Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ULNRC-06850, Special Report 2023-03 Pam Report Inoperability of a Post Accident Monitoring (Pam) Instrument | 21 December 2023 | Special Report 2023-03 Pam Report Inoperability of a Post Accident Monitoring (Pam) Instrument | Post Accident Monitoring |
ML23080A293 | 21 March 2023 | Enclosure - Special Report 23-02 | |
ML22300A082 | 27 October 2022 | Special Report 2022-03, Non-Functionality of Loose-Part Detection System Channel for Greater than 30 Days | |
ULNRC-06745, Special Report 2022-01: Inoperability of a Seismic Instrument for Greater than 30 Days | 10 May 2022 | Special Report 2022-01: Inoperability of a Seismic Instrument for Greater than 30 Days | |
ULNRC-06724, 30-Day Report for Unsatisfactory Performance by an HHS Laboratory for Ameren Missouri Callaway Plant | 16 March 2022 | 30-Day Report for Unsatisfactory Performance by an HHS Laboratory for Ameren Missouri Callaway Plant | |
ULNRC-06708, Special Report 2022-01, Non-Functionality of Loose Parts Monitoring Channel for Greater than 30 Days | 11 January 2022 | Special Report 2022-01, Non-Functionality of Loose Parts Monitoring Channel for Greater than 30 Days | |
ULNRC-06668, Special Report 2021-01 - Callaway Plant, Unit 1, Non-Functional Seismic Instrument for Greater than 30 Days | 8 July 2021 | Special Report 2021-01 - Callaway Plant, Unit 1, Non-Functional Seismic Instrument for Greater than 30 Days | |
ULNRC-06618, Special Report 2020-01 | 12 November 2020 | Special Report 2020-01 | |
ULNRC-06542, SR-2019-003 for Callaway Plant, Unit 1, Inoperability of Loose Parts Detection System Channel 3 for Greater than 30 Days | 18 November 2019 | SR-2019-003 for Callaway Plant, Unit 1, Inoperability of Loose Parts Detection System Channel 3 for Greater than 30 Days | |
ULNRC-05187, Inoperable Channel 3 of the Loose Parts Detection System (Lpds) | 11 August 2005 | Inoperable Channel 3 of the Loose Parts Detection System (Lpds) | |
ML051670202 | 9 June 2005 | Special Report Meteorological Tower 10-60M Air Temperature Delta-T Inoperable | Met Tower |
ULNRC-05089, Special Report on the Inoperability of Unit Vent High Range Radiation Monitor | 10 November 2004 | Special Report on the Inoperability of Unit Vent High Range Radiation Monitor | |
ML042610429 | 3 September 2004 | Special Report: Meteorological Tower 10M - 60M T Indication Inoperable | |
ML042170291 | 28 July 2004 | Special Report, Meteorological Tower 10M - 60M at Wind Direction Indication Inoperable | |
ML040710579 | 4 March 2004 | Special Report Regarding Inoperable Channel 12 of the Loose Parts Detection System (Lpds) | |
ULNRC-04834, Facility Operating License NPF-30 10 CFR 50.46 Thirty Day Report ECCS Evaluation Model Revisons | 8 April 2003 | Facility Operating License NPF-30 10 CFR 50.46 Thirty Day Report ECCS Evaluation Model Revisons | |
ML020850603 | 15 March 2002 | Special Report 2002-01 GT-RT-21B Radiation Monitor Inoperable |