Line 35: |
Line 35: |
| -rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4 60 3 with any questions you have regarding this letter. | | -rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4 60 3 with any questions you have regarding this letter. |
|
| |
|
| Sincerely,/RA/ Randall A. Musser, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: | | Sincerely, |
| | /RA/ Randall A. Musser, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: |
| 50-2 5 0, 50-251 License Nos.: | | 50-2 5 0, 50-251 License Nos.: |
| DPR-31 , DPR-41 | | DPR-31 , DPR-41 Enclosure: |
| | |
| ===Enclosure:===
| |
| Turkey Point Inspection/Activity Plan (0 9/0 1/201 8 - 06/30/20 20) cc Distribution via Listserv SUBJECT: UPDATED INSPECTION PLAN FOR TURKEY POINT NUCLEAR GENERATING STATION , UNIT 3 AND UNIT 4 (REPORT 05000 250/201 8 00 5 AND 05000 251/201 8 00 5) August 23, 2018 DISTRIBUTION: | | Turkey Point Inspection/Activity Plan (0 9/0 1/201 8 - 06/30/20 20) cc Distribution via Listserv SUBJECT: UPDATED INSPECTION PLAN FOR TURKEY POINT NUCLEAR GENERATING STATION , UNIT 3 AND UNIT 4 (REPORT 05000 250/201 8 00 5 AND 05000 251/201 8 00 5) August 23, 2018 DISTRIBUTION: |
| M. Kowal, RII K. Sloan, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource ROPassessment.Resource ROPreports Resource Institute of Nuclear Power Operations (INPO) | | M. Kowal, RII K. Sloan, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource ROPassessment.Resource ROPreports Resource Institute of Nuclear Power Operations (INPO) |
|
---|
Category:Inspection Report
MONTHYEARIR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 IR 05000250/20240022024-08-0101 August 2024 Integrated Inspection Report 05000250/2024002 and 05000251/2024002 IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24072A2382024-03-20020 March 2024 Review of the Fall 2023 Steam Generator Tube Inspections During Refueling Outage No. 33 IR 05000250/20244202024-03-11011 March 2024 – Security Baseline Inspection Report 05000250/2024420 and 05000251/2024420 - Final IR 05000250/20230062024-02-28028 February 2024 Annual Assessment Letter for Turkey Point Units 3 & 4 - Report 05000250/2023006 and 05000251/2023006 IR 05000250/20240112024-02-15015 February 2024 Notification of Turkey Point Nuclear Generating Station - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 05000250/2024011 and 05000251/2024011 IR 05000250/20230042024-02-13013 February 2024 Integrated Inspection Report 05000250/2023004 and 05000251/2023004 IR 05000250/20240102024-01-0505 January 2024 Focused Engineering Inspection 05000250/2024010 and 05000251/2024010 IR 05000250/20230032023-11-0909 November 2023 – Integrated Inspection Report 05000250/2023003 and 05000251/2023003 IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 IR 05000250/20234022023-06-12012 June 2023 – Security Baseline Inspection Report 05000250/2023402 and 05000251/2023402 IR 05000250/20233012023-05-17017 May 2023 – NRC Operator License Examination Report 05000250/2023301 and 05000251/2023301 IR 05000250/20230012023-05-12012 May 2023 – Integrated Inspection Report 05000250/2023001 and 05000251/2023001 IR 05000250/20220062023-03-0101 March 2023 Annual Assessment Letter for Turkey Point, Units 3 & 4 (Report 05000250/2022006 and 05000251/2022006) IR 05000250/20220042023-01-27027 January 2023 Integrated Inspection Report 05000250/2022004 and 05000251/2022004 IR 05000250/20220112022-12-20020 December 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000250/2022011 and 05000251/2022011 IR 05000250/20220102022-11-29029 November 2022 Triennial Fire Protection Inspection Report 05000250/2022010 and 05000251/2022010 IR 05000250/20224022022-11-0707 November 2022 Security Baseline Inspection Report 05000250 2022402 and 05000251 2022402 IR 05000250/20220032022-10-31031 October 2022 Integrated Inspection Report 05000250/2022003 and 05000251/2022003 ML22286A1262022-10-28028 October 2022 Review of the Fall 2021 Steam Generator Tube Inspections During Refueling Outage No. 32 IR 05000250/20234012022-10-19019 October 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000250/2023401 and 05000251/2023401 IR 05000250/20220052022-08-26026 August 2022 Updated Inspection Plan for Turkey Point Units 3 & 4 Report 05000250 2022005 and 05000251 2022005-Final ML22229A5332022-08-18018 August 2022 Notification of Target Set Inspection and Request for Information (NRC Inspection Report No. 05000250 2022402 and 05000251 2022402) IR 05000250/20220022022-08-12012 August 2022 Integrated Inspection Report 05000250/2022002 and 05000251/2022002 IR 05000250/20220012022-05-11011 May 2022 Integrated Inspection Report 05000250/2022001 and 05000251/2022001 L-2022-072, Steam Generator Tube Inspection Report2022-05-0606 May 2022 Steam Generator Tube Inspection Report IR 05000250/20224012022-03-0808 March 2022 Security Baseline Inspection Report 05000250/2022401 and 05000251/2022401(U) IR 05000250/20210062022-03-0202 March 2022 Annual Assessment Letter for Turkey Point, Units 3 and 4 (Report No. 05000250/2021006 and 05000251/2021006) IR 05000250/20210042022-02-0202 February 2022 Integrated Inspection Report 05000250/2021004 and 05000251/2021004 IR 05000250/20210072021-11-0303 November 2021 Follow-Up Assessment Letter Report 05000250/2021007 IR 05000250/20210032021-11-0303 November 2021 Integrated Inspection Report 05000250/2021003 and 05000251/2021003 IR 05000250/20210402021-09-30030 September 2021 95001 Supplemental Inspection Report 05000250/2021040 and 05000251/2021040 IR 05000250/20210052021-08-25025 August 2021 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2021005 and 05000251/2021005) IR 05000250/20210022021-08-0404 August 2021 Integrated Inspection Report 05000250/2021002 and 05000251/2021002 IR 07200062/20210012021-07-21021 July 2021 Operation of an Independent Spent Fuel Storage Installation Report 07200062/2021001 IR 05000250/20214012021-06-11011 June 2021 Security Baseline Inspection Report 05000250/2021401, 05000251/2021401, and 07200062/2021401 IR 05000250/20210012021-05-0707 May 2021 Integrated Inspection Report 05000250/2021001 and 05000251/2021001 and Assessment Follow-Up Letter IR 05000250/20210122021-05-0505 May 2021 Biennial Problem Identification and Resolution Inspection Report 05000250/2021012 and 05000251/2021012 IR 05000250/20214202021-04-29029 April 2021 Security Baseline Inspection Report 05000250/2021420 and 05000251/2021420 Cover Letter IR 05000250/20213012021-04-10010 April 2021 NRC Operator License Examination Report 05000250/2021301 and 05000251/2021301 IR 05000250/20210902021-04-0606 April 2021 Notice of Violation and Proposed Imposition of Civil Penalty $150,000, NRC Inspection Report Nos.05000250/2021090 and 05000251/2021090; Investigation Report Nos. 2-2019-011 and 2-2019-025 Exercise of Enforcement Discretion IR 05000250/20200062021-03-0303 March 2021 Annual Assessment Letter for Turkey Point Nuclear Plant, Unit 3 and Unit 4 Report 05000250/2020006 and 05000251/2020006 IR 05000250/20210102021-02-26026 February 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000250/2021010 and 05000251/2021010 IR 05000250/20204022021-02-12012 February 2021 Material Control and Accounting Program Inspection Report 05000250/2020402 and 05000251/2020402 Public Version (Cover Letter Only) IR 05000250/20200042021-02-11011 February 2021 Integrated Inspection Report 05000250/2020004 and 05000251/2020004 and Independent Spent Fuel Storage Installation Inspection (ISFSI) 07200062/2020002 2024-08-23
[Table view] Category:Letter
MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 2024-09-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
-1257 August 23, 2018 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division Florida Power & Light Company Mail Stop: EX/JB 700 Universe Blvd.
Juno Beach, FL 33408
SUBJECT: UPDATED INSPECTION PLAN FOR TURKEY POINT NUCLEAR GENERATING STATION, UNIT 3 AND UNIT 4 (REPORT 05000250/201 8 005 AND 05000251/201 8 005)
Dear Mr. Nazar:
The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for Turkey Point Nuclear Generating Station Unit 3 and Unit 4. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues.
Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
The NRC plans on conducting one non-routin e inspection per IP 71003, "Post
-Approval Site Inspection for License Renewal
," Phase IV. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4 60 3 with any questions you have regarding this letter.
Sincerely,
/RA/ Randall A. Musser, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.:
50-2 5 0, 50-251 License Nos.:
DPR-31 , DPR-41 Enclosure:
Turkey Point Inspection/Activity Plan (0 9/0 1/201 8 - 06/30/20 20) cc Distribution via Listserv SUBJECT: UPDATED INSPECTION PLAN FOR TURKEY POINT NUCLEAR GENERATING STATION , UNIT 3 AND UNIT 4 (REPORT 05000 250/201 8 00 5 AND 05000 251/201 8 00 5) August 23, 2018 DISTRIBUTION:
M. Kowal, RII K. Sloan, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource ROPassessment.Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)
ADAMS Accession No.
ML18235A12 4 OFFICE RII:DRP RII:DRP NAME LPressley RMusser DATE 8/16/2018 8/16/2018 OFFICIAL AGENCY RECORD
Turkey Point 09/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count UNIT 3 IN-SERVICE INSPECTION 1 3 10/08/2018 10/12/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR RP OCCUPATIONAL RAD SAFETY RAD HAZARDS BASELINE INSPECTION 1 3, 4 10/15/2018 10/19/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls FPL CORP AA/FFD/SGI SECURITY INSPECTION 2 3, 4 10/22/2018 10/26/2018 IP 71130.01 000733 Access Authorization 3, 4 10/22/2018 10/26/2018 IP 71130.06 000738 Protection of Safeguards Information 3, 4 10/22/2018 10/26/2018 IP 71130.08 000740 Fitness For Duty Program TURKEY POINT INITIAL LICENSE EXAM 6 3, 4 12/03/2018 12/07/2018 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
3, 4 01/07/2019 01/25/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
SECURITY BASELINE INSPECTION 1 3, 4 12/10/2018 12/14/2018 IP 71130.01 000733 Access Authorization 3, 4 12/10/2018 12/14/2018 IP 71130.06 000738 Protection of Safeguards Information 3, 4 12/10/2018 12/14/2018 IP 71130.08 000740 Fitness For Duty Program POST-APPROVAL LR PHASE 4 2 3, 4 01/28/2019 02/01/2019 IP 71003 000687 Post-Approval Site Inspection for License Renewal PROBLEM IDENTIFICATION AND RESOLUTION 0 3, 4 02/11/2019 02/15/2019 IP 71152B 000747 Problem Identification and Resolution 3, 4 02/25/2019 03/01/2019 IP 71152B 000747 Problem Identification and Resolution EMERGENCY PREPAREDNESS EXERCISE 3 3, 4 02/18/2019 02/22/2019 IP 71114.01 000716 Exercise Evaluation 3, 4 02/18/2019 02/22/2019 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 3, 4 02/18/2019 02/22/2019 IP 71114.08 000723 Exercise Evaluation Scenario Review 3, 4 02/18/2019 02/22/2019 IP 71151 001397 Performance Indicator Verification UNIT 4 IN-SERVICE INSPECTION 1 4 03/18/2019 03/22/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR Page 1 of 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report Turkey Point 09/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count UNIT 4 SG IN-SERVICE INSPECTION 1 4 03/18/2019 03/22/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION - WEEK 1 2 3, 4 03/18/2019 03/22/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3, 4 03/18/2019 03/22/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 3, 4 03/18/2019 03/22/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 03/18/2019 03/22/2019 IP 71124.04 000729 Occupational Dose Assessment 3, 4 03/18/2019 03/22/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION - WEEK 2 3 3, 4 04/08/2019 04/12/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3, 4 04/08/2019 04/12/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 3, 4 04/08/2019 04/12/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 04/08/2019 04/12/2019 IP 71124.04 000729 Occupational Dose Assessment 3, 4 04/08/2019 04/12/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation TURKEY POINT INITIAL LICENSE EXAM 3 3, 4 06/17/2019 06/21/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
3, 4 07/22/2019 08/02/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
TRIENNIAL HEAT SINK PERFORMANCE 1 3, 4 07/15/2019 07/19/2019 IP 71111.07T 000700 Heat Sink Performance -Triennial SECURITY BASELINE INSPECTION 1 3, 4 07/22/2019 07/26/2019 IP 71151 001338 Performance Indicator Verification DESIGN BASES ASSURANCE INSPECTION (PROGRAM)
3 3, 4 07/29/2019 08/02/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)
3, 4 08/12/2019 08/16/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)
TURKEY POINT REQUAL INSPECTION 2 3, 4 08/26/2019 08/30/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)
NPFA 805 TRIENNIAL FIRE PROTECTION INSPECTION 4 3, 4 10/21/2019 10/25/2019 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)
Page 2 of 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report Turkey Point 09/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count NPFA 805 TRIENNIAL FIRE PROTECTION INSPECTION 4 3, 4 11/04/2019 11/08/2019 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)
SECURITY BASELINE INSPECTION 3 3, 4 10/21/2019 10/25/2019 IP 71130.05 000737 Protective Strategy Evaluation TARGET SET 2 3, 4 11/04/2019 11/08/2019 IP 71130.14 000743 Review of Power Reactor Target Sets DESIGN BASES ASSURANCE INSPECTION (TEAM)
6 3, 4 01/27/2020 01/31/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
3, 4 02/10/2020 02/14/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
RP PUBLIC RAD SAFETY BASELINE INSPECTION 2 3, 4 02/10/2020 02/14/2020 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 3, 4 02/10/2020 02/14/2020 IP 71124.07 000731 Radiological Environmental Monitoring Program CYBER SECURITY 2 3, 4 02/24/2020 02/28/2020 IP 71130.10P 000741 Cyber Security 3, 4 03/09/2020 03/13/2020 IP 71130.10P 000741 Cyber Security UNIT 3 IN-SERVICE/SG IN-SERVICE INSPECTION 2 3 04/06/2020 04/10/2020 IP 71111.08P 000702 Inservice Inspection Activities - PWR SECURITY BASELINE INSPECTION 3 3, 4 06/15/2020 06/19/2020 IP 71151 001338 Performance Indicator Verification Page 3 of 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report