Letter Sequence Acceptance Review |
|---|
EPID:L-2022-LLA-0140, Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Rev 1. Without Attachment 3 Enclosure (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML22353A632, ML23032A244, ML23187A096, ML23241A945, ML24093A091, ML24208A159, ML24243A048, ML24263A003, ML24310A260, ML24361A129, ML25094A145, ML25223A077
|
MONTHYEARML22046A0742022-02-14014 February 2022 Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Rev 1. Without Attachment 3 Enclosure Project stage: Request PMNS20220709, Meeting Between NRC Staff and Constellation Energy Generation, LLC on the Review of the Defense-in-Depth and Diversity Coping Analysis Supporting the Digital Upgrade of Instrumentation and Controls at Limerick Generating Station, Units2022-07-22022 July 2022 Meeting Between NRC Staff and Constellation Energy Generation, LLC on the Review of the Defense-in-Depth and Diversity Coping Analysis Supporting the Digital Upgrade of Instrumentation and Controls at Limerick Generating Station, Units 1 an Project stage: Request ML22224A1492022-08-15015 August 2022 Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Revision 2, July 2022, and the Licensing Technical Report for the Limerick Generating Station Units 1&2 Digital Project stage: Request PMNS20221157, Meeting Between NRC and Constellation Energy Generation, LLC Regarding Ongoing Acceptance Review of Limerick Generating Station, Units 1 and 2 Digital Instrumentation and Controls License Amendment Request2022-11-0707 November 2022 Meeting Between NRC and Constellation Energy Generation, LLC Regarding Ongoing Acceptance Review of Limerick Generating Station, Units 1 and 2 Digital Instrumentation and Controls License Amendment Request Project stage: Acceptance Review ML23009A5622022-11-0707 November 2022, 14 November 2022, 11 January 2023 Summary of December 15, 2022 Public Meeting on Limeric Digital I&C LAR Acceptance Project stage: Request ML22312A4402022-11-10010 November 2022 Public Meeting with Constellation About Acceptance Review: Status of NRC Staffs Acceptance Review of the Limerick Digital Instrumentation and Controls License Amendment Request Project stage: Acceptance Review ML22340A2172022-11-10010 November 2022, 21 November 2022, 6 December 2022 Summary of November 10, 2022, Meeting with Constellation Energy Generation, Lic on Acceptance Review of Limerick Digital Instrumentation and Controls License Amendment Requests Project stage: Request ML22319A0012022-11-14014 November 2022 Constellation Energy Generation, LLCs Presentation for November 10, 2022 Public Meeting with NRC Project stage: Request ML22320A1132022-11-21021 November 2022 Generation Station, Units 1 and 2 - Supplemental Information Needed for Acceptance of Digital Instrumentation and Controls License Amendment Requests Project stage: Acceptance Review ML22333A8172022-11-29029 November 2022 Response to Supplemental Information Needed for Acceptance of Digital Instrumentation and Controls License Amendment Requests for the Limerick Generating Station Project stage: Supplement ML22327A0192022-12-0606 December 2022 Summary of November 10, 2022, Meeting with Constellation Energy Generation, Lic on Acceptance Review of Limerick Digital Instrumentation and Controls License Amendment Requests Project stage: Acceptance Review ML22339A0642022-12-0909 December 2022 Generation Station, Unit Nos. 1 and 2 – Acceptance of Requested Licensing Action Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System Project stage: Acceptance Review ML22347A1532022-12-13013 December 2022 Public Meeting Presentation, December 15, 2022 Di&C License Amendment Request Project stage: Meeting ML23003A1702022-12-15015 December 2022 Official Transcript of the 12/15/22 Meeting with Constellation Energy to Discuss the Exceptions Described for the Independence and Operating Bypass with IEEE 603 of the Proposed Plant Protection System in the Limerick Station, Units 1 and 2 Project stage: Meeting ML23009A5872023-01-11011 January 2023 Summary of December 15, 2022, Meeting with Constellation Energy Generation, LLC on Potential Compliance with Certain Clauses of IEEE Standard 603-1991 in Limerick Digital Instrumentation and Controls License Amendment Requests Project stage: Meeting ML22353A6322023-01-17017 January 2023 Supplement to Regulatory Audit Plan in Support of Review of Digital I&C Upgrade to Protection Systems (EPID L-2022-LLA-0140) - Non-Proprietary Project stage: Other PMNS20230026, Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-01-20020 January 2023 Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23076A1062023-01-20020 January 2023, 12 May 2023 Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request ML23032A2442023-02-0606 February 2023 Regulatory Audit Plan for Review of Human Factors Engineering Portion of Limerick Digital Instrumentation and Controls License Amendment Request Project stage: Other ML23039A1412023-02-0808 February 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)-Human Factors Engineering Project stage: Supplement ML23046A2662023-02-15015 February 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System Project stage: Supplement PMNS20230032, Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-02-23023 February 2023 Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting PMNS20230033, Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-03-0606 March 2023 Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23121A0042023-03-0606 March 2023, 12 May 2023 Summary of March 29, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request PMNS20230254, Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-03-17017 March 2023 Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23118A3792023-03-17017 March 2023, 9 June 2023 April 12, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request ML23089A3242023-03-30030 March 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System Human Factors Engine Project stage: Supplement ML23095A2232023-04-0505 April 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Human Factors Project stage: Supplement PMNS20230423, Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-04-17017 April 2023 Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23132A3092023-04-17017 April 2023, 18 May 2023 Summary of May 3, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request ML23121A0022023-05-12012 May 2023 Summary of March 29, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23076A1042023-05-12012 May 2023 Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23076A0132023-05-12012 May 2023 March 15, 2023, Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting PMNS20230627, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-05-15015 May 2023 Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23145A0672023-05-15015 May 2023, 31 May 2023 May 17, 2023, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request PMNS20230606, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-05-16016 May 2023 Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23156A4172023-05-16016 May 2023, 9 June 2023 Summary of May 24, 2023, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Request ML23132A3082023-05-18018 May 2023 Summary of May 3, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23143A3422023-05-23023 May 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System Project stage: Supplement ML23145A0352023-05-31031 May 2023 Summary of May 17, 2023, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23156A2472023-06-0909 June 2023 Summary of Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23118A3752023-06-0909 June 2023 Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23177A2242023-06-26026 June 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection . Project stage: Supplement PMNS20230846, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22023-07-18018 July 2023 Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML23187A0962023-07-19019 July 2023 Generation Station, Unit Nos. 1 and 2 - Revised Estimated Review Completion Date Concerning License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System Project stage: Other 2023-02-23
[Table View] |
Text
Status of NRC Staffs Acceptance Review of the Limerick Digital Instrumentation and Controls License Amendment Request November 10, 2022 Public Meeting
Purpose of Meeting
- Discuss Identified Information Insufficiencies
- Discuss Potential Information Insufficiencies
- Describe potential acceptance issues
- Describe potential review challenge
- Communicate options NRC staff are considering MW 2
License Amendment Request
- Constellation Submitted LAR on September 26, 2022
- Supporting documents submitted prior to LAR on August 12, 2022
- Non-Proprietary copies of LAR and supporting documents available in NRC document management system ADAMS at Accession Nos. ML22269A569 and ML22224A149
MM 3
Limerick LAR Acceptance Review Team 5 NRR Divisions, 9 Technical Branches, 15 Reviewers, 3 Project Managers
- Rossnyev Alvarado*
- Richard Stattel
- Samir Darbali
- Hang Vu
- Jack Zhao
- Ming Li
- Michael Breach
- Steven Alferink
- Edward Stutzcage
- Deanna Zhang
- Aaron Armstrong
- Kamishan Martin
- Nan Chien
- Charley Peabody
- Tarico Sweat
- Bhagwat Jain
- Michael Marshall
- Ed Miller MM 4
Overview of NRC Staffs Acceptance Review Process
- After receipt of an amendment request, the NRC determines whether the request contain sufficient technical information both in scope and depth for the NRC staff to complete the detailed technical review
- Constellation has provided significant information in many technical areas to support the digital modification
- Constellation has identified information that needs to be provided and a schedule for providing the information needed to complete the review
- NRC staff have identified additional areas that need discussion with Constellation to help determine whether sufficient information for review has been provided and a potential review challenge MM 5
Identified Information Insufficiencies
- Constellation has provided a schedule for providing the following information that is currently not include in LAR:
- Human Factors Engineering (HFE) Conceptual Verification Results Summary Report (RSR): February 9, 2023
- HFE Preliminary Verification RSR: March 30, 2023
- Seismic Equipment Qualification (EQ) Summary Report, Revision 0: April 18, 2023
- Environmental EQ Summary Report, Revision 1: May 3, 2023
- Electromagnetic Compatibility (EMC) EQ Summary Report, Revision 2: June 16, 2023 MM 6
Planned Changes to the Request
- Constellation plans to replace Attachment 5, System Design Specification (SyDS), Revision 2
- WNA-DS-04900-GLIM-P, Revision 3, LGS PPS System Design Specification (SyDS):
February 17, 2023 MM 7
Potential Information Insufficiencies
- 1. Use of CIM for priority module
- 2. Compliance of independence between redundant portions of a safety system with criteria in IEEE 603 (IEEE 279)
- 3. Compliance of bypass removal with criteria in IEEE 603 (IEEE 279)
RA 8
Potential Acceptance Issue (1 of 3)
- Issue: Use of CIM priority module Basis/Context: Section 3.2.5 of the LTR describes the CIM priority module. For the Limerick application, the PPS uses the CIM priority module to perform signal prioritization between the safety system and the DAS. The CIM was developed for AP1000 application. The LAR references WCAP-17179-P for technical description of the CIM.
The NRC reviewed the WCAP-17179-P as part of AP1000. However, in the response to generic open items (GOI) 8 in Section 6.2.1.1 of the LTR, the licensee noted the NRC reviewed Rev. 2, and in the LAR, and noted that the TR is currently at Rev. 6. The LTR does not describe the changes made versus what the staff reviewed for AP1000.
Also, the CIM configuration for AP1000 was modified for Vogtle 3 & 4. The LTR references the review and approval of this configuration as part of AP1000 and Vogtle 3 and 4 ITAAC. The LTR does not include enough information to determine if the planned use of the CIM module for Limerick is similar from how it was used in Vogtle 3 and 4.
In Tables 3.2. 5-1, 3.2.5-2, and 3.2.21-1 the licensee describes conformance with DI&C ISG-04. These tables refer to WCAP-17179-P and the review and approval by the NRC of the ITAAC for AP1000 and Vogtle 3 &4 for disposition. However, because of the items identified above, it is not clear how the PPS system component interface modules for Limerick conform with DI&C ISG-04.
RA 9
Potential Acceptance Issue (1 of 3) cont.
- Issue: Use of CIM priority module
- Description of the differences between Rev. 2 and Rev. 6 of WCAP-17179-P.
- Information describing the configuration of the CIM module for Limerick and similarities with the application developed for Vogtle 3 and 4.
- Description on how the CIM module configuration for Limerick demonstrate conformance with DI&C-ISG-04.
RA 10
Potential Acceptance Issue (2 of 3)
- Issue: Compliance of independence between redundant portions of a safety system with criteria in IEEE 603 (IEEE 279)
Basis/Context: Independence between redundant portions of a safety system: Justification not provided for partial compliance with Clause 5.6.1. Noncompliance part of clause is not described in the referenced Section 3.5.14.1, and a case seems to be made for full compliance.
Information Needed: The licensee will need to identify the portions of IEEE 603 Clause 5.6.1 which have been identified as non-compliant and will need to provide a justification for why this non-compliance is acceptable with the installation of the new system.
RS 11
Potential Acceptance Issue (3 of 3)
Basis/Context: Exception for IEEE Std 603, Clauses 6.6 and 7.4 is identified in LTR Table 7-1. The NRC staff also notes that the proposed design does not appear to be compliant with the equivalent Clause 4.12, Operating Bypasses in IEEE Std 279. The referenced LTR Section 3.3.2.8 describes the exception but does not provide justification other than referring to UFSAR Section 15.0.6.
The UFSAR also does not justify the exception from Bypass Removal criteria.
Information Needed: The licensee should provide a justification for why the non-compliance with the criteria of IEEE Std 603 Clauses 6.6, and 7.4 or IEEE Std 279, Clause 4.12 is acceptable with the installation of the PPS system. If this non-compliance issue is to be characterized as an exception from the regulatory requirements of IEEE 279 (Limericks License Basis).
RS 12
Potential Review Challenge(1 of 1)
- Issue: Partial and non-compliance identified by Constellation (a different aspect of potential acceptance issues 2 of 3 and 3 of 3)
Basis/Context: In the WEC LTR, which was submitted prior to the LAR, Constellation provides a compliance/conformance matrix for IEEE Standards 603-1991 and 7-4.3.2-2003. In the matrix Constellation identifies 3 clauses from IEEE Standard 603-1991 that the PPS is either partially compliant or non-compliant.
As justification for the partial and non-compliance, Constellation references UFSAR and emergency operating procedures, which are documents licensee can change without prior NRC approval. The partial and non-compliance identified by the Constellation would require prior NRC approval. NRC staff plans to confirm that the (1) appropriate prior NRC approval was obtained for the identified partial compliance and non-compliance and (2) whether this aspect of the current licensing basis for the existing system(s) carries over to the new PPS.
MM 13
- The NRC staff will consider the clarifications provided by Constellation
- The NRC staff will decide whether there is a need to give Constellation an opportunity to supplement the LAR prior to making an acceptance decision NRC Staffs Acceptance Review - Next Step MM 14
15 Status of NRC Staffs Acceptance Review of the Limerick Digital Instrumentation and Controls License Amendment Request November 10, 2022 Public Meeting
Acronyms and Initialisms ADAMS - Agencywide Documents Access and Management System BTP - Branch Technical Position CIM - Component Interface Module DAS - Diverse Actuation System DEX - Division of Engineering and External Hazards DRA - Division of Risk Assessment DSS - Division of Safety Systems DORL - Division of Operating Reactor Licensing DRO - Division of Reactor Oversight EMC - Electromagnetic Compatibility ESFAS - Engineered Safety Features Actuation System EQ - Equipment Qualification HFE - Human Factors Engineering IEEE - Institute of Electrical and Electronics Engineers ITAAC - Inspections, Tests, Analyses, And Acceptance Criteria LAR - License Amendment Request LTR - Licensing Technical Report NRR - Office of Nuclear Reactor Regulation PPS - Plant Protection System RPS - Reactor Protection System RSR - Results Summary Report TR - Technical Report TR - Topical Report WEC - Westinghouse Electric Company 16