#REDIRECT [[IR 05000247/2018005]]
{{Adams
| number = ML18240A381
| issue date = 08/28/2018
| title = Updated Inspection Plan for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2018005 and 05000286/2018005)
| author name = Riemer K
| author affiliation = NRC/RGN-III
| addressee name = Sharp S
| addressee affiliation = Nuclear Management Co, LLC
| docket = 05000282, 05000306
| license number = DPR-042, DPR-060
| contact person =
| document report number = IR 2018005
| document type = Inspection Plan, Letter
| page count = 6
}}
 
{{IR-Nav| site = 05000282 | year = 2018 | report number = 005 }}
 
=Text=
{{#Wiki_filter:
[[Issue date::August 28, 2018]]
 
Mr. Scott Sharp Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089
-9642
 
SUBJECT: UPDATED INSPECTION PLAN FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 (REPORT 05000 282/2018005 and 05000286/2018005)
Dear Mr. Sharp
: The enclosed inspection plan lists the inspections scheduled through June 30 , 20 20 , for the Prairie Island Nuclear Generating Plant, Units 1 and The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the last twelve months of the inspection plan are tentative and may be revise The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change As we had previously notified you, the biennial Problem Identification and Resolution inspection originally scheduled to begin on June 25, 2018, was going to be reschedule Although the exact dates of the inspection have not yet been selected, this inspection will be completed by December 31, 201 We will notify your staff once the dates for this inspection have been finalize S. Sharp - 2 - This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading
-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
 
Please contact me at 630-829-9628 with any questions you have regarding this lette
 
Sincerely,
/RA/ Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket No ; 50-306 License No DPR-42; DPR-60 Enclosure:
Inspection Plan cc: Distribution via LISTSERV
}}

Revision as of 03:11, 13 May 2019

Updated Inspection Plan for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2018005 and 05000286/2018005)
ML18240A381
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/28/2018
From: Kenneth Riemer
NRC/RGN-III
To: Sharp S
Nuclear Management Co
References
IR 2018005
Download: ML18240A381 (6)


Text

August 28, 2018

Mr. Scott Sharp Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089

-9642

SUBJECT: UPDATED INSPECTION PLAN FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 (REPORT 05000 282/2018005 and 05000286/2018005)

Dear Mr. Sharp

The enclosed inspection plan lists the inspections scheduled through June 30 , 20 20 , for the Prairie Island Nuclear Generating Plant, Units 1 and The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the last twelve months of the inspection plan are tentative and may be revise The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change As we had previously notified you, the biennial Problem Identification and Resolution inspection originally scheduled to begin on June 25, 2018, was going to be reschedule Although the exact dates of the inspection have not yet been selected, this inspection will be completed by December 31, 201 We will notify your staff once the dates for this inspection have been finalize S. Sharp - 2 - This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading

-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

Please contact me at 630-829-9628 with any questions you have regarding this lette

Sincerely,

/RA/ Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket No ; 50-306 License No DPR-42; DPR-60 Enclosure: