ML18019A016: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
#REDIRECT [[IR 05000275/2018301]]
{{Adams
| number = ML18019A016
| issue date = 01/19/2018
| title = Diablo Canyon Power Plant, Units 1 and 2 - NRC Initial Operator Licensing Examination Approval 05000275/2018301; 05000323/2018301
| author name = Gaddy V G
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Welsch J M
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| license number = DPR-080, DPR-082
| contact person = Gaddy V G
| document report number = 50-275/OL-18-01, 50-323/OL-18-01
| document type = Letter, License-Operator, Part 55 Examination Related Material
| page count = 3
}}
See also: [[followed by::IR 05000275/2018301]]
 
=Text=
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV 1600 E. LAMAR BLVD
. ARLINGTON, TX 76011
-4511  January 19, 2018
  Mr. James Welsch, Chief Nuclear Officer,  and Vice President, Nuclear Generation
Pacific Gas and Electric Company
Diablo Canyon Power Plant
P.O. Box 56, Mail Code 104/6
Avila Beach, CA
  93424  SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND
2 - NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000275/2018301; 05000323/2018301
  Dear Mr. Welsch:  The purpose of this letter is to confirm the final arrangements for the upcoming operator
licensing examinations at your Diablo Canyon Power Plant, Units 1
and 2.  The NRC has completed its review of the operator license applications submitted in connection
with this examination and separately provided a list of approved applicants to Mr. R. Fortier, Lead Examination Developer.  Note that any examination waivers and applications denials
have been addressed in separate correspondence.
  The NRC has approved the subject examinations and hereby authorizes you to administer the
written examination in accordance with NUREG
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11, on February 9, 201 7.  The NRC staff will
administer the operating tests during the week of January 22, 201 8.  This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility.  Based on this review, I have concluded that the examination meets the guidelines of NUREG
-1021 for content, operational, and discrimination validity.  By administering this examination, you also agree that it meets NURE
G-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility.  If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 817
-200-1159.   
J. Welsch 2 Please contact your Chief Examiner, Clyde Osterholtz, at 817
-200-1269, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or
complete written examination and/or operating test) specified for each applicant.
  Sincerely,  /RA/  Vince nt G. Gaddy, Chief Operations Branch
Division of Reactor Safety
  Docket Nos. 50
-275 and 50
-323 License Nos. DPR
-80 and DPR
-82  cc:  Electronic Distribution
 
  ML18019A016
  SUNSI Review 
ADAMS:    Non-Publicly Available
  Non-Sensitive      Keyword:  By:  VGG/RDR  Yes    No  Publicly Available
  Sensitive
      NRC-002 OFFICE DRS:OB/SOE
DRS:OB/C    NAME COsterholtz
VGaddy    SIGNATURE /RA/ /RA/    DATE 1/17/18 1/19/18
}}

Revision as of 14:27, 20 January 2019

Diablo Canyon Power Plant, Units 1 and 2 - NRC Initial Operator Licensing Examination Approval 05000275/2018301; 05000323/2018301
ML18019A016
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/19/2018
From: Vincent Gaddy
Operations Branch IV
To: Welsch J M
Pacific Gas & Electric Co
Gaddy V G
References
50-275/OL-18-01, 50-323/OL-18-01
Download: ML18019A016 (3)


See also: IR 05000275/2018301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV 1600 E. LAMAR BLVD

. ARLINGTON, TX 76011

-4511 January 19, 2018

Mr. James Welsch, Chief Nuclear Officer, and Vice President, Nuclear Generation

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56, Mail Code 104/6

Avila Beach, CA

93424 SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND

2 - NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000275/2018301; 05000323/2018301

Dear Mr. Welsch: The purpose of this letter is to confirm the final arrangements for the upcoming operator

licensing examinations at your Diablo Canyon Power Plant, Units 1

and 2. The NRC has completed its review of the operator license applications submitted in connection

with this examination and separately provided a list of approved applicants to Mr. R. Fortier, Lead Examination Developer. Note that any examination waivers and applications denials

have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the

written examination in accordance with NUREG

-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11, on February 9, 201 7. The NRC staff will

administer the operating tests during the week of January 22, 201 8. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG

-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NURE

G-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 817

-200-1159.

J. Welsch 2 Please contact your Chief Examiner, Clyde Osterholtz, at 817

-200-1269, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or

complete written examination and/or operating test) specified for each applicant.

Sincerely, /RA/ Vince nt G. Gaddy, Chief Operations Branch

Division of Reactor Safety

Docket Nos. 50

-275 and 50

-323 License Nos. DPR

-80 and DPR

-82 cc: Electronic Distribution

ML18019A016

SUNSI Review

ADAMS: Non-Publicly Available

Non-Sensitive Keyword: By: VGG/RDR Yes No Publicly Available

Sensitive

NRC-002 OFFICE DRS:OB/SOE

DRS:OB/C NAME COsterholtz

VGaddy SIGNATURE /RA/ /RA/ DATE 1/17/18 1/19/18