Letter Sequence Request |
|---|
EPID:L-2022-LLA-0140, Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Rev 1. Without Attachment 3 Enclosure (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML22353A632, ML23032A244, ML23187A096, ML23241A945, ML24093A091, ML24208A159, ML24243A048, ML24263A003, ML24310A260, ML24361A129, ML25094A145, ML25223A077
|
MONTHYEARML22046A0742022-02-14014 February 2022 Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Rev 1. Without Attachment 3 Enclosure Project stage: Request PMNS20220709, Meeting Between NRC Staff and Constellation Energy Generation, LLC on the Review of the Defense-in-Depth and Diversity Coping Analysis Supporting the Digital Upgrade of Instrumentation and Controls at Limerick Generating Station, Units2022-07-22022 July 2022 Meeting Between NRC Staff and Constellation Energy Generation, LLC on the Review of the Defense-in-Depth and Diversity Coping Analysis Supporting the Digital Upgrade of Instrumentation and Controls at Limerick Generating Station, Units 1 an Project stage: Request ML22224A1492022-08-15015 August 2022 Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Revision 2, July 2022, and the Licensing Technical Report for the Limerick Generating Station Units 1&2 Digital Project stage: Request PMNS20221157, Meeting Between NRC and Constellation Energy Generation, LLC Regarding Ongoing Acceptance Review of Limerick Generating Station, Units 1 and 2 Digital Instrumentation and Controls License Amendment Request2022-11-0707 November 2022 Meeting Between NRC and Constellation Energy Generation, LLC Regarding Ongoing Acceptance Review of Limerick Generating Station, Units 1 and 2 Digital Instrumentation and Controls License Amendment Request Project stage: Acceptance Review ML23009A5622022-11-0707 November 2022, 14 November 2022, 11 January 2023 Summary of December 15, 2022 Public Meeting on Limeric Digital I&C LAR Acceptance Project stage: Request ML22312A4402022-11-10010 November 2022 Public Meeting with Constellation About Acceptance Review: Status of NRC Staffs Acceptance Review of the Limerick Digital Instrumentation and Controls License Amendment Request Project stage: Acceptance Review ML22340A2172022-11-10010 November 2022, 21 November 2022, 6 December 2022 Summary of November 10, 2022, Meeting with Constellation Energy Generation, Lic on Acceptance Review of Limerick Digital Instrumentation and Controls License Amendment Requests Project stage: Request ML22319A0012022-11-14014 November 2022 Constellation Energy Generation, LLCs Presentation for November 10, 2022 Public Meeting with NRC Project stage: Request ML22320A1132022-11-21021 November 2022 Generation Station, Units 1 and 2 - Supplemental Information Needed for Acceptance of Digital Instrumentation and Controls License Amendment Requests Project stage: Acceptance Review ML22333A8172022-11-29029 November 2022 Response to Supplemental Information Needed for Acceptance of Digital Instrumentation and Controls License Amendment Requests for the Limerick Generating Station Project stage: Supplement ML22327A0192022-12-0606 December 2022 Summary of November 10, 2022, Meeting with Constellation Energy Generation, Lic on Acceptance Review of Limerick Digital Instrumentation and Controls License Amendment Requests Project stage: Acceptance Review ML22339A0642022-12-0909 December 2022 Generation Station, Unit Nos. 1 and 2 – Acceptance of Requested Licensing Action Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System Project stage: Acceptance Review ML22347A1532022-12-13013 December 2022 Public Meeting Presentation, December 15, 2022 Di&C License Amendment Request Project stage: Meeting ML23003A1702022-12-15015 December 2022 Official Transcript of the 12/15/22 Meeting with Constellation Energy to Discuss the Exceptions Described for the Independence and Operating Bypass with IEEE 603 of the Proposed Plant Protection System in the Limerick Station, Units 1 and 2 Project stage: Meeting ML23009A5872023-01-11011 January 2023 Summary of December 15, 2022, Meeting with Constellation Energy Generation, LLC on Potential Compliance with Certain Clauses of IEEE Standard 603-1991 in Limerick Digital Instrumentation and Controls License Amendment Requests Project stage: Meeting ML22353A6322023-01-17017 January 2023 Supplement to Regulatory Audit Plan in Support of Review of Digital I&C Upgrade to Protection Systems (EPID L-2022-LLA-0140) - Non-Proprietary Project stage: Other PMNS20230026, Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-01-20020 January 2023 Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23076A1062023-01-20020 January 2023, 12 May 2023 Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request ML23032A2442023-02-0606 February 2023 Regulatory Audit Plan for Review of Human Factors Engineering Portion of Limerick Digital Instrumentation and Controls License Amendment Request Project stage: Other ML23039A1412023-02-0808 February 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)-Human Factors Engineering Project stage: Supplement ML23046A2662023-02-15015 February 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System Project stage: Supplement PMNS20230032, Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-02-23023 February 2023 Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting PMNS20230033, Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-03-0606 March 2023 Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23121A0042023-03-0606 March 2023, 12 May 2023 Summary of March 29, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request PMNS20230254, Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-03-17017 March 2023 Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23118A3792023-03-17017 March 2023, 9 June 2023 April 12, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request ML23089A3242023-03-30030 March 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System Human Factors Engine Project stage: Supplement ML23095A2232023-04-0505 April 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Human Factors Project stage: Supplement PMNS20230423, Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-04-17017 April 2023 Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23132A3092023-04-17017 April 2023, 18 May 2023 Summary of May 3, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request ML23121A0022023-05-12012 May 2023 Summary of March 29, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23076A1042023-05-12012 May 2023 Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23076A0132023-05-12012 May 2023 March 15, 2023, Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting PMNS20230627, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-05-15015 May 2023 Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23145A0672023-05-15015 May 2023, 31 May 2023 May 17, 2023, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request PMNS20230606, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-05-16016 May 2023 Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23156A4172023-05-16016 May 2023, 9 June 2023 Summary of May 24, 2023, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request ML23132A3082023-05-18018 May 2023 Summary of May 3, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23143A3422023-05-23023 May 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System Project stage: Supplement ML23145A0352023-05-31031 May 2023 Summary of May 17, 2023, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23156A2472023-06-0909 June 2023 Summary of Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23118A3752023-06-0909 June 2023 Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23177A2242023-06-26026 June 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection . Project stage: Supplement PMNS20230846, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-07-18018 July 2023 Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23187A0962023-07-19019 July 2023 Generation Station, Unit Nos. 1 and 2 - Revised Estimated Review Completion Date Concerning License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System Project stage: Other 2023-02-23
[Table View] |
Text
Westinghouse Non-Proprietary Class 3 1
© 2022 Westinghouse Electric Company LLC. All Rights Reserved.
Limerick DMP LAR Acceptance Issues WAAP-12503, Rev. 0
Westinghouse Non-Proprietary Class 3 2
© 2022 Westinghouse Electric Company LLC. All Rights Reserved.
Issue #1 CIM Priority Module WAAP-12503, Rev. 0
3 Westinghouse Non-Proprietary Class 3
© 2022 Westinghouse Electric Company LLC. All Rights Reserved.
WEC CIM TR WCAP-17179-P
- NRC essentially reviewed Revision 6 as stated in LTR Section 6.2.1.1:
The CIM design is documented in the technical report WCAP-17179-P, AP1000 Component Interface Module Technical Report, Reference 8. Westinghouse has docketed a previous revision 2 of WCAP-17179-P (see ML102170259 for non-proprietary version) for NRC review as part of the 10 CFR 52 AP1000 Design Certification process. It is a Tier 2* document incorporated by reference (IBR) in the Vogtle 3&4 UFSAR. A[s] shown in the references, WCAP-17179-P is currently at Revision 6. Since the release of Revision 6, Vogtle 3&4 submitted LAR 16-021 (ML16293A033) capturing all the changes since WCAP-17179-P, Revision 2, in a UFSAR Appendix 7A.
- Vogtle LAR 16-01, which the NRC reviewed and approved, included all changes to WCAP-17179-P including Revision 6, in the UFSAR Appendix 7A (LAR Enclosure 1P).
WAAP-12503, Rev. 0
4 Westinghouse Non-Proprietary Class 3
© 2022 Westinghouse Electric Company LLC. All Rights Reserved.
CIM Configuration Differences between AP1000 and LGS PPS
- Although the CIM was developed initially for the AP1000 PMS, the design is generic as a priority module.
- The AP1000 CIM is exactly the same component as the LGS CIM with no configuration changes.
- An AP1000 CIM can be swapped with an LGS PPS CIM without any configuration changes
- The application of the CIM generic component for the LGS PPS is described in LTR Section 3.2.5
- CIM X-Port (SRNC) connects to the PPS just like it connects to the AP1000 PMS
- CIM Y-port connects to the DCS for manual control and component feedback in exactly the same way as the AP1000 PLS
- CIM Z-port connects to the DPS [DAS] for LGS PPS the same way as ADS Blocker is for PMS. AP1000 DAS does not go through [bypasses] the CIM.
- Only AP1000 licensing precedence being credited is the safety development process for the CIM and not the application of the CIM.
WAAP-12503, Rev. 0
5 Westinghouse Non-Proprietary Class 3
© 2022 Westinghouse Electric Company LLC. All Rights Reserved.
CIM ISG-04 Compliance
- WCAP-17179-P describes the CIM internal design including communication for the three ports. These design descriptions are unchanged since the CIM is unchanged from AP1000.
- The 20 positions in ISG-04 Section 1 are very detailed in criteria for communications (e.g., fixed memory locations, etc.).
- WCAP-17179-P provides an ISG-04 compliance to these 20 positions. Since the internal design of the CIM is unchanged, many of these dispositions are the same regardless of the external interface.
- When a position is unique to PPS, this is explained in the LTR Section 3.2.21 ISG-04 table.
- ISG-04 Sections 2 & 3 compliance are in LTR Section 3.2.5 and do not refer to WCAP-17179-P WAAP-12503, Rev. 0
6 Westinghouse Non-Proprietary Class 3
© 2022 Westinghouse Electric Company LLC. All Rights Reserved.
CIM ISG-04 Section 1 Compliance Example
Position Number Position Description Disposition 2
The safety function of each safety channel should be protected from adverse influence from outside the division of which that channel is a member. Information and signals originating outside the division must not be able to inhibit or delay the safety function. This protection must be implemented within the affected division (rather than in the sources outside the division), and must not itself be affected by any condition or information from outside the affected division. This protection must be sustained despite any operation, malfunction, design error, communication error, or software error or corruption existing or originating outside the division.
CIM The CIM technical report disposition directly applies to the PPS application without modification.
[WCAP-17179-P disposition states: The safety function of the CIM is protected from adverse influence from outside its own division. The data link from the non-safety system uses a qualified fiber optic isolator to ensure that faults from the non-safety system can not affect the safety function. The data from the non-safety system is isolated by the priority logic in the CIM.]
- The WCAP disposition is directly applicable.
As described in LTR Sections 3.5.7 and 3.5.8 qualified isolators are used.
WAAP-12503, Rev. 0
7 Westinghouse Non-Proprietary Class 3
© 2022 Westinghouse Electric Company LLC. All Rights Reserved.
CIM ISG-04 Section 1 Compliance Example
- Example (CIM dispositioned in the LTR)
Position Number Position Description Disposition 3
A safety channel should not receive any communication from outside its own safety division unless that communication supports or enhances the performance of the safety function. It should be demonstrated that the added system/software complexity associated with the performance of functions not directly related to the safety function and with the receipt of information in support of those functions does not significantly increase the likelihood of software specification or coding errors, including errors that would affect more than one division. The applicant should justify the definition of significantly used in the demonstration.
CIM The Y-port facilitates actuating component feedbacks independent of the AC160 portions of the PPS that are susceptible to a CCF. This provides the diverse display indications for these actuating components to support the DPS and SRM/SECY-93-087 Position 4. The Y-port also facilitates LGS operations to control individual safety components from the DPS/RRCS.
WAAP-12503, Rev. 0
8 Westinghouse Non-Proprietary Class 3
© 2022 Westinghouse Electric Company LLC. All Rights Reserved.
CIM ISG-04 Section Compliance Example
- Example - WCAP-17179-P disposition applies Position Number Position Description Disposition 6
Only predefined data sets should be used by the receiving system.
Unrecognized messages and data should be identified and dispositioned by the receiving system in accordance with the pre-specified design requirements.
Data from unrecognized messages must not be used within the safety logic executed by the safety function processor..
CIM The CIM technical report disposition directly applies to the PPS application without modification.
WAAP-12503, Rev. 0
Westinghouse Non-Proprietary Class 3 9
© 2022 Westinghouse Electric Company LLC. All Rights Reserved.
Issue #2 Partial Compliance to IEEE Std 603, Clause 5.6.1 WAAP-12503, Rev. 0
10 Westinghouse Non-Proprietary Class 3
© 2022 Westinghouse Electric Company LLC. All Rights Reserved.
Limerick PPS Compliance to IEEE Std 603 Clause 5.6.1
- The LTR IEEE Std 603 / IEEE Std 7-4.3.2 Compliance Table has a typographical error in the Compliance status column
- The Compliance/Conformance status should be C WAAP-12503, Rev. 0