Forced Outage Hours MONTH 719.0 0.0 287.0 0.0 287.0 0 0-6,031 0.0%39.9%0.0%0.0%0.0%0.0 YEAR 2,903.0 1,485.1 985.9 1,473.6 997.4 4,425,360 1,505,290 1,435,433 50.8%85.1%44.8%42.9%0.0%0.0 CUMULATIVE 99,751.2 71,120.9 1,730.8 68,724.1 1,956.2 204,882,910 69,082,770 66,193,751 68.9%70.9%60.8%59.9%10.8%8,319.7 26.27.Shutdowns scheduled over the next 6 months (type, date, duration):

If currently shutdown, estimated startup date: Refueling, 4/13/96, 55 days June 7, 1996 Note: Cumulative Unit Capacity Factors (MDC&DER)are calculated with weighted averages.

~~I~\

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: May 1, 1996 COMPLETED BY: D.G.Embree TELEPHONE:

(509)377-$448 REPORT PERIOD: APRIL 1996 DAY AVERAGE DAILY POWER LEVEL (Net MWe)-13 AVERAGE DAILY POWER LEVEL DAY (Net MWe)16 10 12 13 14 15-10-10-10-9-9-7-7-7-6-7-7-7-8 17 18 19 20 21 22 23 24 25 26 27 28 29 30-7-7-8-9-9-8,-8-9-9-8 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net)for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

~r ct UNIT SHUTDOWNS AND POWER REDUCTIONS

~$REPORT PERIOD: APRIL 1996 DOCKET Nt3.t 50-397 UNIT NAME: WNP-2 DATE: Mpy 1, 1996 COMPLETED BY: D.G.Embree TELEPHONE:

(509)377-8448 No.Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 9647 3/2/96 S 287.0 H ZZ ZZZZZZ Continuation from previous month-economic dispatch (reserved shutdown).

9648 4/13/96 S 432.0 C NA RC FUELXX Plant entered annual refueling and maintenance outage (R-11)on April 13, 1996.

SUMMARY

At the beginning of the month, the plant remained in economic dispatch (reserve shutdown)until the beginning of the annual planned refueling/maintenance outage which began on April 13, 1996.TYPE MF-o reed S-Scheduled REASON~A-qurumeur Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G'-Operational Error H-Other METHOD I-Meal 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT G-01 1 E tts "J E c'i~s