ES-401 Written Examination Review Worksheet Form ES-401-9
- 1.
- 2.
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. Other
- 6.
- 7.
- 8.
Q#
LOK LOD (F/H)
(1-5)
Stem Cues T/F Cred. Partial Job-Minutia
- I Back-Q=
SRO B/M/N U/E/S Explanation Focus Dist.
Link units ward KIA Only 1
F 2
B s
2 F
2 N
s 3
F 2
B s
4 F
3 M
s 5
H 3
B s
6 F
3 B
s 7
H 3
M E
Include picture of MCR controller 8
H 3
B s
9 H
4 B
s 10 H
3 N
s 11 H
3 B
s 12 F
3 N
s 13 H
3 N
s 14 H
2 B
s 15 H
3 M
E Change correct answer to B due to bypass which is procedurally installed 16 H
2 B
s 17 H
3 B
s Page 1
ES-401 2
Form ES-401-9
- 1.
- 2.
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. Other
- 6.
- 7.
- 8.
LOK LOO Q#
(F/H)
(1-5)
Stem Cues T/F Cred. Partial Job-Minutia
- /
Back-Q=
SRO B/M/N U/E/S Explanation Focus Dist.
Link units ward KIA Only 18 H
3 B
E Change reactor power to 9% to comply with station procedures.
Mode switch cannot be in startup at 10% per procedures.
19 H
3 N
E Change stem to say valve failed closed instead of bad operator action.
20 H
3 B
s 21 H
2 N
s 22 H
3 B
s 23 F
3 B
s 24 F
2 B
s 25 F
2 M
s 26 F
3 N
s 27 H
3 B
s 28 F
3 B
s 29 H
3 B
s 30 H
2 B
s 31 F
3 N
s 32 H
3 N
s 33 F
3 B
s 34 H
3 N
E Adjust stem for increased rad indications on all 4 MSLs.
35 H
2 B
s 36 H
3 M
s 37 F
2 B
s Page 2
ES-401 2
Form ES-401-9
- 1.
- 2.
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. Other
- 6.
- 7.
- 8.
LOK LOO Q#
(F/H)
(1-5)
Stem Cues T/F Cred. Partial Job-Minutia
- /
Back-Q=
SRO B/M/N U/E/S Explanation Focus Dist.
Link units ward KIA Only 38 F
3 B
s 39 F
3 B
s 40 F
3 M
s 41 F
2 B
s 42 H
3 B
E Add "normal electrical line up" to stem 43 H
3 B
s 44 F
3 N
s 45 F
3 N
s 46 H
3 B
s 47 F
3 B
s 48 F
2 B
s 49 H
3 B
s 50 F
3 N
s 51 H
3 B
s 52 H
3 B
E Change stem from "equipment" to "floor" drain.
53 H
3 B
s 54 F
2 M
s Modify stem to say "electrical transient caused a generator 55 H
3 N
E regulation protection relay actuation" instead of listing alarms received.
56 H
3 M
s 57 F
3 B
s Page 3
ES-401 2
Form ES-401-9
- 1.
- 2.
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. Other
- 6.
- 7.
- 8.
LOK LOO Q#
(F/H)
(1-5)
Stem Cues T/F Cred. Partial Job-Minutia
- I Back-Q=
SRO B/M/N U/E/S Explanation Focus Dist.
Link units ward KIA Only 58 H
4 B
s 59 H
4 B
s 60 H
3 B
s 61 F
3 B
s 62 F
3 B
s 63 H
3 M
s 64 H
3 N
s 65 H
3 B
s 66 F
3 N
s 67 F
2 N
s 68 F
3 B
s 69 F
2 N
s 70 H
3 B
s 71 H
3 N
E Change "steam isolation dampers" to "back draft dampers" 72 F
3 N
E Change "ATWAS" to "ATWS" 73 F
3 N
E Include elevation numbers for each location.
74 F
2 M
s 75 F
2 M
s 76 H
3 B
E Include procedure numbers.
77 H
3 B
s 78 H
3 B
s Page4
ES-401 2
Form ES-401-9
- 1.
- 2.
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. Other
- 6.
- 7.
- 8.
LOK LOO Q#
(F/H)
(1-5)
Stem Cues T/F Cred. Partial Job-Minutia
- I Back-Q=
SRO B/M/N U/E/S Explanation Focus Dist.
Link units ward KIA Only 79 H
3 M
s 80 H
3 M
s 81 H
3 M
s 82 H
2 B
s 83 H
3 B
s 84 H
3 N
s 85 H
3 N
s 86 H
3 N
s 87 H
3 B
s Remove "after any associated LCO time expires" from stem.
88 F
3 B
E 89 H
3 B
s 90 H
2 B
E In answer A.) change "IRM trip system" to "RPS trip system" 91 H
3 N
s 92 H
4 N
s 93 H
3 M
s 94 F
2 B
s 95 F
3 N
s 96 F
3 B
s 97 H
3 N
s 98 H
3 B
E Identify the function of the transmitter.
Page 5
ES-401 2
Form ES-401-9
- 1.
- 2.
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. Other
- 6.
- 7.
- 8.
LOK LOD Q#
(F/H)
(1-5)
Stem Cues T/F Cred. Partial Job-Minutia
- I Back-Q=
SRO B/M/N U/E/S Explanation Focus Dist.
Link units ward KIA Only 99 H
3 N
s 100 F
2 B
s Page 6