ULNRC-06668, Special Report 2021-01 - Callaway Plant, Unit 1, Non-Functional Seismic Instrument for Greater than 30 Days

From kanterella
Jump to navigation Jump to search
Special Report 2021-01 - Callaway Plant, Unit 1, Non-Functional Seismic Instrument for Greater than 30 Days
ML21190A021
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/08/2021
From: Meyer S
Ameren Missouri
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC-06668 SR 2021-001
Download: ML21190A021 (5)


Text

Aiiieron MISSOURI Callaway Plant July 8, 2021 ULNRC-06668 U.S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-000 1 Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

RENEWED FACILITY OPERATING LICENSE NPF-30 SPECIAL REPORT 2021-01:

NON-FUNCTIONAL SEISMIC INSTRUMENT FOR GREATER THAN 30 DAYS Enclosed is a special report addressing a non-functional seismic monitoring instrument at the Callaway Plant.

This letter does not contain new commitments, and none ofthe material in this report is considered proprietary by Union Electric Company (Ameren Missouri).

Ifyou have any questions or require additional information, please contact Mr. Thomas Elwood, Supervising Engineer, Regulatory Affairs and Licensing at 3 14-225-1905.

SincerJy, Steve J. Meyer Manager, Regulatory Affairs Enclosure

1) Special Report 2021-0 1

$3 15 County Road 459 : Steedman, MO 65077 AmerenMissouri.com

ULNRC-06662 July 8, 2021 Page 2 of 3 cc: Mr. Scoff A. Morris Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 2201 NRC Road Steedman, MO 65077 Mr. M. Chawla Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O8B1A Washington, DC 20555-000 1

ULNRC-06668 July 8, 2021 Page 3 of 3 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 6500 West Freeway, Suite 400 Fort Worth, TX 76116

( Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Other Situations ULNRC Distribution:

F. M. Diya B. L. Cox F. I. Bianco S. P. Banker S. J. Meyer R. C. Wink T. B. Elwood R. I. Andreasen V. E. Blake NSRB Secretary STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)

Missouri Public Service Commission

Enclosure to ULNRC-06668 Page 1 of2 Special Report 2021-01 Requirement Callaway Plants Final Safety Analysis Report (FSAR) Section 16.3.3.2 specifies requirements for seismic instrumentation. The Limiting Condition for Operation (LCO) specified per F$AR 16.3.3.2 requires seismic monitoring instrumentation to be Functional at all times. With a required instrument non-functional for more than 30 days, Action & applies. It states, With one or more ofthe above required seismic monitoring instruments non-functional for more than 30 days, prepare and submit a Special Report to the Commission within the next 10 days outlining the cause of the malfunction and the plans for restoring the instrument(s) to FUNCTIONAL status.

Cause of the Non-functional Seismic Monitorin% Instrument The seismic monitoring instruments require regular calibration at a frequency of at least once per 18 months, as specified per FSAR Surveillance Requirement 16.3.3.2.1.a. For some ofthe instruments that make up the overall seismic monitoring system, the calibration process involves replacement of the scratch plates for each ofthose instruments since capturing the as-found condition/data from the used scratch plates and resetting the instrument during its calibration renders the scratch plates unsuitable for re-use.

The problem that now exists with the scratch plates for the affected instruments is that they are obsolete, as they are no longer made by the original equipment manufacturer or the approved refurbisher. Consequently, Ameren Missouri has been developing a plan for the replacement of the current seismic monitoring system with a newer, state-of-the-art, electronic system. In parallel, a plan is also being pursued to potentially procure scratch plates for the affected instruments from a different supplier using a reverse engineering approach for replicating and supplying replacement plates. A supplier has been identified, and they have indicated that they could potentially deliver replacement plates as soon as the fourth quarter of 2021.

Due to the inability to procure replacement plates or install a replacement monitoring system, the maximum calibration surveillance interval for one ofthe affected instruments, i.e. SGARS0001 and its three included recorders SGARS0001A, Triaxial Response Spectrum Recorder East-West; SGARS0001B, Triaxial Response Spectrum Recorder North-South; and SGARS0001C, Triaxial Response Spectrum Recorder Vertical, expired on June 1, 2021 The recorders were therefore declared non-functional at that time. With the current plates still installed for the triaxial instrument, continued capability exists for the recorders to record seismic event accelerations, but the accuracy is unknown.

Enclosure to ULNRC-06668 Page 2 of 2 Other, unaffected seismic instruments, i.e., SGAR0005, Containment Structure Peak Recording Accelerometer; SGAR0007, B Steam Generator Piping Peak Recording Accelerometer; and SGAR0008, C Steam Generator Support Peak Recording Accelerometer, provide an alternate means for monitoring a seismic event. These instruments ensure that sufficient capability is available to promptly determine the magnitude ofa seismic event and evaluate the response ofthose plant features important to safety (thus to determine if plant shutdown is required pursuant to Appendix A of 10 CFR Part 100).

Plans for Restoring the Instrument to FUNCTIONAL status SGARS0001 will be returned to FUNCTIONAL status when the new seismic monitoring system or new scratch plates have been received and installed.