Category:Letter type:ULNRC
MONTHYEARULNRC-06901, Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter)2024-10-0101 October 2024 Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter) ULNRC-06892, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00062024-06-26026 June 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0006 ULNRC-06891, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00052024-06-26026 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0005 ULNRC-06884, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00022024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0002 ULNRC-06885, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00032024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0003 ULNRC-06886, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00042024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0004 ULNRC-06880, Application to Revise Technical Specifications to Adopt Tstf-569, Rev. 2, Revise Response Time Testing Definition (LDCN 24-0008)2024-06-0606 June 2024 Application to Revise Technical Specifications to Adopt Tstf-569, Rev. 2, Revise Response Time Testing Definition (LDCN 24-0008) ULNRC-06882, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00122024-05-16016 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0012 ULNRC-06877, Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 252024-05-0606 May 2024 Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25 ULNRC-06856, CFR 50.59 and 10 CFR 72.48 Summary Report2024-05-0101 May 2024 CFR 50.59 and 10 CFR 72.48 Summary Report ULNRC-06869, Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report ULNRC-06876, Registration of Dry Spent Fuel Storage Canister HGMPC00102024-04-25025 April 2024 Registration of Dry Spent Fuel Storage Canister HGMPC0010 ULNRC-06866, Submittal of Cycle 26 Commitment Change Summary Report2024-04-17017 April 2024 Submittal of Cycle 26 Commitment Change Summary Report ULNRC-06871, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00072024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0007 ULNRC-06872, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00082024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0008 ULNRC-06863, Submittal of Annual Exposure Report for 20232024-03-20020 March 2024 Submittal of Annual Exposure Report for 2023 ULNRC-06852, Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 262024-03-0505 March 2024 Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 26 ULNRC-06858, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-02-21021 February 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation ULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 – Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 – Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaways License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaways License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ULNRC-06812, Submittal of 2022 Annual Radiological Environmental Operating Report2023-04-27027 April 2023 Submittal of 2022 Annual Radiological Environmental Operating Report ULNRC-06807, Submittal of Single Positive Test Forms2023-04-0303 April 2023 Submittal of Single Positive Test Forms ULNRC-06801, CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions2023-03-30030 March 2023 CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions ULNRC-06798, Submittal of Status of Plant Decommissioning Funding and ISFSI Decommissioning Funding Plan2023-03-30030 March 2023 Submittal of Status of Plant Decommissioning Funding and ISFSI Decommissioning Funding Plan ULNRC-06803, Submittal of Response to Request for Additional Information Regarding Results of Steam Generator Tube In-Service Inspection2023-03-29029 March 2023 Submittal of Response to Request for Additional Information Regarding Results of Steam Generator Tube In-Service Inspection ULNRC-06751, Application to Revise Technical Specifications to Adopt TSTF-501-A, Rev. 1, Relocate Stored Oil & Lube Oil Volume Values to Licensee Control2023-03-29029 March 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Rev. 1, Relocate Stored Oil & Lube Oil Volume Values to Licensee Control ULNRC-06804, Submittal of Nuclear Property Insurance Reporting2023-03-29029 March 2023 Submittal of Nuclear Property Insurance Reporting ULNRC-06805, Transmittal of Special Report 2023-02 Non-Functionality of Containment Hydrogen Analyzer Channel for Greater than 30 Days2023-03-21021 March 2023 Transmittal of Special Report 2023-02 Non-Functionality of Containment Hydrogen Analyzer Channel for Greater than 30 Days ULNRC-06802, Special Report 2023-01 (PAM Report); Non-Functionality of a Post-Accident Monitoring Instrument2023-03-0909 March 2023 Special Report 2023-01 (PAM Report); Non-Functionality of a Post-Accident Monitoring Instrument ULNRC-06794, Submittal of Fitness for Duty Program Data for 20222023-01-24024 January 2023 Submittal of Fitness for Duty Program Data for 2022 ULNRC-06795, Submittal of Fitness for Duty Reports for 2022, Including Single Positive Test Forms2023-01-24024 January 2023 Submittal of Fitness for Duty Reports for 2022, Including Single Positive Test Forms ULNRC-06787, Response to Request for Additional Information Regarding License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015)2022-12-0808 December 2022 Response to Request for Additional Information Regarding License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015) ULNRC-06780, Additional Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505, LDCN 20-0072022-11-30030 November 2022 Additional Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505, LDCN 20-007 ULNRC-06772, 10 CFR 50.59 and 10 CFR 72.48 Summary Report2022-11-23023 November 2022 10 CFR 50.59 and 10 CFR 72.48 Summary Report ULNRC-06777, Operating Quality Assurance Manual (Oqam) Revision 362022-11-16016 November 2022 Operating Quality Assurance Manual (Oqam) Revision 36 ULNRC-06779, ULNRC-06779: Contesting of Green NCV 05000483/2022010-03, Failure to Perform Required Inservice Testing of Residual Heat Removal Heat Exchanger Pneumatically (Air) Operated Outlet and Bypass Valves2022-11-14014 November 2022 ULNRC-06779: Contesting of Green NCV 05000483/2022010-03, Failure to Perform Required Inservice Testing of Residual Heat Removal Heat Exchanger Pneumatically (Air) Operated Outlet and Bypass Valves ULNRC-06773, Results of Steam Generator Tube In-Service Inspection2022-11-0101 November 2022 Results of Steam Generator Tube In-Service Inspection ULNRC-06775, Submittal of Non-Functionality of Loose-Part Detection System Channel for Greater than 30 Days2022-10-27027 October 2022 Submittal of Non-Functionality of Loose-Part Detection System Channel for Greater than 30 Days 2024-06-06
[Table view] Category:Licensee 30-Day Written Event Report
MONTHYEARULNRC-06502, Special Report 2019-02: Inoperability of a Seismic Instrument for Greater than 30 Days2019-05-0202 May 2019 Special Report 2019-02: Inoperability of a Seismic Instrument for Greater than 30 Days ULNRC-06441, SR 2018-02-00 for Callaway Plant, Unit 1, Non-Functionality of an Accident Monitoring Instrument for Greater than 30 Days2018-06-0505 June 2018 SR 2018-02-00 for Callaway Plant, Unit 1, Non-Functionality of an Accident Monitoring Instrument for Greater than 30 Days ULNRC-06435, Submittal of Special Report 2018-01 Non-Functionality of Loose Parts Monitoring Channel for Greater than 30 Days2018-05-0202 May 2018 Submittal of Special Report 2018-01 Non-Functionality of Loose Parts Monitoring Channel for Greater than 30 Days ULNRC-06406, Special Report 2017-03 for Callaway Plant, Unit 1 Regarding Inoperability of a Post Accident Monitoring (PAM) Instrument2017-12-28028 December 2017 Special Report 2017-03 for Callaway Plant, Unit 1 Regarding Inoperability of a Post Accident Monitoring (PAM) Instrument ULNRC-06368, Supplement to Special Report 2017-01 (PAM Report): Inoperability of Post-Accident Monitoring (PAM) Instruments2017-04-27027 April 2017 Supplement to Special Report 2017-01 (PAM Report): Inoperability of Post-Accident Monitoring (PAM) Instruments ULNRC-06309, Special Report 2016-03: Inoperability of a Seismic Instrument for Greater than 30 Days2016-06-0707 June 2016 Special Report 2016-03: Inoperability of a Seismic Instrument for Greater than 30 Days ULNRC-06306, Special Report 2016-02, Inoperability of Loose Parts Monitoring Instrument for Greater than 30 Days2016-05-18018 May 2016 Special Report 2016-02, Inoperability of Loose Parts Monitoring Instrument for Greater than 30 Days ULNRC-06304, Special Report 2016-01: Inoperability of a Seismic Instrument for Greater than 30 Days2016-05-0909 May 2016 Special Report 2016-01: Inoperability of a Seismic Instrument for Greater than 30 Days ULNRC-06162, Special Report 2014-05 Inoperability of Loose Parts Monitoring Instrument for Greater than 30 Day2014-12-11011 December 2014 Special Report 2014-05 Inoperability of Loose Parts Monitoring Instrument for Greater than 30 Day ULNRC-06098, 10 CFR 50.46 Annual and Thirty Day Report, ECCS Evaluation Model Revisions2014-03-25025 March 2014 10 CFR 50.46 Annual and Thirty Day Report, ECCS Evaluation Model Revisions ULNRC-06002, Special Report 2013-02: Inoperability of a Seismic Instrument for Greater than 30 Days2013-05-31031 May 2013 Special Report 2013-02: Inoperability of a Seismic Instrument for Greater than 30 Days ULNRC-05895, Special Report 2012-01 - Inoperability of Post Accident Monitoring (PAM) Instrument for Greater than 30 Days2012-08-0808 August 2012 Special Report 2012-01 - Inoperability of Post Accident Monitoring (PAM) Instrument for Greater than 30 Days ULNRC-05323, 30-Day Response to Plant - NRC Special Inspection Report 05000483/2006011, Dated July 14, 20062006-08-10010 August 2006 30-Day Response to Plant - NRC Special Inspection Report 05000483/2006011, Dated July 14, 2006 ULNRC-05187, Inoperable Channel 3 of the Loose Parts Detection System (Lpds)2005-08-11011 August 2005 Inoperable Channel 3 of the Loose Parts Detection System (Lpds) ML0516702022005-06-0909 June 2005 Special Report Meteorological Tower 10-60M Air Temperature Delta-T Inoperable ULNRC-05089, Special Report on the Inoperability of Unit Vent High Range Radiation Monitor2004-11-10010 November 2004 Special Report on the Inoperability of Unit Vent High Range Radiation Monitor ML0426104292004-09-0303 September 2004 Special Report: Meteorological Tower 10M - 60M T Indication Inoperable ML0421702912004-07-28028 July 2004 Special Report, Meteorological Tower 10M - 60M at Wind Direction Indication Inoperable ML0407105792004-03-0404 March 2004 Special Report Regarding Inoperable Channel 12 of the Loose Parts Detection System (Lpds) ULNRC-04834, Facility Operating License NPF-30 10 CFR 50.46 Thirty Day Report ECCS Evaluation Model Revisons2003-04-0808 April 2003 Facility Operating License NPF-30 10 CFR 50.46 Thirty Day Report ECCS Evaluation Model Revisons ML0208506032002-03-15015 March 2002 Special Report 2002-01 GT-RT-21B Radiation Monitor Inoperable 2019-05-02
[Table view] Category:Written Event Report (30 or 60 day)
MONTHYEARULNRC-06850, Special Report 2023-03 – Pam Report Inoperability of a Post Accident Monitoring (Pam) Instrument2023-12-21021 December 2023 Special Report 2023-03 – Pam Report Inoperability of a Post Accident Monitoring (Pam) Instrument ML23080A2932023-03-21021 March 2023 Enclosure - Special Report 23-02 ML22300A0822022-10-27027 October 2022 Special Report 2022-03, Non-Functionality of Loose-Part Detection System Channel for Greater than 30 Days ULNRC-06745, Special Report 2022-01: Inoperability of a Seismic Instrument for Greater than 30 Days2022-05-10010 May 2022 Special Report 2022-01: Inoperability of a Seismic Instrument for Greater than 30 Days ULNRC-06724, 30-Day Report for Unsatisfactory Performance by an HHS Laboratory for Ameren Missouri Callaway Plant2022-03-16016 March 2022 30-Day Report for Unsatisfactory Performance by an HHS Laboratory for Ameren Missouri Callaway Plant ULNRC-06708, Special Report 2022-01, Non-Functionality of Loose Parts Monitoring Channel for Greater than 30 Days2022-01-11011 January 2022 Special Report 2022-01, Non-Functionality of Loose Parts Monitoring Channel for Greater than 30 Days ULNRC-06668, Special Report 2021-01 - Callaway Plant, Unit 1, Non-Functional Seismic Instrument for Greater than 30 Days2021-07-0808 July 2021 Special Report 2021-01 - Callaway Plant, Unit 1, Non-Functional Seismic Instrument for Greater than 30 Days ULNRC-06618, Special Report 2020-012020-11-12012 November 2020 Special Report 2020-01 ULNRC-06542, SR-2019-003 for Callaway Plant, Unit 1, Inoperability of Loose Parts Detection System Channel 3 for Greater than 30 Days2019-11-18018 November 2019 SR-2019-003 for Callaway Plant, Unit 1, Inoperability of Loose Parts Detection System Channel 3 for Greater than 30 Days ULNRC-05187, Inoperable Channel 3 of the Loose Parts Detection System (Lpds)2005-08-11011 August 2005 Inoperable Channel 3 of the Loose Parts Detection System (Lpds) ML0516702022005-06-0909 June 2005 Special Report Meteorological Tower 10-60M Air Temperature Delta-T Inoperable ULNRC-05089, Special Report on the Inoperability of Unit Vent High Range Radiation Monitor2004-11-10010 November 2004 Special Report on the Inoperability of Unit Vent High Range Radiation Monitor ML0426104292004-09-0303 September 2004 Special Report: Meteorological Tower 10M - 60M T Indication Inoperable ML0421702912004-07-28028 July 2004 Special Report, Meteorological Tower 10M - 60M at Wind Direction Indication Inoperable ML0407105792004-03-0404 March 2004 Special Report Regarding Inoperable Channel 12 of the Loose Parts Detection System (Lpds) ULNRC-04834, Facility Operating License NPF-30 10 CFR 50.46 Thirty Day Report ECCS Evaluation Model Revisons2003-04-0808 April 2003 Facility Operating License NPF-30 10 CFR 50.46 Thirty Day Report ECCS Evaluation Model Revisons ML0208506032002-03-15015 March 2002 Special Report 2002-01 GT-RT-21B Radiation Monitor Inoperable 2023-03-21
[Table view] |