IR 05000250/2018005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 35: Line 35:
-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4 60 3 with any questions you have regarding this letter.
-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4 60 3 with any questions you have regarding this letter.


Sincerely,/RA/ Randall A. Musser, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.:
Sincerely,
/RA/ Randall A. Musser, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.:
50-2 5 0, 50-251 License Nos.:
50-2 5 0, 50-251 License Nos.:
DPR-31 , DPR-41  
DPR-31 , DPR-41 Enclosure:
 
===Enclosure:===
Turkey Point Inspection/Activity Plan (0 9/0 1/201 8 - 06/30/20 20) cc Distribution via Listserv SUBJECT: UPDATED INSPECTION PLAN FOR TURKEY POINT NUCLEAR GENERATING STATION , UNIT 3 AND UNIT 4 (REPORT 05000 250/201 8 00 5 AND 05000 251/201 8 00 5) August 23, 2018 DISTRIBUTION:
Turkey Point Inspection/Activity Plan (0 9/0 1/201 8 - 06/30/20 20) cc Distribution via Listserv SUBJECT: UPDATED INSPECTION PLAN FOR TURKEY POINT NUCLEAR GENERATING STATION , UNIT 3 AND UNIT 4 (REPORT 05000 250/201 8 00 5 AND 05000 251/201 8 00 5) August 23, 2018 DISTRIBUTION:
M. Kowal, RII K. Sloan, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource ROPassessment.Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)
M. Kowal, RII K. Sloan, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource ROPassessment.Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)

Revision as of 04:26, 9 May 2019

Updated Inspection Plan for Turkey Point Nuclear Generating Station, Unit 3 and Unit 4 (Report 05000250/2018005 and 05000251/2018005)
ML18235A124
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/23/2018
From: Musser R A
NRC/RGN-II/DRP/RPB3
To: Nazar M
Florida Power & Light Co
References
IR 2018005
Download: ML18235A124 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303

-1257 August 23, 2018 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division Florida Power & Light Company Mail Stop: EX/JB 700 Universe Blvd.

Juno Beach, FL 33408

SUBJECT: UPDATED INSPECTION PLAN FOR TURKEY POINT NUCLEAR GENERATING STATION, UNIT 3 AND UNIT 4 (REPORT 05000250/201 8 005 AND 05000251/201 8 005)

Dear Mr. Nazar:

The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for Turkey Point Nuclear Generating Station Unit 3 and Unit 4. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues.

Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

The NRC plans on conducting one non-routin e inspection per IP 71003, "Post

-Approval Site Inspection for License Renewal

," Phase IV. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4 60 3 with any questions you have regarding this letter.

Sincerely,

/RA/ Randall A. Musser, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.:

50-2 5 0, 50-251 License Nos.:

DPR-31 , DPR-41 Enclosure:

Turkey Point Inspection/Activity Plan (0 9/0 1/201 8 - 06/30/20 20) cc Distribution via Listserv SUBJECT: UPDATED INSPECTION PLAN FOR TURKEY POINT NUCLEAR GENERATING STATION , UNIT 3 AND UNIT 4 (REPORT 05000 250/201 8 00 5 AND 05000 251/201 8 00 5) August 23, 2018 DISTRIBUTION:

M. Kowal, RII K. Sloan, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource ROPassessment.Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)

ADAMS Accession No.

ML18235A12 4 OFFICE RII:DRP RII:DRP NAME LPressley RMusser DATE 8/16/2018 8/16/2018 OFFICIAL AGENCY RECORD

Turkey Point 09/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count UNIT 3 IN-SERVICE INSPECTION 1 3 10/08/2018 10/12/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR RP OCCUPATIONAL RAD SAFETY RAD HAZARDS BASELINE INSPECTION 1 3, 4 10/15/2018 10/19/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls FPL CORP AA/FFD/SGI SECURITY INSPECTION 2 3, 4 10/22/2018 10/26/2018 IP 71130.01 000733 Access Authorization 3, 4 10/22/2018 10/26/2018 IP 71130.06 000738 Protection of Safeguards Information 3, 4 10/22/2018 10/26/2018 IP 71130.08 000740 Fitness For Duty Program TURKEY POINT INITIAL LICENSE EXAM 6 3, 4 12/03/2018 12/07/2018 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

3, 4 01/07/2019 01/25/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

SECURITY BASELINE INSPECTION 1 3, 4 12/10/2018 12/14/2018 IP 71130.01 000733 Access Authorization 3, 4 12/10/2018 12/14/2018 IP 71130.06 000738 Protection of Safeguards Information 3, 4 12/10/2018 12/14/2018 IP 71130.08 000740 Fitness For Duty Program POST-APPROVAL LR PHASE 4 2 3, 4 01/28/2019 02/01/2019 IP 71003 000687 Post-Approval Site Inspection for License Renewal PROBLEM IDENTIFICATION AND RESOLUTION 0 3, 4 02/11/2019 02/15/2019 IP 71152B 000747 Problem Identification and Resolution 3, 4 02/25/2019 03/01/2019 IP 71152B 000747 Problem Identification and Resolution EMERGENCY PREPAREDNESS EXERCISE 3 3, 4 02/18/2019 02/22/2019 IP 71114.01 000716 Exercise Evaluation 3, 4 02/18/2019 02/22/2019 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 3, 4 02/18/2019 02/22/2019 IP 71114.08 000723 Exercise Evaluation Scenario Review 3, 4 02/18/2019 02/22/2019 IP 71151 001397 Performance Indicator Verification UNIT 4 IN-SERVICE INSPECTION 1 4 03/18/2019 03/22/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR Page 1 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report Turkey Point 09/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count UNIT 4 SG IN-SERVICE INSPECTION 1 4 03/18/2019 03/22/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION - WEEK 1 2 3, 4 03/18/2019 03/22/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3, 4 03/18/2019 03/22/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 3, 4 03/18/2019 03/22/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 03/18/2019 03/22/2019 IP 71124.04 000729 Occupational Dose Assessment 3, 4 03/18/2019 03/22/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION - WEEK 2 3 3, 4 04/08/2019 04/12/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3, 4 04/08/2019 04/12/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 3, 4 04/08/2019 04/12/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 04/08/2019 04/12/2019 IP 71124.04 000729 Occupational Dose Assessment 3, 4 04/08/2019 04/12/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation TURKEY POINT INITIAL LICENSE EXAM 3 3, 4 06/17/2019 06/21/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

3, 4 07/22/2019 08/02/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

TRIENNIAL HEAT SINK PERFORMANCE 1 3, 4 07/15/2019 07/19/2019 IP 71111.07T 000700 Heat Sink Performance -Triennial SECURITY BASELINE INSPECTION 1 3, 4 07/22/2019 07/26/2019 IP 71151 001338 Performance Indicator Verification DESIGN BASES ASSURANCE INSPECTION (PROGRAM)

3 3, 4 07/29/2019 08/02/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

3, 4 08/12/2019 08/16/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

TURKEY POINT REQUAL INSPECTION 2 3, 4 08/26/2019 08/30/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

NPFA 805 TRIENNIAL FIRE PROTECTION INSPECTION 4 3, 4 10/21/2019 10/25/2019 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

Page 2 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report Turkey Point 09/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count NPFA 805 TRIENNIAL FIRE PROTECTION INSPECTION 4 3, 4 11/04/2019 11/08/2019 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

SECURITY BASELINE INSPECTION 3 3, 4 10/21/2019 10/25/2019 IP 71130.05 000737 Protective Strategy Evaluation TARGET SET 2 3, 4 11/04/2019 11/08/2019 IP 71130.14 000743 Review of Power Reactor Target Sets DESIGN BASES ASSURANCE INSPECTION (TEAM)

6 3, 4 01/27/2020 01/31/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

3, 4 02/10/2020 02/14/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

RP PUBLIC RAD SAFETY BASELINE INSPECTION 2 3, 4 02/10/2020 02/14/2020 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 3, 4 02/10/2020 02/14/2020 IP 71124.07 000731 Radiological Environmental Monitoring Program CYBER SECURITY 2 3, 4 02/24/2020 02/28/2020 IP 71130.10P 000741 Cyber Security 3, 4 03/09/2020 03/13/2020 IP 71130.10P 000741 Cyber Security UNIT 3 IN-SERVICE/SG IN-SERVICE INSPECTION 2 3 04/06/2020 04/10/2020 IP 71111.08P 000702 Inservice Inspection Activities - PWR SECURITY BASELINE INSPECTION 3 3, 4 06/15/2020 06/19/2020 IP 71151 001338 Performance Indicator Verification Page 3 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report