Line 2: |
Line 2: |
| | number = ML060530185 | | | number = ML060530185 |
| | issue date = 03/02/2006 | | | issue date = 03/02/2006 |
| | title = Browns Ferry Nuclear Plant, Unit 1, 2, and 3- Summary of February 13, 2006, Telephone Conference with the Tennessee Valley Authority Regarding the Browns Ferry Extended Power Uprate Amendment Requests (TAC Nos. MC3812, MC3743, and MC3744 | | | title = and 3- Summary of February 13, 2006, Telephone Conference with the Tennessee Valley Authority Regarding the Browns Ferry Extended Power Uprate Amendment Requests (TAC Nos. MC3812, MC3743, and MC3744 |
| | author name = Chernoff M H | | | author name = Chernoff M H |
| | author affiliation = NRC/NRR/ADRO/DORL | | | author affiliation = NRC/NRR/ADRO/DORL |
Letter Sequence Other |
---|
TAC:MC3743, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) TAC:MC3744, (Approved, Closed) TAC:MC3812, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML041980222, ML042370100, ML050590036, ML051150191, ML051160036, ML051320148, ML051430036, ML051570381, ML051660602, ML052290397, ML060530185, ML060670304, ML060680586, ML060680590, ML060680596, ML060680599, ML060720253, ML060720272, ML060720273, ML060720281, ML060720293, ML060720295, ML060720298, ML060720303, ML060720354, ML060880464, ML060880469, ML061040217, ML061660002, ML061770163, ML061840027, ML061910705, ML062050056, ML062090482, ML062090555, ML062120411, ML062130163, ML062130343, ML062200277, ML062210102, ML062220647, ML062270240, ML062360160, ML062400472, ML062510022, ML062510371, ML062510374, ML062510382, ML062510385, ML062620064... further results
|
MONTHYEARML0607202531975-05-23023 May 1975 May 23, 1975 - Final Summary Report Unit 2 Startup Project stage: Other ML0606805861975-05-23023 May 1975 May 23, 1975 - Final Summary Report Startup, Enclosure 4 Project stage: Other ML0607202721977-05-0909 May 1977 May 9, 1977 - Final Summary Report Unit 3 Startup Project stage: Other ML0606805901977-05-0909 May 1977 May 9, 1977 - Final Summary Report Startup, Enclosure 5 Project stage: Other ML0607202731992-11-30030 November 1992 a Guide for Environmental and Best Management Practices for Tennessee Valley Authority Transmission Construction and Maintenance Activities Project stage: Other ML0607202982001-03-13013 March 2001 Environmental Assessment Bear Creek Reservoirs Land Management Plan Project stage: Other ML0607202952001-03-31031 March 2001 Bear Creek Reservoirs Land Management Plan, Resource Stewardship Bear Creek Watershed Project stage: Other ML0606805992001-03-31031 March 2001 Bear Creek Reservoirs Land Management Plan Project stage: Other ML0419802222004-07-0909 July 2004 Technical Specification 436 - Increased Main Steam Isolation Valve Leakage Rate Limits and Exemption from 10CFR50, Appendix J Project stage: Other ML0423701002004-08-23023 August 2004 Browns Ferry, Ltr, Framatome Proprietary Review Project stage: Other ML0423708492004-08-23023 August 2004 (BFN) - Unit 1- Proposed Technical, Specifications (TS) Change TS - 431 - Request for License Amendment - Extended Power Uprate (EPU) Operation Probabilistic Safety Assessment (PSA) Update Project stage: Request ML0429202832004-11-18018 November 2004 Ltr, Results of Acceptance Review for Extended Power Uprate Project stage: Acceptance Review ML0431004762004-11-18018 November 2004 Ltr, Results of Acceptance Review for EPU Project stage: Acceptance Review ML0433701792004-12-29029 December 2004 RAI Re Extended Power Uprate Project stage: RAI ML0434400452004-12-30030 December 2004 RAI, Extended Power Uprate Project stage: RAI ML0500303612005-01-0606 January 2005 Ltr, Request for Information for Status of Amendment (Tac No. MC1330, MC1427, MC2305, MC3812, MC4070, MC4071, MC4072, MC4161, MC3743, MC3744) Project stage: RAI ML0505900362005-02-16016 February 2005 Enclosure 2, 02/01/2005 Conference Call with TVA Presentation Slides on TS Changes Using Method 3 for Interim Solution Project stage: Other ML0505601502005-02-23023 February 2005 Response to NRC Acceptance Review Letter and Request for Additional Information Related to Technical Specifications Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0505603372005-02-23023 February 2005 (BFN) - Response to Nrc'S Acceptance Review Letter and Request for Additional Information Related to Technical Specifications Change No. TS-418 - Request for Extended Power Uprate Operation (Tac Nos MC3743 and MC3744) Project stage: Request ML0607202932005-02-28028 February 2005 Hydrothermal Modeling of Browns Ferry Nuclear Plant with Units 1, 2, and 3 at Extended Power Uprate Project stage: Other ML0606805962005-02-28028 February 2005 Hydrothermal Modeling of Browns Ferry with Units 1, 2, and 3 at Extended Power Uprate Project stage: Other ML0511501912005-04-19019 April 2005 Enclosure 3, Ltr, Licensing Action Status and Interdependencies Project stage: Other ML0511702442005-04-25025 April 2005 (BFN) - Unit 1 - Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0511702422005-04-25025 April 2005 (BFN) - Units 2, and 3 - Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS-418 - Request for Extended Power Uprate Operation Project stage: Request ML0514300362005-05-20020 May 2005 Response to Nrc'S Letter on Licensing Action Status and Interdependencies, Project stage: Other ML0513201462005-05-27027 May 2005 EPU Acceptance Review Results to Increase Maximum Authorized Power Level (TAC No. MC3743, MC3744) (TS-418) Project stage: Acceptance Review ML0515802492005-06-0606 June 2005 Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS - 431 - Request for License Amendment Extended Power Uprate (EPU) Operation Project stage: Request ML0516403912005-06-0606 June 2005 Response to Technical Specifications (TS) Change No. TS-418 - Request for License Amendment - Extended Power Uprate (EPU) Operation Project stage: Request ML0517902372005-06-24024 June 2005 Part 21 Notification - Critical Power Determination for G314 and GE12 Fuel with Zircaloy Spacers, 06/24/2005 Project stage: Request ML0513201482005-06-29029 June 2005 Ltr., Ind FRN Facility Operating License for EPU and Opportunity for a Hearing Project stage: Other ML0515703812005-06-29029 June 2005 Fanp, Withholding Information from Public (TACs MC3743, MC3744) Project stage: Other ML0516606022005-06-29029 June 2005 Ltr., Withholding Public Disclosure for GE Company (TACs MC3743, MC3744) Project stage: Other ML0511600362005-07-0101 July 2005 Notice of Consideration of Issuance of Amendment and Notice of Opportunity for a Hearing Regarding Extended Power Uprate (Tac No. MC3743, MC3744) Project stage: Other ML0518703902005-07-0707 July 2005 06/08/05, Meeting Summary with TVA and Framatome Regarding Fuel Analysis Methodology, Enclosure 2, Framatome Presentation Project stage: Meeting ML0520706042005-07-26026 July 2005 Notice of Meeting with Tennessee Valley Authority (TVA) BFN Units 1, 2, and 3, and Sequoyah Units 1 and 2 on Resolution of Instrument Setpoint Concerns Project stage: Meeting ML0524204912005-08-23023 August 2005 Ltr., GE Request for Withholding Information from Public on Steam Dryer Analysis for EPU Conditions Project stage: Withholding Request Acceptance ML0522901442005-09-0202 September 2005 Summary of Meeting with the Tennessee Valley Authority Regarding Plant-Specific Resolution of Instrument Setpoint Concerns Project stage: Meeting ML0522903972005-09-0202 September 2005 TVA Handout Method 3 Issue BFN Proposed Resolution Project stage: Other ML0524303412005-10-0303 October 2005 RAI, Extended Power Uprate (TS-431) (Tac No. MC3812) Project stage: RAI ML0525104462005-10-0303 October 2005 Request for Additional Information Regarding Extended Power Uprate Project stage: RAI ML0535601862005-12-19019 December 2005 Response to NRC Round 2 Request for Additional Information Related to Technical Specifications Change No. TS-418-Request for Extended Power Uprate Operation Project stage: Request ML0535601942005-12-19019 December 2005 Response to NRC Round 2 Requests for Additional Information Related to Technical Specifications Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0535601202005-12-22022 December 2005 Request for Additional Information, Information Concerning Extended Power Uprate Project stage: RAI ML0535601772005-12-22022 December 2005 Request for Additional Information, Concerning Extended Power Uprate Project stage: RAI ML0535703412006-01-19019 January 2006 Revised Schedule for Response to Extended Power Uprate Requests for Additional Information Project stage: RAI ML0614502612006-02-0101 February 2006 Response to NRC Request EMEB-B.6 from NRC Round 2 Requests for Additional Information Related to Technical Specification (TS) Change No. TS-431- Request for Extended Power Uprate. Project stage: Request ML0603207332006-02-0101 February 2006 Response to NRC Request EMEB-B.7 from NRC Round 2 Requests for Additional Information Related to Technical Specification (TS) Change No. TS-418 - Request for Extended Power Uprate Project stage: Request ML0603901352006-02-0808 February 2006 Forthcoming Meeting with Tennessee Valley Authority, to Discuss Various Topics Regarding Tva'S Extended Power Uprate Amendment Request for the Browns Ferry Nuclear Plant, Units 1 and 2 and 3 Project stage: Meeting ML0607202812006-02-28028 February 2006 NEDO-33173, Applicability of GE Methods to Expanded Operating Domains. Project stage: Other ML0606203072006-02-28028 February 2006 Technical Specifications Change TS-418 - Response to Request for Additional Information SPSB-A.11 Regarding Extended Power Uprate - Credit for Net Positive Suction Head Project stage: Response to RAI 2005-02-28
[Table View] |
|
---|
Category:Note to File incl Telcon Record
MONTHYEARML13204A0942013-07-23023 July 2013 Submittal of Reference Documents Related to EA-13-0118 for Browns Ferry Nuclear Plant Unit 2 ML0605301852006-03-0202 March 2006 Summary of February 13, 2006, Telephone Conference with the Tennessee Valley Authority Regarding the Browns Ferry Extended Power Uprate Amendment Requests (TAC Nos. MC3812, MC3743, and MC3744 ML0428000412004-05-27027 May 2004 Note of Personal Communication - Reference to Leroy M. Koch, Us Fish and Wildlife Service (in Larry E. Goldman, Field Supervisor, Us Fish and Wildlife Service, Daphne, Alabama) ML0427904942004-05-27027 May 2004 Note of Personal Communication with Jeffrey Garner, State Malacologist, Alabama Division of Wildlife and Freshwater Fisheries, at 12/2001 Regional Freshwater Mollusk Conservation Society Meeting 2013-07-23
[Table view] Category:Verbal Comm
MONTHYEARML13204A0942013-07-23023 July 2013 Submittal of Reference Documents Related to EA-13-0118 for Browns Ferry Nuclear Plant Unit 2 ML0605301852006-03-0202 March 2006 Summary of February 13, 2006, Telephone Conference with the Tennessee Valley Authority Regarding the Browns Ferry Extended Power Uprate Amendment Requests (TAC Nos. MC3812, MC3743, and MC3744 ML0428000412004-05-27027 May 2004 Note of Personal Communication - Reference to Leroy M. Koch, Us Fish and Wildlife Service (in Larry E. Goldman, Field Supervisor, Us Fish and Wildlife Service, Daphne, Alabama) ML0427904942004-05-27027 May 2004 Note of Personal Communication with Jeffrey Garner, State Malacologist, Alabama Division of Wildlife and Freshwater Fisheries, at 12/2001 Regional Freshwater Mollusk Conservation Society Meeting 2013-07-23
[Table view] |
Text
March 2, 2006LICENSEE:Tennessee Valley AuthorityFACILITIES:Browns Ferry Nuclear Plant, Units 1, 2, and 3
SUBJECT:
SUMMARY
OF FEBRUARY 13, 2006, TELEPHONE CONFERENCE WITHTHE TENNESSEE VALLEY AUTHORITY REGARDING THE BROWNS FERRY EXTENDED POWER UPRATE AMENDMENT REQUESTS (TAC NOS. MC3812, MC3743, MC3744)On February 13, 2006, the U.S. Nuclear Regulatory Commission (NRC) staff conducted atelephone conference with Tennessee Valley Authority (TVA, the licensee). The objective of the meeting was to discuss technical items and the schedule for TVA to furnish the information necessary for the NRC staff to complete their review of TVA's requested Extended PowerUprate (EPU). The meeting was open to the general public. Enclosure 1 contains a list of NRC participants, and Enclosure 2 is a list of the TVA participants. Enclosure 3 is a copy of TVA's presentation materials. BACKGROUNDBy letter dated June 28, 2004, TVA submitted an amendment request for Browns Ferry NuclearPlant (BFN) Unit 1. The proposed amendment would change the BFN Unit 1, operating license to increase the maximum authorized power level from 3293 megawatts thermal (MWt) to 3952 MWt. This change represents an increase of approximately 20 percent above the current maximum authorized power level. Similarly in a letter dated June 25, 2004, TVA submitted an amendment request for BFN, Units 2 and 3. The proposed amendment would change the BFN, Units 2 and 3, operating licenses to increase the maximum authorized power level from 3458 MWt to 3952 MWt. This change represents an increase of approximately 15 percent above the current maximum authorized power level. The licensee has chosen to implement the EPU on Unit 1 in 2007, Unit 2 in 2007, and Unit 3 in 2008. The NRC staff informed TVA of the information necessary to complete the application by lettersdated November 18, 2004, and issued the first Request for Additional Information (RAI) in letters dated December 30, 2004 (for the Unit 1 application) and December 29, 2004 (for the Units 2 and 3 application). In submittals dated February 23, 2005, and April 25, 2005, TVA supplied the information requested by the NRC staff to complete the applications. The NRCstaff accepted TVA's application and began its technical review of the applications on May 27, 2005.TVA submitted a response to the first RAI on June 6, 2005. The NRC staff issued a second setof RAI's on October 3, 2005. TVA responded to most of the questions via letters dated December 19, 2005. The NRC staff issued the third set of RAI's on December 22, 2005. DISCUSSIONTVA presented an overview of their planned actions for the following topics:Steam DryersTo address the NRC staff's questions regarding the effects of the uprated conditions on thesteam dryers, TVA's actions include benchmarking, scale model testing, stress analysis, and development of limit curves for steam line monitoring during power ascension.Containment Overpressure Credit TVA described their plans for resolving the NRC staff's questions regarding ContainmentOverpressure Credit for Emergency Core Cooling System Pump Net Positive Suction Head Requirements. The NRC staff reminded the licensee that, although they were pursuing asimilar approach to that used successfully by Entergy in the Vermont Yankee Power Uprate application, the approach would need to be customized so that it was clearly applicable to the Browns Ferry plants.Fuel Analysis MethodsTVA described their plans for addressing the NRC staff's questions regarding fuel analysismethods. TVA mentioned their intent to attach or reference a draft topical report in their planned RAI response. The NRC staff cautioned TVA that their response should be standaloneand should not be reliant on a draft topical report. TVA also stated their intent to employ a0.02 Minimum Critical Power Ratio penalty. The NRC staff cautioned TVA to clearlydemonstrate that this was a conservative penalty value for the Browns Ferry facility.Unit 1 Transient TestingTVA also summarized their basis for stating that certain transient testing for the upratedconditions is not required for Unit 1. TVA will be providing more information on their basis in theupcoming response to the NRC staff's RAI. Responses to RAIsTVA confirmed their intent to formally submit a response by March 7, 2006, to the NRC staff'sthird set of RAI's, issued on December 22, 2005. TVA also confirmed their response schedule for the remaining questions from the staff's second set of RAI's. At the conclusion of the meeting, the NRC stated that the staff is still evaluating the schedulefor review of the Browns Ferry Extended Power Uprate. No regulatory decisions were made by the NRC staff during the proceedings./RA/Margaret H. Chernoff, Project ManagerPlant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-259, 50-260 and 50-296
Enclosures:
- 1. List of NRC Partici pants 2. List of TVA Participants
- 3. TVA Handoutcc w/encls: See next page
ML060530185 NRC-001OFFICELPL2-2/PMLPL2-2/LALPL2-2/BCNAMEMChernoffBClaytonMMarshall DATE2/27/062/27/063/02/06 NRC Att endeesTelephone Conference with TVAFebruary 13, 2006Catherine Haney, Director, Division of Operating Reactor Licensing (DORL)Edwin Hackett, Associate Director, Division of Operating Reactor Licensing (DORL)Michael Marshall, Branch Chief, LPLII-2, Division of Operating Reactor Licensing (DORL)
Frank Akstulewicz, Branch Chief, Nuclear Performance and Code Review Branch Greg Cranston, Branch Chief, BWR Systems Branch Louise Lund, Branch Chief, License Renewal Branch AStaff:Margaret Chernoff Dylanne Duvigneaud Zeyna Abdullahi George Thomas Muhammed Razzaque Tom Scarbrough Rich Lobel Raj Goel Martin Stutzke Steve Laur Jim Tatum Angelo Stubbs Bob Pettis Yoira Diaz-SanabriaRalph Caruso, ACRS StaffAnn Hodgdon, Senior Attorney, OGC TVA AttendeesTelephone Conference with NRCFebruary 13, 2006Brian O'Grady - Site Vice PresidentMasoud Bajestani - Unit 1 Vice President Joe Valente - Unit 1 Engineering Manager Bob Moll - Unit 1 System Engineering Manager Bob Marks - EPU Project Manager Ed Hartwig - EPU Project Manager Jim Wolcott - EPU Engineering Manager Tony Langley - Unit 2/3 Licensing Supervisor Joe McCarthy - Unit 1 Licensing Supervisor Bill Crouch - Site Licensing M anager Page 1 of 2Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT cc:Mr. Karl W. SingerChief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801Mr. Ashok S. Bhatnagar, Senior Vice PresidentNuclear Operations Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Larry S. Bryant, Vice PresidentNuclear Engineering & Technical Services Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801Brian O'Grady, Site Vice PresidentBrowns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609Mr. Robert J. Beecken, Vice PresidentNuclear Support Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 General CounselTennessee Valley Authority ET 11A 400 West Summit Hill DriveKnoxville, TN 37902Mr. John C. Fornicola, ManagerNuclear Assurance and Licensing Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801Mr. Bruce M. Aukland, Plant ManagerBrowns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609Mr. Masoud Bajestani, Vice PresidentBrowns Ferry Unit 1 Restart Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609Mr. Robert G. Jones, General ManagerBrowns Ferry Site Operations Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Scott M. ShaefferBrowns Ferry Unit 1 Project Engineer Division of Reactor Projects, Branch 6 U.S. Nuclear Regulatory Commission 61 Forsyth Street, SW.
Suite 23T85 Atlanta, GA 30303-8931Mr. Larry S. MellenBrowns Ferry Unit 1 Project Engineer Division of Reactor Projects, Branch 6 U.S. Nuclear Regulatory Commission 61 Forsyth Street, SW.
Suite 23T85 Atlanta, GA 30303-8931
Page 2 of 2Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT cc:Mr. Glenn W. Morris, Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801Mr. William D. Crouch, M anagerLicensing and Industry Affairs Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609Senior Resident InspectorU.S. Nuclear Regulatory Commission Browns Ferry Nuclear Plant 10833 Shaw Road Athens, AL 35611-6970State Health OfficerAlabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, AL 36130-3017ChairmanLimestone County Commission 310 West Washington Street Athens, AL 35611