Letter Sequence Other |
---|
|
|
MONTHYEARML23272A0622023-09-29029 September 2023 Ultimate Heat Sink Temperature Tech Spec Limit Change Project stage: Other ML23363A0942024-01-0303 January 2024 Summary of October 4, 2023, Pre Submittal Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding Revising Technical Specification 3.7.9. Ultimate Heat Sink (UHS) Project stage: Meeting 2023-09-29
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML24003A1812024-01-0808 January 2024 Handout - Byron-Braidwood Core Monitoring and Support System LAR Pre-Submittal Meeting January 8,2024 ML23345A0362023-12-11011 December 2023 ATWS Uet December 11, 2023 Pre-submittal Meeting Slides ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23272A0622023-09-29029 September 2023 Ultimate Heat Sink Temperature Tech Spec Limit Change ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23163A1642023-06-12012 June 2023 2022 Braidwood/Byron End-of-Cycle Meeting Presentation ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML22159A3332022-06-0909 June 2022 Presentation Slides for Braidwood and Byron 2021 End of Cycle Meeting ML21320A0672021-11-17017 November 2021 NRC Pre-Submittal Meeting - Braidwood, Unit 2, LAR for Removal of Unit 2 License Condition for Closure Stud Hole Location No. 35 (EPID L-2021-LRM-0089) (Slides) ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21166A3722021-06-15015 June 2021 End-of-Cycle Meeting Presentation ML21130A6252021-05-12012 May 2021 NRC Pre-Submittal Meeting - Braidwood LAR for Ultimate Heat Sink (EPID L-2021-LRM-0040) (Slides) ML21078A0952021-03-0808 March 2021 Session W20 - James Petty - Slide Deck 3 ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20209A5322020-07-24024 July 2020 2019 Braidwood and Byron End-of-Cycle Presentation ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20091L0432020-04-0101 April 2020 Public Meeting Handout for Braidwood, Unit 2, April 1, 2020 ML19318F9512019-11-20020 November 2019 Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency ML19317C9952019-11-12012 November 2019 In-Service Testing Supplemental Position Indication Relief Request NRC Pre-Application Meeting November 18, 2019 ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19022A2002019-01-23023 January 2019 Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18218A1122018-08-0808 August 2018 Reactor Pressure Vessel Head Penetration Nozzle Post Peening Follow-up Inspection Relief Requests for Byron Unit 2 and Braidwood Unit 1 ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML18018B4432018-01-25025 January 2018 Summary of December 17, 2017, Closed Meeting with Exelon Generation Company, LLC, Regarding Tvel Lead Test Assemblies to Be Placed in the Braidwood Reactor (EPID 000976/05000456/L-2017-LRM and 000976/05000457/L-2017-LRM-0047 ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML17132A1772017-05-25025 May 2017 LAR for Control Room Cooling at Byron and Braidwood Stations ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML16062A4222016-03-0202 March 2016 Meeting Slides for March 7, 2016 Public Meeting to Discuss Backfit Appeal ML15232A6832015-08-27027 August 2015 Stations Auxiliary Feedwater System - Unit Cross-tie License Amendment Request ML15209A9722015-07-30030 July 2015 Alloy 600 PWSCC Mitigation Plan for Reactor Vessel Head Penetration Nozzles Utilizing Cavitation Peening at Byron and Braidwood ML15133A4732015-05-20020 May 2015 Digital Upgrades of the Non-Safety Related NSSS Control Systems at Byron and Braidwood Stations ML14342A8122014-12-10010 December 2014 Presentation Slides for December 10, 2014 Meeting on Alloy 600 PWSCC Mitigation for Rvh Nozzles ML14261A1112014-09-22022 September 2014 2014 NEI Fire Protection Information Forum NRC Public Slides ML14251A4852014-09-10010 September 2014 Byron/Braidwood Auxiliary Feedwater Cross-Tie ML14177A6412014-06-23023 June 2014 UHS Pre-submittal Meeting Presentation ML13249A1892013-09-0404 September 2013 ILRT Extension LAR Pre-submittal Meeting Slides ML13224A2922013-08-0808 August 2013 2012 Braidwood Station End-of-Cycle Public Meeting NRC Presentation ML13107A0532013-04-23023 April 2013 Pre-Submittal Meeting MSIV Actuators Slides ML12227A5332012-08-14014 August 2012 NRC End-of-Cycle Slide Presentation 2024-01-08
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML24003A1812024-01-0808 January 2024 Handout - Byron-Braidwood Core Monitoring and Support System LAR Pre-Submittal Meeting January 8,2024 ML23345A0362023-12-11011 December 2023 ATWS Uet December 11, 2023 Pre-submittal Meeting Slides ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23272A0622023-09-29029 September 2023 Ultimate Heat Sink Temperature Tech Spec Limit Change ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23163A1642023-06-12012 June 2023 2022 Braidwood/Byron End-of-Cycle Meeting Presentation NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML22159A3332022-06-0909 June 2022 Presentation Slides for Braidwood and Byron 2021 End of Cycle Meeting ML21320A0672021-11-17017 November 2021 NRC Pre-Submittal Meeting - Braidwood, Unit 2, LAR for Removal of Unit 2 License Condition for Closure Stud Hole Location No. 35 (EPID L-2021-LRM-0089) (Slides) ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21166A3722021-06-15015 June 2021 End-of-Cycle Meeting Presentation ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML21130A6252021-05-12012 May 2021 NRC Pre-Submittal Meeting - Braidwood LAR for Ultimate Heat Sink (EPID L-2021-LRM-0040) (Slides) ML21078A0952021-03-0808 March 2021 Session W20 - James Petty - Slide Deck 3 ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20209A5322020-07-24024 July 2020 2019 Braidwood and Byron End-of-Cycle Presentation ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20091L0432020-04-0101 April 2020 Public Meeting Handout for Braidwood, Unit 2, April 1, 2020 ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18218A1122018-08-0808 August 2018 Reactor Pressure Vessel Head Penetration Nozzle Post Peening Follow-up Inspection Relief Requests for Byron Unit 2 and Braidwood Unit 1 ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17132A1772017-05-25025 May 2017 LAR for Control Room Cooling at Byron and Braidwood Stations ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16062A4222016-03-0202 March 2016 Meeting Slides for March 7, 2016 Public Meeting to Discuss Backfit Appeal ML15232A6832015-08-27027 August 2015 Stations Auxiliary Feedwater System - Unit Cross-tie License Amendment Request ML15209A9722015-07-30030 July 2015 Alloy 600 PWSCC Mitigation Plan for Reactor Vessel Head Penetration Nozzles Utilizing Cavitation Peening at Byron and Braidwood ML15204A4932015-07-23023 July 2015 Bb Station Requests for Relief for Alternate Examination Frequency ML15204A5052015-07-23023 July 2015 EPRI Tech Basis for Brd-Byr Head RR ML15133A4732015-05-20020 May 2015 Digital Upgrades of the Non-Safety Related NSSS Control Systems at Byron and Braidwood Stations ML15135A4262015-05-19019 May 2015 EOC Public Meeting Slides ML15104A4932015-04-14014 April 2015 Preliminary Site-Specific Results of the Environmental Review for Braidwood Station License Renewal ML14342A8122014-12-10010 December 2014 Presentation Slides for December 10, 2014 Meeting on Alloy 600 PWSCC Mitigation for Rvh Nozzles ML14261A1112014-09-22022 September 2014 2014 NEI Fire Protection Information Forum NRC Public Slides ML14251A4852014-09-10010 September 2014 Byron/Braidwood Auxiliary Feedwater Cross-Tie ML14177A6412014-06-23023 June 2014 UHS Pre-submittal Meeting Presentation ML13249A1892013-09-0404 September 2013 ILRT Extension LAR Pre-submittal Meeting Slides ML13224A2882013-08-12012 August 2013 2012 Braidwood Station End-of-Cycle Public Meeting Licensee Presentation ML13224A2922013-08-0808 August 2013 2012 Braidwood Station End-of-Cycle Public Meeting NRC Presentation ML13107A0532013-04-23023 April 2013 Pre-Submittal Meeting MSIV Actuators Slides ML12227A5172012-08-14014 August 2012 Licensee End-of-Cycle Public Meeting Slides ML12227A5332012-08-14014 August 2012 NRC End-of-Cycle Slide Presentation 2024-01-08
[Table view] |
Text
Braidwood Ultimate Heat Sink Temperature Tech Spec Limit Change Diurnal Curve Methodology Agenda:
Problem Statement Braidwood Technical Specification 3.7.9 limits the maximum temperature of the Ultimate Heat Sink to 102 °F.
In July of 2020, environmental conditions resulted in a recorded UHS temperature that exceeded 101 °F. Although the maximum average temperature remained below the TS limit, the existing margin is < 1 °F. This summer, the maximum recorded UHS temperature was approximately 96
°F. Furthermore, a Braidwood Resiliency Assessment from March of 2022 concluded that many stations are experiencing some operational challenges due to extreme temperatures in the past five years. Actions are necessary to increase the UHS temperature margin in order to ready the plant for operation in warmer future periods.
Braidwood Ultimate Heat Sink Temperature Tech Spec Limit Change Page 2
Proposed Solution The diurnal curve allows the Tech Spec limit to change throughout the day following the diurnal temperature cycle of the UHS. The allowed limit will be the lowest early in the day with the maximum in early evening, around 18:00. The early evening is the time of maximum UHS temperature due to the solar heating throughout the day.
Preliminary assessment for the Maximum Diurnal Temperature is shown in Figure 1 below.
Braidwood Ultimate Heat Sink Temperature Tech Spec Limit Change Page 3
Scope Overview
- 1. UHS Post-Accident Temperature Analysis (Calc. ATD-0109)
-Revise UHS temperature response analysis post-accident to determine diurnal cycle curve that meets the limitations of not exceeding 104 °F in the first 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />
-No Containment Integrity Analyses update required for temperature less than or equal to 104 °F
- 2. Non-accident/non-LOCA analyses (104 °F max temp from Diurnal Cycle)
-CC HX Thermal Analysis (Calc. BRW-97-1072-M): Revise for higher SX temperature (104 °F)
-GL 96-06 Analysis - SX to the RCFCs: Revise for higher SX temperature (104 °F)
-Diesel Driven Aux. Feedwater Pump operation for 2-hours post-LOCA (Calc. BRW-13-0031-M)
-Revise for higher SX temperature (104 °F)
- 3. Determine maximum normal OPS CC temperature (dependent on CC HX Thermal Analysis)
-Perform EC for CC normal temperature if higher than 105 °F (expected to be around 107 °F)
-Disposition CC Temperature increase above 105 °F SX = Essential Service Water System CC = Component Cooling System Braidwood Ultimate Heat Sink Temperature Tech Spec Limit Change Page 4
Schedule
- Winter/Spring 2024 - Complete calculations and Engineering Change for Tech Spec limit change
- - Submit License Amendment Request to NRC
- Early Summer 2025 - NRC approval of License Amendment Request Therefore, the increased Tech Spec limit for the Ultimate Heat Sink will be utilized during the expected warmer temperature months in 2025.
Braidwood Ultimate Heat Sink Temperature Tech Spec Limit Change Page 5