Braidwood and Byron Core Monitoring and Support System January 8, 2024

Agenda

  • Purpose and Background
  • Reason for the Change
  • Key Milestones
  • References 2 Byron-Braidwood - Core Monitoring and Support System Pre-submittal Meeting 01/08/2024

Purpose and Background

  • On February 13, 2001, Byron and Braidwood received NRC approval of license amendment (Reference 1) allowing for the relaxation of several Technical Specifications when the Best Estimate Analyzer for Core Operations Nuclear (BEACON) power distribution monitoring system (PDMS) is Operable.
  • PDMS is a component within Westinghouses BEACON Core Monitoring System which allows for the relaxation of several Technical Specifications.
  • Currently, the Byron and Braidwood Technical Specifications are written such that Limiting Conditions for Operations (LCOs) can be completed satisfactory in the event PDMS becomes INOPERABLE.

3 Byron-Braidwood - Core Monitoring and Support System Pre-submittal Meeting 01/08/2024

License Amendment Request Scope

  • Constellation proposes to remove the current PDMS relaxations from Byron and Braidwood Technical Specifications, reverting to its previous licensing bases which aligns with industry Standard Technical Specifications (STS), NUREG 1431 Revision 1.
  • This proposal would revert changes made to incorporate PDMS that was issued on 13 February 2001.

- TS 3.2.3 - Axial Flux Difference (AFD) was revised and approved for both Braidwood and Byron stations in 2018 (Reference 2) to remove any association with PDMS. Therefore, the proposed changes as part of this upcoming request will not include a revision to TS 3.2.3.

4 Byron-Braidwood - Core Monitoring and Support System Pre-submittal Meeting 01/08/2024

License Amendment Request Scope (continued)

  • Technical Specification Sections impacted:

TS Section Notes Remove references to inoperable PMDS and restore action to perform Surveillance Requirements 3.1.4 - Rod Group Alignment Limits (SRs).

Clarify Required Actions (RAs) to verify position of the rods with inoperable Digital Rod Position 3.1.7 - Rod Position Indication Indications (DRPIs) indirectly. Completion Time (CT) of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> added.

Set RAs, CT , and SRs to ensure compliance and monitoring to FQ(Z) limit. Remove references to 3.2.1 - Heat Flux Hot Channel Factor PDMS (to align with STS 3.2.1B from NUREG 1431).

3.2.2 - Nuclear Enthalpy Rise Hot Channel Factor State specific SR for FNH (SR 3.2.2.1) and remove references to PDMS.

Remove reference for inoperable PDMS as QPTR TS ensures QPTR limit is met so the gross radial 3.2.4 - Quadrant Power Tilt Ratio (QPTR) power distribution remains consistent with Safety Analysis.

3.2.5 - Departure from Nucleate Boiling Ratio (DNBR) Delete from TS Restore Condition D to TS LCO which involves One Power Range Neutron Flux-High Channel 3.3.1 - Reactor Trip System (RTS) inoperable. Ensure that under specific unit status of TS applicability that all instrumentation performing a RTS function is operable.

5.6.5 - Core Operating Limits Report (COLR) Remove text LCO 3.2.5, Departure from Nucleate Boiling Ratio (DNBR) from 5.6.5.a list 5 Byron-Braidwood - Core Monitoring and Support System Pre-submittal Meeting 01/08/2024

Reason for the change

  • Standard Technical Specifications (STS) for Westinghouse Plants (NUREG-1431) are agnostic to the specific core monitoring system software used to satisfy LCOs and Surveillance Requirements (SRs).
  • Byron and Braidwood are currently outliers in the U.S. PWR fleet by referencing a specific core monitoring system (i.e., PDMS) in Technical Specifications.
  • Constellation desires to align Byron and Braidwood closer to industry STS to position itself for future projects.

6 Byron-Braidwood - Core Monitoring and Support System Pre-submittal Meeting 01/08/2024

Key Milestones

  • Pre-Submittal Meeting - 08 January 2024
  • Expected Submittal Date -29 March 2024
  • Requested Approval Date - 30 April 2025 7 Byron-Braidwood - Core Monitoring and Support System Pre-submittal Meeting 01/08/2024

References

1. Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2 - Issuance of Amendments to Technical Specifications for Implementation of the Best Estimate Analyzer for Core Operations Nuclear Power Distribution Monitoring System (TAC Nos. MA8254, MA8255, MA8252, and MA8253), February 13, 2001
2. Braidwood Station, Units 1 and 2, and Byron Station, Unit Nos. 1 and 2 - Issuance of Amendments Regarding Axial Flux Difference Technical Specifications (EPID L-2018-LLA-0098), December 12, 2018 8 Byron-Braidwood - Core Monitoring and Support System Pre-submittal Meeting 01/08/2024

Questions 9