ES-301 Administrative Topics Outline Form ES-301-1 Facility:
Hope Creek Generating Station Date of Examination:
2/23/15 Examination Level:
RO IZI SRO D Operating Test Number:
1 Administrative Topic (see Note)
Conduct of Operations Conduct of Operations Equipment Control Radiation Control Type Code*
D,S M,S M,S Describe activity to be performed Complete Daily Surveillance Log. (ZZ016)
Operator completes required Daily Surveillance Log entries in accordance with HC.OP-DL.ZZ-0026. (Items 61-74)
Perform Power Changes During Operation-Single Loop Operations (ZZ047)
Operator performs Section 5.1, Jet Pump Operability Verification, of HC.OP-ST.BB-0007 and identifies and reports any Unsatisfactory information Isolate Leak (ZZ048)
Operator identifies the mechanical and electrical components, and their required positions, to isolate, vent, and drain a leak identified on an ECCS system pipe using controlled station Mechanical Drawings.
Perform Licensed Operator Review of MEES.(ZZ014)
Emergency Procedures/Plan M,S Operator performs the Licensed Operator Review of the Major Equipment and Electrical Status (MEES) Form.
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (:5 3 for ROs; ::;; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (?: 1)
(P)revious 2 exams (:5 1; randomly selected)
ES-301 Administrative Topics Outline Form ES-301-1 Facility:
Hope Creek Generating Station Date of Examination:
2/23/15 Examination Level:
ROD SRO ~
Operating Test Number:
1 Administrative Topic Type Describe activity to be performed (see Note)
Code*
Complete an Action Statement Log Entry. (ZZ029)
Conduct of Operations D,R Operator completes a manual Action Statement log entry for the failure of a containment isolation valve, AND submits for CONCURRENCE REVIEW in accordance with OP-HC-108-115-1001.
Review Operations Logs In Use During A Shift (ZZ049)
Conduct of Operations N,R Operator performs the CRS review of Attachment 3 of OP-HC-108-116-1001, Spent Fuel Pool Decay Heat Load Determination.
Review Power Distribution Lineup. (ZZ022)
Equipment Control M,R Operator performs the SM/CRS review of the completed HC.OP-ST.ZZ-0001.and identifies applicable Technical Specification requirements.
Determine Liquid Radwaste Rad Monitor CTB Weir Radiation Control D,P,R Flow (ZZ050) [2013 NRG]
Operator performs the Control Room Supervisor review, and correction, of HG.OP DL.ZZ 0026 Surveillance Log Classify an event. (ECG007)
Emergency Procedures/Plan D,S Operator classifies an event and makes notifications within identified Critical Times in accordance with EP-HC-111-101 NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (:s; 3 for ROs; :s; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (~ 1)
(P)revious 2 exams (:s; 1; randomly selected)
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:
Hope Creek Generating Station Date of Examination:
2/23/15 Exam Level:
RO~ SRO-I~
SRO-U D Operating Test No:
1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System I JPM Title Type Code*
Safety Function
- a.
REACTOR PROTECTION SYSTEM (SB013)
Operator resets RPS, identifies a control rod out of position and A,D,E 7
reseats the control rod in accordance with HC.OP-SO.SB-0001.
- b.
RWCU (BG003)
Operator responds to a containment isolation and restores E,N 2
- c.
CRDH SYSTEM (BF012)
Operator responds to a loss of CRD regulating function in A,D,E,L 1
accordance with HC.OP-AB.IC-0001.
- d.
CONTROL ROOM HVAC (GK003)
Operator places Control Area Ventilation Train B in-service EN,N 9
without coolingin accordance with Steps 5.8.1 through 5.8.5 of HC.OP-SO.GK-0001.
- e.
PRIMARY CONTAINMENT SYSTEM (GS011)
Operator vents the Drywell, and secures venting the Drywell in EN,N 5
accordance with HC.OP-AB.CONT-0001.
- f.
SACS (EG008)
A,D,E 8
Operator implements Condition A of HC.OP-AB.COOL-0002.
- g.
MAIN TURBINE (AC007)
Operator responds to an abnormal Main Turbine condition during A,D 3
Main Turbine roll in accordance with HC.OP-SO.AC-0001.
- h.
RECIRCULATION SYSTEM (88001) RO ONLY Operator resets the Reactor Recirculation Runbacks in D,E 4
accordance with HC.OP-SO.BB-0002 In-Plant Systems<21 (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i.
CRDH SYSTEM (BF001)
D,R 1
Operator alternates CRDH System Flow Control Valves in accordance with Section 5.2 of HC.OP-SO.BF-0001.
- j.
INSTRUMENT GAS (KL006)
E,EN,N 5
Operator overrides a valve containment isolation signal in accordance with HC.OP-AB.COMP-0002
- k.
120 VAC Distribution (PN004)
A,N 6
Operator removes a 120 VAC inverter from service IAW HG.OP-SO.PN-0001 All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO I SRO-I I SRO-U (A)lternate path 4-6 I 4-6 I 2-3 (C)ontrol room (D)irect from bank
- 59/:58/:54 (E)mergency or abnormal in-plant
<:1/<:1/<:1 (EN)gineered safety feature
- I - I <:1 (control room system)
(L)ow-Power I Shutdown
<:1/<:1/<:1 (N)ew or (M)odified from bank including 1 (A)
<:2/<:2/<:1 (P)revious 2 exams
- 5 3 I :5 3 I :5 2 (randomly selected)
(R)CA
<:1/<:1/<:1 (S)imulator ES-301, Page 23 of 27
Appendix D Scenario Outline Form ES-D-1 Facility:
Hope Creek Scenario No.:
1 Op-Test No.:
2015 Examiners:
Operators:
(SRO)
(RO)
(BOP)
Initial Conditions:
84% ~ower. Power lowered for RFP maintenance.
Turnover:
Place RFP in service. Raise Reactor power to 100%.
New Event Malf.
Event Event No.
No.
Type*
Description 1
N(BOP)
Place RFP In Service N(SRO) 2 R(ATC)
Raise Reactor Power with Recirculation System R(SRO)
Recirculation Pump Runaway TS( SRO)
Loss of 100482 TS( SRO) 5 M(ALL)
LOCA 6
C(ATC)
RPS Failure-ATWS/ARI Scram Successful C(SRO) 7 C(BOP)
HPCI Injection Valve Failures-Loss of Condensate C(SRO)
(N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor Appendix D, Page 38 of 39
Appendix D Scenario Outline Form ES-D-1 Facility:
Hope Creek Scenario No.:
2 Op-Test No.:
2015 Examiners:
Operators:
(SRO)
(RO)
(BOP)
Initial Conditions:
95% Power. Power reduction in progress for a rod pattern adjustment.
Turnover:
Swap EHC ~umps. Reduce power to 85%. Hold for Reactor Engineer review of plant conditions.
ESG-073 modified.
Event Malf.
Event Event No.
No.
Type*
Description 1
N(BOP)
Lower Power With Control Rods and Recirculation Flow R(SRO) l(ATC) 3 l(SRO)
Flow Unit Failure TS( SRO) 4 C(ALL)
EHC System Leak 5
M(ALL)
ATWS-Main Turbine Trip-Bypass Valve Failure 6
C(BOP)
Failure of SBLC to Automatically Initiate C(SRO) 7 C(ATC)
CRD Pump trip-EOP Implementation Failure C(SRO)
(N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor Appendix D, Page 38 of 39
Appendix D Scenario Outline Form ES-D-1 Facility:
Ho~e Creek Scenario No.:
3 Op-Test No.:
2015 Examiners:
Operators:
(SRO)
(RO)
(BOP)
Initial Conditions:
100% Power.
Turnover:
Maintain 100% ~ower.
ESG-002 Modified Event Malf.
Event Event No.
No.
Type*
Inadvertent SBLC System Actuation TS( SRO) 3 TS( SRO)
Loss of 100410 4
M(ALL)
C(BOP)
Auto Start Failure of EDGs C(SRO) 6 C(BOP)
RCIC Overspeed Trip C(SRO) 7 C(ATC)
SACS Pump Trip C(SRO)
(N)ormal, (R)eactivity,
( l)nstrument, (C)omponent, (M)ajor Appendix D, Page 38 of 39
Appendix D Scenario Outline Form ES-D-1 Facility:
Hope Creek Scenario No.:
4 Op-Test No.:
2015 Examiners:
Operators:
(SRO)
(RO)
(BOP)
Initial Conditions:
100% Power.
Turnover:
Maintain 100% power.
ESG-082 Modified Event Malf.
Event Event No.
No.
Type*
Description 1
N(BOP)
Containment 02 Weekly Surveillance Test N(SRO)
Earthquake-Service Air Compressor Trip C(SRO) 4 C(ATC)
RWCU Pump Leak-Failure to Automatically Isolate C(SRO) 5 C(ALL)
Air Leak w/Multiple Rod Drift -Scram 6
M(ALL)
LOP-Station Blackout 7
C(BOP)
LOCA Requiring Steam Cooling-RCIC Isolation C(SRO) 8 C(BOP)
(N)ormal, (R)eactivity, (l)nstrument, (C)omponent, (M)ajor Appendix D, Page 38 of 39