Category:Letter
MONTHYEARIR 05000354/20240032024-10-23023 October 2024 Integrated Inspection Report 05000354/2024003 ML24295A3742024-10-23023 October 2024 Project Manager Assignment ML24291A0572024-10-17017 October 2024 License Amendment Request (LAR) – Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 1 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0059, 2024 Annual 10 CFR 50.46 Report2024-09-30030 September 2024 2024 Annual 10 CFR 50.46 Report LR-N24-0056, Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-09-26026 September 2024 Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001-01, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves NUREG-1433, – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 52024-07-16016 July 2024 – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 ML24197A0552024-07-15015 July 2024 Requalification Program Inspection ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 LR-N24-0027, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram 05000354/LER-2023-003-01, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges 05000354/LER-2023-003, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-02-12012 February 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers 2024-09-05
[Table view] Category:License-Operator
MONTHYEARML24197A0552024-07-15015 July 2024 Requalification Program Inspection NTD-24-027, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-20020 May 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations NTD-23-038, Response to RIS 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-11011 May 2023 Response to RIS 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23121A1412023-05-0101 May 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22312A4352022-10-0303 October 2022 Exam Form 1.3-1 ML22312A5892022-09-0101 September 2022 Exam Proctor Log ML22284A1102022-08-0101 August 2022 Administered Operating Test ML22284A1052022-08-0101 August 2022 Administered Written Examination with Answer Key ML23055B0522022-08-0101 August 2022 Exam Forms (Delayed Release) 2.3-4, 3.2-1, 3.2-2, 3.3-1, 4.1 ML23055A3812022-07-31031 July 2022 Exam Forms 2.3-1, 2.3-2, 3.4-1 ML22003A0042022-01-0303 January 2022 Senior Reactor and Reactor Operator Initial License Examinations ML21117A0842021-04-0909 April 2021 Final Q/A Related - Forms (Folder 1) ML21076A0622021-03-0909 March 2021 Draft Operating Test (Section a, Section B, Section C)(Folder 2) ML21076A0632021-03-0909 March 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21076A0642021-03-0909 March 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21076A0662021-03-0909 March 2021 Final Operating Test (Section a, B, and C) (Folder 3) ML21075A1022021-03-0909 March 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21075A1052021-03-0909 March 2021 Draft Written Examination (Folder 2) ML21075A1032021-03-0909 March 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21075A1042021-03-0909 March 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21032A1022021-02-0101 February 2021 Operator Licensing Examination Approval ML21117A0832021-01-28028 January 2021 Final Q/A Related Form ES-401-6 (Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 NTD-20-014, Response to RIS 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-03-18018 March 2020 Response to RIS 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML21041A1732019-10-0101 October 2019 Original Question for Modified Question 80 ML19219A1022019-08-0606 August 2019 Operator Licensing Examination Approval ML19009A2502019-01-0808 January 2019 GFE Annual Registration Letter - 2019 Examinations, Region III ML19302F9902019-01-0808 January 2019 NRC Corporate Notification Letter (Folder 1) ML18311A1572018-07-24024 July 2018 Operating Test Retake - Examination Approval Letter (Folder 1) ML18311A1562018-07-14014 July 2018 NRC Corporate Notification Letter (Folder 1) NTD-18-044, Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000354/20183012018-04-0303 April 2018 Initial Operator Licensing Examination Report 05000354/2018301 ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17178A3092017-06-22022 June 2017 Senior Reactor and Reactor Operator Initial License Examinations LR-N17-0098, Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17034A1062017-02-0202 February 2017 December 7, 2016, NRC Generic Fundamentals Examination Results for Hope Creek Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML16293A1232016-10-18018 October 2016 September 7, 2016, NRC Generic Fundamentals Examination Results for Hope Creek Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML16295A0562016-10-11011 October 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML16295A0552016-10-10010 October 2016 Post Exam Comments and Resolution (Folder 1) ML16295A0572016-10-0101 October 2016 Final Operating Exam (Sections a, B, and C) (Folder 3) ML17186A1212016-08-16016 August 2016 Final Qa/Related Forms (Folder 1) ML17186A1452016-08-14014 August 2016 Final Outlines (Folder 3) ML17186A2372016-07-28028 July 2016 Facility Comments on Draft Facility-Developed Exam (Written) (Folder 2) ML17186A2442016-07-28028 July 2016 Draft - Outlines (Folder 2) LR-N16-0125, Response to RIS 2016-09, Preparation of Scheduling of Operator Licensing Examination2016-07-0808 July 2016 Response to RIS 2016-09, Preparation of Scheduling of Operator Licensing Examination ML16053A1032016-02-22022 February 2016 Senior Reactor and Reactor Operator Initial License Examinations - Hope Creek Generating Station ML15163A2462015-12-17017 December 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) 2024-07-15
[Table view] Category:Part 55 Examination Related Material
MONTHYEARNTD-24-027, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-20020 May 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations NTD-23-038, Response to RIS 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-11011 May 2023 Response to RIS 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23121A1412023-05-0101 May 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22312A4352022-10-0303 October 2022 Exam Form 1.3-1 ML22312A5892022-09-0101 September 2022 Exam Proctor Log ML22284A1102022-08-0101 August 2022 Administered Operating Test ML23055B0522022-08-0101 August 2022 Exam Forms (Delayed Release) 2.3-4, 3.2-1, 3.2-2, 3.3-1, 4.1 ML22284A1052022-08-0101 August 2022 Administered Written Examination with Answer Key ML23055A3812022-07-31031 July 2022 Exam Forms 2.3-1, 2.3-2, 3.4-1 ML22003A0042022-01-0303 January 2022 Senior Reactor and Reactor Operator Initial License Examinations ML21117A0842021-04-0909 April 2021 Final Q/A Related - Forms (Folder 1) ML21075A1052021-03-0909 March 2021 Draft Written Examination (Folder 2) ML21076A0662021-03-0909 March 2021 Final Operating Test (Section a, B, and C) (Folder 3) ML21076A0622021-03-0909 March 2021 Draft Operating Test (Section a, Section B, Section C)(Folder 2) ML21075A1022021-03-0909 March 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21075A1032021-03-0909 March 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21075A1042021-03-0909 March 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21076A0632021-03-0909 March 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21076A0642021-03-0909 March 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21032A1022021-02-0101 February 2021 Operator Licensing Examination Approval ML21117A0832021-01-28028 January 2021 Final Q/A Related Form ES-401-6 (Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 NTD-20-014, Response to RIS 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-03-18018 March 2020 Response to RIS 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML21041A1732019-10-0101 October 2019 Original Question for Modified Question 80 ML19219A1022019-08-0606 August 2019 Operator Licensing Examination Approval ML19302F9902019-01-0808 January 2019 NRC Corporate Notification Letter (Folder 1) ML18311A1572018-07-24024 July 2018 Operating Test Retake - Examination Approval Letter (Folder 1) ML18311A1562018-07-14014 July 2018 NRC Corporate Notification Letter (Folder 1) NTD-18-044, Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000354/20183012018-04-0303 April 2018 Initial Operator Licensing Examination Report 05000354/2018301 ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17178A3092017-06-22022 June 2017 Senior Reactor and Reactor Operator Initial License Examinations LR-N17-0098, Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML16293A1232016-10-18018 October 2016 September 7, 2016, NRC Generic Fundamentals Examination Results for Hope Creek Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML16295A0562016-10-11011 October 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML16295A0552016-10-10010 October 2016 Post Exam Comments and Resolution (Folder 1) ML16295A0572016-10-0101 October 2016 Final Operating Exam (Sections a, B, and C) (Folder 3) ML17186A1212016-08-16016 August 2016 Final Qa/Related Forms (Folder 1) ML17186A1452016-08-14014 August 2016 Final Outlines (Folder 3) ML17186A2442016-07-28028 July 2016 Draft - Outlines (Folder 2) ML17186A2372016-07-28028 July 2016 Facility Comments on Draft Facility-Developed Exam (Written) (Folder 2) ML16053A1032016-02-22022 February 2016 Senior Reactor and Reactor Operator Initial License Examinations - Hope Creek Generating Station ML15163A2452015-12-17017 December 2015 Draft Written Exam (Folder 2) ML15163A2462015-12-17017 December 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15198A2332015-07-14014 July 2015 June 10, 2015, NRC Generic Fundamentals Examination Results for Hope Creek Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML15163A2412015-06-10010 June 2015 Final Outlines (Folder 3) ML16145A2442015-03-31031 March 2015 Final Qa/Related Forms (Folder 1) ML15100A0422015-03-0606 March 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) 2024-05-20
[Table view] |
Text
[Type here]
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406
-2713 April 3, 2018 Mr. Peter P. Sena, III President and Chief Nuclear Officer PSEG Nuclear LLC
- N09 P. O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT: HOPE CREEK GENERATING STATION
- INITIAL OPERATOR LICENSING EXAMINATION REPORT 05000 354/201 8 30 1
Dear Mr. Sena:
On February 21, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at Hope Creek. The enclosed examination report documents the examination results, which were discussed on March 20, 2018, with Mr. M. Shaffer, Operations Training Manager, and other members of your staff.
The examination included the evaluation of two applicants for reactor operator license s, six applicants for instant senior reactor operator license s, and one applicant for an upgrade senior reactor operator licens e. The written and operating examinations were developed using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors,"
Revision 11. The license examiners determined that eight of nine applicants satisfied the requirements of Title 10 o f the Code of Federal Regulation s (10 CFR) Part 55, and the appropriate licenses were issued on March 20, 2018. No findings were identified during this examination.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice,"
a copy of this letter and its enclosure will be available electronically for public inspection in the NRC
's Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document s Access Management System (ADAMS). ADAMS is accessible from the NRC w ebsite http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/ Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No.
50-354 License No.
NPF-57
Enclosure:
Examination Report 05000 354/20 1 8 30 1
w/Attachment:
Supplementary Information cc w/encl:
Distribution via ListServ SUBJECT: HOPE CREEK GENERATING STATION
- INITIAL OPERATOR LICENSING EXAMINATION REPORT 05000354/2018301 DATED APRIL 3, 2018 DISTRIBUTION w/encl (via e-mail) DLew, RA (R1ORAMail Resource)
DCollins, DRA (R1ORAMail Resource)
DPelton, DRP (R1DRPMail Resource)
MGray, DRP (R1DRPMail Resource)
JYerokun, DRS (R1DRSMail Resource)
BWelling, DRS (R1DRSMAIL Resource)
MFerdas, DRP FBower, DRP RBarkley, DRP MDraxton, DRP JHawkins, DRP, SRI SHaney, DRP, RI JBowen, RI, OEDO RidsNrrPMHopeCreek Resource RidsNrrDorlLpl1 Resource ROPReports Resource DOCUMENT NAME
- G:\DRS\Operations Branch
\FISH\Exam 18 -HC Feb 2018
\EXAM REPORT.docx ADAMS PKG: ML17138A098 ADAMS ACCESSION NO.
- ML18095A013 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB NAME TFish DEJackson DATE 4/2/18 4/3/18 OFFICIAL RECORD CO PY 1 Enclosure EXAMINATION REPORT U.S. NUCLEAR REGULATORY COMMISSION REGION I Docket No. 50-354 License No.
NPF-57 Report No.
05000 354/20 1 8301 Licensee: PSEG Nuclear LLC Enterprise Identifier
- L-2018-OLL-0017 Facility: Hope Creek Location: Hancocks Bridge, NJ 08038 Dates: February 12
-15, 2018 (Operating Test Administration)
February 21, 2018 (Written Examination Administration)
February 27, 2018 (Licensee Submitted Post Exam Package)
February 16
- March 9, 2018 (NRC Examination Grading)
March 20, 2018 (Licenses Issued) Examiners:
T. Fish, Chief Examiner, Operations Branch B. Fuller, Senior Operations Engineer J. DeMarshall, Senior Operations Engineer T. Hedigan, Operations Engineer Approved By:
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety
2
SUMMARY
ER 05000 354/201 8301; 2/12-15 and 21/2018
- Hope Creek
- Initial Operator Licensing Examination Report
. Four NRC examiners evaluated the competency of two applicants for reactor operator licenses, six applicants for instant senior reactor operator licenses, and one applicant for an upgrade senior reactor operator license. The facility developed the examinations using NUREG
-1021, "Operator Licensing Examination Standard s for Power Reactors," Revision 11. The written examination was administered by the facility on February 21, 2018. NRC examiner s administered the operating tests February 12
-15, 2018. The NRC examiner s determined that eight of nine applicant s satisfied the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 55, and the appropriate licenses have been issued.
No findings were identified.
3
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities Initial Operator License Examination
.1 License Applications
a. Scope
The examiners reviewed all license applications submitted by the licensee to ensure the applications reflected that each applicant satisfied relevant license eligibility requirements. The applications were submitted on NRC Form 398, "Personal Qualification Statement," and NRC Form 396, "Certification of Medical Examination by Facility Licensee." The examiner s also audited three of the license application s in detail to confirm that they accurately reflected the subject applicant's qualifications. This audit focused on the applicant's experience and on
-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings were identified.
.2 Operator Knowledge and Performance
a. Examination Scope
On February 21, 2018, the licensee proctored the administration of the written examinations to all applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on February 27, 2018
. The NRC examination team administered the various portions of the operating examination to all applicants on February 12
-15, 2018. The applicants for reactor operator licenses participated in at least two dynamic simulator scenarios, in a control room and facilities walkthrough test consisting of 11 system tasks, and an administrative test consisting of four administrative tasks. The applicants seeking an instant senior reactor operator license participated in at least two dynamic simulator scenarios, a control room and facilities walkthrough test consisting of 10 system tasks, and an administrative test consisting of five administrative tasks. The applicant seeking an upgrade senior reactor license participated in two dynamic simulator scenarios, a control room and facilities walkthrough test consisting of five system tasks, and an administrative test consisting of five administrative tasks.
b. Findings
Eight of nine applicants passed all parts of the operating test and the written examination. For the written examinations, the reactor operator applicants' average score was 84.00 percent and ranged from 80.00 to 88.00 percent, the senior operator applicants' average score was 93.29 percent and ranged from 90.00 to 97.00 percent. The text of the examination questions may be accessed in the ADAMS system under the accession numbers noted in Attachment 1. In accordance with current NRC policy, the release of this written examination in ADAMS to the public will be delayed for two years
. Chapter ES
-403 and Form ES 1 of NUREG 1021 require the licensee to analyze the validity of any written examination questions that were missed by half or more of the applicants. Licensee training staff performed this analysis and forwarded it to the chief examiner.
.3 Initial Licensing Examination Development
a. Examination Scope
The facility developed the examinations in accordance with NUREG
-1021, Revision 11. All licensee facility training and operations staff involved in examination preparation and validation wer e listed on a security agreement. The facility licensee submitted both the written and operating examination outlines on September 6, 2017. The chief examiner reviewed the outlines against the requirements of NUREG
-1021, and provided comments to the licensee. The facility licensee submitted the draft examination package on December 6, 2017. The chief examiner reviewed the draft examination package against the requirements of NUREG
-1021, and provided comments to the licensee. The NRC conducted an onsite validation of the operating examinations and provided further comments during the week of January 11, 2018. The licensee satisfactorily completed comment resolution on February 2, 2018
.
b. Findings
The examiners determined that the written and operating examinations initially submitted by the licensee were within the range of acceptability expected for a proposed examination.
No findings were identified.
.4 S imulation Facility Performance
a. Examination Scope
The examiners observed simulator performance with regard to plant fidelity during the examination validation and administration.
b. Findings
No findings were identified.
.5 Examination Security
a. Examination Scope
The examiners reviewed examination security for examination development and during both the onsite preparation week and examination administration week for compliance with NUREG
-1021, Revision 11 requirements. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings were identified
.
4OA6 Meetings, Including Exit
The chief examiner presented the examination results to Mr. M. Shaffer, Operations Training Manager , and other members of the licensee's staff on March 20, 2018. The licensee acknowledged the findings presented.
The licensee did not identify any information or materials used during the examination as proprietary.
ATTACHMENT
=SUPPLEMENTARY
INFORMATION=
KEY POINTS OF CONTACT
Licensee Personnel
- D. Rein, Exam Author
- P. Breidenbach, Exam Author
ITEMS OPENED, CLOSED, AND DISCUSSED
NONE.
ADAMS DOCUMENTS REFERENCED
Accession No.
- ML 18087A161 -
- FINAL-Written Exam (Note:
- In accordance with current
- NRC policy, the release of this written examination in ADAMS to the public will be delayed for
- 2.5 years.)
- Accession No.
- ML 18087A163 -
- FINAL-Operating Exam
(Note: In accordance with current NRC policy, the release of this operating examination in ADAMS to the public will be delayed for 2.5 years.)