Line 2: |
Line 2: |
| | number = ML18054B359 | | | number = ML18054B359 |
| | issue date = 02/27/2018 | | | issue date = 02/27/2018 |
| | title = Exelon Generation Company, LLC - Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the Qatr, February 27, 2018, Profile Info: Submitted by Frank Mascitelli | | | title = Company, LLC - Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the Qatr, February 27, 2018, Profile Info: Submitted by Frank Mascitelli |
| | author name = | | | author name = |
| | author affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | | author affiliation = Exelon Generation Co, LLC, Exelon Nuclear |
Revision as of 13:21, 9 April 2019
Company, LLC - Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the Qatr, February 27, 2018, Profile Info: Submitted by Frank MascitelliML18054B359 |
Person / Time |
---|
Site: |
Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Oyster Creek, Byron, Braidwood, Limerick, Ginna, Clinton, Quad Cities, LaSalle, 07000650 |
---|
Issue date: |
02/27/2018 |
---|
From: |
Exelon Generation Co, Exelon Nuclear |
---|
To: |
Purnell B A Plant Licensing Branch III |
---|
Purnell B A, NRR/DORL,/LPLIII, 415-1380 |
References |
---|
Download: ML18054B359 (9) |
|
Similar Documents at Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Oyster Creek, Byron, Braidwood, Limerick, Ginna, Clinton, Quad Cities, LaSalle, 07000650 |
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24267A0522024-09-24024 September 2024 Standby Gas Treatment Planned Amendment Preapplication Meeting Presentation ML24232A2052024-08-12012 August 2024 Presentation Slides for Dresden End-of-Cycle Meeting ML24172A1092024-08-0707 August 2024 Scoping Power Point Presentation ML24200A2312024-07-22022 July 2024 Constellations Pre-Submittal Meeting Presentation About Peach Bottom ECCS Compensated Level System Replacement Project - July 22, 2024 ML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24121A1862024-05-14014 May 2024 Attachment 3: Peach Bottom ECCS Compensated Level System Replacement Project Presentation Material (Non-Proprietary Information) ML24131A1282024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment ML24134A2032024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment - Rev 0 ML24127A0952024-05-0606 May 2024 License Renewal Public Scoping Meeting May 2024 ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24060A1692024-03-0707 March 2024 NRC Slides for March 7, 2024 Regulatory Conference with Constellation Nuclear Regarding Braidwood BW240007, Attachment 5: BW-MISC-062 Rev. 0 - Braidwood Station Unit 2 Diesel Driven AFW MAAP Calculations2024-02-29029 February 2024 Attachment 5: BW-MISC-062 Rev. 0 - Braidwood Station Unit 2 Diesel Driven AFW MAAP Calculations ML24057A3032024-02-26026 February 2024 Attachment 1: Braidwood Station Regulatory Conference Information ML24057A3062024-02-24024 February 2024 Attachment 4: BW-SDP-006 Rev. 0 - Braidwood 2B AF Pump Fuel Oil Leak SOP Sensitivities ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML24057A3042024-01-22022 January 2024 Attachment 2: EC 640630 Rev. 000 - Documentation of Test Results with Diluted Lube Oil from Fuel In-Leakage - 28 AF Diesel Engine Past Operability ML24003A1812024-01-0808 January 2024 Handout - Byron-Braidwood Core Monitoring and Support System LAR Pre-Submittal Meeting January 8,2024 ML24057A3052023-12-12012 December 2023 Attachment 3: EC 640287 Rev. 000 - Past Operability Test Plan Acceptance Related to 2AF01PB-K ML23345A0362023-12-11011 December 2023 ATWS Uet December 11, 2023 Pre-submittal Meeting Slides ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23272A0622023-09-29029 September 2023 Ultimate Heat Sink Temperature Tech Spec Limit Change ML23262B2602023-09-19019 September 2023 Slides - Constellation - Pre-Application EP 9/25/2023 Meeting Handout ML23229A4832023-08-17017 August 2023 RR 20-Year ISI Pre-Submittal NRC Meeting Handout ML23229A0132023-08-17017 August 2023 Relief Request for Alternative Requirements for Byron Unit 1 Reactor Pressure Vessel Inservice Inspection Intervals NRC Meeting Handout ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23170A0082023-06-29029 June 2023 Decommissioning Presentation for NRC Pre-submittal Meeting, June 29, 2023 ML23172A2092023-06-28028 June 2023 LRA - NRC Pre-Submittal Meeting Slides ML23172A2102023-06-28028 June 2023 CPS Lr Pre-Submittal Meeting Presentation ML23173A0462023-06-28028 June 2023 DNPS SLR Pre-submittal Meeting Presentation Rev. 1 ML23173A0472023-06-28028 June 2023 SLRA - NRC Presubmittal Meeting Slides - 6-28-23 ML23145A1322023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - Constellation Slides ML23165A0242023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - NRC Slides ML23145A1342023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - Constellation Slides ML23165A0162023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - NRC Slides ML23163A1642023-06-12012 June 2023 2022 Braidwood/Byron End-of-Cycle Meeting Presentation ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23103A4072023-04-13013 April 2023 Presentation Slides for Information Call on 4/13/23 N2E Recirc Discharge Nozzle Weld Repair 2nd Request for Alternative ML23094A1492023-04-11011 April 2023 Licensee Presentation on Whr Exemption Request for Public Meeting on April 11, 2023 ML23076A0442023-03-16016 March 2023 Pb U2 Scram Barrier Presentation KT Session ML23055A2712023-03-0202 March 2023 March 2, 2023, Preapplication Meeting to Discuss Planned Amendments to Adopt TSTF-505 and 10 CFR 50.69 (EPID L-2023-LRM-0007) - Slides ML23076A2822023-02-23023 February 2023 Licensee Presentation on Defense-in-Depth Process ML23076A2812023-02-23023 February 2023 Licensee Presentation on Pressure Boundary Process ML23053A1562023-02-23023 February 2023 NRC Presentation Slides for Public Meeting on February 23, 2023 - 10 CFR 50.69 Alternate Processes License Amendment Request Preliminary Partial Denial ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML23006A2572023-01-10010 January 2023 Digital Modernization Project Installation Support License Amendment Request and Exemption Request Presentation - January 10, 2023 (EPID L-2022-LRM-0099) (Slides) ML22347A1532022-12-13013 December 2022 Public Meeting Presentation, December 15, 2022 Di&C License Amendment Request ML22319A0012022-11-14014 November 2022 Constellation Energy Generation, Llc'S Presentation for November 10, 2022 Public Meeting with NRC ML22312A4402022-11-10010 November 2022 Public Meeting with Constellation About Acceptance Review: Status of NRC Staff'S Acceptance Review of the Limerick Digital Instrumentation and Controls License Amendment Request 2024-09-24
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24267A0522024-09-24024 September 2024 Standby Gas Treatment Planned Amendment Preapplication Meeting Presentation ML24249A3092024-09-0606 September 2024 September 6, 2024, Public Meeting Related to Digital Instrumentation and Control Amendment Slides ML24232A2052024-08-12012 August 2024 Presentation Slides for Dresden End-of-Cycle Meeting ML24172A1092024-08-0707 August 2024 Scoping Power Point Presentation ML24200A2312024-07-22022 July 2024 Constellations Pre-Submittal Meeting Presentation About Peach Bottom ECCS Compensated Level System Replacement Project - July 22, 2024 ML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24134A2032024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment - Rev 0 ML24131A1282024-05-14014 May 2024 Lessons Learned for ECCS Digital I&C License Amendment ML24121A1862024-05-14014 May 2024 Attachment 3: Peach Bottom ECCS Compensated Level System Replacement Project Presentation Material (Non-Proprietary Information) ML24127A0952024-05-0606 May 2024 License Renewal Public Scoping Meeting May 2024 ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24060A1692024-03-0707 March 2024 NRC Slides for March 7, 2024 Regulatory Conference with Constellation Nuclear Regarding Braidwood ML24057A3032024-02-26026 February 2024 Attachment 1: Braidwood Station Regulatory Conference Information ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML24003A1812024-01-0808 January 2024 Handout - Byron-Braidwood Core Monitoring and Support System LAR Pre-Submittal Meeting January 8,2024 ML23345A0362023-12-11011 December 2023 ATWS Uet December 11, 2023 Pre-submittal Meeting Slides ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML24051A0462023-10-31031 October 2023 UFSAR Revision 17, Chapter 6, Figure 6.3-35-6.4-1, Redacted (2) ML24051A0472023-10-31031 October 2023 UFSAR Revision 17, Chapter 6, Figure 6.3-4-6.3-34, Redacted (1) ML23272A0622023-09-29029 September 2023 Ultimate Heat Sink Temperature Tech Spec Limit Change ML23262B2602023-09-19019 September 2023 Slides - Constellation - Pre-Application EP 9/25/2023 Meeting Handout ML23251A0782023-09-0606 September 2023 DRE1 Decom Pre-Submittal Slides ML23229A4832023-08-17017 August 2023 RR 20-Year ISI Pre-Submittal NRC Meeting Handout ML23229A1722023-08-17017 August 2023 RR Pen-75 Pre-Submittal NRC Meeting Handout ML23229A0132023-08-17017 August 2023 Relief Request for Alternative Requirements for Byron Unit 1 Reactor Pressure Vessel Inservice Inspection Intervals NRC Meeting Handout ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23170A0082023-06-29029 June 2023 Decommissioning Presentation for NRC Pre-submittal Meeting, June 29, 2023 ML23172A2092023-06-28028 June 2023 LRA - NRC Pre-Submittal Meeting Slides ML23172A2102023-06-28028 June 2023 CPS Lr Pre-Submittal Meeting Presentation ML23173A0462023-06-28028 June 2023 DNPS SLR Pre-submittal Meeting Presentation Rev. 1 ML23173A0472023-06-28028 June 2023 SLRA - NRC Presubmittal Meeting Slides - 6-28-23 ML23145A1322023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - Constellation Slides ML23165A0242023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - NRC Slides ML23145A1342023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - Constellation Slides ML23165A0162023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - NRC Slides ML23163A1642023-06-12012 June 2023 2022 Braidwood/Byron End-of-Cycle Meeting Presentation ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23103A4072023-04-13013 April 2023 Presentation Slides for Information Call on 4/13/23 N2E Recirc Discharge Nozzle Weld Repair 2nd Request for Alternative ML23094A1492023-04-11011 April 2023 Licensee Presentation on Whr Exemption Request for Public Meeting on April 11, 2023 ML23080A2972023-03-21021 March 2023 Presentation Slides for Information Call on 3/21/23 N2E Recirc Discharge Nozzle Weld Repair Request for Alternative ML23076A0442023-03-16016 March 2023 Pb U2 Scram Barrier Presentation KT Session ML23055A2712023-03-0202 March 2023 March 2, 2023, Preapplication Meeting to Discuss Planned Amendments to Adopt TSTF-505 and 10 CFR 50.69 (EPID L-2023-LRM-0007) - Slides ML23076A2812023-02-23023 February 2023 Licensee Presentation on Pressure Boundary Process ML23053A1562023-02-23023 February 2023 NRC Presentation Slides for Public Meeting on February 23, 2023 - 10 CFR 50.69 Alternate Processes License Amendment Request Preliminary Partial Denial ML23076A2822023-02-23023 February 2023 Licensee Presentation on Defense-in-Depth Process NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML23006A2572023-01-10010 January 2023 Digital Modernization Project Installation Support License Amendment Request and Exemption Request Presentation - January 10, 2023 (EPID L-2022-LRM-0099) (Slides) 2024-09-06
[Table view] |
Text
NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate the TS Unit Staff Qualification ANSI Requirements to the Exelon QATR February 27, 2018 Purpose for Discussion*Discuss evolution of current proposed Fleet License Amendment Request (LAR)*Provide overview of current LAR
- Discuss 6-month turnaround request
- Discuss the QATR proposed Mark-ups
Opening Remarks*Executive Sponsor for LAR-Julie Sickle*Chair of the ANS working level committee that developed ANSI/ANS-3.1-2014 3
Evolution*11/14ANSI/ANS-3.1-2014 approved*3/22/16Initial Exelon Pre-submittal meeting
- 4/6/16Pre-Submittal NRC meeting summary
- 3/27/17NRC approves TVA LAR to relocate TS ANSI requirements to TVA QAP*Fall/17Exelon decides to change original LAR scope to: Relocate the TS ANSI requirements to the
Exelon Quality Assurance Topical Report*Feb/18Fleet LAR internally reviewed and approved
- 2/27/18Pre-submittal meeting
- 3/1/18Submit Fleet LAR to NRC 4
LAR Overview
- Current Technical Specification Requirements for TS 5/6.3.1(Unit/Plant/Facility Staff Qualifications):ANS-3.1/N18.1-1971*Braidwood, Byron, Calvert Cliffs, Dresden, Ginna, LaSalle, Peach Bottom, Nine Mile Point Unit 1, Quad
Cities ANSI/ANS-3.1-1978*Clinton, Limerick, FitzPatrick, Nine Mile Point Unit 2, Three Mile Island Unit 1
- Proposed Technical Specification Requirements:"Each member of the unit [facility or plant] staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Exelon Quality
Assurance Topical Report" 5
LAR Overview*TS verbatim wording relocated to QATR*Minor exceptions for FitzPatrick
- Oyster Creek not included in Fleet Submittal
- Complies with the requirements of AL 95-06 (Relocation of Technical Specification Administrative Controls Related to
Quality Assurance)*These ANSI Standards are considered quality assurance controls*Consistent with TVA precedence for Browns Ferry and Sequoyah (ML16105A287) 6 6-Month Turnaround*The 6-month turnaround will position Exelon to more efficiently adopt and implement the ANSI-2014 standard upon issuance of
RG 1.8 Rev 4Prevents an additional year delay in Exelon achieving a common fleet standard and alignment for staff qualifications if no LAR is needed at the time RG 1.8 Rev 4 is issued*In 3/22/16 pre-submittal meeting NRC advised not to submit until NRC vetted the ANSI-2014 standard via the RG 1.8 Rev 4 process*In 3/22/16 meeting NRC had anticipated that the draft RG 1.8 Rev 4 would be noticed for public comments by end of May 2016*Draft RG 1.8 Rev 4 was noticed for public comments on 2/12/18
- Exelon has had a project in place for 3 years to adopt the ANSI-2014 standard 7
- TS wording relocated verbatim to QATR*FitzPatrick minor exceptions:Referenced "Entergy" QAP exceptionsTS 5.3.1 is already in most recent QATR revisionTS 5.2.2.f requires STAs at FitzPatrickto comply to the ANSI 1993 standard*Mark-ups throughout QATR Appendix C (Codes, Standards and Guides)*Proposed revisions are consistent with existing format for taking exceptions to RG compliance on a station by station
basis 8 QATR-Mark-ups RG 1.8 Rev 4 QATR revision*Exelon will implement the approved TS amendments within 60 days*No training standards are changed; only change management is to issue revised TS and revise the QATR
as proposed*After ANSI/ANS-3.1-2014 is endorsed via approved RG 1.8 Rev 4, Exelon will again revise the QATR via 10 CFR 50.54(a) evaluation process to adopt it*NRC exceptions to the ANSI/ANS-3.1-2014 that will be in the approved RG 1.8 Rev 4 will be carefully reviewed*It is expected that the subsequent 10 CFR 50.54(a) evaluation will not be a reduction in commitment 9