Presentation Slides for Dresden End-of-Cycle Meeting
ML24232A205
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 08/12/2024
From:
NRC/RGN-III/DORS/RPB1
To:
Shared Package
ML24057A270 List:
References
Download: ML24232A205 (1)


Text

Dresden Nuclear Power Station, Units 2 and 3 Annual Assessment Meeting 2023 Reactor Oversight Process Nuclear Regulatory Commission - Region 3

The NRC mission is to regulate the civilian use of radioactive materials, to protect the public health and safety, and to protect the environment.

The NRC goal is to foster public confidence in the NRC mission.

Dresden Resident Inspectors Jakob Steffes Senior Resident Inspector Courtney St. Peters Resident Inspector Zackery Helgert Acting Resident Inspector

NRC Annual Assessment Summary Constellation operated the plant safely and in a manner that preserved the public health and safety and protected the environment.

Dresden, Units 2 and 3, were in the Licensee Response Column of the NRCs ROP Action Matrix at the end of 2023.

No cross-cutting issues were identified Dresden Nuclear Power Station

NRC Inspection Activities 2248 hours0.026 days <br />0.624 hours <br />0.00372 weeks <br />8.55364e-4 months <br /> of inspection and related activities 2 resident inspectors on site - residents make four quarterly inspection reports per year and walk through the plant every day 12 regional inspections 2 major team inspections Comprehensive Engineering Team Biennial Problem Identification and Resolution Dresden Units 2 and 3 for 2023

Significance Threshold Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Performance Indicators Inspection Findings Green Very low safety or security significance finding White Low to moderate safety or security significance finding Yellow Substantial safety or security significance finding Red High safety or security significance finding

NRC 2023 Assessment and Inspection Plans for 2024 In 2023, Dresden Units 2 and 3 had all Green Findings and Performance Indicators. Therefore, NRC plans baseline inspections for 2024.

NRC Social Media Channels Facebook: https://www.facebook.com/nrcgov/

X (formerly Twitter): https://x.com/nrcgov YouTube: https://www.youtube.com/user/NRCgov Flickr: https://www.flickr.com/photos/nrcgov/sets LinkedIn: https://www.linkedin.com/company/u-s--nuclear-regulatory-commission/mycompany/

GovDelivery:

https://service.govdelivery.com/accounts/USNRC/subscriber/new X

Contacting the NRC Report an emergency

  • (301) 816-5100 (call collect)

Report a safety concern

  • (800) 695-7403
  • Allegation@nrc.gov General information or questions
  • www.nrc.gov Contact Dresden Resident Inspectors
  • (630)-829-9985

Questions Public Affairs Officers Prema Chandrathil Public Affairs Officer 630-829-9663 Prema.Chandrathil@nrc.gov Viktoria Mitlyng Senior Public Affairs Officer 630-829-9662 Viktoria.Mitlyng@nrc.gov

Feedback/Comments/

General Questions Public Meeting Feedback Form:

1.

Navigate to https://feedback.nrc.gov/pmfs/

2.

Enter meeting code number: 20240932

End of Presentation Nuclear Regulatory Commission Region 3 Lisle, IL 8/8/2024