ML18052B191: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 06/17/1987
| issue date = 06/17/1987
| title = Forwards EGG-NTA-7720, Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28,Reactor Trip Sys Vendor Interface:Calvert Cliffs-1 & -2,Millstone-2 & Palisades, Final Informal Rept. Plants Conform to Generic Ltr Item
| title = Forwards EGG-NTA-7720, Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28,Reactor Trip Sys Vendor Interface:Calvert Cliffs-1 & -2,Millstone-2 & Palisades, Final Informal Rept. Plants Conform to Generic Ltr Item
| author name = ROBERTS E W
| author name = Roberts E
| author affiliation = EG&G IDAHO, INC., IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY
| author affiliation = EG&G IDAHO, INC., IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY
| addressee name = CARRINGTON M
| addressee name = Carrington M
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000000, 05000255, 05000317, 05000318, 05000336
| docket = 05000000, 05000255, 05000317, 05000318, 05000336

Revision as of 21:36, 17 June 2019

Forwards EGG-NTA-7720, Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28,Reactor Trip Sys Vendor Interface:Calvert Cliffs-1 & -2,Millstone-2 & Palisades, Final Informal Rept. Plants Conform to Generic Ltr Item
ML18052B191
Person / Time
Site: Millstone, Calvert Cliffs, Palisades, 05000000
Issue date: 06/17/1987
From: Roberts E
EG&G IDAHO, INC., IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY
To: Carrington M
Office of Nuclear Reactor Regulation
Shared Package
ML18052B192 List:
References
CON-FIN-D-6001, CON-FIN-D-6002 EWR-148-87, GL-83-28, NUDOCS 8707170226
Download: ML18052B191 (1)


Text

' . i ** S-O*Jl1 311' Idaho National Englnflflrlng Laboratwy June 17, 1987 Mr. M. Carrington, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 TRANSMITTAL OF FINAL REPORT, 11 CONFORMANCE TO ITEM 2.1 (PART 2) OF GENERIC LETTER 83-28, REACTOR TRIP SYSTEM VENDOR INTERFACE:

CALVERT CLIFFS-1 AND -2, MILLSTONE-2, AND PALISADES, 11 EGG-NTA-7720, JUNE 1987 (FINS D6001 AND D.600*2) -EWR-148-87 . ..--33, -:I.Sf" *Ref: NRC Form 189, 11 Evaluation of Conformance to Generic Letter 83-28 For ORs (Project 2)11 (D6001); 11 Evaluation of Conformance to Generic Letter 83-28 For OLs (Project 3)11 (D6002)

Dear Mr. Carrington:

Transmitted herewith is the above subject report. The report documents INEL's evaluation of the licensee/applicant actions in response to NRC Generic LetteF 83-28, Item 2.1 (Part 2), Reactor Trip System Vendor Interface.

Based on the licensee/applicant submittals, we. conclude that the plants reviewed conform to the generic letter on this item. FGF:gp

Enclosure:

As Stated cc: G. L. Jones, DOE-ID D. Lasher, SICB . . _ E. W. Roberts, Manager NRC Headquarters Support J. 0. Zane, EG&G Idaho, Inc. (w/o Encl.) ( 8707170226 870617 11 : PDR ADOCK 05000255 ' P PDR ----** . . -----. --* *-*t' EBt:G ldahO, Inc. 11428 Rockville Pike Suite 410' ; Rockville, MD 20852