Constellation Energy Generation, Llc'S Presentation for November 10, 2022 Public Meeting with NRC
ML22319A001
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/14/2022
From:
Westinghouse
To:
NRC/NRR/DORL/LPL1
Sreenivas V, NRR/DORL/LPLI, 415-2597
References
WAAP-12503, Rev 0
Download: ML22319A001 (1)


Text

Westinghouse Non-Proprietary Class 3 © 2022 Westinghouse Electric Company LLC. All Rights Reserved.

Limerick DMP LAR Acceptance Issues WAAP-12503, Rev. 0 1

Westinghouse Non-Proprietary Class 3 © 2022 Westinghouse Electric Company LLC. All Rights Reserved.

Issue #1 CIM Priority Module WAAP-12503, Rev. 0 2

Westinghouse Non-Proprietary Class 3 © 2022 Westinghouse Electric Company LLC. All Rights Reserved.

WEC CIM TR WCAP-17179-P

  • Latest Revision is 6
  • NRC essentially reviewed Revision 6 as stated in LTR Section 6.2.1.1:

The CIM design is documented in the technical report WCAP-17179-P, AP1000 Component Interface Module Technical Report, Reference 8. Westinghouse has docketed a previous revision 2 of WCAP-17179-P (see ML102170259 for non-proprietary version) for NRC review as part of the 10 CFR 52 AP1000 Design Certification process. It is a Tier 2* document incorporated by reference (IBR) in the Vogtle 3&4 UFSAR. A[s] shown in the references, WCAP-17179-P is currently at Revision 6. Since the release of Revision 6, Vogtle 3&4 submitted LAR 16-021 (ML16293A033) capturing all the changes since WCAP-17179-P, Revision 2, in a UFSAR Appendix 7A.

  • Vogtle LAR 16-01, which the NRC reviewed and approved, included all changes to WCAP-17179-P including Revision 6, in the UFSAR Appendix 7A (LAR Enclosure 1P).

WAAP-12503, Rev. 0 3

Westinghouse Non-Proprietary Class 3 © 2022 Westinghouse Electric Company LLC. All Rights Reserved.

CIM Configuration Differences between AP1000 and LGS PPS

  • Although the CIM was developed initially for the AP1000 PMS, the design is generic as a priority module.
  • The AP1000 CIM is exactly the same component as the LGS CIM with no configuration changes.

- An AP1000 CIM can be swapped with an LGS PPS CIM without any configuration changes

  • The application of the CIM generic component for the LGS PPS is described in LTR Section 3.2.5

- CIM X-Port (SRNC) connects to the PPS just like it connects to the AP1000 PMS

- CIM Y-port connects to the DCS for manual control and component feedback in exactly the same way as the AP1000 PLS

- CIM Z-port connects to the DPS [DAS] for LGS PPS the same way as ADS Blocker is for PMS. AP1000 DAS does not go through [bypasses] the CIM.

  • Only AP1000 licensing precedence being credited is the safety development process for the CIM and not the application of the CIM.

WAAP-12503, Rev. 0 4

Westinghouse Non-Proprietary Class 3 © 2022 Westinghouse Electric Company LLC. All Rights Reserved.

CIM ISG-04 Compliance

  • WCAP-17179-P describes the CIM internal design including communication for the three ports. These design descriptions are unchanged since the CIM is unchanged from AP1000.
  • The 20 positions in ISG-04 Section 1 are very detailed in criteria for communications (e.g., fixed memory locations, etc.).
  • WCAP-17179-P provides an ISG-04 compliance to these 20 positions. Since the internal design of the CIM is unchanged, many of these dispositions are the same regardless of the external interface.
  • When a position is unique to PPS, this is explained in the LTR Section 3.2.21 ISG-04 table.
  • ISG-04 Sections 2 & 3 compliance are in LTR Section 3.2.5 and do not refer to WCAP-17179-P WAAP-12503, Rev. 0 5

Westinghouse Non-Proprietary Class 3 © 2022 Westinghouse Electric Company LLC. All Rights Reserved.

CIM ISG-04 Section 1 Compliance Example

Position Position Description Disposition

  • The WCAP disposition Number 2 The safety function of each safety CIM is directly applicable.

channel should be protected from adverse influence from outside the The CIM technical report disposition directly As described in LTR division of which that channel is a member. Information and signals applies to the PPS application without modification.

Sections 3.5.7 and originating outside the division must not be able to inhibit or delay [WCAP-17179-P disposition states: The safety 3.5.8 qualified isolators the safety function. This protection must be implemented within the function of the CIM is protected from adverse influence from outside its own division. The data are used.

affected division (rather than in the link from the non-safety system uses a qualified sources outside the division), and fiber optic isolator to ensure that faults from the must not itself be affected by any non-safety system can not affect the safety condition or information from function. The data from the non-safety system is outside the affected division. This isolated by the priority logic in the CIM.]

protection must be sustained despite any operation, malfunction, design error, communication error, or software error or corruption existing or originating outside the division.

WAAP-12503, Rev. 0 6

Westinghouse Non-Proprietary Class 3 © 2022 Westinghouse Electric Company LLC. All Rights Reserved.

CIM ISG-04 Section 1 Compliance Example

  • Example (CIM dispositioned in the LTR)

Position Position Description Disposition Number 3 A safety channel should not receive CIM any communication from outside its own safety division unless that The Y-port facilitates actuating component communication supports or feedbacks independent of the AC160 portions of enhances the performance of the the PPS that are susceptible to a CCF. This safety function. It should be provides the diverse display indications for these demonstrated that the added actuating components to support the DPS and system/software complexity SRM/SECY-93-087 Position 4. The Y-port also associated with the performance of facilitates LGS operations to control individual functions not directly related to the safety components from the DPS/RRCS.

safety function and with the receipt of information in support of those functions does not significantly increase the likelihood of software specification or coding errors, including errors that would affect more than one division. The applicant should justify the definition of significantly used in the demonstration.

WAAP-12503, Rev. 0 7

Westinghouse Non-Proprietary Class 3 © 2022 Westinghouse Electric Company LLC. All Rights Reserved.

CIM ISG-04 Section Compliance Example

  • Example - WCAP-17179-P disposition applies Position Position Description Disposition Number 6 Only predefined data sets should CIM be used by the receiving system.

Unrecognized messages and data The CIM technical report disposition directly should be identified and applies to the PPS application without dispositioned by the receiving modification.

system in accordance with the pre-specified design requirements.

Data from unrecognized messages must not be used within the safety logic executed by the safety function processor..

WAAP-12503, Rev. 0 8

Westinghouse Non-Proprietary Class 3 © 2022 Westinghouse Electric Company LLC. All Rights Reserved.

Issue #2 Partial Compliance to IEEE Std 603, Clause 5.6.1 WAAP-12503, Rev. 0 9

Westinghouse Non-Proprietary Class 3 © 2022 Westinghouse Electric Company LLC. All Rights Reserved.

Limerick PPS Compliance to IEEE Std 603 Clause 5.6.1

  • The LTR IEEE Std 603 / IEEE Std 7-4.3.2 Compliance Table has a typographical error in the Compliance status column